A reinforced assembly structure for an integral bathroom waterproof chassis
Through CNC equipment processing foamed ceramic materials, combined with the combined structure of card parts and reinforced profiles, the problems of high production costs and difficult customization of the overall bathroom chassis are solved, customized production and structural strength are improved, and customers have been met with diversified needs. And reduce operating costs.
Patent Information
- Application Number
- CN201911109838.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-11-05
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2039-11-05
AI Technical Summary
The production method of the existing overall bathroom chassis relies on mold molding, which leads to high production costs for structural modification and customized, making it difficult to meet customers' diverse needs, and limits the development of the company.
CNC equipment is used to process foamed ceramic materials, and customized production is achieved through the combined structure of card parts and reinforced profiles, replacing the traditional molding method, and enhancing the structural strength and waterproof performance of the chassis.
The customized production of the chassis is realized, which reduces the operating costs of the enterprise and meets the diverse needs of customers. The waterproof performance of foamed ceramic materials is avoided and the use conditions of the overall bathroom is improved.
Smart Images

Figure CN110725388B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of home furnishing technology, and in particular to a reinforced assembly structure of an integral bathroom waterproof chassis. Background Art
[0002] In the prior art, the chassis of the integrated bathroom is generally molded by thermosetting materials or thermoplastic materials. The size, shape and other structural features of the integrated bathroom need to be prefabricated inside the mold, so the processing method is simple. If the structure of the product needs to be modified, the mold needs to be repaired or remade, which requires high costs and is difficult to meet production needs.
[0003] However, in the market sales corresponding to the above situation, it is necessary to choose to produce chassis of different sizes and shapes according to different customer needs, but the company's existing chassis models are difficult to meet the requirements of all customers, which requires the production of more production molds. This cycle of demand and supply relationship can easily cause the company to bear high operating costs, invest a lot of production equipment, and restrict the company's development. Summary of the invention
[0004] In order to solve the deficiencies in the prior art, the purpose of the present invention is to provide a reinforced assembly structure of an integral bathroom waterproof chassis. The chassis is no longer produced by mold compression molding, but is customized by CNC equipment.
[0005] The technical solution adopted by the present invention to solve its technical problem is:
[0006] A reinforcement assembly structure for an integral bathroom waterproof chassis, characterized in that it comprises a chassis body, a clamp and a reinforcement profile;
[0007] The top edge of the chassis body is provided with an annular boss and a groove, and the groove is located inside the boss;
[0008] The reinforcing profiles are distributed along the surfaces of the boss and the groove respectively, and the clamps are provided between the ends of the reinforcing profiles. The clamps are located at the corners of the bosses. The outer side of the reinforcing profiles and the inner side of the clamps are connected and form a first groove body wrapped around the outer surface of the boss. The inner side of the reinforcing profiles constitutes a second groove body located on the inner surface of the groove, and a pressure plate distributed perpendicularly thereto is also provided on the outer side of the outer side wall edge of the second groove body.
[0009] The chassis body is also provided with a floor drain installation groove, which is located inside the groove and close to the groove. The floor drain installation groove is connected to the groove through a channel lower than the surface of the chassis body.
[0010] The depth of the floor drain installation groove is lower than the depth of the groove, and the channel is inclined.
[0011] The chassis body is made of foamed ceramic.
[0012] The reinforcement profile includes a first profile and a second profile;
[0013] The two ends of the outer side wall of the second trough body of the first profile are respectively provided with first notches, and the two ends of the pressing plate of the first profile are respectively provided with second notches;
[0014] The bottom surface and the outer side wall of the second groove body of the second profile and both ends of the pressing plate are respectively provided with third notches.
[0015] The first profile and the second profile are provided in two groups, the chassis body adopts a rectangular structure, the first profile is symmetrically distributed on two opposite sides of the chassis body, and the second profile is symmetrically distributed on the other two opposite sides of the chassis body.
[0016] The lengths of the first notch and the third notch are equal to the bottom width of the second slot body, and the bottom end of the second slot body of the first profile is inserted into the third notch.
[0017] The length of the second notch is equal to the width of the rib, the second notch is inserted to the lower part of the rib end of the second profile and is abutted against the outer side wall of the second trough body of the second profile, and the rib end of the first profile abuts against the rib side of the second profile.
[0018] The bottom surface and two adjacent side surfaces of the clamp are open, the bottom surface is used to be connected to the boss, and the openings of the two side surfaces are aligned with the ends of the reinforcing profile and are interconnected to form the first trough body.
[0019] A limiting column connected to the bottom surface is provided in the middle of the openings on the two sides of the clamp, the horizontal cross section of the limiting column is square, the length of the limiting column is equal to the height of the boss, and the cross-sectional side length of the limiting column is equal to the thickness of the reinforcement profile.
[0020] The beneficial effects of the present invention are:
[0021] The structural design is reasonable, and the chassis body is made of foamed ceramic. The material itself is easy to process and can be processed by CNC equipment such as milling machines. It is convenient and fast, replacing the compression molding method. Under the premise of realizing customized production, it simultaneously reduces the company's operating costs and meets the different requirements of customers.
[0022] The foamed ceramic itself has a good waterproof effect, which prevents a large amount of water from leaking to the outside, avoids the need for additional waterproof treatment of the chassis, and is convenient to use.
[0023] The reinforcement profiles are respectively installed on the periphery of the chassis body to reinforce the edge of the chassis body and improve its structural strength so that it meets the use conditions of the overall bathroom. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] The present invention is further described below in conjunction with the accompanying drawings and embodiments.
[0025] Figure 1 This is a schematic diagram of the structure before the clamps and reinforcement profiles are spliced together.
[0026] Figure 2 This is a schematic diagram of the structure after the clamps and reinforcement profiles are spliced together.
[0027] Figure 3 It is a structural diagram of the chassis body.
[0028] Figure 4 It is a schematic diagram of the structure of a single set of clamps, a first profile and a second profile before being spliced together.
[0029] Figure 5 It is a schematic diagram of the structure after a single set of clamps, a first profile and a second profile are spliced together.
[0030] Figure 6 It is a schematic structural diagram of the first profile.
[0031] Figure 7 It is a schematic structural diagram of the second profile.
[0032] Figure 8 It is a schematic diagram of the structure of the card.
[0033] In the figure: 100 first profile, 101 first notch, 102 second notch, 200 second profile, 201 third notch, 300 first trough, 400 second trough, 500 pressure plate, 600 clamp, 601 limit column, 700 chassis body, 701 groove, 702 boss, 703 floor drain installation groove, 704 channel. DETAILED DESCRIPTION
[0034] The following is a description of the implementation of the present invention by means of specific embodiments. Those skilled in the art can easily understand other advantages and effects of the present invention from the contents disclosed in this specification.
[0035] according to Figures 1 to 8 As shown: This embodiment provides a reinforcement assembly structure of an integral bathroom waterproof chassis, including a chassis body 700, a clamp 600 and a reinforcement profile. The clamp 600 and the reinforcement profile are respectively used to be installed around the chassis body 700 to reinforce its edges. The specific structure and connection relationship of each component are described as follows;
[0036] The chassis body 700 is made of foamed ceramics, which are light in weight, low in hardness, and stable in shape, and can be processed by CNC equipment such as a milling machine. The chassis body 700 is a rectangular or square plate structure as a whole. The top surface of the chassis body 700 is respectively provided with an annular boss 702 and a groove 701 on the edges around it. The boss 702 is higher than the top surface of the chassis body 700, and the groove 701 is lower than the top surface of the chassis body 700. The groove 701 is located on the inner side of the boss 702, that is, the bottom of the inner side wall of the boss 702 is the groove 701.
[0037] The chassis body 700 is also provided with a floor drain installation groove 703, and the interior of the floor drain installation groove 703 is used for installing a floor drain. The floor drain installation groove 703 is located on the inner side of the groove 701 and is arranged close to the groove 701. The floor drain installation groove 703 is connected to the groove 701 through a channel 704 below the surface of the chassis body 700, wherein the depth of the floor drain installation groove 703 is lower than the depth of the groove 701, and the channel 704 is inclined to facilitate the return of water accumulated in the groove 701 to the interior of the floor drain installation groove 703 for discharge.
[0038] The reinforcing profiles are distributed along the surfaces of the boss 702 and the groove 701 respectively, and the clamp 600 is provided between the ends of the reinforcing profiles. The clamp 600 is located at the corner of the boss 702. The cross-sectional shape of the overall structure formed by the reinforcing profile and the clamp 600 is S-shaped as a whole. The outer side of the reinforcing profile and the inner side of the clamp 600 are connected and form a first groove body 300 wrapped around the outer surface of the boss 702. The first groove body 300 is located on the outer side of the reinforcing profile and its opening is set downward. The inner side of the reinforcing profile constitutes a second groove body 400 located on the inner surface of the groove 701. The second groove body 400 is located on the inner side of the reinforcing profile and its opening is set upward. The second groove body 400 00 is also provided with a pressing plate 500 which is vertically distributed therewith on the outer side of the outer side wall edge; in the above structure, the shape of the reinforcing profile and the clamp 600 matches the shape of the edge of the chassis body 700 and is distributed along the surface of the chassis body 700, and is used to protect and reinforce the vulnerable structures such as the boss 702 and the groove 701, so that it can maintain a stable structure when assembled with the wall plate, that is, the bottom end of the wall plate is inserted into the groove 701, and the bottom end of the outer side wall of the wall plate is supported by the boss 702. At this time, the thickness of the groove 701 part and the thickness of the boss 702 are relatively thin, and because of the low strength of the material, reinforcement treatment is required;
[0039] The reinforcing profile includes a first profile 100 and a second profile 200. The first profile 100 and the second profile 200 are provided with two groups. The first profile 100 is symmetrically distributed on two opposite sides of the chassis body 700, and the second profile 200 is symmetrically distributed on the other two opposite sides of the chassis body 700. When the first profile 100 and the second profile 200 are spliced with each other through the clamp 600, it is necessary to process the structure used for splicing so that the splicing structure between the clamp 600, the first profile 100 and the second profile 200 matches each other and is relatively closed after splicing. At the same time, the clamp 600, the first profile 100 and the second profile 200 maintain a communication effect between the first trough 300, and the first profile 100 and the second profile 200 maintain a communication effect between the second trough 400. The splicing structure is specifically as follows;
[0040] The two ends of the outer side wall of the second trough body 400 of the first profile 100 are respectively provided with a first notch 101, and the two ends of the pressing plate 500 of the first profile 100 are respectively provided with a second notch 102; in the splicing structure, the lengths of the first notch 101 and the third notch 201 are equal to the bottom width of the second trough body 400, and the bottom end of the second trough body 400 of the first profile 100 is inserted into the third notch 201, and the outer side wall end of the second trough body 400 of the first profile 100 is set against the outer side wall of the second trough body 400 of the second profile 200, and this partial splicing structure makes the second trough bodies 400 spliced and connected with each other;
[0041] The bottom surface and the outer side wall of the second trough body 400 of the second profile 200 and the two ends of the pressing plate 500 are respectively provided with a third notch 201; in the splicing structure, the length of the second notch 102 is equal to the width of the rib, the second notch 102 is inserted into the lower part of the rib end of the second profile 200 and is set against the outer side wall of the second trough body 400 of the second profile 200, the rib end of the first profile 100 is against the rib side of the second profile 200, and this part of the splicing structure enables the ribs to be spliced;
[0042] Since the main structures of the first profile 100 and the second profile 200 have many bending parts, each surface of the first profile 100 and the second profile 200 needs to be aligned and spliced with each other or aligned and spliced with the clamp 600. The first notch 101, the second notch 102 and the third notch 201 in the above structure all meet the splicing requirements.
[0043] The clamp 600 is a rectangular parallelepiped structure, the height of the clamp 600 is equal to the height of the outer side wall of the first slot body 300, the bottom surface and two adjacent side surfaces of the clamp 600 are open, the bottom surface is used to connect with the boss 702, the openings of the two side surfaces are aligned with the ends of the reinforcement profile and are interconnected to form the first slot body 300, so that the first slot bodies 300 between the reinforcement profiles are interconnected through the clamp 600, and the entire boss 702 is wrapped inside; the middle position of the openings of the two sides of the clamp 600 is set There is a limiting column 601 connected to its bottom surface, the horizontal cross-section of the limiting column 601 is a square, the length of the limiting column 601 is equal to the height of the boss 702, the cross-sectional side length of the limiting column 601 is equal to the thickness of the reinforcing profile, and after the first profile 100 and the second profile 200 are spliced together, a gap will be formed between the side wall ends of the first trough body 300 and the second trough body 400. At this time, the limiting column 601 is inserted from the top into the gap to fill and seal it, so that the entire reinforcement structure is stable and an ideal setting effect is achieved.
[0044] During the splicing process of the reinforced assembly structure of the above-mentioned integral bathroom waterproof chassis, the clamp 600, the first profile 100 and the second profile 200 are respectively inserted into the four corners and the outer sides of the four sides of the chassis body 700 from top to bottom, and the two sides of the clamp 600 are aligned with the end faces of the first profile 100 and the second profile 200 respectively to complete the splicing. The various connection parts are relatively closed and then sealed.
[0045] The above-mentioned apparatus is a preferred implementation mode of the present invention. As long as the technical solution of the purpose of the present invention is achieved by basically the same means, it belongs to the protection scope of the present invention.
Claims
1. A reinforced assembly structure for an integral bathroom waterproof chassis, characterized in that: Including chassis body, clamps and reinforcement profiles; The top edge of the chassis body is provided with an annular boss and a groove, and the groove is located inside the boss; the chassis body is made of foamed ceramic; The reinforcing profiles are distributed along the surfaces of the boss and the groove, respectively. The clamps are provided between the ends of the reinforcing profiles. The clamps are located at the corners of the bosses. The outer side of the reinforcing profiles and the inner side of the clamps are connected to form a first groove body wrapped around the outer surface of the boss. The inner side of the reinforcing profiles forms a second groove body located on the inner surface of the groove. A pressure plate is also provided on the outer side of the outer side wall edge of the second groove body and is vertically distributed therewith. The reinforcement profile includes a first profile and a second profile; The two ends of the outer side wall of the second trough body of the first profile are respectively provided with first notches, and the two ends of the pressing plate of the first profile are respectively provided with second notches; The bottom surface and the outer side wall of the second trough body of the second profile and both ends of the pressing plate are respectively provided with third notches; The lengths of the first notch and the third notch are equal to the bottom width of the second slot body, and the bottom end of the second slot body of the first profile is inserted into the third notch.
2. The reinforced assembly structure of the integral bathroom waterproof chassis according to claim 1, characterized in that: The chassis body is also provided with a floor drain installation groove, which is located inside the groove and close to the groove. The floor drain installation groove is connected to the groove through a channel lower than the surface of the chassis body.
3. The reinforced assembly structure of the integral bathroom waterproof chassis according to claim 2, characterized in that: The depth of the floor drain installation groove is lower than the depth of the groove, and the channel is inclined.
4. The reinforced assembly structure of the integral bathroom waterproof chassis according to claim 1, characterized in that: The first profile and the second profile are provided in two groups, the chassis body adopts a rectangular structure, the first profile is symmetrically distributed on two opposite sides of the chassis body, and the second profile is symmetrically distributed on the other two opposite sides of the chassis body.
5. The reinforced assembly structure of the integral bathroom waterproof chassis according to claim 1, characterized in that: The length of the second notch is equal to the width of the rib, the second notch is inserted to the lower part of the rib end of the second profile and is abutted against the outer side wall of the second trough body of the second profile, and the rib end of the first profile abuts against the rib side of the second profile.
6. The reinforced assembly structure of the integral bathroom waterproof chassis according to claim 1, characterized in that: The bottom surface and two adjacent side surfaces of the clamp are open, the bottom surface is used to be connected to the boss, and the openings of the two side surfaces are aligned with the ends of the reinforcing profile and are interconnected to form the first trough body.
7. The reinforced assembly structure of the integral bathroom waterproof chassis according to claim 6, characterized in that: A limiting column connected to the bottom surface is provided in the middle of the openings on the two sides of the clamp, the horizontal cross section of the limiting column is square, the length of the limiting column is equal to the height of the boss, and the cross-sectional side length of the limiting column is equal to the thickness of the reinforcement profile.
