A reinforcement construction structure and construction method for a communication channel between shield tunnels
By setting tie rod connections and temporary internal supports between shield tunnels, and using the principle of self-balancing of internal forces, the deformation problem of shield tunnels caused by mechanical construction is solved, the reinforcement construction is simplified, and the disturbance of the soil and surface is reduced. It is suitable for Construction of compact shield tunnel communication channel.
Patent Information
- Application Number
- CN201911162781.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-11-25
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2039-11-25
AI Technical Summary
During the construction of shield tunnel communication channels, mechanical construction can easily lead to horizontal displacement and deflection of the existing shield tunnel. The reinforcement cost is high, the construction is difficult, and the effect is difficult to guarantee.
By setting tie rods between two parallel shield tunnels for connection, the principle of self-balancing of internal forces in the system is used to avoid deformation caused by the shield boring machine, and temporary internal supports are set up in the shield tunnel for support to ensure construction stability.
It effectively avoids the deflection deformation and cross-sectional deformation of the shield tunnel during the construction of the communication channel, reduces the impact on the surrounding soil and surface, simplifies the reinforcement construction, and is suitable for the construction of communication channels where the net distance of the shield tunnel is not more than 15m.
Smart Images

Figure CN110735650B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of shield tunnels, and in particular relates to a reinforcement construction structure of a communication channel between shield tunnels and a construction method thereof. Background Art
[0002] The subway design specification stipulates that two single-track shield tunnels should have a connecting channel, and the distance between two adjacent connections should not be greater than 600m. The subway shield tunnel is generally more than 1000m long, so the connecting channel is an indispensable auxiliary structure for two single-track subway shield tunnels. The mining method is commonly used at home and abroad to construct the connecting channel. The construction method uses the freezing method to reinforce the area that needs to be excavated. When the soil is frozen and reinforced, the frost heave of the soil will affect the existing shield tunnel, such as Figure 1 shown.
[0003] In order to avoid collapse accidents during the construction of the connecting channel, mechanical construction of the connecting channel (i.e., using the jacking method and the shield method) has been carried out at home and abroad in recent years. However, when the mechanical method is used to construct the connecting channel, the jacking force of the construction equipment is likely to cause the shield tunnel at the origin to shift horizontally and bend, and when the construction machinery approaches the shield tunnel at the receiving end, the pushing force of the cutter head is also likely to cause the shield tunnel at the receiving end to shift horizontally and bend. Figure 2 shown.
[0004] In order to reduce the excessive horizontal displacement of the existing shield tunnel caused by the construction of the mechanical connecting channel, the strata around the existing shield tunnel near the connecting channel are usually reinforced. This is costly, difficult to construct, and takes a long time to construct, and the reinforcement effect is difficult to guarantee. Summary of the invention
[0005] The purpose of the present invention is to provide a reinforcement construction structure and a construction method for a connecting channel between shield tunnels in accordance with the above-mentioned deficiencies of the prior art. The reinforcement construction structure is connected by arranging a number of tie rods between two parallel shield tunnels, and utilizes the principle of self-balancing of the internal force of the system to avoid flexural deformation and cross-sectional deformation of the shield tunnel caused by the shield tunneling machine when excavating the connecting channel, thereby reducing the deformation impact on the shield tunnel and the surrounding soil.
[0006] The purpose of the present invention is achieved by the following technical solutions:
[0007] A reinforcement construction structure for a communication channel between shield tunnels, involving two parallel distributed shield tunnels, characterized in that the reinforcement structure includes tie rods arranged between the two shield tunnels and temporary internal supports arranged in the shield tunnels, the arrangement position of the tie rods corresponds to the design position of the communication channel to be constructed, and the cross-sectional shape of the area enclosed by the tie rod arrangement corresponds to the cross-sectional shape of the communication channel to be constructed.
[0008] The tie rod is composed of a plurality of steel pipe sections connected by threads, and the end of the tie rod passes through the pipe segment on the shield tunnel and is fixed by bolts.
[0009] The pull rod is arranged between 30-50 cm outside the designed position of the communication channel to be constructed.
[0010] The temporary inner support located in the shield tunnel is connected and fixed to the pull rod.
[0011] A construction method for reinforcing a construction structure of a communication channel between any of the shield tunnels, characterized in that the construction method comprises the following steps: arranging temporary internal supports in two shield tunnels respectively to support the shield tunnels; setting tie rods between the two shield tunnels to connect the two shield tunnels together, and the cross-sectional shape of the area enclosed by the tie rod arrangement corresponds to the cross-sectional shape of the communication channel to be constructed; arranging a shield tunneling machine or a pipe jacking machine in one of the shield tunnels, and the shield tunneling machine or the pipe jacking machine excavates along the area enclosed by the tie rods and simultaneously installs the pipe segments of the communication channel to be constructed until excavating into the other shield tunnel to complete the construction of the communication channel.
[0012] The pull rod is composed of a plurality of steel pipe sections. A through hole is opened on the pipe segment of the shield tunnel for the steel pipe section to pass through. In one of the shield tunnels, the first section of the steel pipe section is pressed into the soil through the through hole. When the first section of the steel pipe section is pressed into the end, the second section of the steel pipe section is threadedly connected to the end of the first section of the steel pipe section and continues to be pressed into the soil. This process is repeated until the front end of the first section of the steel pipe section reaches the through hole on another shield tunnel. Then, the two ends of the pull rod are bolted to the pipe segment and the temporary internal support respectively using bolts.
[0013] After the construction of the communication channel is completed, the temporary internal support in the shield tunnel is removed, and the pull rod is left in the soil between the two shield tunnels.
[0014] The advantages of the present invention are: the reinforcement construction structure is simple, and by arranging a plurality of tie rods between two parallel shield tunnels for connection, the principle of self-balancing of the internal force of the system is utilized, so that the shield tunneling machine can effectively avoid the influence of the shield tunnel deflection and cross-sectional deformation during the construction of the connecting channel, and at the same time reduce the disturbance of the surrounding soil and the influence of the upper surface caused by the construction of the connecting channel, and is suitable for the construction of connecting channels of shield tunnels with a net distance of no more than 15m between parallel shield tunnels. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1The expansion and freezing effect on the built shield tunnel caused by freezing the soil in the area of the connecting channel to be constructed by the freezing method in the existing technology;
[0016] Figure 2 The deformation effect on the existing shield tunnel caused by the shield tunneling machine when the shield tunneling machine is excavating without using a reinforcement structure in the prior art;
[0017] Figure 3 It is a schematic diagram of arranging tie rods between adjacent shield tunnels in the present invention;
[0018] Figure 4 It is a schematic diagram of arranging temporary internal supports in each shield tunnel in the present invention;
[0019] Figure 5 It is a schematic diagram of freezing reinforcement in the peripheral soil body of the area enclosed by the tie rods in the present invention;
[0020] Figure 6 It is a schematic diagram of the shield tunneling machine in the present invention performing tunneling construction of a communication channel in the area enclosed by the pull rods. DETAILED DESCRIPTION
[0021] The features of the present invention and other related features are further described in detail below through embodiments in conjunction with the accompanying drawings to facilitate understanding by those skilled in the art:
[0022] like Figure 1-6 In the figure, marks 1-9 are respectively: shield tunnel 1, connecting channel 2, connecting channel boring machine 3, tie rod 4, steel pipe section 5, bolt 6, temporary internal support 7, shield boring machine or jacking machine 8.
[0023] Example: Figure 3-6 As shown, the present embodiment specifically relates to a reinforcement construction structure of a communication channel between shield tunnels and a construction method thereof. The reinforcement construction structure includes a plurality of tie rods 4 arranged between two existing shield tunnels 1, temporary internal supports 7 arranged in each shield tunnel 1, and freezing holes arranged in the outer soil of the area enclosed by the tie rods 4. The two shield tunnels 1 can be effectively connected by setting the tie rods 4 to prevent deformation of the shield tunnel 1 during mechanical construction.
[0024] like Figure 3-6 As shown, two built shield tunnels 1 are distributed in parallel in the soil, and the net distance between them is no more than 15m. In this embodiment, it is necessary to construct a communication channel 2 between the two built shield tunnels 1. In order to avoid deformation of the shield tunnel 1 during the construction process, it is necessary to arrange a corresponding reinforcement construction structure between the two.
[0025] The tie rods 4 are arranged between the two shield tunnels 1 to connect them together. The cross-sectional shape of the area enclosed by the tie rods 4 corresponds to the cross-sectional shape of the communication channel 2 to be constructed, and the cross-sectional shape of the area enclosed by the tie rods 4 is slightly larger than the cross-sectional shape of the communication channel 2 to be constructed, that is, each tie rod 4 is at least 30 cm away from the communication channel 2 to be constructed, and the distance can be between 30-50 cm. It should be noted that the tie rods 4 in this embodiment are specifically formed by connecting a plurality of steel pipe sections 5 with a length of 3-5 m, and the two ends of the tie rods 4 connected as a whole respectively penetrate the pipe segments on the shield tunnel 1 and are fixed to the pipe segments by bolts 6. Under the limit fixation of the tie rods 4, the shield tunnels 1 on both sides will be restricted from deforming outward.
[0026] Temporary internal supports 7 are also arranged in the shield tunnel 1. The temporary internal supports 7 support the top surface, bottom surface and two side surfaces of the shield tunnel 1 respectively, and the temporary internal supports 7 are also fixedly connected to the ends of the tie rods 4 that pass through the shield tunnel 1, thereby forming a whole with each tie rod 4.
[0027] like Figure 3-6 As shown, the reinforcement construction method of the communication channel between shield tunnels in this embodiment specifically includes the following steps:
[0028] (1) Determine the location of the communication passage 2 to be constructed between two existing shield tunnels 1;
[0029] (2) According to the designed position of the communication channel 2 to be constructed, temporary internal supports 7 are arranged in the corresponding area in the shield tunnel 1. The temporary internal supports 7 respectively support the top surface, the bottom surface and the two side walls of the shield tunnel 1 to effectively support the inner wall of the shield tunnel 1;
[0030] (3) A plurality of through holes for the tie rods 4 to pass through are provided at intervals in the shield tunnel 1 in the area corresponding to the communication channel 2 to be constructed. In the through hole in the shield tunnel 1 on one side, each tie rod 4 is pressed into the through hole in the shield tunnel 1 on the other side in turn. The specific installation method of the tie rod 4 includes the following steps: taking any through hole as an example, in the shield tunnel 1 on one side, the first section of the steel pipe section 5 of the tie rod 4 is pressed into the soil through the through hole. When the first section of the steel pipe section 5 is pressed into the end, the end of the first section of the steel pipe section 5 is extended by threaded connection. , that is, the front end of the second steel pipe section 5 is threadedly connected to the end of the first steel pipe section 5, and then the top pressing operation is continued. After the second steel pipe section 5 is pressed to the end, it is continued to be extended, and this process is repeated until the front end of the first steel pipe section 5 reaches the shield tunnel 1 on the other side and passes through the through hole on the pipe segment, and then the two ends of the tie rod 4 are respectively fixed with bolts 6; according to the above method, the installation and fixation of each tie rod 4 are completed in turn, so as to form a circle of enclosure structure surrounded by tie rods 4 in the peripheral area of the communication channel 2 to be constructed;
[0031] (4) After the construction of the temporary inner support 7 and the tie rods 4 is completed, the temporary inner support 7 is connected and fixed with the tie rods 7 to form an integral support structure;
[0032] (5) Move the shield tunneling machine or pipe jacking machine 8 in the shield tunnel 1 to the corresponding area of the communication channel 2 to be constructed, first break the pipe segments at the communication channel 2, and then the shield tunneling machine or pipe jacking machine 8 advances and lays the pipe segments of the communication channel 2 at the same time, until it is excavated into the shield tunnel 1 on the other side, completing the construction of the communication channel 2; it should be noted that the size of the shield tunneling machine or pipe jacking machine 8 is smaller than that of the shield tunnel 1, so it can move and turn freely in the shield tunnel 1; in addition, since the pull rod 4 and the temporary internal support 7 limit and support the shield tunnel 1 accordingly, the shield tunnel 1 will not be deformed during the excavation process of the shield tunneling machine or pipe jacking machine 8, ensuring the structural stability of the shield tunnel 1;
[0033] (6) After the construction of the connecting channel 2 is completed, the temporary internal supports 7 in the two shield tunnels 1 are removed, while the tie rods 4 are permanently left in the soil without being removed.
[0034] The beneficial effects of this embodiment are: the reinforcement construction structure is simple, and by setting a number of tie rods between two parallel shield tunnels for connection, the shield tunneling machine can effectively avoid the influence of flexural deformation and cross-sectional deformation on the shield tunnel during the construction of the connecting channel, and at the same time reduce the disturbance of the surrounding soil and the impact of the upper surface caused by the construction of the connecting channel. It is suitable for the construction of connecting channels of shield tunnels with a net distance of no more than 15m between parallel shield tunnels.
Claims
1. A construction method for reinforcing a construction structure of a communication channel between shield tunnels, involving two parallel shield tunnels, characterized in that The reinforcement construction structure includes a tie rod arranged between the two shield tunnels and a temporary internal support arranged in the shield tunnel, the arrangement position of the tie rod corresponds to the design position of the communication channel to be constructed, and the cross-sectional shape of the area enclosed by the tie rod arrangement corresponds to the cross-sectional shape of the communication channel to be constructed; The tie rod is composed of several steel pipe sections connected by threads, and the end of the tie rod passes through the pipe segment on the shield tunnel and is fixed by bolts; The temporary inner support located in the shield tunnel is connected and fixed to the tie rod; The construction method of the reinforcement construction structure comprises the following steps: arranging temporary internal supports in two shield tunnels respectively to support the shield tunnels; arranging tie rods between the two shield tunnels to connect the two shield tunnels together, and the cross-sectional shape of the area enclosed by the tie rod arrangement corresponds to the cross-sectional shape of the communication channel to be constructed; arranging a shield tunneling machine or a pipe jacking machine in one of the shield tunnels, and the shield tunneling machine or the pipe jacking machine excavates along the area enclosed by the tie rods and simultaneously installs the pipe segments of the communication channel to be constructed until the excavation reaches the other shield tunnel, thereby completing the construction of the communication channel; The pull rod is composed of a plurality of steel pipe sections. A through hole is opened on the pipe segment of the shield tunnel for the steel pipe section to pass through. In one of the shield tunnels, the first section of the steel pipe section is pressed into the soil through the through hole. When the first section of the steel pipe section is pressed into the end, the second section of the steel pipe section is threadedly connected to the end of the first section of the steel pipe section and continues to be pressed into the soil. This process is repeated until the front end of the first section of the steel pipe section reaches the through hole on another shield tunnel. Then, the two ends of the pull rod are bolted to the pipe segment and the temporary internal support respectively using bolts.
2. The construction method of the reinforcement construction structure of the communication channel between shield tunnels according to claim 1 is characterized in that The pull rod is arranged between 30-50 cm outside the designed position of the communication channel to be constructed.
3. The construction method of the reinforcement construction structure of the communication channel between shield tunnels according to claim 1 is characterized in that After the construction of the communication channel is completed, the temporary internal support in the shield tunnel is removed, and the pull rod is left in the soil between the two shield tunnels.