A device integrating the bogie of a beam transport vehicle and a bridge erection and feeding beam mechanism
The integration of a beam transport vehicle bogie and bridge erection mechanism with an oil cylinder and pin shaft facilitates continuous beam transport and feeding, addressing inefficiencies in traditional bridge erection machines by improving speed and safety.
Patent Information
- Application Number
- CN201910993989.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-10-18
- Publication Date
- 2024-12-17
- Estimated Expiration
- 2039-10-18
AI Technical Summary
Traditional bridge erection machines require separate mechanisms for beam transport and feeding, which are time-consuming and inefficient.
An integrated device combining a beam transport vehicle bogie and a bridge erection mechanism, utilizing an oil cylinder, pin shaft, and beam transport mechanism to enable continuous beam transport and feeding without intermediate conversions.
The integrated mechanism allows for rapid transportation and feeding of pre-supported beams, enhancing efficiency and safety by eliminating the need for intermediate conversion mechanisms.
Smart Images

Figure CN110607762B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of bridge erection machine equipment, and in particular to a device integrating a bogie of a beam transport vehicle and a bridge erection and beam feeding mechanism. Background Art
[0002] With the continuous development of my country's railways, the span of prefabricated bridge piers erected on railway lines is getting larger and larger, and the length of the erected concrete box beams is also increasing, which puts higher and higher requirements on bridge erection machines.
[0003] Traditional bridge erection machines are separated in beam transport and beam feeding. The beam transport vehicle transports the pre-supported beam to the designated location, and then a beam transport trolley on the bridge erection machine lifts one end of the pre-supported beam and moves it to the appropriate location, and then another beam transport trolley lifts the other end of the pre-supported beam, and finally completes the entire beam feeding process. The whole process involves three mechanisms and is time-consuming. In order to solve the above technical problems, a device is provided that integrates a beam transport vehicle bogie with a bridge erection beam feeding mechanism. Summary of the invention
[0004] In order to solve the above technical problems, the object of the present invention is to provide a device integrating a beam transport vehicle bogie and a bridge erection and beam feeding mechanism.
[0005] The technical problems to be solved by the present invention are:
[0006] The present invention can realize both rapid transportation of pre-supported beams and rapid feeding of pre-supported beams by means of the oil cylinder, the pin shaft and the beam transporting mechanism. The integrated mechanism is designed so that beam transport and beam feeding can be completed continuously without the need for a conversion mechanism in between, thus saving time, improving efficiency and greatly improving the safety of the device, thereby solving the technical problem in the prior art that the beam transport and beam feeding processes of the bridge erecting machine are separate and involve many mechanisms, which is time-consuming.
[0007] The purpose of the present invention can be achieved through the following technical solutions:
[0008] A device integrating a beam transport vehicle bogie and a bridge erection beam feeding mechanism, comprising two beam transport vehicles, a pre-support beam, a main beam mechanism, a beam pier and a suspension frame, wherein the main beam mechanism and the beam transport vehicle are both erected directly above the beam pier, the pre-support beam is respectively connected and fixed to the two beam transport vehicles, and the suspension frame is fixed on a side of the main beam mechanism away from the beam transport vehicle;
[0009] The beam transport vehicle comprises a frame and a plurality of parallel running wheels located on the outer surface of the lower end of the frame, and a beam transport mechanism is fixedly installed on the outer surface of the upper end of the frame;
[0010] The beam transport mechanism comprises a bearing frame and a sliding wheel. The bearing frame is fixedly mounted on the outer surface of the upper end of the frame, and the sliding wheel is movably connected to the inner side wall of the bearing frame.
[0011] Furthermore, a pin shaft is movably mounted on the outer surface of the upper end of the beam transport vehicle, and an oil cylinder for controlling the lifting of the pin shaft is fixedly mounted on the outer surface of one side of the beam transport vehicle.
[0012] Furthermore, the pin shaft is connected and fixed to the beam transport mechanism through oil cylinder lifting.
[0013] Furthermore, a track is laid between the frame and the supporting frame, and the track and the sliding wheel are mutually matched structures.
[0014] Furthermore, the specific method of using the device integrating the bogie of the beam transport vehicle and the bridge erection and feeding beam mechanism is as follows:
[0015] S1: When transporting the pre-supported beam, fix the bearing frame on two beam transport vehicles, lift the pin shaft through the oil cylinder, so that the beam transport mechanism is connected and fixed with the beam transport vehicle, then fix the pre-supported beam on the bearing frame, and transport the pre-supported beam by the beam transport vehicle;
[0016] S2: When the pre-supported beam is transported to the designated position, the beam feeding operation is performed. The pin shaft is controlled to descend by the oil cylinder, so that the beam transport mechanism is separated from the beam transport vehicle. Then, under the sliding action of the sliding wheel on the track, the pre-supported beam is sent to the designated position to complete the beam feeding process.
[0017] Beneficial effects of the present invention:
[0018] The present invention can realize both rapid transportation of pre-supported beams and rapid feeding of pre-supported beams by means of the oil cylinder, the pin shaft and the beam transporting mechanism. The integrated mechanism is designed so that beam transportation and beam feeding can be completed continuously without the need for a conversion mechanism in between, thus saving time, improving efficiency and greatly improving the safety of the device. When in use, the carrier frame is fixed on two beam transporting vehicles and connected to the vehicle frame through the pin shaft, wherein the pin shaft can be controlled to rise and fall by the oil cylinder. When the pre-supported beam is to be transported, the pin shaft is lifted by the oil cylinder so that the beam transporting mechanism and the beam transporting vehicle are connected together, thereby realizing the beam transporting process; when the pre-supported beam is transported to the designated position, the pin shaft is controlled to descend by the oil cylinder so that the beam transporting mechanism and the beam transporting vehicle are out of contact, so that the beam transporting mechanism can deliver the pre-supported beam to the designated position through the rails on the beam transporting vehicle and the main beam mechanism, thereby completing the beam feeding process. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] The present invention will be further described below in conjunction with the accompanying drawings.
[0020] Figure 1 It is a schematic diagram of the structure of the present invention;
[0021] Figure 2 It is a structural schematic diagram of the beam transport vehicle in the present invention;
[0022] Figure 3 It is another structural schematic diagram of the beam transport vehicle in the present invention;
[0023] Figure 4 The present invention Figure 3 A partial enlarged view of
[0024] Figure 5 It is a partial view of the present invention.
[0025] In the figure: 1. beam transport vehicle; 101. vehicle frame; 102. traveling wheel; 2. beam transport mechanism; 201. oil cylinder; 202. pin shaft; 203. load-bearing frame; 204. track; 205. sliding wheel; 3. pre-supported beam; 4. main beam mechanism; 5. beam pier; 6. suspension frame. DETAILED DESCRIPTION
[0026] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0027] See also Figure 1-5 As shown, this embodiment provides a device integrating a beam transport vehicle bogie and a bridge erection beam feeding mechanism, comprising two beam transport vehicles 1, a pre-support beam 3, a main beam mechanism 4, a beam pier 5 and a suspension frame 6, wherein the main beam mechanism 4 and the beam transport vehicle 1 are both erected directly above the beam pier 5, the pre-support beam 3 is respectively connected and fixed to the two beam transport vehicles 1, and the suspension frame 6 is fixedly arranged on a side of the main beam mechanism 4 away from the beam transport vehicle 1;
[0028] The beam transport vehicle 1 comprises a frame 101 and a plurality of parallel running wheels 102 located on the outer surface of the lower end of the frame 101, and a beam transport mechanism 2 is fixedly installed on the outer surface of the upper end of the frame 101;
[0029] The beam transport mechanism 2 includes a support frame 203 and a sliding wheel 205 . The support frame 203 is fixedly mounted on the outer surface of the upper end of the frame 101 , and the sliding wheel 205 is movably connected to the inner side wall of the support frame 203 .
[0030] A pin shaft 202 is also movably mounted on the outer surface of the upper end of the beam transport vehicle 1 , and an oil cylinder 201 for controlling the lifting and lowering of the pin shaft 202 is fixedly mounted on the outer surface of one side of the beam transport vehicle 1 .
[0031] The pin shaft 202 is lifted by the oil cylinder 201 and connected and fixed to the beam transport mechanism 2 .
[0032] A track 204 is laid between the frame 101 and the carrier frame 203 , and the track 204 and the sliding wheel 205 are mutually matched structures.
[0033] The specific method of using the device integrating the bogie of the beam transport vehicle with the bridge erection and feeding beam mechanism is as follows:
[0034] S1: When transporting the pre-supported beam 3, the carrier frame 203 is fixed on the two beam transport vehicles 1, and the pin shaft 202 is lifted by the oil cylinder 201, so that the beam transport mechanism 2 is connected and fixed with the beam transport vehicle 1, and then the pre-supported beam 3 is fixed on the carrier frame 203, and the pre-supported beam 3 is transported by the beam transport vehicle 1;
[0035] S2: When the pre-supported beam 3 is transported to the designated position, the beam feeding operation is performed, and the pin shaft 202 is controlled to descend by the oil cylinder 201, so that the beam transport mechanism 2 is separated from the beam transport vehicle 1. Then, under the sliding action of the sliding wheel 205 on the track 204, the pre-supported beam 3 is sent to the designated position, completing the beam feeding process.
[0036] The present invention can realize fast transportation of pre-supported beam 3 and fast feeding of pre-supported beam 3 by setting oil cylinder 201 in cooperation with pin shaft 202 and beam transport mechanism 2. By designing the integrated mechanism, beam transportation and beam feeding can be completed continuously without the need for conversion mechanism in the middle, which saves time, improves efficiency and greatly improves the safety of the device. When in use, the carrier frame 203 is fixed on two beam transport vehicles 1 and connected to the vehicle frame 101 through pin shaft 202, wherein the pin shaft 202 can be controlled to rise and fall by oil cylinder 201. When the pre-supported beam 3 is to be transported, the pin shaft 202 is lifted by oil cylinder 201, so that the beam transport mechanism 2 and the beam transport vehicle 1 are connected together, thereby realizing the beam transportation process; when the pre-supported beam 3 is transported to the specified position, the pin shaft 202 is controlled to descend by oil cylinder 201, so that the beam transport mechanism 2 and the beam transport vehicle 1 are out of contact, so that the beam transport mechanism 2 can deliver the pre-supported beam 3 to the specified position through the rail 204 on the beam transport vehicle 1 and the main beam mechanism 4, thereby completing the beam feeding process.
[0037] The above contents are merely examples and explanations of the structure of the present invention. The technicians in this technical field may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the structure of the invention or exceed the scope defined by the claims, they should all fall within the protection scope of the present invention.
Claims
1. A device integrating a beam transport vehicle bogie and a bridge erection and feeding beam mechanism, characterized in that: The invention comprises two beam transport vehicles (1), a main beam mechanism (4) and a suspension frame (6), wherein the main beam mechanism (4) and the beam transport vehicle (1) are both mounted directly above the beam pier (5), the pre-supported beam (3) is respectively connected and fixed to the two beam transport vehicles (1), and the suspension frame (6) is fixedly mounted on a side of the main beam mechanism (4) away from the beam transport vehicle (1); The beam transport vehicle (1) comprises a vehicle frame (101) and a plurality of parallel running wheels (102) located on the outer surface of the lower end of the vehicle frame (101); a beam transport mechanism (2) is fixedly mounted on the outer surface of the upper end of the vehicle frame (101); The beam transport mechanism (2) comprises a bearing frame (203) and a sliding wheel (205); the bearing frame (203) is fixedly mounted on the outer surface of the upper end of the vehicle frame (101); and the sliding wheel (205) is movably connected to the inner side wall of the bearing frame (203); A pin shaft (202) is also movably mounted on the outer surface of the upper end of the beam transport vehicle (1), and an oil cylinder (201) for controlling the lifting and lowering of the pin shaft (202) is fixedly mounted on the outer surface of one side of the beam transport vehicle (1); The pin shaft (202) is lifted by the oil cylinder (201) and connected and fixed to the beam transport mechanism (2); A track (204) is laid between the vehicle frame (101) and the carrier frame (203), and the track (204) and the sliding wheel (205) are mutually matched structures; The beam transport mechanism (2) delivers the pre-supported beam (3) to a designated position via the beam transport vehicle (1) and the track (204) on the main beam mechanism (4), thereby completing the beam feeding process.
2. The device according to claim 1, wherein the bogie of the beam transport vehicle and the bridge erection and feeding beam mechanism are integrated, characterized in that: The specific method of using the device integrating the bogie of the beam transport vehicle with the bridge erection and feeding beam mechanism is as follows: S1: When transporting the pre-supported beam (3), the bearing frame (203) is fixed on two beam transport vehicles (1), and the pin shaft (202) is lifted by the oil cylinder (201) so that the beam transport mechanism (2) is connected and fixed to the beam transport vehicle (1), and then the pre-supported beam (3) is fixed on the bearing frame (203), and the pre-supported beam (3) is transported by the beam transport vehicle (1); S2: When the pre-supported beam (3) is transported to the designated position, the beam feeding operation is performed. The pin shaft (202) is controlled to descend by the oil cylinder (201), so that the beam transport mechanism (2) is separated from the beam transport vehicle (1). Then, under the sliding action of the sliding wheel (205) and the track (204), the beam transport mechanism (2) sends the pre-supported beam (3) to the designated position through the beam transport vehicle (1) and the track (204) on the main beam mechanism (4), thereby completing the beam feeding process.
Citation Information
Patent Citations
Box girder lifting device of girder transport carriage
CN101648535A
Bridge erecting unit with automatic bearing balancing function and method for erecting bridges by aid of bridge erecting unit
CN103590336A
Two-span type bridge girder erection machine
CN107858935A
Method for mounting beam guiding machine on beam erecting station
CN110273370A
Method for mounting monorail track beam, and its beam carrier and bridging machine
CN1272437A