Experimental device and method for testing the starting conditions of water and sand burst during coal mining
By designing an experimental device including an earth pressure equivalent supply system and a water surface air pressure supply system, the starting conditions for water and sand collapse during coal mining are simulated, which solves the problem of limited quantitative research on water and sand collapse disasters in the existing technology, and achieves It simulates and evaluates water and sand collapse disasters under on-site conditions, provides basis for prevention and treatment, and improves the safety of underground mining environments.
Patent Information
- Application Number
- CN201910985605.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-10-17
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2039-10-17
AI Technical Summary
The existing technology lacks complete indoor simulation test equipment to test the conditions for starting water and sand bursts during coal mining, which results in limited quantitative research on water and sand burst disasters and a lack of experimental data under engineering conditions.
Provide an experimental device including a containment cavity, earth pressure equivalent supply system, water level loading system and water surface air pressure supply system to simulate the in-situ pressure and water head height of loose layer soil on site, and use these systems to test bedrock specimens The equivalent in-situ pressure loading and hydraulic head pressure simulation of the loose layer soil of the experimental samples were carried out to realize the indoor experiment of the conditions for the initiation of water and sand collapse.
It achieves a realistic simulation of the on-site water head height and the original stress state of the sand and soil units at the bottom of the loose layer, and can carry out quantitative research and disaster assessment of water and sand burst disasters according to different on-site engineering conditions, providing a basis for the prevention and control of water and sand burst disasters. Improve the safety of underground mining environment.
Smart Images

Figure CN110579406B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field related to coal mine experiments, and in particular to an experimental device and method for testing the starting conditions of water and sand bursts during coal mining. Background Art
[0002] After coal resources are mined, goafs are formed. The upper rock mass in the goaf loses the bottom constraint, which causes the stability of the entire overburden rock mass to be broken. Under the action of gravity, the overburden rock mass collapses, moves, and settles toward the goaf. After a long period of internal stress adjustment, it finally reaches a new equilibrium state. In the process of adjusting from the original stress equilibrium state to the new stress equilibrium state, huge damage occurs inside the overburden rock mass, and the rock mass destruction process is the development process of "germination-development-penetration-closure" of the internal cracks of the rock mass.
[0003] The western part of my country has rich coal resources and simple coal occurrence conditions, which are extremely suitable for large-scale mechanized mining. In the process of shallow coal mining, it is common to encounter working conditions where the bedrock specimen is thin, the loose layer is thick, and the water head height in the loose layer is large. Due to the small thickness of the bedrock specimen, the entire bedrock specimen layer completely collapsed under the influence of mining, and the rock cracks ran through the entire bedrock specimen layer, forming a fracture channel connecting the loose aquifer and the goaf, causing water and sand to burst along the bedrock specimen cracks to the coal mining face. The accumulated sand buried the hydraulic support and mining equipment, making it impossible for the hydraulic support to move forward with the advancement of the working face. The bursting water-sand mixture caused a sudden increase in the underground water inflow, and the water carrying sediment could not be directly discharged using a water pump, which seriously affected the normal progress of mining work and posed a serious threat to the lives and safety of underground workers.
[0004] At present, the problems encountered by mining production units in the process of drainage are: what range of water head height needs to be controlled to be safe, what thickness of bedrock specimens is safe, and what is the minimum extent to which cement slurry needs to be injected into the loose layer at the top of the bedrock specimen. It is necessary to determine the quantitative relationship between the various main controlling factors of water and sand bursts, so as to change the current technical status quo of lack of theoretical guidance, blind increase of drainage holes, and blind increase of grouting volume in the implementation of existing technologies.
[0005] In response to the problems encountered during on-site construction, many experts and scholars have conducted a lot of research. The research results show that the occurrence of water and sand burst disasters is related to many influencing factors, among which the thickness of the bedrock specimens overlying the working face, the thickness of the clay layer, the thickness of the loose aquifer, and the crack characteristics of the mined bedrock specimens are all important influencing factors for the initiation of water and sand burst disasters. However, the quantitative research results on the initiation conditions of water and sand burst disasters are relatively scarce. The main reason is that the initiation conditions of water and sand burst disasters under the influence of multiple factors require a large amount of experimental sample data, and the data that can be provided for reference are only the engineering conditions at the disaster site. The lack of complete indoor simulation test equipment has seriously restricted the progress of quantitative research on water and sand burst disasters. Summary of the invention
[0006] Based on this, it is necessary to provide an experimental device and method for testing the starting conditions for water and sand bursts during coal mining in order to address the technical problem that the existing technology lacks complete indoor simulation test equipment for testing the starting conditions for water and sand bursts during coal mining.
[0007] The present invention provides an experimental device for testing the starting conditions of water and sand burst during coal mining, comprising: a containing cavity for containing experimental samples, an earth pressure equivalent supply system connected to the containing cavity for providing loose layer soil in-situ pressure equivalent loading to the experimental samples in the containing cavity, a water level loading system connected to the containing cavity for injecting water into the containing cavity, and a water surface air pressure supply system connected to the containing cavity for providing water head pressure equivalent loading to the containing cavity;
[0008] A bedrock specimen with a fracture channel is arranged in the accommodating cavity and is placed at the bottom of the experimental sample. A water pressure sensor which is communicatively connected to a water pressure information collector is arranged on the top of the bedrock specimen. An opening area which can be opened and closed is arranged at the bottom of the accommodating cavity, and an outlet at the lower end of the fracture channel is located in the opening area.
[0009] Further, the accommodating cavity comprises: a base, a barrel, and a top cover provided with the opening area, the bedrock specimen is placed on the base, and the lower end outlet of the fracture channel is located in the opening area, the opening area is provided with a rotating screw plug, the barrel is passed through the bedrock specimen and erected on the base, and the top cover is installed on the upper part of the barrel;
[0010] The soil pressure equivalent replenishment system is provided with a soil pressure replenishment plate which passes through the top cover and provides the experimental sample in the barrel with an equivalent load of in-situ pressure of loose layer soil;
[0011] The top cover is provided with a water injection air inlet hole for the water surface air pressure supply system to provide a water head pressure equivalent load to the experimental sample of the barrel body.
[0012] Furthermore, the soil pressure equivalent replenishment system also includes: an air pump, a first air pressure control valve, a first stop valve, an air pressure reversal control valve, and a cylinder, which are connected in sequence, and the telescopic rod of the cylinder is connected to the soil pressure replenishment plate.
[0013] Furthermore, the water level loading system includes: a water source and a third stop valve which are connected in sequence, and the third stop valve is connected to the water injection air inlet hole.
[0014] Furthermore, the surface air pressure replenishment system includes: a three-way joint, a first quick joint, a second quick joint, and a fourth stop valve arranged between the air pump and the first air pressure control valve, the three-way joint is connected to the second quick joint through the second air pressure control valve and the second stop valve, the third stop valve is connected to the first quick joint and the fourth stop valve in sequence, and the first quick joint and the second quick joint are detachably connected.
[0015] The present invention provides an experimental method for an experimental device for testing the start-up conditions of water and sand burst during coal mining as described above, comprising:
[0016] A clay layer corresponding to the experimental scheme is filled on the bedrock specimen, and after being compacted and leveled, a sand layer of required thickness and mixed according to a proportion is filled, and then compacted and leveled;
[0017] closing the accommodating cavity;
[0018] Providing in-situ pressure equivalent loading of loose layer soil in the accommodating cavity through the soil pressure equivalent supply system;
[0019] Filling water into the accommodating cavity to the experimental design height through the water level loading system;
[0020] The water surface air pressure supply system is used to provide air pressure to the accommodating cavity, and the water head height in the actual engineering is simulated by the air pressure acting on the water;
[0021] The opening area is opened to conduct an experiment to test the starting conditions for water and sand burst during coal mining.
[0022] Further, the accommodating cavity comprises: a base, a barrel, and a top cover, the bedrock specimen is placed on the base, and the lower end outlet of the fracture channel is located in the opening area, the barrel passes through the bedrock specimen and stands upright on the base, and the top cover is installed on the upper part of the barrel;
[0023] The bedrock specimen having a fracture channel is arranged in the accommodating cavity, a water pressure sensor connected to the water pressure information collector is arranged on the upper part of the bedrock specimen, the lower end outlet of the fracture channel is located in the opening area, and the opening area is closed, specifically comprising:
[0024] A bedrock specimen having a fracture channel is arranged in the accommodating cavity;
[0025] The upper end lead of the crack channel is connected to the water pressure sensor, and the lower end lead is connected to the water pressure information collector;
[0026] Seal the opening area of the bottom plate;
[0027] The inside of the fracture channel is filled with dry sand, and small colored round particles are placed on the upper surface of the channel;
[0028] Fill the gap between the bedrock specimen and the barrel with caulking sand, and use a thin metal rod to tamp it down along the gap.
[0029] Furthermore, the soil pressure equivalent replenishment system is provided with a soil pressure replenishment plate which passes through the top cover and provides the experimental sample in the barrel with an equivalent load of in-situ pressure of loose layer soil;
[0030] The providing the loose layer soil in-situ pressure equivalent loading in the accommodating cavity by the soil pressure equivalent supply system specifically includes:
[0031] The in-situ pressure equivalent loading value of the loose layer soil is calculated based on the loose layer thickness, the water-containing thickness at the bottom of the loose layer, the dry density and the saturated density of the loose layer sand body in the field project. The in-situ pressure equivalent loading value of the loose layer soil body P 实 =ρ 干土 HkDJ 干 +ρ 饱和土 HkDJ 饱和 , where Hdry is the thickness of the dry part of the upper loose layer, Hsaturated is the thickness of the aquifer at the bottom of the loose layer, ρdry soil is the actual density of the dry sand in the loose layer on site, ρsaturated soil is the actual density of the saturated soil at the bottom of the loose layer on site, and g is the acceleration of gravity;
[0032] The soil pressure equivalent supply system provides the in-situ pressure equivalent loading value of the loose layer soil into the accommodating cavity.
[0033] Furthermore, providing the in-situ pressure equivalent loading value of the loose layer soil into the accommodating cavity through the soil pressure equivalent supply system specifically includes:
[0034] Supplementary air pressure is applied to the cylinder to provide the equivalent loading value P of the in-situ pressure of the loose layer soil into the accommodating cavity through the soil pressure supplementary plate. 实 , the supplementary air pressure P 补土 =P 实 × 2 板 / r 2 缸 , where the earth pressure supplementary plate is a circular rigid sieve plate, r 板 is the radius of the earth pressure supplementary plate, r 缸 is the inner radius of the cylinder.
[0035] Furthermore, the water surface air pressure supply system is used to provide air pressure to the accommodating cavity, and the water head height in the actual engineering is simulated by the air pressure acting on the water, which specifically includes:
[0036] The head pressure is calculated based on the actual head height involved in the on-site project;
[0037] The water head pressure is provided to the accommodating cavity, and the water head height in the actual engineering is simulated by the effect of air pressure on water. The water head pressure P 补水 =P 水 -ρ 水 HkDJ 水层 , where P 水 is the actual water pressure on the sandy soil unit at the bottom of the loose layer on site, P 水 =ρ 水 HkDJ 水头 , ρ 水 is the density of water, H 水层 is the thickness of the water layer filled in the experimental apparatus.
[0038] The present invention realizes the real simulation of the on-site water head height, realizes the real simulation of the original stress state of the sand and soil unit at the bottom of the loose layer on-site, and realizes the indoor disaster process simulation of water and sand burst accidents at the coal mining working face. Through indoor experiments, quantitative research and disaster assessment of water and sand burst disasters can be carried out according to different on-site engineering conditions, and systematic experimental research can be carried out on the starting conditions of water and sand burst disasters. The information on the change of pore water pressure before the start of water and sand burst disasters can be effectively collected, thereby providing a basis for disaster warning and providing a rationale for the prevention and control of water and sand burst disasters, so as to prevent economic losses and improve the safety of the underground mining environment. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] Figure 1 It is a structural schematic diagram of an experimental device for testing the starting conditions of water and sand bursting during coal mining according to the present invention;
[0040] Figure 2 It is a work flow chart of an experimental method for testing the starting conditions of water and sand bursting during coal mining in the present invention;
[0041] Figure 3 The present invention is a flowchart of an experimental method for testing the starting conditions for water and sand bursting during coal mining in the best embodiment of the present invention. DETAILED DESCRIPTION
[0042] The present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0043] like Figure 1The figure shows a schematic diagram of the structure of an experimental device for testing the starting conditions of water and sand burst during coal mining according to the present invention, comprising: a containing cavity for containing experimental samples, an earth pressure equivalent supply system connected to the containing cavity for providing an equivalent load of loose layer soil in-situ pressure to the experimental samples in the containing cavity, a water level loading system connected to the containing cavity for injecting water into the containing cavity, and a water surface air pressure supply system connected to the containing cavity for providing an equivalent load of water head pressure to the containing cavity;
[0044] A bedrock specimen 22 having a fracture channel 19 and placed at the bottom of the experimental sample is disposed in the accommodating cavity. A water pressure sensor 20 communicating with the water pressure information collector 1 is disposed on the upper portion of the bedrock specimen 22. An opening area that can be opened and closed is disposed at the bottom of the accommodating cavity, and the lower end outlet of the fracture channel 19 is located in the opening area.
[0045] Specifically, experimental samples are set on the bedrock specimen 22, and the experimental samples include but are not limited to a clay layer 24 and a sand layer 25 corresponding to the experimental scheme.
[0046] During the experiment, the opening area is closed first, and the clay layer 24 corresponding to the experimental scheme is filled above the bedrock specimen 22. After being compacted and leveled, a sand layer 25 of the required thickness and mixed according to the proportion is filled, and then compacted and leveled. Then, the loose layer soil in situ pressure equivalent loading is provided to the accommodating cavity through the soil pressure equivalent supply system, and water is injected into the accommodating cavity to the experimental design height through the water level loading system; air pressure is provided to the accommodating cavity through the water surface air pressure supply system, and the water head height in the actual engineering is simulated by the action of air pressure on water.
[0047] Then, the opening area is opened to conduct experiments to test the starting conditions for water and sand burst during coal mining.
[0048] The present invention realizes the real simulation of the on-site water head height, realizes the real simulation of the original stress state of the sand and soil unit at the bottom of the loose layer on-site, and realizes the indoor disaster process simulation of water and sand burst accidents at the coal mining working face. Through indoor experiments, quantitative research and disaster assessment of water and sand burst disasters can be carried out according to different on-site engineering conditions, and systematic experimental research can be carried out on the starting conditions of water and sand burst disasters. The information on the change of pore water pressure before the start of water and sand burst disasters can be effectively collected, thereby providing a basis for disaster warning and providing a rationale for the prevention and control of water and sand burst disasters, so as to prevent economic losses and improve the safety of the underground mining environment.
[0049] In one embodiment, the accommodating cavity comprises: a base 2, a barrel 3, and a top cover 4 provided with the opening area, the bedrock specimen 22 is placed on the base 2, and the lower end outlet of the fracture channel 19 is located in the opening area, the opening area is provided with a rotating screw plug 33, the barrel 3 is passed through the bedrock specimen and erected on the base 2, and the top cover 4 is installed on the upper part of the barrel 3;
[0050] The soil pressure equivalent supply system is provided with a soil pressure supplement plate 21 which passes through the top cover 4 and provides the experimental sample in the barrel body 3 with an equivalent load of the in-situ pressure of the loose layer soil;
[0051] The top cover 4 is provided with a water injection air inlet hole 6 for the water surface air pressure supply system to provide a water head pressure equivalent load to the experimental sample of the barrel body 3.
[0052] This embodiment realizes the specific structure of the accommodating cavity.
[0053] In one embodiment, the water pressure information collector 1 is communicatively connected to the water pressure sensor 20 via a communication line buried in the bedrock specimen 22 .
[0054] Specifically, the link communication line between the water pressure sensor 20 and the water pressure information collector 1 is built into the concrete during the prefabrication of the bedrock.
[0055] In this embodiment, the communication line is buried in the bedrock specimen to ensure smooth communication between the water pressure sensor and the water pressure information collector.
[0056] In one of the embodiments, a groove is provided on the base 2, the barrel body 3 is provided on the groove, and a sealing member 28 is provided between the barrel body 3 and the groove.
[0057] Specifically, the sealing member 28 is a sealing rubber ring.
[0058] In this embodiment, a sealing member is provided to ensure the sealing of the barrel.
[0059] In one of the embodiments, caulking sand 23 is filled between the barrel body 3 and the bedrock specimen 22 .
[0060] Specifically, the gap between the bedrock specimen 22 and the barrel body 3 is filled with caulking sand 23, and a thin metal rod is used to tamp the gap down.
[0061] In one of the embodiments, the accommodating cavity further includes a leveling support 34 disposed below the base 2 .
[0062] In this embodiment, the leveling of the base 2 is achieved by providing a leveling support 34 .
[0063] In one embodiment, the soil pressure equivalent supply system also includes: an air pump 11, a first air pressure control valve 9, a first stop valve 8, an air pressure reversal control valve 7, and a cylinder 5 connected in sequence, and the telescopic rod of the cylinder 5 is connected to the soil pressure supplement plate 21.
[0064] In this embodiment, the pressure on the earth pressure supplement plate is provided by a cylinder.
[0065] In one embodiment, the water level loading system includes: a water source 14 and a third stop valve 15 which are connected in sequence, and the third stop valve 15 is connected to the water injection air inlet 6.
[0066] In this embodiment, water is injected into the accommodating cavity through a water source and a third stop valve.
[0067] In one embodiment, the surface air pressure replenishment system includes: a three-way joint 10, a first quick joint 16, a second quick joint 17, and a fourth stop valve 18 arranged between the air pump 11 and the first air pressure control valve 9, the three-way joint 10 is connected to the second quick joint 17 through the second air pressure control valve 13 and the second stop valve 12, the third stop valve 15 is connected to the first quick joint 16 and the fourth stop valve 18 in sequence, and the first quick joint 16 and the second quick joint 17 are detachably connected.
[0068] In this embodiment, the water surface air pressure is replenished by an air pump.
[0069] In one embodiment, the earth pressure supplement plate 21 is a rigid sieve plate.
[0070] like Figure 2 The flowchart of the experimental method for testing the start-up conditions of water and sand burst during coal mining of the present invention is shown, comprising:
[0071] Step S201, a clay layer 24 corresponding to the experimental scheme is filled on the bedrock specimen 22, and after being compacted and leveled, a sand layer 25 of a required thickness and mixed according to a proportion is filled, and then compacted and leveled;
[0072] Step S202, closing the accommodating cavity;
[0073] Step S203, providing in-situ pressure equivalent loading of loose layer soil in the accommodating cavity through the soil pressure equivalent supply system;
[0074] Step S204, injecting water into the accommodating cavity to the experimental design height through the water level loading system;
[0075] Step S205, providing air pressure into the accommodating cavity through the water surface air pressure supply system, and simulating the water head height in actual engineering by the effect of air pressure on water;
[0076] Step S206, opening the opening area to conduct an experiment to test the starting conditions for water and sand bursting during coal mining.
[0077] Specifically, if Figure 1 The experimental device used in the present invention is shown in FIG. 1 . Steps S201 to S202 complete the installation of the experimental device. Then, step S203 provides an equivalent load of in-situ pressure of loose soil, step S204 injects water into the accommodating cavity to the experimental design height, and step S205 simulates the actual head height of the project. Finally, step S206 is used to test the starting conditions of water and sand bursting during coal mining.
[0078] The present invention realizes the real simulation of the on-site water head height, realizes the real simulation of the original stress state of the sand and soil unit at the bottom of the loose layer on-site, and realizes the indoor disaster process simulation of water and sand burst accidents at the coal mining working face. Through indoor experiments, quantitative research and disaster assessment of water and sand burst disasters can be carried out according to different on-site engineering conditions, and systematic experimental research can be carried out on the starting conditions of water and sand burst disasters. The information on the change of pore water pressure before the start of water and sand burst disasters can be effectively collected, thereby providing a basis for disaster warning and providing a rationale for the prevention and control of water and sand burst disasters, so as to prevent economic losses and improve the safety of the underground mining environment.
[0079] In one embodiment, the accommodating cavity comprises: a base 2, a barrel 3, and a top cover 4, the bedrock specimen 22 is placed on the base 2, and the lower end outlet of the fracture channel 19 is located in the opening area, the barrel 3 is placed on the base 2 through the bedrock specimen, and the top cover 4 is installed on the upper part of the barrel 3;
[0080] The bedrock specimen 22 having a fracture channel 19 is arranged in the accommodating cavity, a water pressure sensor 20 communicating with the water pressure information collector 1 is arranged on the upper part of the bedrock specimen 22, the lower end outlet of the fracture channel 19 is located in the opening area, and the opening area is closed, specifically including:
[0081] A bedrock specimen 22 having a fracture channel 19 is arranged in the accommodating cavity;
[0082] The upper end lead of the crack channel 19 is connected to the water pressure sensor 20, and the lower end lead is connected to the water pressure information collector 1;
[0083] Blocking the opening area of the bottom plate 2;
[0084] The crack channel 19 is filled with dry sand, and small colored round particles are placed on the upper surface of the channel;
[0085] The gap between the bedrock specimen 22 and the barrel body 3 is filled with caulking sand 23, and a thin metal rod is used to tamp the gap down.
[0086] In this embodiment, dry sand is filled inside the crack channel 19, and small colored round particles are placed on the upper surface of the channel for marking and timing.
[0087] In one embodiment, the soil pressure equivalent replenishment system includes: an air pump 11, a first air pressure control valve 9, a first stop valve 8, an air pressure reversal control valve 7, and a cylinder 5 connected in sequence, wherein the telescopic rod of the cylinder 5 is connected to the soil pressure replenishment plate 21 disposed in the barrel 3;
[0088] The providing the loose layer soil in-situ pressure equivalent loading in the accommodating cavity by the soil pressure equivalent supply system specifically includes:
[0089] Close the first stop valve 8, start the air pump 11, and obtain a continuous and stable experimental air pressure by adjusting the first air pressure control valve 9;
[0090] After the pressure is stabilized, the air cylinder 5 is controlled to be in an extended state through the air pressure reversal control valve 7;
[0091] The first stop valve 8 is opened, and the sand layer 25 is compacted by the soil pressure supplementary plate 21 connected to the front section of the telescopic rod of the cylinder 5.
[0092] This embodiment realizes that the soil pressure equivalent supply system provides in-situ pressure equivalent loading of loose layer soil in the accommodating cavity.
[0093] In one embodiment, the water level loading system includes: a water source 14 and a third stop valve 15 connected in sequence, wherein the third stop valve 15 is connected to a water injection air inlet 6 provided on the top cover 4;
[0094] The step of injecting water into the accommodating cavity to the experimental design height through the water level loading system specifically includes:
[0095] The third stop valve 15 is opened, and water is injected into the accommodating cavity to the experimental design height using the water source 14 .
[0096] This embodiment realizes injecting water into the accommodating cavity to the experimental design height through the water level loading system.
[0097] In one embodiment, the surface air pressure replenishment system includes: a three-way joint 10, a first quick joint 16, a second quick joint 17, and a fourth stop valve 18 arranged between the air pump 11 and the first air pressure control valve 9, the three-way joint 10 is connected to the second quick joint 17 through the second air pressure control valve 13 and the second stop valve 12, the third stop valve 15 is connected to the first quick joint 16 and the fourth stop valve 18 in sequence, and the first quick joint 16 and the second quick joint 17 are detachably connected;
[0098] The step of injecting water into the accommodating cavity to the experimental design height through the water level loading system specifically includes:
[0099] The first quick connector 16 and the second quick connector 17 are disassembled, the third stop valve 15 is opened, the fourth stop valve 18 is opened, and water is injected into the accommodating cavity to the experimental design height using the water source 14 .
[0100] In one embodiment, the water surface air pressure supply system is used to provide air pressure to the accommodating cavity, and the water head height in the actual engineering is simulated by the air pressure acting on the water, which specifically includes:
[0101] Reconnect the first quick connector 16 and the second quick connector 17, close the third stop valve 15, close the fourth stop valve 18, open the second stop valve 12, and adjust the second air pressure control valve 13;
[0102] After the required numerical air pressure is continuously stable, the fourth stop valve 18 is opened to simulate the actual water head height in the engineering through the effect of air pressure on water.
[0103] This embodiment simulates the water head height in actual engineering practice for the water effect.
[0104] In one embodiment, providing in-situ pressure equivalent loading of loose layer soil in the accommodating cavity by the soil pressure equivalent supply system specifically includes:
[0105] The in-situ pressure equivalent loading value of the loose layer soil is calculated based on the loose layer thickness, the water-containing thickness at the bottom of the loose layer, the dry density and the saturated density of the loose layer sand body in the field project. The in-situ pressure equivalent loading value of the loose layer soil body P 实 =ρ 干土 HkDJ 干 +ρ 饱和土 HkDJ 饱和 , where Hdry is the thickness of the dry part of the upper loose layer, Hsaturated is the thickness of the aquifer at the bottom of the loose layer, ρdry soil is the actual density of the dry sand in the loose layer on site, ρsaturated soil is the actual density of the saturated soil at the bottom of the loose layer on site, and g is the acceleration of gravity;
[0106] The soil pressure equivalent supply system provides the in-situ pressure equivalent loading value of the loose layer soil into the accommodating cavity.
[0107] The pressure load of the earth pressure supplementary plate in this embodiment needs to be calculated based on the loose layer thickness, the water content thickness at the bottom of the loose layer, the dry density and the saturated density of the loose layer sand body involved in the on-site project, so that the pressure load is more in line with on-site requirements.
[0108] In one embodiment, providing the in-situ pressure equivalent loading value of the loose layer soil into the accommodating cavity through the soil pressure equivalent supply system specifically includes:
[0109] Supplementary air pressure is applied to the cylinder to provide the equivalent loading value P of the in-situ pressure of the loose layer soil into the accommodating cavity through the soil pressure supplementary plate 21. 实 , the supplementary air pressure P 补土 =P 实 × 2 板 / r 2 缸 , wherein the earth pressure supplementary plate 21 is a circular rigid sieve plate, r 板 is the radius of the earth pressure supplementary plate, r 缸 is the inner radius of the cylinder.
[0110] In one embodiment, the water surface air pressure supply system is used to provide air pressure to the accommodating cavity, and the water head height in the actual engineering is simulated by the air pressure acting on the water, which specifically includes:
[0111] The head pressure is calculated based on the actual head height involved in the on-site project;
[0112] The water head pressure is provided to the accommodating cavity, and the water head height in the actual engineering is simulated by the effect of air pressure on water. The water head pressure P 补水 =P 水 -ρ 水 HkDJ 水层 , where P 水 is the actual water pressure on the sandy soil unit at the bottom of the loose layer on site, P 水 =ρ 水 HkDJ 水头 , ρ 水 is the density of water, H 水层 is the thickness of the water layer filled in the experimental apparatus.
[0113] This embodiment calculates the water head pressure according to the actual water head height involved in the on-site project, so that the water head pressure better meets the on-site requirements.
[0114] In one embodiment, the water pressure sensor 20 is installed at a preset height threshold above the fracture channel 19 of the bedrock specimen 22 and deviates from a preset distance threshold directly above the fracture channel 19 .
[0115] This embodiment can prevent the loss of material in the lower part of the sand body during the experiment, which causes the water pressure sensor to be directly immersed in water and unable to collect the pore water pressure.
[0116] like Figure 3 The best embodiment of the present invention is shown as an experimental method for testing the starting conditions of water and sand burst during coal mining. Figure 1 The experimental setup shown includes:
[0117] Step S301, adjusting the leveling support 33 to make the bottom plate 2 in a horizontal state.
[0118] Step S302, place the bedrock specimen 22 in the central shallow groove of the bottom plate 2, so that the lower end outlet of the fracture channel 19 is in the opening area of the bottom plate 2, and apply sealant to the contact part of the upper edge of the shallow groove with the surface of the bedrock specimen 22 to prevent the side sand from flowing out along the bottom plate.
[0119] Step S303, the upper end lead of the crack channel 19 is connected to the sensor 20, and the lower end lead is connected to the collector 1. The central opening of the bottom plate 2 is sealed.
[0120] Step S304, cleaning the slot of the bottom plate 2 for placing the transparent acrylic bucket 3, and placing the embedded O-ring 28 and the flat O-ring 29 inside the slot.
[0121] Step S305, dry sand is filled inside the crack channel 19, and small colored round particles are placed on the upper surface of the channel for marking and timing.
[0122] Step S306 , placing the acrylic bucket 3 in the card slot of the bottom plate 2 .
[0123] Step S307, fill the gap between the bedrock specimen 22 and the acrylic barrel 3 with caulking sand 23, and use a thin metal rod to tamp it down along the gap. Fill the clay layer 24 corresponding to the experimental scheme above the bedrock specimen 22, and after compacting and leveling, fill the sand layer 25 of the required thickness and mixed according to the proportion, and then compact and level it.
[0124] Step S308, assemble the flat O-ring 29 and the flange 30 with the bottom plate 2, and fix them with the external support screws 31 and nuts 32. First assemble the lower part of the equipment. After the four external support screws 31 are installed, assemble the flange 30, the flat O-ring, and the top cover 4 from bottom to top in order to ensure that the slot of the top cover 2 fits the acrylic barrel 3. The airtightness requirements inside the equipment are achieved by adjusting the nuts 32.
[0125] Step S309, close the first stop valve 8 and the second stop valve 12, start the air pump 11, and obtain a continuous and stable experimental air pressure by adjusting the first air pressure control valve 9. After the pressure is stable, adjust the hand valve 7 to extend the cylinder 5, open the first stop valve 8, and compact the sand layer 25 through the soil pressure supplement plate 21 connected to the front section of the telescopic rod of the cylinder 5, so as to achieve the purpose of supplementing the experimental soil pressure in the actual simulation engineering.
[0126] Step S310, remove the second quick connector 17, open the third stop valve 15 and the fourth stop valve 18, and use the water source 14 to inject water into the experimental equipment through the water injection inlet 6 to the experimental design height.
[0127] Step S311, reconnect the second quick connector 17, close the third stop valve 15 and the fourth stop valve 18, open the second stop valve 12, adjust the pressure reducing valve B13, open the fourth stop valve 18 after the required numerical air pressure is continuously stable, and simulate the actual water head height in the project through the effect of air pressure on water.
[0128] Step S312, let it stand and prepare for data and phenomenon record collection.
[0129] Step S313, remove the plugging of the central opening of the bottom plate 2 and start the experiment.
[0130] Step S314, after the experiment is completed, the soil pressure supplement plate 21 is removed through the air pressure reversal control valve 7, the first stop valve 8, the first air pressure control valve 9, the three-way connector 10, and the air pump to complete the dismantling of the experimental model.
[0131] The experimental device includes: a water pressure information collector 1, a base 2, a barrel body 3 using a transparent acrylic barrel, a top cover 4, a cylinder 5, a water injection inlet hole 6, an air pressure reversal control valve 7, a first stop valve 8, a first air pressure control valve 9, a three-way joint 10, an air pump 11, a second stop valve 12, a second air pressure control valve 13, a water source 14, a third stop valve 15, a first quick connector 16, a second quick connector 17, a fourth stop valve 18, a crack channel 19, a water pressure sensor 20, an earth pressure supplementary plate 21, a bedrock specimen 22, caulking sand 23, a clay layer 24, a sand layer 25, a water layer 26, air 27, a sealing rubber ring 28, an acrylic barrel fixing groove 29, a flange 30, a screw 31, a nut 32, a rotating screw plug 33, and a leveling support 34. The prefabricated bedrock specimen 22 with cracks is placed in the middle of the circular groove on the upper part of the leveling support 34. The water pressure sensor 20 connected to the water pressure information collector 1 is placed on the upper part of the bedrock specimen. The wire of the water pressure information collector 1 is placed in the bedrock specimen 22 in advance during the prefabrication process. The sealing rubber ring 28 is placed at the edge of the circular groove 29 on the upper surface of the leveling support 34. The acrylic barrel 3 is placed on the bedrock specimen 22 and erected in the circular groove 29 on the upper surface of the leveling support 34. 9 and ensure that the bottom of the acrylic barrel 3 is evenly pressed on the sealing rubber ring 28, the caulking sand 23 is loaded into the gap between the bedrock specimen 22 and the acrylic barrel 3, the sand layer 25 sampled on site is paved on the upper part of the bedrock specimen 22, the top 4 is installed on the upper part of the acrylic barrel 3, the top cover 4 is adjusted to be horizontal through the flange 30, the screw 31 and the nut 32, and the cylinder 5, the air pressure reversal control valve 7, the first stop valve 8, the first air pressure control valve 9, the three-way joint 10, and the air pump 11 are connected in series through the conduit to form an earth pressure equivalent The replenishment system realizes the equivalent loading of the in-situ pressure of the loose layer soil by adjusting the first air pressure control valve 9, the first stop valve 8, the air pressure reversal control valve 7, and the soil pressure supplement plate 21. The water injection air inlet 6, the fourth stop valve 18, the three-way joint 10, the third stop valve 15, the second air pressure control valve 13, the three-way joint 10 and the air pump 11 are connected in series through the conduit to form a water surface air pressure replenishment system. The water head pressure is equivalently loaded by adjusting the second air pressure control valve 13, the third stop valve 15 and the fourth stop valve 18. The water injection air inlet 6, the fourth stop valve 18, the three-way joint 10, the third stop valve 15 and the water source 14 are connected in series through the conduit to form a water level loading system. After the experimental design scheme is installed and assembled and the loading is completed, the lower rotary screw plug 33 of the leveling support is opened to realize the unblocking of the prefabricated cracks. The experiment begins to observe and record the experimental phenomena. After the experiment is completed, the soil pressure supplementary plate is lifted through the air pressure reversal control valve 7, the first stop valve 8, the first air pressure control valve 9, the three-way joint 10, and the air pump 11 to complete the dismantling of this experimental model.
[0132] Among them, the pressure load of the earth pressure supplementary plate needs to be calculated based on the loose layer thickness, water content thickness at the bottom of the loose layer, dry density and saturated density of the loose layer sand body involved in the on-site project. The actual pressure load on the sand body unit at the bottom of the loose layer on site is: P 实 =ρ 干土 HkDJ 干 +ρ 饱和土 HkDJ 饱和 The soil pressure supplement plate is a circular rigid sieve plate, which can achieve uniform soil pressure without hindering the passage of water. The air pressure that needs to be supplemented in the cylinder during the simulation experiment is: P 补土 =P 实 × 2 板 / r 2 缸 The pressure value of water pressure replenishment needs to be calculated based on the actual water head height involved in the on-site project. The calculation method is P 水 =ρ 水 HkDJ 水头 , P 补水 =P 水 -ρ 水 HkDJ 水层 The air pressure source of the soil pressure supplement plate and the water head height supplement is unified as an external air pump, and the specific pressure value is adjusted by the air pressure control valve. 实 is the actual overburden load of the sand at the bottom of the loose layer, H 干 H is the thickness of the upper dry part of the loose layer, 饱和 is the thickness of the aquifer at the bottom of the loose layer, ρ 干土 is the actual density of loose layer dry sandy soil on site, ρ 饱和土 is the actual saturated soil density at the bottom of the loose layer on site, g is the gravitational acceleration, P 补土 is the overburden load that needs to be supplemented by the earth pressure supplementary plate on the sand body during the experiment, r 板 is the radius of the earth pressure supplementary plate, r 缸 is the inner radius of the cylinder, P 水 is the actual water pressure on the sandy soil unit at the bottom of the loose layer on site, P 补水 is the partial pressure of the water pressure replenished by air pressure in order to achieve the real simulated field water head during the experiment, ρ 水 is the density of water, H 水层 is the thickness of the water layer filled in the experimental apparatus.
[0133] Among them, the connecting wires between the water pressure sensor and the water pressure information collector need to be built into the concrete during the prefabrication of the bedrock specimen. During the installation process before the experiment, the water pressure sensor needs to be installed at a height of 5 cm above the crack channel opening of the bedrock specimen and deviate from the crack channel opening by 10 cm to prevent the loss of material in the lower part of the sand body during the experiment, causing the water pressure sensor to be directly immersed in water and unable to collect pore water pressure.
[0134] So far, the present embodiment has been described in detail in conjunction with the accompanying drawings. Based on the above description, those skilled in the art should have a clear understanding of the experimental device for testing the starting conditions of water and sand bursts during coal mining in the present invention. The present invention realizes the true simulation of the on-site water head height, realizes the true simulation of the original stress state of the sand and soil unit at the bottom of the loose layer on site, and realizes the indoor disaster process simulation of water and sand burst accidents at the coal mining face. Through indoor experiments, quantitative research and disaster assessment of water and sand burst disasters can be carried out for different on-site engineering conditions, and systematic experimental research can be carried out on the starting conditions of water and sand burst disasters. The information on the changes in pore water pressure before the start of water and sand burst disasters can be effectively collected to provide a basis for disaster warning, and provide a rationale for the prevention and control of water and sand burst disasters, so as to prevent economic losses and improve the safety of the underground mining environment.
[0135] The above-mentioned embodiments only express several implementation methods of the present invention, and the description thereof is relatively specific and detailed, but it cannot be understood as limiting the scope of the patent of the present invention. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the present invention, which all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be subject to the attached claims.
Claims
1. An experimental device for testing the starting conditions of water and sand burst during coal mining, characterized in that: include: A housing cavity for accommodating experimental samples, an earth pressure equivalent supply system connected to the housing cavity for providing an equivalent load of loose layer soil in-situ pressure to the experimental samples in the housing cavity, a water level loading system connected to the housing cavity for injecting water into the housing cavity, and a water surface air pressure supply system connected to the housing cavity for providing an equivalent load of water head pressure to the housing cavity; The accommodating cavity is provided with a bedrock specimen (22) placed at the bottom of the experimental sample and having a fracture channel (19); a water pressure sensor (20) is provided on the top of the bedrock specimen (22) and is communicatively connected to the water pressure information collector (1); an opening area that can be opened and closed is provided at the bottom of the accommodating cavity; and a lower end outlet of the fracture channel (19) is located in the opening area; The accommodating cavity comprises: a base (2) on which the opening area is arranged, a barrel (3), and a top cover (4); the bedrock specimen (22) is placed on the base (2), and the lower end outlet of the fracture channel (19) is located in the opening area; a rotating screw plug (33) is arranged in the opening area; the barrel (3) is passed through the bedrock specimen and is erected on the base (2); and the top cover (4) is installed on the upper part of the barrel (3); The soil pressure equivalent supply system is provided with a soil pressure supplement plate (21) which passes through the top cover (4) to provide the experimental sample in the barrel body (3) with an equivalent load of in-situ pressure of loose layer soil, and the soil pressure supplement plate (21) is a rigid sieve plate; The top cover (4) is provided with a water injection air inlet hole (6) for the water surface air pressure supply system to provide a water head pressure equivalent load to the experimental sample of the barrel body (3); The soil pressure equivalent replenishment system further comprises: an air pump (11), a first air pressure control valve (9), a first stop valve (8), an air pressure reversal control valve (7), and a cylinder (5) which are connected in sequence, wherein the telescopic rod of the cylinder (5) is connected to the soil pressure replenishment plate (21); The water level loading system comprises: a water source (14) and a third stop valve (15) which are connected in sequence, wherein the third stop valve (15) is connected to the water injection air inlet hole (6); The surface air pressure replenishment system comprises: a three-way joint (10), a first quick joint (16), a second quick joint (17), and a fourth stop valve (18) arranged between the air pump (11) and the first air pressure control valve (9); the three-way joint (10) is connected to the second quick joint (17) via the second air pressure control valve (13) and the second stop valve (12); the third stop valve (15) is connected to the first quick joint (16) and the fourth stop valve (18) in sequence; the first quick joint (16) and the second quick joint (17) are detachably connected.
2. An experimental method for testing the starting conditions of water and sand burst during coal mining according to claim 1, characterized in that: include: A clay layer corresponding to the experimental scheme is filled on the bedrock specimen, and after being compacted and leveled, a sand layer of required thickness and mixed according to a proportion is filled, and then compacted and leveled; closing the accommodating cavity; Providing in-situ pressure equivalent loading of loose layer soil in the accommodating cavity through the soil pressure equivalent supply system; Filling water into the accommodating cavity to the experimental design height through the water level loading system; The water surface air pressure supply system is used to provide air pressure to the accommodating cavity, and the water head height in the actual engineering is simulated by the air pressure acting on the water; The opening area is opened to conduct an experiment to test the starting conditions for water and sand burst during coal mining.
3. The experimental method for testing the starting conditions of water and sand burst during coal mining according to claim 2 is characterized in that: The accommodating cavity comprises: a base, a barrel, and a top cover, the bedrock specimen is placed on the base, and the lower end outlet of the fracture channel is located in the opening area, the barrel is passed through the bedrock specimen and erected on the base, and the top cover is installed on the upper part of the barrel; The bedrock specimen having a fracture channel is arranged in the accommodating cavity, a water pressure sensor connected to the water pressure information collector is arranged on the upper part of the bedrock specimen, the lower end outlet of the fracture channel is located in the opening area, and the opening area is closed, specifically comprising: A bedrock specimen having a fracture channel is arranged in the accommodating cavity; The upper end lead of the crack channel is connected to the water pressure sensor, and the lower end lead is connected to the water pressure information collector; Seal the opening area of the bottom plate; The inside of the fracture channel is filled with dry sand, and small colored round particles are placed on the upper surface of the channel; Fill the gap between the bedrock specimen and the barrel with caulking sand, and use a thin metal rod to tamp it down along the gap.
4. The experimental method for testing the starting conditions of water and sand burst during coal mining according to claim 3 is characterized in that: The soil pressure equivalent replenishment system is provided with a soil pressure replenishment plate which passes through the top cover and provides the experimental sample in the barrel with an equivalent load of in-situ pressure of loose layer soil; The providing the loose layer soil in-situ pressure equivalent loading in the accommodating cavity by the soil pressure equivalent supply system specifically includes: The in-situ pressure equivalent loading value of the loose layer soil is calculated based on the loose layer thickness, the water-containing thickness at the bottom of the loose layer, the dry density and the saturated density of the loose layer sand body in the field project. The in-situ pressure equivalent loading value of the loose layer soil body P 实 =ρ 干土 HkDJ 干 +ρ 饱和土 HkDJ 饱和 , where Hdry is the thickness of the dry part of the upper loose layer, Hsaturated is the thickness of the aquifer at the bottom of the loose layer, ρdry soil is the actual density of the dry sand in the loose layer on site, ρsaturated soil is the actual density of the saturated soil at the bottom of the loose layer on site, and g is the acceleration of gravity; The soil pressure equivalent supply system provides the in-situ pressure equivalent loading value of the loose layer soil into the accommodating cavity.
5. The experimental method for testing the starting conditions of water and sand burst during coal mining according to claim 4 is characterized in that: The providing the in-situ pressure equivalent loading value of the loose layer soil into the accommodating cavity through the soil pressure equivalent supply system specifically includes: Supplementary air pressure is applied to the cylinder to provide the equivalent loading value P of the in-situ pressure of the loose layer soil into the accommodating cavity through the soil pressure supplementary plate. 实 , the supplementary air pressure P 补土 =P 实 × 2 板 / r 2 缸 , where the earth pressure supplementary plate is a circular rigid sieve plate, r 板 is the radius of the earth pressure supplementary plate, r 缸 is the inner radius of the cylinder.
6. The experimental method for testing the starting conditions of water and sand burst during coal mining according to claim 5, characterized in that: The water surface air pressure supply system is used to provide air pressure to the accommodating cavity, and the water head height in the actual engineering is simulated by the air pressure acting on the water, which specifically includes: The head pressure is calculated based on the actual head height involved in the on-site project; The water head pressure is provided to the accommodating cavity, and the water head height in the actual engineering is simulated by the effect of air pressure on water. The water head pressure P 补水 =P 水 -ρ 水 HkDJ 水层 , where P 水 is the actual water pressure on the sandy soil unit at the bottom of the loose layer on site, P 水 =ρ 水 HkDJ 水头 , ρ 水 is the density of water, H 水层 is the thickness of the water layer filled in the experimental apparatus.
