A trestle system and construction method combined with an internal support system
Through the internal support system combined with the internal support system, the problems of low efficiency and large construction volume of traditional earth excavation and transportation are solved, efficient earth excavation and transportation and construction efficiency are achieved, and the removal of resources can be recovered after the construction is completed.
Patent Information
- Application Number
- CN201910917157.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-09-26
- Publication Date
- 2024-11-05
- Estimated Expiration
- 2039-09-26
AI Technical Summary
Traditional earthwork excavation and transportation efficiency is low and the construction volume is large. It cannot be deep-level earthwork excavation and transportation, which occupies a large space, and the later slope closing operation is cumbersome.
Using a trestle system combined with an internal support system, the soft soil layer is excavated and the dry hard soil layer is backfilled, concrete is solid and concrete is poured to form a ramp, and vibration is reserved. The port and the pouring port are built to build support frames and formwork, pour concrete, and form a continuous channel between the trest and the inner support system to reduce the construction volume and material use.
It has achieved improvements in the efficiency of earth excavation and transportation, reduced construction volume and material use, and can be removed after construction is completed, which is convenient for resource recycling and utilization.
Smart Images

Figure CN110593080B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction structure and construction engineering, and in particular to a support-interval trestle system combined with an internal support system and a construction method. Background Art
[0002] With the continuous development of engineering construction, the application of high-rise buildings is becoming more and more extensive, and the full use of underground space is more important. The space occupied by the underground parts of various buildings and the burial depth are gradually increasing.
[0003] Traditional earth excavation and transportation requires the construction of ramps, which take up a large space and make the subsequent slope reduction operation cumbersome. In addition, due to the limitations of the construction site, deep earth excavation and transportation cannot be carried out. Deep earth excavation and transportation requires reverse transportation in space, which has low earth excavation efficiency. Summary of the invention
[0004] The purpose of the present invention is to provide a support-interval trestle system and a construction method combined with a support system to overcome the defects of low earth excavation and transportation efficiency and large construction workload.
[0005] The technical solution adopted by the present invention to solve the above technical problem is to include the following steps:
[0006] S1, setting up an internal support system, the internal support system including vertically layered plate supports and columns between adjacent plate supports, removing the soft soil layer on the surface of the slope between adjacent columns and backfilling with dry hard soil layer;
[0007] S2, compact the soil layer and pour the concrete layer to form a ramp, reserve a vibration port in the middle of the ramp, reserve a pouring port above the ramp, and the vibration port corresponds to the position of the column;
[0008] S3, excavate the slope foot and build a retaining brick wall, and set up a support frame;
[0009] S4, laying formwork;
[0010] S5, pouring concrete into the formwork.
[0011] In a preferred embodiment, the S4 step comprises:
[0012] S41, tie the steel bars in two layers to form the formwork;
[0013] S42, tension screws are set on the side of the formwork and welded to the horizontal reinforcement;
[0014] S43, lay ribs on the top of the formwork, place protective pads, and lay the upper formwork.
[0015] In a preferred embodiment, after the step S4, the middle and lower sections of the template are top-formed.
[0016] In a preferred embodiment, the jacking method is: fixing jacking supports on the columns on both sides of the ramp and the plate supports, connecting the jacking supports to steel pipes, and the steel pipes are pushed back to the upper template.
[0017] In a preferred embodiment, the pouring method in step S5 is: pouring concrete towards the vibrating port and the pouring port in sections from bottom to top.
[0018] In a preferred embodiment, the pouring method in step S5 is: pouring concrete into the pouring port, and vibrating the concrete in each vibrating port.
[0019] In a preferred embodiment, after the step S5, a transverse groove is cut on the surface of the concrete after hardening.
[0020] In a preferred embodiment, after the step S4, a plurality of wooden beams arranged at intervals are nailed into the inner side of the formwork.
[0021] The present invention also provides a support bridge system combined with an internal support system, which is formed by any of the above-mentioned embodiments, including an internal support system and a support bridge, wherein the internal support system includes at least two plate supports stacked in a vertical direction, and a plurality of supporting columns are arranged between adjacent plate supports. The support bridge is obliquely connected between adjacent plate supports, and the plate supports are provided with a passage port connected to the support bridge; and also includes a load-bearing beam, the top of the load-bearing beam is connected to the support bridge, and the bottom of the load-bearing beam is connected to the supporting column.
[0022] In a preferred embodiment, a plurality of the load-bearing beams are provided along the extension direction of the support trestle.
[0023] In a preferred embodiment, negative reinforcement is anchored at the connection between the load-bearing beam and the span trestle.
[0024] In a preferred embodiment, the upper surface of the support bridge is provided with a groove.
[0025] In a preferred embodiment, a support plate is disposed around the outside of the support column.
[0026] In a preferred embodiment, a plurality of first support rods are arranged between the support plate and the support columns, and ends of the first support rods are fixed to the plate support surface.
[0027] In a preferred embodiment, second support rods that cross each other are arranged between adjacent support columns.
[0028] The present invention has at least the following beneficial effects:
[0029] The inner support system and the support bridge in the present invention are combined into one, and there is no need to construct an additional trestle, which reduces the amount of construction investment. The support bridge and the inner support system form a continuous through passage for transportation machinery to penetrate into the bottom of the foundation pit, receive the soil delivered by the excavator and then transport it, thereby improving the efficiency of earth excavation and transportation; and the support bridge is constructed by using the soil slope in the inner support system, so that the support bridge and the inner support system are combined into one, and they can be dismantled together after the construction is completed, which is convenient for the circulation and use of materials. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] The present invention is further described below in conjunction with the accompanying drawings and embodiments.
[0031] Figure 1 It is a structural schematic diagram of an embodiment of a support-to-support trestle system combined with a support system;
[0032] Figure 2 yes Figure 1 A schematic plan view of the illustrated embodiment;
[0033] Figure 3 It is a structural schematic diagram of an embodiment of a plate support;
[0034] Figure 4 It is a structural schematic diagram of an embodiment of a span trestle;
[0035] Figure 5 is a schematic structural diagram of an embodiment of a first support rod;
[0036] Figure 6 It is a structural schematic diagram of an embodiment of a support column;
[0037] Figure 7 It is a structural schematic diagram of the first construction state of the span trestle system;
[0038] Figure 8 It is a structural schematic diagram of the second construction state of the span trestle system;
[0039] Fig. 9 It is a structural diagram of the third construction state of the support trestle system. DETAILED DESCRIPTION
[0040] The following will clearly and completely describe the concept, specific structure and technical effects of the present invention in combination with the embodiments and drawings, so as to fully understand the purpose, characteristics and effects of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, other embodiments obtained by technicians in this field without creative work are all within the scope of protection of the present invention. In addition, all the connection / connection relationships involved in the patent do not refer to the direct connection of components, but refer to the formation of a better connection structure by adding or reducing connection accessories according to the specific implementation situation. The various technical features in the present invention can be combined interchangeably without conflicting with each other.
[0041] Reference Figure 1 and Figure 2 The support bridge system in this embodiment includes an inner support system 100 and a support bridge 200. The inner support system 100 includes no less than two plate supports 120. The plate supports 120 are stacked and distributed in the vertical direction. A number of support columns 110 are arranged between adjacent plate supports 120. The support columns 110 are used to support the plate supports 120 to ensure that the inner support system 100 has sufficient structural strength and safety performance; the support bridge 200 is obliquely connected between two adjacent plate supports 120. The plate supports 120 are provided with a passage 121 connected to the support bridge 200. The surface of the support bridge 200 and the surface of the plate support 120 form a passage for transportation machinery such as mud trucks to pass through. The transportation machinery can go deep into the bottom of the foundation pit through the support bridge 200 to pick up soil for transportation, thereby improving the efficiency of earth excavation and transportation.
[0042] The support trestle 200 in this embodiment is combined with the internal support system 100, which not only avoids repeated construction and dismantling of trestle bridges, increased construction workload, and occupation of foundation pit sites, but also greatly reduces the construction workload and improves excavation efficiency.
[0043] It also includes a load-bearing beam 300, which is located at the bottom of the support trestle 200 and connected to the support column 110 to support the bottom of the support trestle 200 and prevent the support trestle 200 from collapsing. Specifically, the load-bearing beam 300 extends in the horizontal direction, and the two ends of the load-bearing beam 300 are fixedly connected to the adjacent support columns 110, so that the load-bearing beam 300 and the support column 110 are combined to form a support member to support the support trestle 200. The load on the support trestle 200 is first transmitted to the load-bearing beam 300 for distribution, and the support column 110 receives the force transmitted by the load-bearing beam 300 and maintains the original force direction and force transmission direction, so that the overall structure of the internal support system 100 remains stable to bear the external load.
[0044] Traditional support systems are generally provided with connecting beams. Since the connecting beams can easily block the movement of transport machinery and the connecting beams are subjected to relatively small forces, they do not affect the force transmission of the internal support system 100. The internal support system 100 in this embodiment is not provided with connecting beams. Under the premise of ensuring the overall bearing strength of the internal support system 100, the structure of the internal support system 100 is simplified.
[0045] The load-bearing beam 300 can be connected to the support bridge 200 and the support column 110 by pouring concrete, so that the support bridge 200 and the inner support system 100 have sufficient connection strength. The load-bearing beam 300 in this embodiment extends in the horizontal direction and is fixed between adjacent support columns 110, the support bridge 200 passes between adjacent support columns 110, and both ends are fixedly connected to adjacent plate supports 120, and the support column 110 extends in the vertical direction and is fixed between adjacent plate supports 120. It can be imagined that a plurality of plate supports 120 can be stacked in the vertical direction, and a support bridge 200 is arranged between every two adjacent plate supports 120, so that the support bridge 200 and the inner support system 100 form a continuous channel in space, and a plurality of load-bearing beams 300 can be arranged along the extension direction of the support bridge 200 to ensure that the support bridge 200 has sufficient structural strength.
[0046] Reference Figure 3 , the internal support system 100 may include multiple plate supports 120 arranged in the vertical direction. This embodiment is described by taking one of the plate supports 120 as an example. The plate supports 120 are hollowed out as a whole to reduce the weight and load of the plate supports 120. The plate supports 120 are cast with concrete floors on the walking path of the transport machinery to provide a walking path for the transport machinery. The thickness of the floors can be set to 300mm. The plate supports 120 are arranged continuously in the vertical direction. The inter-support trestles 200 are connected between adjacent plate supports 120 to form a walking passage for the transport machinery to pass. The part of the plate supports 120 that is not cast with the floor and docked with the inter-support trestles 200 serves as a passage 121 connecting the plate supports 120 and the inter-support trestles 200. The inter-support trestles 200 and the plate supports 120 need to meet the clearance requirements to ensure that the transport machinery can walk, rotate, turn around, etc. in the internal support system 100.
[0047] A plane vibrator may be used to polish the surface of the support trestle 200, and grooves may be pressed out on the surface of the support trestle 200 to form a road surface with a certain degree of roughness, so as to facilitate the passage of transport machinery.
[0048] Reference Figure 4In this embodiment, additional anchored negative reinforcement 210 is provided at the joint of the load-bearing beam 300 and the support trestle 200 to increase the shear bearing capacity of the support trestle 200 and the load-bearing beam 300. Specifically, the negative reinforcement 210 can be tied together with the steel bars when constructing the support trestle 200, or after the support trestle 200 is formed, the concrete of the support trestle 200 is chiseled out to form an installation gap for laying the negative reinforcement 210. It can be imagined that two negative reinforcements 210 are placed in opposite directions in the middle area of the support trestle 200, and one negative reinforcement 210 is placed in the bottom and top areas of the support trestle 200, so as to further enhance the shear strength of the support trestle 200.
[0049] Reference Figure 5 , a second support rod 130 is connected between adjacent support columns 110. In this embodiment, two second support rods 130 are arranged crosswise between adjacent support columns 110 to increase the support strength of the support columns 110 to the board support 120 and the support bridge 200, and to increase the lateral rigidity of the walking path of the support bridge 200. It can be imagined that the second support rod 130 can be selected as a channel steel and combined into a scissors support.
[0050] Reference Figure 6 , a plurality of support plates 140 are arranged around the surface of each support column 110, and the support plates 140 are arranged in sequence in the vertical direction. In this embodiment, there are three support plates 140 arranged along the axial direction of the support column 110; a plurality of first support rods 150 are also arranged between the support plates 140 and the support columns 110, and the first support rods 150 are arranged along the circumference of the support column 110, and the first support rods 150 are welded and fixed to the inner wall surface of the support plates 140, and the bottom of the first support rods 150 is fixedly connected to the plate support 120 by expansion bolts. There is a certain gap between the first support rods 150 and the support column 110. When the support column 110 is hit, under the buffering effect of the gap, the first support rods 150 and the support plates 140 can absorb the impact of the collision and reduce the collision force on the support column 110. Since the support column 110 is the main load-bearing component of the internal support system 100, by setting the above anti-collision measures, the safety performance of the internal support system 100 can be improved, and the construction project can be carried out smoothly.
[0051] It is conceivable that angle steel scissor braces may be connected between the first support rods 150 to further enhance the anti-collision performance of the first support rods 150; and a reflective strip for warning may be attached to the surface of the support column 110. The support column 110 may be a column with a diameter of 800 mm, the support plate 140 may be a circular steel plate with a diameter of 1200 mm and a thickness of 2 mm, and the first support rod 150 may be a square steel column with a height of 1200 mm.
[0052] The support trestle 200 and the inner support system 100 in the present invention are an integrated structure, and can be dismantled as a whole after the construction is completed, which reduces the amount of engineering measures invested in the construction process, is conducive to resource recovery, and improves resource utilization; the support trestle 200 can penetrate from the ground to the bottom of the foundation pit, and the support trestle 200 and the inner support system 100 form a continuous passage in space, and the transportation machinery can directly enter the foundation pit and receive the soil delivered by the excavator for transportation; the load of the support trestle 200 is distributed through the load-bearing beam 300 below it, and will not be directly transmitted to the axial components of the inner support system 100, so that the inner support system 100 maintains the original force transmission direction and has sufficient bearing strength.
[0053] The present invention also provides a method for constructing a trestle bridge system. Figure 7 and Figure 8 , including the following steps,
[0054] S1, setting up an internal support system, the internal support system including vertically layered plate supports 120 and support columns 110 placed between adjacent plate supports 120, removing the soft soil layer on the surface of the slope between adjacent support columns 110 and backfilling with a dry hard soil layer 410;
[0055] S2, compacting the soil layer and pouring a concrete layer 420 to form a ramp, with a vibration opening 432 reserved in the middle of the ramp and a pouring opening 431 reserved above the ramp, and the vibration opening 432 corresponds to the position of the column;
[0056] S3, excavating the slope foot and building a retaining brick wall 440, and setting up a support frame 450;
[0057] S4, laying formwork 460;
[0058] S5, pouring concrete into the formwork 460.
[0059] Based on the internal support system, in order to avoid occupying the foundation pit site, the inter-support trestles are connected between the adjacent plate supports 120, so that the inter-support trestles are combined with the internal support system to form a spatial walking channel for transportation machinery such as mud trucks to pass through, and to transfer earth deep into the foundation pit, thereby improving construction efficiency.
[0060] Specifically, the inter-support trestle is constructed based on the earth slope between adjacent plank supports 120. During the earth excavation process, the soil layer under the internal support system is violently disturbed and is relatively loose and cannot be used as a foundation. The soft soil layer on the surface of the earth slope needs to be excavated first, and then backfilled with dry and hard soil with high shear strength and low compressibility, such as gravel, slag, and ash soil, to form a dry and hard soil layer 410 on the surface of the earth slope. The replacement depth can be selected to be 800mm-1000mm according to the actual soil conditions at the construction site. After the replacement is completed, the dry hard soil layer 410 is repeatedly compacted by an excavator to ensure that the dry hard soil layer 410 maintains sufficient structural strength, and then concrete is poured on the surface of the dry hard soil layer 410 to form a concrete layer 420, so that the dry hard soil layer 410 and the concrete layer 420 are combined into a double-layer foundation and a ramp is formed on the surface of the concrete layer, so that the foundation has sufficient strength to facilitate later formwork; the thickness of the concrete layer 420 can be reasonably selected according to the actual construction situation, but it is necessary to ensure that the slope of the ramp is less than the maximum allowable value for the climbing of the transport machinery; a vibration port 432 is reserved in the middle of the ramp, and the position of the vibration port 432 corresponds to the position of the support column 110, so as to facilitate subsequent pouring to form a load-bearing beam combined with the support column 110; a pouring port 431 is reserved at the top of the ramp to facilitate pouring into the template 460 to combine with the foundation to form a support trestle. The foot of the ramp is excavated, and a retaining brick wall 440 is built at the foot of the ramp. The retaining brick wall 440 resists the bottom of the ramp to prevent the ramp from sliding and collapsing. Then a support frame 450 is set up at the foot of the slope. The support frame 450 is used to support the template 460. The support frame 450 and the retaining brick wall 440 support each other. The template 460 is formed by bundling steel bars, and the template 460 is laid on the top of the ramp. Concrete is poured on the template 460. After the concrete solidifies, a support bridge is formed. The bottom of the support bridge has a load-bearing beam, which is integrated with the support column 110.
[0061] The inner support system may include multiple board supports 120, and adjacent board supports 120 may also be provided with at least two inter-support trestle bridges to provide a walking route for the transport machinery and improve the efficiency of earthwork transportation. The inter-support trestle bridges are constructed in the order of being built from top to bottom between adjacent board supports 120, so that the inner support system and the inter-support trestle bridges form a continuous spatial walking passage.
[0062] Reference Figure 8 In this embodiment, a plurality of support frames 450 are arranged at intervals along the extension direction of the support bridge, and an installation space for inserting the template 460 is provided between adjacent support frames 450, so that the template 460 resists the support frame 450 after laying, and the template 460 is fixed above the ramp to facilitate the later pouring and prevent the template 460 from moving. The support frames 450 are made of steel pipes.
[0063] The method for constructing the template 460 in step S4 includes the following steps:
[0064] S41, tying steel bars in two layers to form a template 460;
[0065] S42, a tension screw 461 is provided on the side of the template 460 and welded to the horizontal rib;
[0066] S43, laying ribs on the upper part of the formwork 460, placing the protective layer pad 463, and laying the upper formwork 460.
[0067] Specifically, the formwork 460 is arranged in two layers, an upper layer and an lower layer, and a pouring port 431 is formed at the top of the two layers of formwork 460 for pouring concrete to form a support trestle. Each layer of formwork 460 is formed by tying steel bars; tension screws 461 are arranged on the side to make the tension screws 461 bear the lateral pressure and other loads of the concrete and the formwork 460, ensuring that the inner and outer sides of the formwork 460 meet the strength requirements; an area is laid on the upper part of the formwork 460 to increase the shear and crack resistance of the formwork 460, and then a protective layer pad 463 is placed. The protective layer pad 463 has an anchoring force on the steel bars, utilizes the close combination between the concrete and the steel bars, and enhances the bearing capacity and durability of the concrete; then the upper layer formwork 460 is laid on top of the lower layer formwork 460.
[0068] Reference Fig. 9 In order to prevent the template 460 from floating up in the middle and lower sections of the ramp, a method combining a steel pipe 472 and a top support 471 is used to support the template 460. Specifically, the top support 471 is fixed on the plate support 120 and the supporting columns 110 on both sides of the ramp by using the internal support system. The top support 471 is connected with a steel pipe 472. The steel pipe 472 is returned to the upper template 460 to prevent the upper template 460 from tilting up and affecting the quality of the later pouring. In this embodiment, a plurality of steel pipes 472 are provided, and the steel pipes are supported at different positions of the template 460, so that the supporting force of the steel pipe 472 on the template 460 is more uniform, and different areas of the template 460 are supported to optimize the top-returning effect. The end of the steel pipe 472 is provided with an adjustable support, which can adjust the supporting force of the steel pipe 472 on the template 460, so that the installation between the steel pipe 472 and the template 460 is more convenient.
[0069] The pouring method in step S5 is: pour concrete onto the template 460 from bottom to top, and vibrate the concrete in the vibrating port 432 to make it dense, so that the concrete is tightly combined and the honeycomb surface of the concrete is eliminated. The pouring of each section needs to be carried out after the initial setting and before the final setting of the concrete poured in the previous section, to ensure that each section of concrete is combined as a whole to prevent concrete cracking.
[0070] Alternatively, concrete is poured directly into the pouring port 431 at the top of the template 460, and the concrete is laid from top to bottom in the template 460 and the vibration port 432. The concrete in the vibration port 432 is vibrated to be dense, and after the concrete solidifies, a support bridge and a load-bearing beam are formed. The support bridge and the support column 110 are combined into one through the load-bearing beam.
[0071] After step S5, a transverse groove is cut on the surface of the concrete after hardening to increase the roughness of the surface of the support bridge, which is convenient for the transportation machinery to move. Or after step S4, a number of spaced wooden beams are nailed into the template 460, and after the concrete is poured and solidified, the wooden beams form anti-slip strips to achieve the purpose of increasing the surface roughness of the support bridge; the wooden beams can be selected to be 15mm long and 10mm wide, and the spacing can be set to 100mm.
[0072] The above is a specific description of the preferred embodiments of the present invention, but the present invention is not limited to the embodiments. Those skilled in the art may make various equivalent modifications or substitutions without violating the spirit of the present invention. These equivalent modifications or substitutions are all included in the scope defined by the claims of this application.
Claims
1. A method for constructing a trestle bridge system, characterized in that: The following steps are included: S1, setting up an internal support system, the internal support system including vertically layered plate supports and columns between adjacent plate supports, removing the soft soil layer on the surface of the slope between adjacent columns and backfilling with dry hard soil layer; S2, compacting the soil layer and pouring the concrete layer, so that the dry hard soil layer and the concrete layer are combined into a double-layer foundation and a ramp is formed on the surface of the concrete, a vibration port is reserved in the middle of the ramp, and a pouring port is reserved above the ramp, and the vibration port corresponds to the position of the column; S3, excavate the slope foot and build a retaining brick wall, and set up a support frame; S4, laying formwork above the ramp; S5, pouring concrete into the formwork, and the concrete pouring and vibrating opening forms a load-bearing beam and a supporting column; The S4 step includes: S41, tie the steel bars in two layers to form the formwork; S42, tension screws are set on the side of the formwork and welded to the horizontal reinforcement; S43, lay ribs on the top of the formwork, place protective pads, and lay the upper formwork; After the step S4, the middle and lower sections of the template are formed; The jacking method is as follows: fixing jacking supports on the columns on both sides of the ramp and the board supports, connecting the jacking supports to the steel pipes, and returning the steel pipes to the upper template; The pouring method in step S5 is: pouring concrete from bottom to top towards the vibrating port and the pouring port in sections; Among them, the inter-support trestle is connected between adjacent plank supports, so that the inter-support trestle is combined with the internal support system to form a space walking channel; In step S3, a plurality of support frames are arranged at intervals along the extension direction of the support bridge, and installation spaces for template insertion are provided between adjacent support frames, so that the template and the support frames resist each other after laying, and the template is fixed above the ramp to facilitate later pouring and prevent the template from moving; A plurality of steel pipes are connected to the jacking support, and the ends of the steel pipes are provided with adjustable supports so as to support the template at different positions.
2. The method for constructing a trestle bridge system according to claim 1, characterized in that: The pouring method in step S5 is: pouring concrete into the pouring port, and vibrating the concrete in each vibrating port.
3. The method for constructing a span trestle system according to claim 1, characterized in that: After the step S5, a transverse groove is cut on the surface of the concrete after hardening.
4. The method for constructing a trestle bridge system according to claim 1, characterized in that: After the step S4, a number of wooden beams arranged at intervals are nailed into the inner side of the formwork.
5. A trestle bridge system combined with an internal support system, characterized in that: Formed by any of the methods of claims 1 to 4, comprising an internal support system and an inter-support trestle, wherein the internal support system comprises at least two vertically stacked plate supports, a plurality of support columns are arranged between adjacent plate supports, the inter-support trestle is obliquely connected between adjacent plate supports, and the plate supports are provided with a passage port connected to the inter-support trestle; It also includes a load-bearing beam, the top of which is connected to the support trestle, and the bottom of which is connected to the supporting column; Negative reinforcement is anchored at the connection between the load-bearing beam and the support bridge, and two negative reinforcements are arranged in opposite directions in the middle area of the support bridge, and one negative reinforcement is arranged at the bottom and top area of the support bridge, and the negative reinforcement is used to increase the shear bearing capacity of the support bridge and the load-bearing beam; A support plate is arranged around the outside of the support column; A plurality of first support rods are arranged between the support plate and the support column, and are arranged along the circumference of the support column. The ends of the first support rods are fixed to the surface of the plate support, and the bottoms of the first support rods are fixedly connected to the plate support through expansion bolts.
6. The inter-support trestle system combined with the internal support system according to claim 5, characterized in that: A plurality of load-bearing beams are arranged along the extending direction of the support trestle.
7. The inter-support trestle system combined with the internal support system according to claim 5, characterized in that: The upper surface of the support trestle is provided with a groove.
8. The inter-support trestle system combined with the internal support system according to claim 5, characterized in that: Second support rods that cross each other are arranged between adjacent support columns.
Citation Information
Patent Citations
Unearthed ramp and construction method based on deep foundation pit supporting structure
CN110004936A
Oblique landing stage of portable earthwork transportation
CN204690573U
Concrete landing stage and foundation ditch connected node structure
CN207109824U
Inter-support trestle system combined with inner support system
CN211340370U
Process for the construction of a segment of an open-air work by prefabricated structural members, and prefabricated structural member related thereto
US20060239779A1