A gas operation training and assessment device and assessment method thereof
By designing a gas operation training and assessment device and using multiple assessment units and sensors to simulate the operation of gas equipment, the problem of difficulty in mastering operating skills during training was solved, achieving efficient and intuitive training effects and reducing transportation costs.
Patent Information
- Application Number
- CN201910975976.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-10-15
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2039-10-15
AI Technical Summary
In gas operation training, candidates cannot master equipment operation skills effectively, intuitively, and quickly. Existing 3D software training cannot simulate physical operations, making it difficult to get started quickly in actual operations.
A gas operation training and assessment device is designed, including seven assessment units, which are used to simulate blind blind plates, pipes to stop gas supply, U-shaped water seals, fire maintenance in gas cabinets, vertical drainers, and electric blind plates. For valves and heating furnace gas deactivation and resumption operations, flange pipes, electric blind valves, infrared photoelectric sensors, magnetic switches and other components are used, combined with controllers and host computers for simulation and scoring.
It achieves clear detection and scoring of candidates' operation steps, ensuring the coherence and rationality of the operation steps. It also reduces the size and transportation cost of the equipment, improves examination efficiency, and supports multi-person online examinations.
Smart Images

Figure CN110634346B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of special operation assessment, and in particular to a gas operation training and assessment device and an assessment method thereof. Background Art
[0002] In the field of special operations, gas operations, as a high-risk industry, have always attracted much attention. During the operation of equipment, any slight operating error will lead to an accident, so it is particularly important to train gas operators;
[0003] At present, gas training and examinations are all conducted with 3D software, which makes it impossible to realize physical operation and feel the existence of the equipment intuitively. Even if you pass the examination, you still cannot quickly get started when you actually operate the gas equipment on site. In view of this, we have developed a proportional reduction based on the original gas equipment structure and principle without changing it, which not only ensures the authenticity of the equipment, but also reduces the weight, volume, transportation and installation costs. Summary of the invention
[0004] In view of the above-mentioned technical deficiencies, the purpose of the present invention is to provide a gas operation training and assessment device and an assessment method thereof, which solves the problem that candidates are unable to effectively, intuitively and quickly master the operating skills of gas equipment during training in this industry. The invention not only meets training needs, but also improves examination efficiency.
[0005] In order to solve the above technical problems, the present invention adopts the following technical solutions:
[0006] The present invention provides a gas operation training and assessment device, comprising a first assessment unit, a second assessment unit, a third assessment unit, a fourth assessment unit, a fifth assessment unit, a sixth assessment unit and a seventh assessment unit connected end to end in sequence, and a host computer connected to each assessment unit;
[0007] The first assessment unit is used to assess the operation of extracting and plugging the blind plate, and the first assessment unit includes a first fixing frame and at least two sections of flange pipes sequentially arranged on the first fixing frame; the first assessment unit also includes a detection device for detecting the existence of the blind plate between the two sections of flange pipe; the first fixing frame is also provided with a tool table, and the tool table is placed with tools for operating the extraction and plugging of the blind plate;
[0008] The second assessment unit is used to assess the operation of stopping gas delivery in the pipeline. The second assessment unit includes a second fixing frame and at least three sections of flange pipes sequentially arranged on the second fixing frame, wherein a section of the flange pipe in the middle is provided with two manholes and a proximity switch for detecting the opening and closing of the corresponding manholes, and the flange pipes connected to both ends of the section of the flange pipe are respectively provided with an electric blind plate valve and two infrared photoelectric sensors for detecting the opening and closing of the corresponding electric blind plate valves, and an induced draft fan is provided at one of the two manholes;
[0009] The third assessment unit is used to assess the U-shaped water seal operation, and the third assessment unit includes a third fixing frame and a V-shaped pipe arranged on the third fixing frame, the V-shaped pipe is connected to a sewage tank and a water supply pipe, and the sewage tank is connected to a trapezoidal pipe; the water supply pipe is provided with a water supply valve and an infrared photoelectric sensor for detecting the opening and closing of the water supply valve, the trapezoidal pipe is provided with a drain valve for detecting the opening and closing of the drain valve, and the drain valve is also connected to a dial switch;
[0010] The fourth assessment unit is used to assess the hot work inspection and maintenance operation in the gas tank. The fourth assessment unit includes a fourth fixing frame and a gas tank. Both sides of the gas tank are connected with a plurality of flange pipes connected end to end. One end of the V-shaped pipe is connected with the flange pipe on the second assessment unit, and the other end of the V-shaped pipe is connected with the flange pipe on the fourth assessment unit. A section of the flange pipes on both sides of the gas tank is provided with an electric blind plate valve and an infrared photoelectric sensor for detecting the opening and closing of the corresponding electric blind plate valve. The gas tank is provided with a manhole and a proximity switch for detecting the opening and closing of the manhole. An induced draft fan is provided at the manhole of the gas tank.
[0011] The fifth assessment unit is used to assess the operation of the vertical drainer, and the fifth assessment unit includes a fifth fixing frame, a flange pipe arranged on the fifth fixing frame, and a vertical drainer connected to the flange pipe; the vertical drainer on the fifth assessment unit is connected to the flange pipe of the fifth assessment unit; the vertical drainer includes a cylinder, on which a water inlet pipe, a sampling pipe, a high-pressure sealing cap and a low-pressure sealing cap are arranged, a sampling valve is arranged on the sampling pipe, a water inlet valve is arranged on the water inlet pipe, a branch pipe is also arranged at the bottom of the cylinder, a sewage valve is arranged on the branch pipe, a manhole is also arranged on the cylinder, a proximity switch for detecting the opening and closing of the manhole is arranged in the manhole, the sampling valve, the water inlet valve and the sewage valve are all provided with a magnetic control switch for detecting the opening and closing of the valve, and the high-pressure sealing cap and the low-pressure sealing cap are also provided with a magnetic control switch for detecting the opening and closing of the high-pressure sealing cap and the low-pressure sealing cap;
[0012] The sixth assessment unit is used to assess the operation of the electric blind plate valve. The sixth assessment unit includes a sixth fixing frame and several sections of connected flange pipes arranged on the sixth fixing frame. One section of the flange pipe on the sixth assessment unit is provided with an electric blind plate valve; a blind hole and a through hole are provided on the electric blind plate of the sixth assessment unit. Two proximity switches are provided on the sixth assessment unit, which are respectively used to detect the positions of the blind hole and the through hole of the electric blind plate valve. A pressure sensor is also provided in the electric blind plate valve to detect the clamping degree of the electric blind plate valve;
[0013] The seventh assessment unit is used to assess the gas decommissioning and recommissioning operation of the heating furnace. The seventh assessment unit includes a seventh fixing frame, a heating furnace, a plurality of interconnected flange pipes and a U-shaped pipe. The heating furnace is connected to the flange pipe on the seventh assessment unit through an air intake pipe; the air intake pipe is provided with a manual butterfly valve and a relief valve, and the manual butterfly valve is provided with a magnetically controlled switch for detecting the opening and closing of the manual butterfly valve; an ignition tube is provided above the heating furnace, an igniter is hung outside the ignition tube, a proximity switch is provided inside the ignition tube, a combustion-supporting tube is connected to the ignition tube through a butterfly valve, and a combustion-supporting fan is provided inside the combustion-supporting tube;
[0014] The assessment device also includes a controller for collecting information of each assessment unit, and the controller is electrically connected to the upper machine.
[0015] Preferably, there are seven controllers, and the seven controllers correspond one by one to the first assessment unit, the second assessment unit, the third assessment unit, the fourth assessment unit, the fifth assessment unit, the sixth assessment unit and the seventh assessment unit respectively; the controller is an STM32F103C8T6 chip, and the controller is wired by assigning different address codes through RS-485, and finally connected to the host computer through USB-485.
[0016] Preferably, the flange pipe of the fifth test unit is connected to the vertical drainer on the fifth test unit through a capillary tube, two butterfly valves are arranged on the capillary tube, and a sampling tube connected to the capillary tube is arranged between the two butterfly valves; a sewage pipe, a main water pipe and a nitrogen pipe are arranged at the bottom of the fifth fixed frame, two branch pipes connected to the sewage pipe are arranged at the bottom of the cylinder, and two manholes are arranged on the cylinder;
[0017] The fifth assessment unit is also provided with a water injection pipe, on which a water supply valve and a check valve are sequentially provided, and the water supply valve is provided with a magnetically controlled switch for detecting the opening and closing of the water supply valve.
[0018] Preferably, the first test unit includes two sections of interconnected flange pipes, the second test unit includes six sections of interconnected flange pipes, the two sections of the flange pipes of the first test unit are connected through a butterfly valve, the second section of the flange pipe of the first test unit is connected to the first section of the flange pipe of the second test unit, and a detachable gasket is provided between the second section of the flange pipe of the first test unit and the butterfly valve on the first test unit;
[0019] The detection device of the first test unit includes an infrared photoelectric sensor arranged on the inner wall of the second section of the flange pipe of the first test unit, and a proximity switch arranged on the outer wall of the flange pipe, and a proximity switch is also arranged on the outer wall of the butterfly valve of the first test unit; a plurality of tool grooves and ring grooves for placing gaskets are respectively arranged on the workbench, and infrared photoelectric sensors are arranged at the bottom of the tool grooves and the ring grooves;
[0020] The first section of the flange pipe of the second assessment unit is connected to the second section of the flange pipe of the second assessment unit through a butterfly valve, two relief valves are provided on the fourth section of the flange pipe of the second assessment unit, and a relief valve is provided on the second section of the flange pipe and the sixth section of the flange pipe of the second assessment unit. The sixth section of the flange pipe of the second assessment unit is connected to the third assessment unit through a butterfly valve, and a purge valve is connected to the first section of the flange pipe of the second assessment unit; the third section of the flange pipe and the fifth section of the flange pipe of the second assessment unit are both provided with electric blind valves;
[0021] The fourth section flange pipe of the second assessment unit is provided with two manholes and an induced draft fan, and the induced draft fan is provided with a switch; the second assessment unit is provided with a vertical drainer, and the vertical drainer on the second assessment unit is connected with the fourth section flange pipe of the second assessment unit, and the connection between the two relief valves on the fourth section flange pipe of the second assessment unit and the fourth section flange pipe and the sampling tube on the vertical drainer on the second assessment unit are provided with a dial switch; the fourth section flange pipe of the second assessment unit is also provided with a purge valve, and the purge valve is provided with a proximity switch;
[0022] The relief valve, purge valve and electric blind valve in the second assessment unit are all provided with infrared photoelectric sensors for detecting the opening and closing of the valves;
[0023] The second test unit is also provided with a vertical drainer, and the vertical drainer on the second test unit is connected to the flange pipe with a manhole on the second test unit.
[0024] The butterfly valve on the first assessment unit and the butterfly valve on the second assessment unit are also provided with a magnetically controlled switch for detecting the opening and closing degree of the butterfly valve.
[0025] Preferably, the V-shaped pipe of the third assessment unit is connected with the second assessment unit and the fourth assessment unit through a right-angle pipe, the water supply pipe is provided with a water supply valve connected to a check valve, both ends of the water supply valve are connected with a bypass pipe, the bypass pipe is provided with a bypass water supply valve, and the bypass water supply valve is provided with a magnetically controlled switch sensor for detecting the opening and closing of the bypass water supply valve.
[0026] Preferably, the fourth assessment unit includes six sections of flange pipes, wherein the third section of the flange pipe and the fourth section of the flange pipe of the fourth assessment unit are respectively connected to the gas inlet end and the gas outlet end of the gas holder, and the first section of the flange pipe and the sixth section of the flange pipe of the fourth assessment unit are both connected to a butterfly valve; the first section of the flange pipe of the fourth assessment unit is connected to the third assessment unit through the butterfly valve thereon, and the sixth section of the flange pipe of the fourth assessment unit is connected to the seventh assessment unit through the butterfly valve thereon;
[0027] The first section flange pipe, the third section flange pipe and the fourth section flange pipe of the fourth assessment unit are all provided with relief valves, and the fourth section flange pipe of the fourth assessment unit is also provided with a purge valve;
[0028] The second section flange pipe and the fifth section flange pipe of the fourth assessment unit are both provided with electric blind valves;
[0029] The relief valve and the purge valve in the fourth assessment unit are both provided with an infrared photoelectric sensor for detecting the opening and closing of the valves, and the purge valve on the fourth section of the flange pipe of the fourth assessment unit is also provided with a proximity switch; the relief valves on the third section of the flange pipe and the fourth section of the flange pipe of the fourth assessment unit are both provided with a dial switch, and the dial switch is located at the connection between the relief valve and the flange pipe;
[0030] An induced draft fan is hung above the manhole of the gas cabinet, and a switch is arranged on the induced draft fan; a pressure gauge is arranged on the gas cabinet; a sampling tube is also connected to the gas cabinet, and a dial switch is connected to the sampling tube.
[0031] Preferably, the sixth assessment unit includes four sections of interconnected flange pipes, the first section of the flange pipe of the sixth assessment unit is connected to the fifth assessment unit, the first section of the flange pipe of the sixth assessment unit is connected to the second section of the flange pipe of the sixth assessment unit through a butterfly valve, the third section of the flange pipe of the sixth assessment unit is provided with an electric blind valve, the first section of the flange pipe, the third section of the flange pipe and the fourth section of the flange pipe of the sixth assessment unit are each provided with a relief valve, the fourth section of the flange pipe of the sixth assessment unit is also provided with a purge valve, and the relief valve on the fourth section of the flange pipe of the sixth assessment unit is connected to a dip switch at the connection between the flange pipe and the relief valve.
[0032] Preferably, the seventh assessment unit comprises four sections of interconnected flange pipes, the first section of the flange pipe of the seventh assessment unit is connected to the sixth assessment unit, the first section of the flange pipe of the seventh assessment unit is connected to the second section of the flange pipe of the seventh assessment unit through a butterfly valve, and the third section of the flange pipe of the seventh assessment unit is provided with an electric blind valve; the first section of the flange pipe, the second section of the flange pipe, and the fourth section of the flange pipe of the seventh assessment unit are each provided with a relief valve, and the fourth section of the flange pipe of the seventh assessment unit is also provided with a purge valve, and the purge valve is provided with a proximity switch;
[0033] The fourth section of the flange pipe of the seventh test unit is connected to the U-shaped pipe through a butterfly valve, and the U-shaped pipe is connected to four sections of air intake pipes, which are distributed on both sides of the heating furnace in pairs and are connected to the heating furnace. A manual butterfly valve and a relief valve are provided on each section of the air intake pipe, and a switch is provided on the combustion-supporting fan;
[0034] A manhole is provided on each side of the heating furnace, and a furnace inlet and outlet door and a chimney are also provided on the heating furnace. The chimney is connected to the heating furnace through a butterfly valve;
[0035] The relief valve, purge valve and electric blind valve in the seventh assessment unit are all provided with infrared photoelectric sensors for detecting the opening and closing of the valves. The butterfly valve in the seventh assessment unit is provided with a magnetic control switch for detecting the opening and closing degree of the butterfly valve. The manual butterfly valve in the seventh assessment unit is provided with a magnetic control switch for detecting the opening and closing of the manual butterfly valve; the manhole and the inlet and outlet furnace doors of the heating furnace are all provided with proximity switches;
[0036] A dip switch is provided on the vent valve on the second section flange pipe and the fourth section flange pipe of the seventh assessment unit, a dip switch is connected to the two air inlet pipes away from the sixth assessment unit, and a dip switch is also connected to the heating furnace.
[0037] Preferably, the assessment method collects signals from the detection devices of each assessment unit during the examinee's operation, scores each step of each assessment item in sequence, and determines whether the examinee is qualified based on the score; the assessment method includes two assessment modes, a computer simulation test and a practical test; in the computer simulation test mode, the host computer generates operation animations step by step according to the assessment items, and each operation animation is matched one by one with the scoring item.
[0038] Preferably, the following steps are included: Step 1: The host computer receives an instruction sent by the administrator, and the host computer enters a corresponding assessment mode according to the instruction of the administrator, including randomly generating one of the two assessment modes or specifying a certain assessment mode. In each assessment mode, the host computer can generate scoring items for one assessment unit or all assessment units according to the candidate's choice;
[0039] Step 2: Candidates take the corresponding test according to the assessment mode generated by the host computer. If a mock test is conducted, candidates answer questions according to the operation animation generated by the host computer. The operation steps of the answers will be compared with the corresponding scoring items, and the host computer will calculate the candidate's score based on the comparison results. If a practical test is conducted, the host computer receives the signal from the controller of the corresponding assessment unit, and then compares it with the scoring items. The host computer calculates the candidate's score based on the comparison results.
[0040] The beneficial effects of the present invention are:
[0041] (1) The gas assessment device of the present invention is mainly capable of detecting whether the examinee can clearly know the operating steps of each section. The valve opening detection function is added to the switch detection of the butterfly valve, so as to meet the function of slightly opening the butterfly valve in the test steps, thereby realizing the continuity and rationality of the entire operation steps. At the same time, while ensuring the original real gas function, the size ratio is coordinated and can be realistic in the scene. Since each work section is designed independently, the transportation cost is greatly reduced. At the same time, the test system can be used by multiple people to take the test online, shortening the test time and improving the test efficiency.
[0042] (2) The controller main chip of the present invention adopts STM32F103C8T6. Since the controller requires more signals, with a maximum of 48 signals in one section, it is costly to use a multi-pin MCU. The present invention adopts an external expansion 165 to increase the number of input pins, which effectively solves the problem of conflict in simultaneous communication between a computer and multiple controllers, thereby enabling a computer to control 7 sections of gas operation respectively. BRIEF DESCRIPTION OF THE DRAWINGS
[0043] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0044] Figure 1 A schematic diagram of the structure of a gas operation training and assessment device provided by an embodiment of the present invention;
[0045] Figure 2 This is a structural diagram of the first assessment unit;
[0046] Figure 3 It is a partial top view of the first assessment unit;
[0047] Figure 4 for Figure 3Enlarged view of part A in the middle;
[0048] Figure 5 This is a structural diagram of the second assessment unit;
[0049] Figure 6 This is a structural diagram of the third assessment unit;
[0050] Figure 7 This is a structural diagram of the fourth assessment unit;
[0051] Figure 8 This is a structural diagram of the fifth assessment unit;
[0052] Fig. 9 This is a structural diagram of the sixth assessment unit;
[0053] Fig.10 This is the structural diagram of the seventh assessment unit;
[0054] Fig.11 It is the structural diagram of the controller;
[0055] Fig.12 The structure of the expansion module is shown in Figure 1. Figure 1 ;
[0056] Fig.13 The structure of the expansion module is shown in Figure 1. Figure 2 ;
[0057] Fig.14 The structure of the expansion module is shown in Figure 1. Figure 3 ;
[0058] Fig.15 The dial diagram of the DIP switch Figure 1 ;
[0059] Fig.16 The dial diagram of the DIP switch Figure 2 ;
[0060] Fig.17 The dial diagram of the DIP switch Figure 3 ;
[0061] Fig.18 The dial diagram of the DIP switch Figure 4 ;
[0062] Fig.19 The dial diagram of the DIP switch Figure 5 ;
[0063] Fig. 20 The structure diagram of the electric blind plate valve Figure 1 ;
[0064] Fig.21 The structure diagram of the electric blind plate valve Figure 2 ;
[0065] Fig. 22 A schematic diagram of the assessment method.
[0066] Description of the accompanying drawings: 1-first assessment device, 11-first fixed frame, 2-second assessment device, 21-second fixed frame, 22-turntable, 3-third assessment device, 31-third fixed frame, 32-V-shaped pipe, 33-right-angle pipe, 34-drain box, 341-water seal drain valve, 35-trapezoidal pipe, 351-drain valve, 36-water pipe, 37-bypass pipe, 4-fourth assessment device, 41-fourth fixed frame, 42-gas cabinet, 421-pressure gauge, 5-fifth assessment device, 51-fifth fixed frame, 52-cylinder, 521-branch pipe, 522-low pressure sealing cap, 523-high pressure sealing cap, 524-water inlet pipe, 525-manhole, 526 -sampling tube, 53-thin tube, 6-sixth test device, 61-sixth fixed frame, 7-seventh test device, 71-seventh fixed frame, 72-heating furnace, 721-inlet pipe, 722-manual butterfly valve, 723-chimney, 724-inlet and outlet furnace doors, 73-ignition tube, 74-combustion-supporting tube, 8-flange tube, 9-butterfly valve, 101-release valve, 102-purge valve, 103-electric blind plate valve, 1031-blind hole, 1032-through hole, 1033-clamping sleeve, 104-check valve, 105-water supply valve, 106-drain valve, 107-induced draft fan, 108-sampling valve, 201-drain pipe, 202-nitrogen pipe, 203-main water pipe. DETAILED DESCRIPTION
[0067] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0068] Example
[0069] like Figure 1As shown, the present invention provides a gas operation training and assessment device. According to the "Gas Operation Safety Technical Training Outline and Assessment Standards" of the former State Administration of Work Safety, the device includes seven assessment units, namely the first assessment unit 1, the second assessment unit 2, the third assessment unit 3, the fourth assessment unit 4, the fifth assessment unit 5, the sixth assessment unit 6 and the seventh assessment unit 7, which can realize the extraction and plugging of the blind plate K23 (corresponding to the first assessment unit 1), the pipeline gas delivery K31 (corresponding to the second assessment unit 2), the U-shaped water seal operation K22 (corresponding to the third assessment unit 3), the container hot maintenance K33 (corresponding to the fourth assessment unit 4), the vertical drain K21 (corresponding to the fifth assessment unit 5), the electric blind plate valve K24 (corresponding to the sixth assessment unit 6), and the heating furnace gas shutdown and re-commissioning K32 (corresponding to the seventh assessment unit 7); the seven assessment units are arranged in sequence, and each assessment unit is provided with a controller for receiving the detection information of the sensor in the assessment unit;
[0070] In addition, since some assessment units need to be provided with a sewage pipe 201, a main water pipe 203 and a nitrogen pipe 202, in actual manufacturing, in order to facilitate the unification and true simulation of each assessment unit, in this embodiment, a sewage pipe 201, a main water pipe 203 and a nitrogen pipe 202 are provided in each assessment unit;
[0071] The controller is an STM32F103C8T6 chip. Since the controller requires more signals, the external expansion 165 is used to increase the number of input pins. At the same time, multiple controllers are connected using RS-485 to assign different address codes for wiring and time-sharing reading. Finally, they are connected to the host computer (computer) through USB-485, which effectively solves the problem of simultaneous communication conflicts between one computer and multiple controllers, thereby realizing that one computer can control seven assessment units of gas operation separately; Figures 11 to 14 The controller and expansion module of each assessment unit are the same. Since each assessment unit requires a different number of access points, the number of expansion modules required by each assessment unit is also different. The drawings of this application only show three expansion modules, which does not mean that each controller must be equipped with three modules. If a certain assessment unit requires fewer access pins, for example, the third assessment unit 3 described below only requires one expansion module, while the seventh assessment unit 7 requires more than three expansion modules.
[0072] like Figure 2As shown, the first assessment unit 1 is used to assess the operation of extracting and plugging the blind plate (K23). The first assessment unit 1 includes a first fixing frame 11 and two sections of flange pipes 8 connected end to end and sequentially arranged on the first fixing frame 11. The first fixing frame 11 is also provided with a tool bench, and tools for operating the extraction and plugging blind plate are placed on the tool bench; the two sections of flange pipes 8 of the first assessment unit 1 are connected through a butterfly valve 9, and the butterfly valve 9 on the first assessment unit 1 is provided with a magnetically controlled switch for detecting the opening and closing degree of the butterfly valve 9, as shown in FIG. Figure 3 and Figure 4 As shown, when the butterfly valve 9 is opened or closed, the turntable thereon is provided with a permanent magnet, and three reed switches a, b, and c of the magnetically controlled switch are provided on the butterfly valve 9, which respectively represent the closing, slightly opening, and fully opening of the butterfly valve 9 (when the butterfly valve itself is rotating, there will be a turntable thereon to follow the rotation, that is, the present application utilizes the existing structure of the butterfly valve and provides a magnetically controlled switch thereon, thereby realizing the detection of the opening and closing degree). In addition, it should be noted that in the present application, the opening of the butterfly valve 9 refers to the full opening of the butterfly valve 9 (the butterfly valve 9 in the other assessment units described below is the same as the butterfly valve 9 in the first assessment unit); a detachable gasket is provided between the second section flange pipe 8 of the first assessment unit 1 and the butterfly valve 9 on the first assessment unit 1, and the first detection device in the first assessment unit 1 includes an infrared photoelectric sensor (such as Figure 2 C1), a proximity switch (such as Figure 2 C2), a proximity switch (such as Figure 2 C3); the workbench is respectively provided with a plurality of tool slots and ring slots for placing washers (the specific size and structure of the tool slots and the ring slots are not limited in this application, as long as they can hold the corresponding tools), two ring slots are provided, a washer is placed on each ring slot, respectively named as washer Ⅰ and washer Ⅱ, and infrared photoelectric sensors are provided at the bottom of the tool slots and the ring slots; wherein the workbench is provided with tools for assessing K23, including a lime water bottle, a crowbar, and a Bajin shovel, these tools are placed in the corresponding tool slots, and the infrared photoelectric sensors in the tool slots detect whether these tools are removed and put back; when conducting the K23 assessment, the sensor in the first assessment unit 1 sends the detection signal to the controller in the assessment unit, and then the controller sends the detection result to the host computer for scoring and assessment;
[0073] The assessment steps of K23 are as follows. The full score of this assessment is 80 points, which is divided into blind plate blocking and blind plate extraction. For the convenience of description:
[0074] 1. Blind plate operation (40 points in total)
[0075]
[0076] 2. Blind plate extraction operation (40 points in total)
[0077]
[0078] The detection of the fastening bolts is sensed by the proximity switch C3 arranged on the outer wall of the butterfly valve 9 of the first assessment unit 1. The sensing distance is adjusted in advance. When the fastening bolts are inserted into the fixing holes of the butterfly valve 9 and the second section flange pipe 8, C3 will sense it. The withdrawal and insertion of the blind plate are detected by the infrared photoelectric sensor C1 on the inner wall of the second section flange pipe 8, that is, the blind plate will block C1 after being inserted, thereby realizing the detection. The correctness of the insertion position of the blind plate and the gasket is sensed by the proximity switch C2 on the outer wall of the second section flange pipe 8. Figure 2 When the blind plate is inserted to the left and the gasket is on the right, it is an incorrect placement method. At this time, C2 will not be blocked. The distance of the infrared photoelectric sensor has been adjusted in advance and can only be sensed when the blind plate is on the right and the gasket is on the left. The assessment system determines whether the candidate has followed the above steps based on the signal collected by the controller in the first assessment unit 1. If the candidate does not follow the above steps, zero points will be given. For example, in blocking the blind plate, step ③ is missing, which means that the sensor used to detect whether the lime water bottle is removed has not sent a signal.
[0079] like Figures 11 to 14 , the sensor connection relationship in the first assessment unit 1 is as follows:
[0080] Magnetic switch for butterfly valve closing detection, connected to in1;
[0081] Magnetic switch for butterfly valve half-open detection, connected to in2;
[0082] Magnetic switch for butterfly valve full opening detection, connected to in3;
[0083] Infrared photoelectric sensor C1 for blind plate detection, connected to in4
[0084] The position and correctness of insertion of the blind plate and the gasket are detected by infrared photoelectric sensor C2, connected to in5;
[0085] Infrared photoelectric sensor C3 for bolt detection, connected to in6;
[0086] Infrared photoelectric sensor for lime water detection, connected to in7;
[0087] Infrared photoelectric sensor for Bajin shovel detection, connected to in8;
[0088] Infrared photoelectric sensor for crowbar detection, connected to in9;
[0089] Infrared photoelectric sensor for gasket Ⅰ detection, connected to in10;
[0090] Infrared photoelectric sensor for gasket II detection, connected to in11.
[0091] like Figure 5 As shown, the second assessment unit 2 is used to assess the operation of stopping gas supply in the pipeline (K31), and the second assessment unit 2 includes a second fixing frame 21 and six sections of interconnected flange pipes 8 arranged in sequence on the second fixing frame 21; the first section of the flange pipe 8 on the second assessment unit 2 is connected to the second section of the flange pipe 8 on the first assessment unit 1; the first section of the flange pipe 8 of the second assessment unit 2 is connected to the second section of the flange pipe 8 of the second assessment unit 2 through a butterfly valve 9, and the sixth section of the flange pipe 8 of the second assessment unit 2 is connected to the third assessment unit 3 through the butterfly valve 9, and a purge valve 102 is connected to the first section of the flange pipe 8 of the second assessment unit 2, and the structure of the butterfly valve 9 on the second assessment unit 2 is the same as that of the butterfly valve 9 in the first assessment unit 1; the third section of the flange pipe 8 and the fifth section of the flange pipe 8 of the second assessment unit 2 are both provided with electric blind plate valves 103. Since the second assessment unit 2 is mainly used for assessing K31, the assessment of the electric blind plate valve 103 is placed in the sixth assessment unit 6, wherein the structure of the electric blind plate valve 103 of the second assessment unit 2 is the same as that of the electric blind plate valve 103 in the sixth assessment unit 6 (the electric blind plate valve 103 on other assessment units is also the same as the electric blind plate valve 103 in the sixth assessment unit 6, and the electric blind plate valve 103 in the sixth assessment unit 6 please refer to the sixth assessment unit 6 below). Due to different assessment focuses, the detection method of the electric blind plate valve 103 is adjusted, that is, except for the electric blind plate valve 103 in the sixth assessment unit 6, the detection of other electric blind plate valves 103 uses an infrared photoelectric sensor to detect whether the electric blind plate valve 103 is open or closed. The infrared photoelectric sensor is arranged in the electric blind plate valve 103. When the blind hole of the electric blind plate valve 103 blocks the flange pipe 8, the infrared photoelectric sensor is blocked, thereby sensing whether the electric blind plate valve 103 is closed;
[0092] The fourth section flange pipe 8 of the second test unit 2 is provided with two manholes 525 and an induced draft fan (the induced draft fan is a model of a real induced draft fan, and the same is true for the induced draft fan in the fourth test unit 4 described below). The manhole 525 is provided with a proximity switch for detecting the opening and closing of the manhole 525. The induced draft fan is provided with a switch. The induced draft fan is located at Figure 5 The right side of the manhole 525 on the left side (in actual operation, the role of the induced draft fan is to be placed on the manhole 525 to exhaust air to prevent the staff from being poisoned); the second assessment unit 2 is provided with a vertical drainer, wherein the fifth assessment unit 5 is also provided with a vertical drainer, and the vertical drainers in the two assessment units have the same structure. Since the second assessment unit 2 is mainly used to assess K31, the assessment items on the vertical drainer are placed in the fifth assessment unit 5;
[0093] The vertical drain includes a cylinder 52, on which is disposed a water inlet pipe 524, a sampling tube 526, a high-pressure sealing cap 523 and a low-pressure sealing cap 522. The vertical drain is connected to the corresponding flange pipe 8 through a capillary 53, the sampling tube 526 is connected to the capillary 53, a sampling valve 108 is disposed on the sampling tube 526, and a magnetically controlled switch is disposed on the sampling valve 108 for detecting the opening and closing of the valve, the water inlet pipe 524 is provided with a water inlet valve, the water inlet valve is provided with a magnetically controlled switch for detecting the opening and closing of the water inlet valve, the high-pressure sealing cap 523 and the low-pressure sealing cap 526 are connected to the capillary 53, and the sampling tube 526 is connected to the capillary 53. 2 are provided with magnetically controlled switches for detecting the opening and closing of the high-pressure sealing cap 523 and the low-pressure sealing cap 522; the bottom of the cylinder 52 is also provided with two branch pipes connected to the sewage pipe 201, and the branch pipes are provided with sewage valves 106, and the sewage valves 106 are provided with magnetically controlled switches for detecting the opening and closing of the sewage valves; the cylinder 52 is also provided with two manholes 525, and the manholes 525 are provided with proximity switches for detecting the opening and closing of the manholes 525; since the second assessment unit 2 is mainly used for assessing K31, the sensor on the vertical drain in the second assessment unit 2 is not connected to the controller of the second assessment unit 2;
[0094] The vertical drainer on the second assessment unit 2 is connected to the fourth section flange pipe 8 of the second assessment unit 2 through a capillary tube 53. Two relief valves 101 are provided on the fourth section flange pipe 8 of the second assessment unit 2. A relief valve 101 is provided on the second section flange pipe 8 and the sixth section flange pipe 8 of the second assessment unit 2. A dial switch is provided on the sampling tube 526 on the vertical drainer on the second assessment unit 2 and at the connection between the two relief valves 101 on the fourth section flange pipe 8 of the second assessment unit 2 and the fourth section flange pipe 8; a purge valve 102 is also provided on the fourth section flange pipe 8 of the second assessment unit 2, and a proximity switch is provided on the outside of the purge valve 102;
[0095] A sewage pipe 201, a main water pipe 203 and a nitrogen pipe 202 are arranged at the bottom of the second fixed frame. A purge valve 102 connected to the nitrogen pipe 202 is also arranged on the second assessment unit 2. The purge valve 102 is connected to the purge valve 102 on the fourth section flange pipe 8 through a purge pipeline (the proximity switch on the purge valve 102 on the fourth section flange pipe 8 is used to detect whether the purge pipeline is connected. The relief valve 101, the purge valve 102 in the second assessment unit 2 and the electric blind plate valve 103 in the second assessment unit 2 are all provided with infrared photoelectric sensors for detecting the opening and closing of the valve (because the pipeline will be blocked when the valve is closed, a sensor can be arranged inside the valve. When the valve is closed, the valve will block the sensor, thereby realizing detection); when the K31 assessment is performed, the sensor in the second assessment unit 2 sends the detection signal to the controller in the assessment unit, and then the controller sends the detection result to the host computer for scoring and assessment;
[0096] The assessment steps of K31 are as follows. The full score of this assessment is set to 40 points, which is divided into pipeline gas stopping operation and pipeline gas delivery operation; for the convenience of description, the butterfly valve connected to the first section of the flange pipe of the second assessment unit is named Butterfly Valve I, and the butterfly valve connected to the sixth section of the flange pipe is named Butterfly Valve II; the two manholes on the fourth section of the flange pipe of the second assessment unit are named Manhole I and Manhole II in the direction away from Butterfly Valve I; the electric blind valve on the third section of the flange pipe of the second assessment unit is named Electric Blind Valve I, and the electric blind valve on the fifth section of the flange pipe is named Electric Blind Valve II; the relief valve on the second section of the flange pipe in the second assessment unit is named Relief Valve I, and the two relief valves on the third section are named Relief Valve II and Relief Valve III in the direction away from Relief Valve I; the purge valve on the fourth section of the flange pipe of the second assessment unit is named Purge Valve II, and the Purge Valve II will pass through the pipe The pipeline is connected to the nitrogen pipe, so a purge valve is also provided on the nitrogen pipe (named as purge valve I); the relief valve II on the fourth section flange pipe of the second assessment unit and the connection between the relief valve III and the third section flange pipe are respectively provided with a dial switch, and a dial switch is also provided on the sampling pipe in the second assessment unit. The sampling valve on the sampling pipe in the second assessment unit is named sampling valve I (the valve is located in front of the sampling valve dial switch and is used to control whether the airflow can pass into the dial switch). The dial switch forms a monitoring point, and the relief valve II, relief valve III and the dial switches on the sampling valve pipe are named monitoring point I, monitoring point II and monitoring point III respectively. In order to realize real simulation, the dial switches on monitoring point I, monitoring point II and monitoring point III are selected from rotary dial switches (rotary dial switches are existing technology and will not be described in detail here), thereby simulating a dial, and the shape of the dial is as follows Fig.15 As shown, it is provided with four gears, which respectively represent the four positions in the figure;
[0097] 1. Operation of stopping pipeline gas (20 points in total)
[0098]
[0099] 2. Operation of pipeline gas delivery (20 points in total)
[0100]
[0101] The opening and closing detection of the butterfly valve is sensed by the magnetic control switch thereon, the opening and closing status of the electric blind plate valve, the vent valve and the purge valve are sensed by the infrared photoelectric sensor thereon, the opening and closing of the manhole is sensed by the proximity switch, the opening and closing of the induced draft fan is judged by the switch thereon, and whether the purge pipe is connected is judged by the proximity switch on the purge valve on the fourth section flange pipe of the second assessment unit; the assessment system determines whether the examinee has followed the above steps based on the signal collected by the controller in the second assessment unit. If not, zero points will be given. For example, in the eighth step of the pipeline gas delivery operation, if the examinee does not operate this step or the butterfly valve is fully opened, it means that the magnetic control switch of the butterfly valve in step eighth detects a slightly open position, and the score of this step is zero.
[0102] like Figures 11 to 14 , the sensor connection relationship in the second assessment unit is as follows:
[0103] Magnetic switch for butterfly valve I slightly open detection, connected to in1;
[0104] Magnetic switch for butterfly valve I full opening detection, connected to in2;
[0105] Magnetic switch for butterfly valve I closing detection, connected to in3;
[0106] Magnetic switch for butterfly valve II closing detection, connected to in4;
[0107] Magnetic switch for butterfly valve II micro-opening detection, connected to in5;
[0108] Magnetic switch for butterfly valve II full opening detection, connected to in6;
[0109] Infrared photoelectric sensor for electric blind valve Ⅰ detection, connected to in7;
[0110] Infrared photoelectric sensor for electric blind valve II detection, connected to in8
[0111] Infrared photoelectric sensor for purge valve Ⅰ detection, connected to in9;
[0112] Infrared photoelectric sensor for purge valve II detection, connected to in10;
[0113] Infrared photoelectric sensor for relief valve II detection, connected to in11
[0114] Infrared photoelectric sensor for relief valve III detection, connected to in12;
[0115] Proximity switch for manhole Ⅰ detection, connected to in13;
[0116] Draft fan switch, connected to in14;
[0117] Proximity switch for manhole II detection, connected to in15;
[0118] Magnetic switch for sampling valve detection, connected to in16;
[0119] Proximity switch for purge pipe connection detection, connected to in17;
[0120] The dip switch of monitoring point Ⅰ is connected to in18;
[0121] The dip switch of monitoring point II is connected to in18;
[0122] The dip switch of monitoring point III is connected to in19.
[0123] like Figure 6 As shown, the third assessment unit 3 is used to assess the U-shaped water seal operation (K22), and the third assessment unit 3 includes a third fixing frame 31 and a V-shaped pipe 32 arranged on the third fixing frame 31, and a sewage pipe 201, a main water pipe 203 and a nitrogen pipe 202 are arranged at the bottom of the third fixing frame 3, and a sewage box 34 and an upper water pipe 36 are connected to the V-shaped pipe 31, and a trapezoidal pipe 35 is connected to the sewage box 34, wherein the upper water pipe 36 is connected to the main water pipe 203, and a drain valve 351 is arranged on the trapezoidal pipe 35, and water is discharged into the sewage pipe 201 through the drain valve 351; The V-shaped pipe 32 of the core unit 3 is connected to the second assessment unit 2 and the fourth assessment unit 4 through a right-angle pipe 33. The water supply pipe 36 is provided with a water supply valve 105 and a check valve 104. The two ends of the water supply valve 105 are connected with a bypass pipe 37. The bypass pipe 37 is provided with a bypass water supply valve. The water supply valve 105 and the drain valve 351 in the third assessment unit 3 are both provided with infrared photoelectric sensors for detecting the opening and closing of the valves. The bypass water supply valve is provided with a magnetically controlled switch sensor for detecting the opening and closing of the bypass water supply valve; the drain valve 351 in the third assessment unit 3 is also connected with a dial switch (such as Figure 6 As shown, its installation position can be at the dotted circle), the dial switch is connected to the trapezoidal tube 35, and the dial switch forms a monitoring point. In order to achieve true simulation, the dial switch uses a rotary dial switch to simulate a dial. The shape of the dial is as follows Fig.16 As shown; when the K22 assessment is performed, the sensor in the third assessment unit 3 sends the detection signal to the controller in the assessment unit, and then the controller sends the detection result to the host computer for scoring assessment;
[0124] The assessment steps for K22 are as follows, and the full score for this assessment is set at 40 points:
[0125]
[0126]
[0127] The opening and closing detection of the drain valve and the water supply valve is sensed by the infrared photoelectric sensors thereon, and the opening and closing detection of the bypass water supply valve is sensed by the magnetically controlled switch thereon; the assessment system determines whether the examinee has performed the above steps based on the signal collected by the controller in the third assessment unit. If the examinee does not perform the above steps, zero points will be given. For example, in step 7 of K22, if the examinee does not open the drain valve and directly turns the monitoring point to the water-free position, the points for step 7 will be deducted.
[0128] like Figures 11 to 14 As shown, the connection relationship of the sensors in the third assessment unit is as follows:
[0129] Infrared photoelectric sensor for water supply valve detection, connected to in1;
[0130] Infrared photoelectric sensor for drain valve detection, connected to in2;
[0131] Magnetic switch for bypass water supply valve detection, connected to in3;
[0132] The dip switch of the monitoring point is connected to in4.
[0133] like Figure 7As shown, the fourth assessment unit 4 is used to assess the hot work inspection and maintenance operation (K33) in the gas tank. The fourth assessment unit 4 includes a fourth fixed frame 41 and a gas tank 42. The bottom of the fourth fixed frame 4 is provided with a sewage pipe 201, a main water pipe 203 and a nitrogen pipe 202. The two sides of the gas tank 42 are respectively connected with three sections of flange pipes 8 connected end to end, a total of six sections, wherein the third section of the flange pipe 8 and the fourth section of the flange pipe 8 of the fourth assessment unit 4 are respectively connected to the air inlet end and the air outlet end of the gas tank 42, and the first section of the flange pipe 8 and the sixth section of the flange pipe 8 of the fourth assessment unit 4 are connected to a butterfly valve 9 (the butterfly valve 9 is connected to the first section of the flange pipe 8 and the sixth section of the flange pipe 8 of the fourth assessment unit 4). The butterfly valve 9 in the first assessment unit 1 has the same structure); the first section of the flange pipe 8 of the fourth assessment unit 4 is connected to the third assessment unit 3 through the butterfly valve 9 thereon, and the sixth section of the flange pipe 8 of the fourth assessment unit 4 is connected to the fifth assessment unit 5 through the butterfly valve 9 thereon; the first section of the flange pipe 8, the third section of the flange pipe 8 and the fourth section of the flange pipe 8 of the fourth assessment unit 4 are all provided with a relief valve 101, and the fourth section of the flange pipe 8 of the fourth assessment unit 4 is also provided with a purge valve 102, and a proximity switch is provided on the outside of the purge valve 102, which is used to detect whether the purge pipeline is connected; the fourth assessment unit 4 The second section flange pipe 8 and the fifth section flange pipe 8 are both provided with an electric blind valve 103 (the electric blind valve 103 is the same as the electric blind valve 103 on the second assessment unit 2. Since the assessment of the electric blind valve 103 is placed in the sixth assessment unit 6, the electric blind valves 103 in the fourth assessment unit 4 and the second assessment unit 2 are simplified); the relief valve 101, the purge valve 102 and the electric blind valve 103 in the fourth assessment unit 4 are all provided with infrared photoelectric sensors for detecting the opening and closing of the valves. The purge valve 102 on the fourth section flange pipe 8 of the fourth assessment unit 4 is also provided with a proximity switch for Check whether the purge pipe is connected; a dial switch is provided on the relief valve 101 on the third section flange pipe 8 and the fourth section flange pipe 8 of the fourth assessment unit 4, and the dial switch is located at the connection between the relief valve 101 and the flange pipe 8; an induced draft fan is suspended above the manhole 525 of the gas tank 42 (the induced draft fan is the same as the induced draft fan in the second assessment unit), a switch is provided on the induced draft fan, and a proximity switch for detecting the opening and closing of the manhole 525 is provided in the manhole 525; a pressure gauge 421 is provided on the gas tank 42. In order to simulate the test operation realistically, the pressure gauge 421 also adopts a rotary dial switch, and its dial is as shown in FIG. Fig.17 As shown; the gas cabinet 42 is also connected to a sampling tube 526, the sampling tube 526 is provided with a sampling valve 108, and the sampling tube 526 is connected to a dial switch; when the K33 assessment is performed, the sensor in the fourth assessment unit 4 sends a detection signal to the controller in the assessment unit, and then the controller sends the detection result to the host computer for scoring assessment;
[0134] The assessment steps of K33 are as follows. The full score of this assessment is set at 40 points, which is divided into operation during hot work maintenance and shutdown in the gas tank and operation to shutdown during hot work maintenance in the gas tank; for the convenience of description, the entrance on the gas tank is named manhole III, the butterfly valve connected to the first section of the flange pipe of the fourth assessment unit is named butterfly valve III, and the butterfly valve connected to the sixth section of the flange pipe is named butterfly valve IV; the electric blind valves on the second section of the flange pipe and the fifth section of the flange pipe of the fourth assessment unit are named electric blind valve III and electric blind valve IV respectively; the relief valves on the first section of the flange pipe, the third section of the flange pipe, and the fourth section of the flange pipe of the fourth assessment unit are named The sampling valve on the sampling tube of the fourth assessment unit is named sampling valve II; the purge valve on the fourth flange tube of the fourth assessment unit is named purge valve III, and a purge valve is also provided on the nitrogen tube in the fourth assessment unit, which is named purge valve IV; the dip switches on the relief valve V and relief valve VI are named monitoring point IV and monitoring point V respectively, and the dip switch on the sampling tube of the fourth assessment unit is named monitoring point VI (the function of the dip switch in the fourth assessment unit is the same as that of the dip switch in the second assessment unit, which is to form a monitoring point), and its dial is as follows Fig.15 As shown;
[0135] 1. Hot work inspection and shutdown of gas cabinet (20 points in total)
[0136]
[0137] 2. Hot work inspection and shutdown of gas tank (20 points in total)
[0138]
[0139]
[0140] The opening and closing detection of the butterfly valve is sensed by the magnetic control switch thereon, the opening and closing status of the electric blind plate valve, the relief valve and the purge valve are sensed by the infrared photoelectric sensor thereon, the opening and closing of the manhole is sensed by the proximity switch, the opening and closing of the induced draft fan is judged by the switch thereon, and whether the purge pipe is connected is sensed by the proximity switch on the purge valve on the fourth section of the flange pipe of the fourth assessment unit; the assessment system determines whether the examinee has performed the above steps according to the signal collected by the controller in the fourth assessment unit. If not, zero score will be given. For example, if the pressure gauge of the gas tank is not returned to its position, the score of this step will be zero.
[0141] like Figures 11 to 14 , the sensor connection relationship in the fourth assessment unit is as follows:
[0142] Infrared photoelectric sensor for butterfly valve III closing detection, connected to in1;
[0143] Magnetic switch for half-open detection of butterfly valve III, connected to in2;
[0144] Magnetic switch for butterfly valve III full opening detection, connected to in3;
[0145] Infrared photoelectric sensor for butterfly valve IV closing detection, connected to in4;
[0146] Magnetic switch for butterfly valve Ⅳ half-open detection, connected to in5;
[0147] Magnetic switch for butterfly valve IV full opening detection, connected to in6;
[0148] Infrared photoelectric sensor for electric blind valve III detection, connected to in7;
[0149] Electric blind valve IV detection infrared photoelectric sensor, connected to in8;
[0150] Metal infrared photoelectric sensor for detection of relief valve IV, connected to in9;
[0151] Metal infrared photoelectric sensor for detection of relief valve V, connected to in10;
[0152] Metal infrared photoelectric sensor for relief valve VI detection, connected to in11;
[0153] Purge valve III detects infrared photoelectricity of metal shell, connected to in12;
[0154] Purge valve IV detects infrared photoelectricity of metal shell, connected to in13;
[0155] Infrared photoelectric sensor for relief valve IV detection, connected to in14;
[0156] Infrared photoelectric sensor for detection of relief valve V, connected to in15;
[0157] Infrared photoelectric sensor for relief valve VI detection, connected to in16;
[0158] Proximity switch for manhole III detection, connected to in17;
[0159] Draft fan switch, connected to in18;
[0160] Proximity switch for purge pipe connection detection, connected to in19;
[0161] The dip switch of monitoring point IV is connected to in20;
[0162] The dip switch of monitoring point V is connected to in21;
[0163] The dip switch of monitoring point VI is connected to in22.
[0164] like Figure 8As shown, the fifth assessment unit 5 is used to assess the operation of the vertical drain (K21). The fifth assessment unit 5 includes a fifth fixing frame 51, a flange pipe 8 arranged on the fifth fixing frame 51, and a vertical drain connected to the flange pipe 8. The bottom of the fifth fixing frame 5 is provided with a sewage pipe 201, a main water pipe 203 and a nitrogen pipe 202. The vertical drain is the same as the vertical drain on the second assessment unit 2. In the actual assessment, the operation of the vertical drain will be placed in the fifth assessment unit 5; wherein a water injection pipe is also provided on the fifth assessment unit, and the water injection pipe is connected to the water inlet pipe 524 through a plug-in pipe. The main water pipe in the fifth assessment unit 5 A water supply valve 105 and a check valve 104 are sequentially arranged on 203, and the water injection pipe is connected to the main water pipe 203 in the fifth assessment unit, wherein an infrared photoelectric sensor is arranged inside the water supply valve 105 to detect whether the water supply valve 105 is opened or closed, and a proximity switch is arranged outside the check valve 104 to detect whether there is a pipe inserted into the check valve 104 and connected to the water inlet pipe 524; the sensor of the vertical drain in the fifth assessment unit 5 is connected to the controller in the fifth assessment unit 5; when the K21 assessment is performed, the sensor in the fifth assessment unit 5 sends the detection signal to the controller in the assessment unit, and then the controller sends the detection result to the host computer for scoring and assessment;
[0165] The K21 assessment steps are as follows. The full score of this assessment is 80 points, which is divided into vertical drainer shutdown operation and vertical drainer commissioning operation. Figure 8 The drain valve on the left branch of the neutral drain is named drain valve I, and the drain valve on the right branch is named drain valve II. Figure 8 The manhole on the left is named manhole IV, and the manhole on the right is named manhole V. Figure 8 The two butterfly valves on the medium and thin tube are named butterfly valve V and butterfly valve VI from top to bottom (the butterfly valve is the same as the butterfly valve in the first assessment unit). Since butterfly valve VI is close to the cylinder, closing butterfly valve VI in actual operation can prevent gas from entering. In addition, since the assessment step involves the extraction and plugging of blind plates, and the operation of the extraction and plugging of blind plates is placed in the first assessment unit, the extraction and plugging of blind plates is simplified in the fifth assessment unit, that is, only an infrared photoelectric sensor is set on the inner wall of butterfly valve VI to sense whether a gasket and a blind plate are inserted at the connection between butterfly valve VI and the cylinder.
[0166] 1. Vertical drain shut-down operation (40 points in total)
[0167]
[0168] 2. Operation of vertical drainer (40 points in total)
[0169]
[0170] In the fifth assessment unit, the opening and closing detection of the butterfly valve is sensed by the magnetic control switch thereon, the blind plate is sensed by the infrared photoelectric sensor, the high and low pressure sealing caps are sensed by the magnetic control switch, the opening and closing of the sewage valve and the water inlet valve are sensed by the magnetic control switch, the opening and closing of the water supply valve is sensed by the infrared photoelectric sensor, and the opening and closing of the manhole is sensed by the proximity switch; the assessment system determines whether the examinee has followed the above steps based on the signal collected by the controller in the fifth assessment unit. If the examinee fails to follow the above steps, zero points will be given. For example, if the high and low pressure sealing caps are not closed, the score for this step will be zero.
[0171] like Figures 11 to 14 , the sensor connection relationship in the fifth assessment unit is as follows:
[0172] Magnetic switch for butterfly valve VI micro-opening detection, connected to in1;
[0173] Magnetic switch for butterfly valve VI full opening detection, connected to in2;
[0174] The magnetic switch for butterfly valve VI closing detection is connected to in3;
[0175] The magnetic switch for water inlet valve detection is connected to in4;
[0176] Magnetic switch for high-voltage hood detection, connected to in5;
[0177] Magnetic switch for low-voltage hood detection, connected to in6;
[0178] Hand hole IV detection uses metal infrared photoelectric, connected to in7;
[0179] Hand hole V detection uses metal infrared photoelectric, connected to in8;
[0180] Infrared photoelectric sensor for blind plate detection is connected to in9;
[0181] The drain valve I is tested with a magnetic switch, in10;
[0182] The magnetic control switch for drain valve II detection is connected to in11;
[0183] The water supply valve is detected by infrared photoelectric sensor, in12;
[0184] Pipeline connection detection uses proximity switch, in13.
[0185] like Fig. 9As shown, the sixth test unit 6 is used to test the operation of the electric blind plate valve (K24), wherein the electric blind plate valve 103 is a prior art, and its size is adaptively reduced to adapt to the present application; the sixth test unit 6 includes a sixth fixing frame 61 and four sections of flange pipes 8 connected end to end and arranged on the sixth fixing frame 61, and a sewage pipe 201, a main water pipe 203 and a nitrogen pipe 202 are arranged at the bottom of the sixth fixing frame 6, and the first section of the flange pipe 8 of the sixth test unit 6 is connected to the fifth test unit 5, and the first section of the flange pipe 8 of the sixth test unit 6 is connected to the fifth test unit 5. The butterfly valve 9 (the butterfly valve 9 is the same as the butterfly valve 9 in the first test unit 1) is connected to the second section of the flange pipe 8 of the sixth test unit 6, the third section of the flange pipe 8 of the sixth test unit 6 is provided with an electric blind valve 103, the first section of the flange pipe 8, the third section of the flange pipe 8 and the fourth section of the flange pipe 8 of the sixth test unit 6 are each provided with a relief valve 101, the fourth section of the flange pipe 8 of the sixth test unit 6 is also provided with a purge valve 102, and the relief valve 101 on the fourth section of the flange pipe 8 of the sixth test unit 6 is connected to a dial switch at the connection between the flange pipe 8 and the relief valve 101;
[0186] like Fig. 20 and Fig.21 As shown, in the prior art, the electric blind plate valve 103 is provided with a valve plate, the valve plate is provided with a blind hole 1031 and a through hole 1032, the electric blind plate valve 103 is provided with a clamping sleeve 1033 for clamping the valve plate, and the sixth assessment unit 6 is provided with two proximity switches ( Fig. 20 and Fig.21 w), respectively used to detect the position of the blind hole 1031 and the through hole 1032 of the electric blind plate valve 103, and the sixth test unit 6 is also provided with a pressure sensor for detecting whether the clamping is tight. Fig. 20 and Fig.21 , the positions of the two proximity switches w are as follows Fig. 20 and Fig.21 As shown, the pressure sensor is arranged on the clamping sleeve 1033. When the clamping sleeve 1033 is pressed against the valve plate, the pressure sensor generates a sensing signal. Fig. 20 When the proximity switch at the middle and lower part is in contact, the sensor senses that the blind hole 1031 is in place, which means that the electric blind plate valve 103 is open. At this time, the upper proximity switch cannot sense the through hole 1032. When the upper proximity switch senses the through hole 1032, it means that the electric blind plate valve 103 is closed, while the lower proximity switch cannot sense the blind hole 1031, thereby judging whether the blind hole 1031 and the through hole 1032 are in place; when the K24 assessment is performed, the sensor in the sixth assessment unit 6 sends the detection signal to the controller in the assessment unit, and the controller sends the detection result to the host computer for scoring and assessment;
[0187] The K24 assessment steps are as follows. The full score of this assessment is 80 points, which is divided into the operation of the electric blind valve and the shutdown of the electric blind valve. Fig. 9 On the basis of, the three relief valves from left to right are named relief valve VII, relief valve VIII, relief valve IX, and the butterfly valve in the sixth assessment unit (which is the same as the butterfly valve in the first assessment unit) is named butterfly valve VII; Fig. 20 On the basis of, the upper proximity switch is named proximity switch Ⅰ, and the lower proximity switch is named proximity switch Ⅱ; the dial switch set at the connection between the relief valve Ⅸ and the fourth section of the flange pipe of the sixth assessment unit forms a monitoring point, named monitoring point Ⅶ. The dial switch also adopts a rotary dial switch, which is a real simulation and also has a dial, such as Fig.17 As shown;
[0188] 1. Electric blind plate valve operation to shutdown (40 minutes in total)
[0189]
[0190] 2. Shutdown and operation of electric blind valve (40 minutes in total)
[0191]
[0192] The opening and closing detection of butterfly valve Ⅶ is sensed by the magnetic control switch thereon, the detection of the electric blind plate valve is sensed by the proximity switch and the pressure sensor, and the detection of the monitoring point is sensed by the dip switch; the assessment system determines whether the examinee has followed the above steps based on the signal collected by the controller in the sixth assessment unit. If the examinee has not followed the above steps, the erroneous steps will be scored zero.
[0193] like Figures 11 to 14 , the sensor connection relationship in the sixth assessment unit is as follows:
[0194] Magnetic switch for butterfly valve Ⅶ micro-opening detection, connected to in1;
[0195] Magnetic switch for butterfly valve VII full opening detection, connected to in2;
[0196] The magnetic switch for butterfly valve VII closing detection is connected to in3;
[0197] Pressure sensor for electric blind plate valve clamping detection, connected to in4;
[0198] Proximity switch Ⅱ for electric blind valve opening detection, connected to in5;
[0199] Proximity switch Ⅰ for electric blind plate valve closing detection, connected to in6;
[0200] The dip switch of monitoring point Ⅶ is connected to in7.
[0201] like Fig.10 As shown, the seventh assessment unit 7 is used to assess the decommissioning and recommissioning operation (K32) of the heating furnace gas. The seventh assessment unit 7 includes a seventh fixed frame 71, a heating furnace 72, four sections of interconnected flange pipes 8 and a U-shaped pipe. A sewage pipe 201, a main water pipe 203 and a nitrogen pipe 202 are arranged at the bottom of the seventh fixed frame 71. The heating furnace 72 is connected to the flange pipe 8 on the seventh assessment unit 7 through an air inlet pipe 721; the first section of the flange pipe 8 of the seventh assessment unit 7 is connected to the sixth assessment unit 6, and the first section of the flange pipe 8 of the seventh assessment unit 7 is connected to the second section of the flange pipe 8 of the seventh assessment unit 7 through a butterfly valve 9. The third section flange pipe 8 of the seventh assessment unit 7 is connected, and an electric blind valve 103 is provided on the third section flange pipe 8 of the seventh assessment unit 7; the first section flange pipe 8, the second section flange pipe 8, and the fourth section flange pipe 8 of the seventh assessment unit 7 are all provided with a relief valve 101, and the fourth section flange pipe 8 of the seventh assessment unit 7 is also provided with a purge valve 102, and the purge valve 102 is provided with a proximity switch for sensing whether there is a pipeline connection and performing a purge operation. A purge valve 102 is also provided on the inner nitrogen pipe 202 of the seventh assessment unit 7. When purging, the pipeline connects the pipeline on the nitrogen pipe 202 with the purge valve 102 on the fourth section flange pipe 8;
[0202] The fourth section flange pipe 8 of the seventh test unit 7 is connected to the U-shaped pipe through a butterfly valve 9. Fig.10 As shown, the U-shaped pipeline is formed by connecting three sections of flange pipes 8, and a butterfly valve 9 is connected between two adjacent sections of flange pipes 8. The U-shaped pipe is connected with four sections of air inlet pipes 721, and the four sections of air inlet pipes 721 are distributed on both sides of the heating furnace 72 in pairs and are connected to the heating furnace 72. A manual butterfly valve 722 and a relief valve 101 are provided on each section of the air inlet pipe 721, and a magnetically controlled switch is provided on the manual butterfly valve 722 for detecting the opening and closing of the manual butterfly valve 722;
[0203] An ignition tube 73 is arranged above the heating furnace 72, and an igniter is hung outside the ignition tube 73. The igniter is a prior art, but for the convenience of assessment, the igniter in this application is not a real igniter, and it can be a model of an igniter actually used. A proximity switch is arranged in the ignition tube 73 (to detect whether the igniter is inserted), and a combustion-supporting tube 74 is connected to the ignition tube 73 through a butterfly valve 9, and the butterfly valve 9 is used to adjust the air. A combustion-supporting fan is arranged in the combustion-supporting tube 74 (the combustion-supporting fan is similar to the igniter, and for the convenience of assessment, it is also a model of the combustion-supporting fan actually used), and a switch is arranged on the combustion-supporting fan 74;
[0204] A manhole 525 is provided on both sides of the heating furnace 72. The heating furnace 72 is also provided with a furnace door 724 for inlet and outlet and a chimney 723. The chimney 723 is connected to the heating furnace 72 through a butterfly valve 9.
[0205] The relief valve 101, the purge valve 102 and the electric blind valve 103 in the seventh assessment unit 7 are all provided with infrared photoelectric sensors for detecting the opening and closing of the valves. The manual butterfly valve 722 in the seventh assessment unit 7 is provided with a magnetic control switch for detecting the opening and closing of the manual butterfly valve 722; the manhole 525 and the inlet and outlet furnace door 724 of the heating furnace 72 are both provided with proximity switches;
[0206] A dip switch is provided at the relief valve 101 on the second section flange pipe 8 and the fourth section flange pipe 8 of the seventh assessment unit 7. The two dip switches are connected at the connection between the relief valve 101 and the corresponding flange pipe 8. A dip switch is connected on the two air inlet pipes 721 away from the sixth assessment unit 6, and a dip switch is also connected on the heating furnace 72.
[0207] When conducting the K32 assessment, the sensor in the seventh assessment unit sends a detection signal to the controller in the assessment unit, and the controller then sends the detection result to the host computer for scoring and assessment.
[0208] The K32 assessment steps are as follows. The full score of this assessment is 40 points, which is divided into heating furnace gas decommissioning and heating furnace gas recommissioning. For the convenience of description, the relief valves on the first section of the flange pipe, the second section of the flange pipe, and the fourth section of the flange pipe of the seventh assessment unit are named relief valve a, relief valve b, and relief valve c respectively; the relief valve on the intake pipe is named as Fig.10 The direction of the dotted arrows is named relief valve d, relief valve e, relief valve f, relief valve g, where the arrow is relief valve g; the manual butterfly valve is Fig.10 The directions of the dotted arrows are named manual butterfly valve a, manual butterfly valve b, manual butterfly valve c, and manual butterfly valve d respectively; the dip switches on the second section flange pipe and the fourth section flange pipe of the seventh assessment unit are named monitoring point a and monitoring point b respectively, the dip switch on the intake pipe where the relief valve e is located is named monitoring point c, the dip switch on the intake pipe where the relief valve f is located is named monitoring point d, and the dip switch on the heating furnace is named monitoring point e. Similarly, the dip switches in the seventh assessment unit also use rotary dip switches, and the dials of the dip switches corresponding to monitoring point a, monitoring point b, monitoring point c, and monitoring point d are as shown in the figure. Fig.15 As shown, the dial of the DIP switch corresponding to the monitoring point e is as follows Fig.19As shown; the butterfly valve between the first section of the flange pipe and the second section of the flange pipe of the seventh assessment unit is named butterfly valve a, the butterfly valve between the fourth section of the flange pipe and the U-shaped pipe is named butterfly valve b, the two butterfly valves on the U-shaped pipe are named butterfly valve c and butterfly valve d respectively, the butterfly valve on the ignition pipe is named butterfly valve e, and the butterfly valve on the chimney is named butterfly valve f; the butterfly valve in the seventh assessment unit is the same as the butterfly valve in the first assessment unit; the two manholes on the heating furnace are named manhole a and manhole b respectively; the purge valve on the fourth section of the flange pipe of the seventh assessment unit is named purge valve a, and the purge valve on the nitrogen pipe in the seventh assessment unit is named purge valve b;
[0209] 1. Heating furnace gas decommissioning (20 points in total)
[0210]
[0211]
[0212] 2. Heating furnace gas recommissioning (20 points in total)
[0213]
[0214] The opening and closing detection of the butterfly valve and manual butterfly valve in the seventh assessment unit is sensed by the magnetic control switch thereon, the opening and closing of the purge valve and electric blind plate valve are sensed by infrared photoelectric sensors, the connection of the purge pipe, the inlet and outlet furnace doors, and the opening and closing of the manhole are sensed by proximity switches; the monitoring points are monitored by rotating the dial switch; the combustion-supporting fan is controlled by the switch thereon; the assessment system determines whether the examinee has followed the above steps based on the signal collected by the controller in the seventh assessment unit. If the examinee fails to follow the above steps, zero points will be given for the wrong steps.
[0215] like Figures 11 to 14 , the sensor connection relationship in the sixth assessment unit is as follows:
[0216] Manual butterfly valve a detection magnetic switch, connected to in1;
[0217] Manual butterfly valve b detection magnetic switch, connected to in2;
[0218] Manual butterfly valve c detection magnetic switch, connected to in3;
[0219] Manual butterfly valve d detection magnetic switch, connected to in4;
[0220] Electric blind valve detection infrared photoelectric sensor, connected to in5;
[0221] The infrared photoelectric sensor for detecting the relief valve a is connected to in6;
[0222] The infrared photoelectric sensor for detecting the relief valve a is connected to in7;
[0223] The infrared photoelectric sensor for detecting the relief valve a is connected to in8;
[0224] The infrared photoelectric sensor for detecting the relief valve a is connected to in9;
[0225] Connect the proximity switch for purge pipe detection to in10;
[0226] Infrared photoelectric sensor for detection of purge valve a, connected to in11;
[0227] Infrared photoelectric sensor for detection of purge valve b, connected to in12;
[0228] The dip switch of monitoring point a is connected to in13;
[0229] The dip switch of monitoring point b is connected to in14;
[0230] The dip switch of monitoring point c is connected to in15;
[0231] The dip switch of monitoring point d is connected to in16;
[0232] The dip switch of monitoring point e is connected to in17;
[0233] Combustion-supporting fan switch, connected to in18;
[0234] Infrared photoelectric sensor for butterfly valve a closing detection, connected to in19;
[0235] Butterfly valve a half-open detection with magnetic switch, connected to in20;
[0236] Butterfly valve a fully open detection magnetic switch, connected to in21;
[0237] Infrared photoelectric sensor for butterfly valve e closing detection, connected to in22;
[0238] Magnetic switch for half-open detection of butterfly valve e, connected to in23;
[0239] Magnetic switch for butterfly valve e full opening detection, connected to in24;
[0240] Infrared photoelectric sensor for butterfly valve f closing detection, connected to in25;
[0241] Butterfly valve f half-open detection with magnetic switch, connected to in26;
[0242] Magnetic switch for butterfly valve f full opening detection, connected to in27;
[0243] Proximity switch for manhole a detection, connected to in28;
[0244] Proximity switch for manhole b detection, connected to in29;
[0245] Proximity switch for inlet and outlet furnace door detection, connected to in30;
[0246] Proximity switch for ignition detection, connected to in31.
[0247] It should be noted in the present application that not all sensors in a certain assessment unit need to be connected to the controller in the assessment unit, because the assessment purpose of each assessment unit is different. Therefore, a certain valve in a certain assessment unit may not be used, so there is no need to connect the sensor again. The unconnected ones can be reserved for subsequent connection; for example, the vertical drainer in the second assessment unit 2, since the assessment of the vertical drainer is placed in the fifth assessment unit 5, some sensors on the vertical drainer in the second assessment unit 2 do not need to be connected to the controller of the second assessment unit 2, and the butterfly valve c and butterfly valve d in the seventh assessment unit 7 are not operated in the assessment step, so the magnetic control switch thereon does not need to be connected to the seventh Inside the controller of the assessment unit 7; in addition, in order to facilitate the examination of candidates, the flange pipe 8 and the corresponding valves, vertical drainers, gas tanks, heating furnaces, sewage boxes and other components are reduced in size. Therefore, the structures of the valves, vertical drainers, gas tanks, heating furnaces, sewage boxes and other components in this application are the same as the existing actual components. The specific structure and size of the valves, vertical drainers, gas tanks, heating furnaces, sewage boxes and other components are no longer limited here, and the actual structure can be referred to. At the same time, for the sensors in the assessment unit, they are also prior art, and the specific models and connection methods of the sensors are not described, such as E12-D5NK, E3F-DS100C4, E12-D5NK and other sensors.
[0248] Furthermore, the present application also provides an assessment method for a gas operation training and assessment device, which collects signals from the detection devices of each assessment unit during the candidate's operation, scores each step of each assessment item in sequence, and determines whether the candidate is qualified based on the score; the assessment method includes two assessment modes, a computer simulation test and a practical test; in the computer simulation test mode, the upper computer generates operation animations step by step according to the assessment items, and each operation animation is matched one by one with the scoring item.
[0249] Furthermore, the assessment method includes the following steps:
[0250] Step 1: The host computer receives the instruction sent by the administrator, and enters the corresponding assessment mode according to the administrator's instruction, including randomly generating one of the two assessment modes or specifying a certain assessment mode. In each assessment mode, the host computer can generate scoring items for one or all assessment units according to the candidate's choice;
[0251] Step 2: Candidates take the corresponding test according to the assessment mode generated by the host computer. If a mock test is conducted, candidates answer questions according to the operation animation generated by the host computer. The operation steps of the answers will be compared with the corresponding scoring items, and the host computer will calculate the candidate's score based on the comparison results. If a practical test is conducted, the host computer receives the signal from the controller of the corresponding assessment unit, and then compares it with the scoring items. The host computer calculates the candidate's score based on the comparison results.
[0252] like Fig. 22 As shown, the administrator sends a command to the host computer, and the host computer generates two test modes, namely computer-based test and practical test. When conducting the practical test, the controller collects signals and transmits them to the host computer for scoring.
[0253] Obviously, those skilled in the art can make various changes and modifications to the present invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A gas operation training and assessment device, characterized in that: It includes a first assessment unit, a second assessment unit, a third assessment unit, a fourth assessment unit, a fifth assessment unit, a sixth assessment unit and a seventh assessment unit connected end to end in sequence, and a host computer connected to the control of each assessment unit; The first assessment unit is used to assess the operation of extracting and plugging the blind plate, and the first assessment unit includes a first fixing frame and at least two sections of flange pipes sequentially arranged on the first fixing frame; the first assessment unit also includes a detection device for detecting the existence of the blind plate between the two sections of flange pipe; the first fixing frame is also provided with a tool table, and the tool table is placed with tools for operating the extraction and plugging of the blind plate; The second assessment unit is used to assess the operation of stopping gas delivery in the pipeline. The second assessment unit includes a second fixing frame and at least three sections of flange pipes sequentially arranged on the second fixing frame, wherein a section of the flange pipe in the middle is provided with two manholes and a proximity switch for detecting the opening and closing of the corresponding manholes, and the flange pipes connected to both ends of the section of the flange pipe are respectively provided with an electric blind plate valve and two infrared photoelectric sensors for detecting the opening and closing of the corresponding electric blind plate valves, and an induced draft fan is provided at one of the two manholes; The third assessment unit is used to assess the U-shaped water seal operation, and the third assessment unit includes a third fixing frame and a V-shaped pipe arranged on the third fixing frame, the V-shaped pipe is connected to a sewage tank and a water supply pipe, and the sewage tank is connected to a trapezoidal pipe; the water supply pipe is provided with a water supply valve and an infrared photoelectric sensor for detecting the opening and closing of the water supply valve, the trapezoidal pipe is provided with a drain valve for detecting the opening and closing of the drain valve, and the drain valve is also connected to a dial switch; The fourth assessment unit is used to assess the hot work inspection and maintenance operation in the gas tank. The fourth assessment unit includes a fourth fixing frame and a gas tank. Both sides of the gas tank are connected with a plurality of flange pipes connected end to end. One end of the V-shaped pipe is connected with the flange pipe on the second assessment unit, and the other end of the V-shaped pipe is connected with the flange pipe on the fourth assessment unit. A section of the flange pipes on both sides of the gas tank is provided with an electric blind plate valve and an infrared photoelectric sensor for detecting the opening and closing of the corresponding electric blind plate valve. The gas tank is provided with a manhole and a proximity switch for detecting the opening and closing of the manhole. An induced draft fan is provided at the manhole of the gas tank. The fifth assessment unit is used to assess the operation of the vertical drainer, and the fifth assessment unit includes a fifth fixing frame, a flange pipe arranged on the fifth fixing frame, and a vertical drainer connected to the flange pipe; the vertical drainer on the fifth assessment unit is connected to the flange pipe of the fifth assessment unit; the vertical drainer includes a cylinder, on which a water inlet pipe, a sampling pipe, a high-pressure sealing cap and a low-pressure sealing cap are arranged, a sampling valve is arranged on the sampling pipe, a water inlet valve is arranged on the water inlet pipe, a branch pipe is also arranged at the bottom of the cylinder, a sewage valve is arranged on the branch pipe, a manhole is also arranged on the cylinder, a proximity switch for detecting the opening and closing of the manhole is arranged in the manhole, the sampling valve, the water inlet valve and the sewage valve are all provided with a magnetic control switch for detecting the opening and closing of the valve, and the high-pressure sealing cap and the low-pressure sealing cap are also provided with a magnetic control switch for detecting the opening and closing of the high-pressure sealing cap and the low-pressure sealing cap; The sixth assessment unit is used to assess the operation of the electric blind plate valve. The sixth assessment unit includes a sixth fixing frame and several sections of connected flange pipes arranged on the sixth fixing frame. One section of the flange pipe on the sixth assessment unit is provided with an electric blind plate valve; a blind hole and a through hole are provided on the electric blind plate of the sixth assessment unit. Two proximity switches are provided on the sixth assessment unit, which are respectively used to detect the positions of the blind hole and the through hole of the electric blind plate valve. A pressure sensor is also provided in the electric blind plate valve to detect the clamping degree of the electric blind plate valve; The seventh assessment unit is used to assess the gas decommissioning and recommissioning operation of the heating furnace. The seventh assessment unit includes a seventh fixing frame, a heating furnace, a plurality of interconnected flange pipes and a U-shaped pipe. The heating furnace is connected to the flange pipe on the seventh assessment unit through an air intake pipe; the air intake pipe is provided with a manual butterfly valve and a relief valve, and the manual butterfly valve is provided with a magnetically controlled switch for detecting the opening and closing of the manual butterfly valve; an ignition tube is provided above the heating furnace, an igniter is hung outside the ignition tube, a proximity switch is provided inside the ignition tube, a combustion-supporting tube is connected to the ignition tube through a butterfly valve, and a combustion-supporting fan is provided inside the combustion-supporting tube; The assessment device also includes a controller for collecting information of each assessment unit, and the controller is electrically connected to the upper machine; The first test unit includes two sections of connected flange pipes, and the second test unit includes six sections of connected flange pipes. The two sections of flange pipes of the first test unit are connected through a butterfly valve. The second section of the flange pipe of the first test unit is connected to the first section of the flange pipe of the second test unit. A detachable gasket is provided between the second section of the flange pipe of the first test unit and the butterfly valve on the first test unit. The detection device of the first test unit includes an infrared photoelectric sensor arranged on the inner wall of the second section of the flange pipe of the first test unit, and a proximity switch arranged on the outer wall of the flange pipe, and a proximity switch is also arranged on the outer wall of the butterfly valve of the first test unit; a plurality of tool grooves and ring grooves for placing gaskets are respectively arranged on the workbench, and infrared photoelectric sensors are arranged at the bottom of the tool grooves and the ring grooves; The first section of the flange pipe of the second assessment unit is connected to the second section of the flange pipe of the second assessment unit through a butterfly valve, two relief valves are provided on the fourth section of the flange pipe of the second assessment unit, and a relief valve is provided on the second section of the flange pipe and the sixth section of the flange pipe of the second assessment unit. The sixth section of the flange pipe of the second assessment unit is connected to the third assessment unit through a butterfly valve, and a purge valve is connected to the first section of the flange pipe of the second assessment unit; the third section of the flange pipe and the fifth section of the flange pipe of the second assessment unit are both provided with electric blind valves; The fourth section flange pipe of the second assessment unit is provided with two manholes and an induced draft fan, and the induced draft fan is provided with a switch; the second assessment unit is provided with a vertical drainer, and the vertical drainer on the second assessment unit is connected with the fourth section flange pipe of the second assessment unit, and the connection between the two relief valves on the fourth section flange pipe of the second assessment unit and the fourth section flange pipe and the sampling tube on the vertical drainer on the second assessment unit are provided with a dial switch; the fourth section flange pipe of the second assessment unit is also provided with a purge valve, and the purge valve is provided with a proximity switch; The relief valve, purge valve and electric blind valve in the second assessment unit are all provided with infrared photoelectric sensors for detecting the opening and closing of the valves; The second test unit is also provided with a vertical drainer, and the vertical drainer on the second test unit is connected to the flange pipe with a manhole on the second test unit. The butterfly valve on the first assessment unit and the butterfly valve on the second assessment unit are also provided with a magnetically controlled switch for detecting the opening and closing degree of the butterfly valve.
2. A gas operation training and assessment device as claimed in claim 1, characterized in that: There are seven controllers, and the seven controllers correspond one by one to the first assessment unit, the second assessment unit, the third assessment unit, the fourth assessment unit, the fifth assessment unit, the sixth assessment unit and the seventh assessment unit respectively; the controller is an STM32F103C8T6 chip, and the controller is wired by assigning different address codes through RS-485, and finally connected to the host computer through USB-485.
3. A gas operation training and assessment device as claimed in claim 2, characterized in that: The flange pipe of the fifth test unit is connected to the vertical drainer on the fifth test unit through a capillary tube, two butterfly valves are arranged on the capillary tube, and a sampling tube connected to the capillary tube is arranged between the two butterfly valves; a sewage pipe, a main water pipe and a nitrogen pipe are arranged at the bottom of the fifth fixed frame, two branch pipes connected to the sewage pipe are arranged at the bottom of the cylinder, and two manholes are arranged on the cylinder; The fifth assessment unit is also provided with a water injection pipe, on which a water supply valve and a check valve are sequentially provided, and the water supply valve is provided with a magnetically controlled switch for detecting the opening and closing of the water supply valve.
4. A gas operation training and assessment device as claimed in claim 2, characterized in that: The V-shaped pipe of the third assessment unit is connected with the second assessment unit and the fourth assessment unit through a right-angle pipe. The water supply pipe is provided with a water supply valve connected to a check valve. Both ends of the water supply valve are connected to bypass pipes. The bypass pipe is provided with a bypass water supply valve. The bypass water supply valve is provided with a magnetically controlled switch sensor for detecting the opening and closing of the bypass water supply valve.
5. A gas operation training and assessment device as claimed in claim 2, characterized in that: The fourth test unit includes six sections of flange pipes, wherein the third section of the flange pipe and the fourth section of the flange pipe of the fourth test unit are respectively connected to the gas inlet end and the gas outlet end of the gas holder, and the first section of the flange pipe and the sixth section of the flange pipe of the fourth test unit are both connected to a butterfly valve; the first section of the flange pipe of the fourth test unit is connected to the third test unit through the butterfly valve thereon, and the sixth section of the flange pipe of the fourth test unit is connected to the seventh test unit through the butterfly valve thereon; The first section flange pipe, the third section flange pipe and the fourth section flange pipe of the fourth assessment unit are all provided with relief valves, and the fourth section flange pipe of the fourth assessment unit is also provided with a purge valve; The second section flange pipe and the fifth section flange pipe of the fourth assessment unit are both provided with electric blind valves; The relief valve and the purge valve in the fourth assessment unit are both provided with an infrared photoelectric sensor for detecting the opening and closing of the valves, and the purge valve on the fourth section of the flange pipe of the fourth assessment unit is also provided with a proximity switch; the relief valves on the third section of the flange pipe and the fourth section of the flange pipe of the fourth assessment unit are both provided with a dial switch, and the dial switch is located at the connection between the relief valve and the flange pipe; An induced draft fan is hung above the manhole of the gas cabinet, and a switch is arranged on the induced draft fan; a pressure gauge is arranged on the gas cabinet; a sampling tube is also connected to the gas cabinet, and a dial switch is connected to the sampling tube.
6. A gas operation training and assessment device as claimed in claim 2, characterized in that: The sixth assessment unit includes four sections of interconnected flange pipes, the first section of the flange pipe of the sixth assessment unit is connected to the fifth assessment unit, the first section of the flange pipe of the sixth assessment unit is connected to the second section of the flange pipe of the sixth assessment unit through a butterfly valve, the third section of the flange pipe of the sixth assessment unit is provided with an electric blind valve, the first section of the flange pipe, the third section of the flange pipe and the fourth section of the flange pipe of the sixth assessment unit are each provided with a relief valve, the fourth section of the flange pipe of the sixth assessment unit is also provided with a purge valve, and the relief valve on the fourth section of the flange pipe of the sixth assessment unit is connected to a dial switch at the connection between the flange pipe and the relief valve.
7. A gas operation training and assessment device as claimed in claim 2, characterized in that: The seventh test unit includes four sections of interconnected flange pipes, the first section of the flange pipe of the seventh test unit is connected to the sixth test unit, the first section of the flange pipe of the seventh test unit is connected to the second section of the flange pipe of the seventh test unit through a butterfly valve, and the third section of the flange pipe of the seventh test unit is provided with an electric blind plate valve; the first section of the flange pipe, the second section of the flange pipe, and the fourth section of the flange pipe of the seventh test unit are each provided with a relief valve, and the fourth section of the flange pipe of the seventh test unit is also provided with a purge valve, and the purge valve is provided with a proximity switch; The fourth section of the flange pipe of the seventh test unit is connected to the U-shaped pipe through a butterfly valve, and the U-shaped pipe is connected to four sections of air intake pipes, which are distributed on both sides of the heating furnace in pairs and are connected to the heating furnace. A manual butterfly valve and a relief valve are provided on each section of the air intake pipe, and a switch is provided on the combustion-supporting fan; A manhole is provided on each side of the heating furnace, and a furnace inlet and outlet door and a chimney are also provided on the heating furnace. The chimney is connected to the heating furnace through a butterfly valve; The relief valve, purge valve and electric blind valve in the seventh assessment unit are all provided with infrared photoelectric sensors for detecting the opening and closing of the valves. The butterfly valve in the seventh assessment unit is provided with a magnetic control switch for detecting the opening and closing degree of the butterfly valve. The manual butterfly valve in the seventh assessment unit is provided with a magnetic control switch for detecting the opening and closing of the manual butterfly valve; the manhole and the inlet and outlet furnace doors of the heating furnace are all provided with proximity switches; A dip switch is provided on the vent valve on the second section flange pipe and the fourth section flange pipe of the seventh assessment unit, a dip switch is connected to the two air inlet pipes away from the sixth assessment unit, and a dip switch is also connected to the heating furnace.
8. An assessment method using any one of claims 1 to 7 of the gas operation training and assessment device, characterized in that: The assessment method collects signals from the detection devices of each assessment unit during the candidate's operation, scores each step of each assessment item in sequence, and determines whether the candidate has passed based on the score; the assessment method includes two assessment modes, a computer simulation test and a practical test; in the computer simulation test mode, the host computer generates operation animations step by step according to the assessment items, and each operation animation is matched one by one with the scoring item.
9. The assessment method of a gas operation training and assessment device as claimed in claim 8, characterized in that: The steps include: Step 1: The host computer receives the instruction sent by the administrator, and enters the corresponding assessment mode according to the administrator's instruction, including randomly generating one of the two assessment modes or specifying a certain assessment mode. In each assessment mode, the host computer can generate scoring items for one or all assessment units according to the candidate's choice; Step 2: Candidates take the corresponding test according to the assessment mode generated by the host computer. If a mock test is conducted, candidates answer questions according to the operation animation generated by the host computer. The operation steps of the answers will be compared with the corresponding scoring items, and the host computer will calculate the candidate's score based on the comparison results. If a practical test is conducted, the host computer receives the signal from the controller of the corresponding assessment unit, and then compares it with the scoring items. The host computer calculates the candidate's score based on the comparison results.
Citation Information
Patent Citations
Gas operation training assessment device
CN211124476U
Cited By
Shield tunneling machine simulation practical operation test scoring method and system, equipment and medium
CN119851534A
Shield tunneling machine simulation practical operation examination scoring method, system and device, and medium
CN119851534B