By using multiple stacked core tube units and different types of sleeve connections in prefabricated buildings, the problems of low monomer prefabrication rate and construction efficiency are solved, and efficient construction and quality assurance are achieved.

CN110847374BActive Publication Date: 2024-10-29SHANGHAI CONSTR NO 5 GRP CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN201911270602.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-12-12
Publication Date
2024-10-29
Estimated Expiration
2039-12-12

AI Technical Summary

Technical Problem

The requirements for individual prefabrication rates in prefabricated buildings continue to increase. The design of prefabricated edge components is complex, factory production is cumbersome, and on-site installation is difficult, resulting in low construction quality and efficiency.

Method used

Multiple stacked core units are used, including four shear walls, edge members and different types of sleeve connections. The core structure is connected through grouting sleeves and glue injection sleeves, allowing for overall prefabrication and rapid on-site assembly. .

Benefits of technology

It improves the monomer prefabrication rate and construction speed, simplifies factory production and on-site installation, ensures construction quality, saves labor costs and construction cycles, reduces steel bar collisions at nodes, and improves construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110847374B_ABST
    Figure CN110847374B_ABST
Patent Text Reader

Abstract

The present invention relates to an assembled core tube structure and an application construction method thereof. The assembled core tube structure comprises a plurality of core tube units stacked in sequence, and the core tube unit comprises four shear walls, an edge member, a grouting sleeve and a glue injection sleeve. The shear walls are arranged adjacent to each other in sequence to form a tubular structure, and the edge member is filled between the shear walls; the grouting sleeve is arranged on the shear wall, and the shear walls of adjacent core tube units are connected by the grouting sleeve; the glue injection sleeve is arranged on the edge member, and the edge members of adjacent core tube units are connected by the glue injection sleeve. The assembled core tube structure has a high prefabrication rate and is easy to manufacture, while ensuring the construction quality. In addition, the application construction method of the assembled core tube structure has simple steps and is easy to operate, and is suitable for popularization and application.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of prefabricated buildings, and in particular to a prefabricated core tube structure and an application construction method thereof. Background Art

[0002] For the growing construction market in my country, the drawbacks of cast-in-place structural systems are becoming more and more obvious. In the face of these problems, combined with the successful experience of foreign construction industrialization, my country's construction industry has set off a wave of prefabricated building industrialization, bringing its development into a new era and promoting a huge change in the production mode in the construction field.

[0003] Prefabricated buildings refer to buildings that transfer a large amount of on-site work in traditional construction methods to factories, where building components and accessories (such as floor slabs, wall panels, stairs, balconies, etc.) are processed and manufactured in factories, transported to construction sites, and assembled and installed on site through reliable connection methods. Prefabricated buildings mainly include prefabricated concrete structures, steel structures, modern wooden structures, etc., and are representatives of modern industrialized production methods because they use standardized design, factory production, assembly construction, information management, and intelligent applications.

[0004] However, with the booming development of prefabricated buildings, there are also problems such as the increasing requirements for the prefabrication rate of single units, the complex in-depth design of prefabricated edge components, the troublesome factory production, and the difficulty of on-site installation. Therefore, in order to increase the prefabrication rate of single units, facilitate factory production, and ensure construction quality, the invention of an assembled sleeve-connected core tube structure system has become a technical problem that the industry needs to solve urgently. Summary of the invention

[0005] Based on this, it is necessary to provide an assembled core tube structure and its application construction method with high monomer prefabrication rate, convenient production and guaranteed construction quality in order to solve the above problems.

[0006] An assembled core tube structure, the core tube structure comprising a plurality of core tube units stacked in sequence, the core tube units comprising:

[0007] Four shear walls, the shear walls are arranged adjacent to each other in sequence to form a cylindrical structure;

[0008] Edge components, filled between the shear walls;

[0009] A grouting sleeve is provided on the shear wall, and the shear walls of adjacent core tube units are connected via the grouting sleeve;

[0010] The glue injection sleeve is arranged on the edge component, and the edge components of adjacent core tube units are connected by the glue injection sleeve.

[0011] In one embodiment, the edge member comprises a prefabricated section and a cast-in-place section, wherein the cast-in-place section is located at both ends of the prefabricated section.

[0012] In one embodiment, the number of the cast-in-place sections is two, the glue injection sleeve is provided in one of the cast-in-place sections, and the connecting steel bars are provided in the other cast-in-place section.

[0013] In one embodiment, an angle zone is formed between adjacent shear walls, and the edge member is located in the angle zone and matches the shape of the angle zone.

[0014] In one embodiment, an inner formwork shell is provided on a side of the cast-in-place section close to the cylindrical structure.

[0015] In one embodiment, an outer formwork is provided on a side of the cast-in-place section away from the cylindrical structure.

[0016] In one embodiment, the shear wall is further provided with a plurality of embedded steel bars, and the embedded steel bars and the grouting sleeve are respectively located at opposite ends of the shear wall.

[0017] In one embodiment, the position of the embedded steel bars on the shear wall corresponds to the position of the grouting sleeve on the shear wall.

[0018] In one embodiment, there are multiple grouting sleeves, and the multiple grouting sleeves are evenly arranged along the length direction of the shear wall.

[0019] The application construction method of the above-mentioned assembled core tube structure comprises the following steps:

[0020] The integral prefabricated shear wall forms a cylindrical structure, wherein the shear wall is provided with a grouting sleeve;

[0021] Prefabricate edge components and fill the edge components in the angle area between the shear walls to form a core tube unit; wherein the edge components are provided with a glue injection sleeve;

[0022] The core tube units are stacked, the upper and lower shear walls are connected by the grouting sleeves, and the upper and lower edge members are connected by the glue injection sleeves;

[0023] Grouting material is injected into the grouting sleeve, and glue is injected into the glue injection sleeve to complete the construction of the assembled core tube structure.

[0024] In the above-mentioned prefabricated core tube structure, the shear wall can be prefabricated as a whole, and the connection of the shear walls in the upper and lower core tube units can be achieved through the grouting sleeve, and the edge components can be connected to the edge components in the upper and lower core tube units through the glue injection sleeve. Compared with traditional shear walls, the four shear walls of the prefabricated core tube structure in this case can be prefabricated on site as a whole, and then directly hoisted, which improves the prefabrication rate and construction speed of prefabricated buildings. In addition, the edge components are connected by glue injection sleeves, which can realize the connection of the shear walls in adjacent core tube units and the connection of the edge components at one time, thereby improving the construction efficiency. Therefore, the above-mentioned prefabricated core tube structure has a high prefabrication rate, is easy to manufacture, and at the same time guarantees the construction quality. In addition, the application construction method of the above-mentioned prefabricated core tube structure has simple steps and is easy to operate, which is suitable for popularization and application. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 A formal diagram of a core tube unit of an assembled core tube structure according to an embodiment;

[0026] Figure 2 for Figure 1 AA section view of the fabricated core tube structure shown;

[0027] Figure 3 for Figure 1 The BB cross-section of the assembled core tube structure is shown. DETAILED DESCRIPTION

[0028] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0029] The assembled core tube structure of the present invention is particularly suitable for a frame structure or a core tube structure with an elevator, and the present invention will be described in detail below with reference to the accompanying drawings.

[0030] like Figure 1-3 As shown, an assembled core tube structure of an embodiment includes a plurality of core tube units 1 stacked in sequence, and the core tube unit 1 includes four shear walls 10, edge components 20, grouting sleeves 12 and glue injection sleeves 22. The shear walls 10 are arranged adjacent to each other in sequence to form a cylindrical structure, and the edge components 20 are filled between the shear walls 10; the grouting sleeves 12 are arranged on the shear walls 10, and the shear walls 10 of adjacent core tube units 1 are connected by the grouting sleeves 12; the glue injection sleeves 22 are arranged on the edge components 20, and the edge components 20 of adjacent core tube units 1 are connected by the glue injection sleeves 22.

[0031] According to the needs of construction, the assembled core tube structure can be set to different heights. Generally, the core tube structure can include multiple core tube units 1, and multiple core tube units 1 are stacked from bottom to top to form a core tube structure. For the convenience of explanation, Figure 1 Only one core barrel unit 1 is shown.

[0032] like Figure 2 and Figure 3 As shown, the core tube unit 1 includes four shear walls 10, which are arranged adjacent to each other in sequence to form a tube-like structure. Figure 1 As shown, the shear wall 10 includes a first end and a second end that are arranged opposite to each other. The first end is provided with embedded steel bars 14, and the second end is provided with a grouting sleeve 12. When the upper and lower core tube units 1 are assembled, the embedded steel bars 14 of the upper core tube unit 1 can be inserted into the grouting sleeve 12 of the lower core tube unit 1. Then, grouting material is injected into the grouting sleeve 12, and when the grouting material solidifies, the connection between the upper and lower core tube units 1 is achieved. The shear wall 10 is connected by the grouting sleeve 12, which is simple to construct and does not require additional formwork on site.

[0033] In this embodiment, there are multiple grouting sleeves 12, and multiple grouting sleeves 12 are arranged along the length direction of the shear wall 10. Correspondingly, there are also multiple embedded steel bars 14, and the embedded steel bars 14 and the grouting sleeves 12 are respectively located at opposite ends of the shear wall 10. The embedded steel bars 14 and the grouting sleeves 12 are used to connect adjacent core tube units 1. By matching the arrangement positions of the two on the shear wall 10, the assembly of the core tube unit 1 can be facilitated, and the construction efficiency can be improved.

[0034] Please continue reading Figure 1 and Figure 2 , the shear wall 10 is in the shape of a cuboid, and four shear walls 10 are arranged adjacent to each other in sequence to form a cuboid-shaped cavity. Since the shear wall 10 has a certain thickness, there is an angle zone between adjacent shear walls 10. Correspondingly, in this embodiment, the number of angle zones is 4. The edge member 20 is located in the angle zone and matches the shape of the angle zone to ensure the integrity of the appearance of the core tube unit 1. In this embodiment, the edge member 20 is in the shape of an L-shape, and its two sides are used to connect with adjacent shear walls 10 respectively.

[0035] In this embodiment, the edge member 20 includes a prefabricated section 200 and a cast-in-place section 202, the cast-in-place section 202 is located at both ends of the prefabricated section 200, and the glue injection sleeve 22 is arranged on the cast-in-place section 202. There are two cast-in-place sections 202, and the two cast-in-place sections 202 are respectively located at opposite ends of the prefabricated section 200. In actual construction, the prefabricated section 200 can be prefabricated, and the cast-in-place section 202 is a post-casting area. After the shear wall 10 of the upper and lower core tube units 1 is assembled, the prefabricated section 200 of the edge member 20 is arranged in the angle area, and then the cast-in-place section 202 of the edge member 20 is cast, and at the same time, the glue injection sleeve 22 and the reserved steel bar 24 are respectively arranged on the two cast-in-place sections 202, and then the reserved steel bar 24 of the upper core tube unit 1 is inserted into the glue injection sleeve 22 of the lower core tube unit 1 to complete the connection of the edge member 20. The reserved steel bars 24 and the glue injection sleeve 22 are both cast on site in the cast-in-place section 202 and formed in one go.

[0036] The connection method of the reserved steel bars 24 of the cast-in-place section 202 of the edge member 20 is the connection method of the glue injection sleeve 22. The differences between the glue injection sleeve 22 and the grouting sleeve 12 are as follows: (1) The glue injection space is small. When connecting steel bars of the same diameter, the outer diameter of the glue injection sleeve 22 is smaller than that of the grouting sleeve 12. (2) The glue injection sleeve 22 has only one grouting port, and the grout is discharged from both ends of the glue injection sleeve 22. (3) The grouting material is replaced by a resin-based glue.

[0037] like Figure 2 As shown, in this embodiment, an inner formwork 30 is provided on the side of the cast-in-place section 202 close to the cylindrical structure. Since the cast-in-place section 202 is manufactured on site, the inner formwork 30 can serve as a template. Furthermore, in this embodiment, an outer formwork is provided on the side of the cast-in-place section 202 away from the cylindrical structure. Similarly, the outer formwork can also serve as a template. Among them, the inner formwork 30 and the outer formwork are set in advance before the cast-in-place section 202 is cast. In other embodiments, when used for the lateral connection of the edge member 20 of the core tube structure, the outer formwork may not be provided.

[0038] Compared with the traditional shear wall 10, the above-mentioned assembled core tube structure can be prefabricated as a whole and directly hoisted on site, and the construction speed is increased by more than three times. At the same time, the edge member 20 is connected by a glue injection sleeve 22, which optimizes the construction method, shortens the construction period, and saves 50% of the labor cost. The steel bar connection and concrete pouring in the cast-in-place area are completed at one time, which improves the construction efficiency. Therefore, the above-mentioned assembled core tube structure can not only improve the monomer prefabrication rate, but also make the site less molded and moldless, which can save 50% of the labor cost and 40% of the construction period, reduce the collision of steel bars at the nodes, facilitate on-site construction, improve construction efficiency, and ensure construction quality.

[0039] The following is an explanation of the application and construction method of the above-mentioned assembled core tube structure. An application and construction method of the assembled core tube structure includes the following steps:

[0040] Step 1: prefabricate the shear wall 10 as a whole to form a cylindrical structure, wherein the shear wall 10 is provided with a grouting sleeve 12. Four shear walls 10 are arranged adjacent to each other in sequence to form a cylindrical structure, and the upper and lower core tube units 1 are connected by the grouting sleeve 12.

[0041] Step 2: prefabricate edge components 20, and fill the edge components 20 between the shear walls 10 to form the core tube unit 1; wherein the edge components 20 are provided with a glue injection sleeve 22. The edge components 20 include a prefabricated section 200 and a cast-in-place section 202, the cast-in-place sections 202 are respectively located at opposite ends of the prefabricated section 200, the glue injection sleeve 22 is provided at the cast-in-place section 202, and the edge components 20 of the upper and lower core tube units 1 are connected by the glue injection sleeve 22.

[0042] Step 3: stack the core tube units 1, connect the upper and lower shear walls 10 through the grouting sleeves 12, and connect the upper and lower edge members 20 through the glue injection sleeves 22. The connection between the upper and lower adjacent core tube units 1 is completed through the grouting sleeves 12 and the glue injection sleeves 22.

[0043] Step 4: inject grouting material into the grouting sleeve 12 and inject glue into the glue injection sleeve 22 to complete the construction of the assembled core tube structure.

[0044] The application construction method of the above-mentioned assembled core tube structure has simple steps and is convenient for on-site construction, which is beneficial to improving construction efficiency and ensuring construction quality.

[0045] The technical features of the above-described embodiments may be arbitrarily combined. To make the description concise, not all possible combinations of the technical features in the above-described embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0046] The above-mentioned embodiments only express several implementation methods of the present invention, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the invention patent. It should be pointed out that, for ordinary technicians in this field, several variations and improvements can be made without departing from the concept of the present invention, and these all belong to the protection scope of the present invention. Therefore, the protection scope of the patent of the present invention shall be subject to the attached claims.

Claims

1. An assembled core tube structure, It is characterized in that The core tube structure includes a plurality of core tube units stacked in sequence, and the core tube units include: Four shear walls, the shear walls are arranged adjacent to each other in sequence to form a cylindrical structure; Edge components, filled between the shear walls; A grouting sleeve is provided on the shear wall, and the shear walls of adjacent core tube units are connected via the grouting sleeve; A glue injection sleeve, which is arranged on the edge component, and the edge components of adjacent core tube units are connected by the glue injection sleeve; The edge member includes a prefabricated section and a cast-in-place section, wherein the cast-in-place section is located at both ends of the prefabricated section; There are two cast-in-place sections, one of which is provided with the glue injection sleeve, and the other is provided with reserved steel bars; An angle zone is formed between adjacent shear walls, and the edge member is located in the angle zone and matches the shape of the angle zone; The cast-in-place section is provided with an inner formwork shell on the side close to the cylindrical structure; The side of the cast-in-place section away from the cylindrical structure is provided with an outer formwork; The shear wall is also provided with a plurality of pre-embedded steel bars, and the pre-embedded steel bars and the grouting sleeve are respectively located at opposite ends of the shear wall; The position of the embedded steel bars on the shear wall corresponds to the position of the grouting sleeve on the shear wall; There are multiple grouting sleeves, and the multiple grouting sleeves are evenly arranged along the length direction of the shear wall; The application construction method of the above-mentioned assembled core tube structure comprises the following steps: The integral prefabricated shear wall forms a cylindrical structure, wherein the shear wall is provided with a grouting sleeve; Prefabricate edge components, and fill the edge components between the shear walls to form a core tube unit; wherein the edge components are provided with a glue injection sleeve; The core tube units are stacked, the upper and lower shear walls are connected by the grouting sleeves, and the upper and lower edge members are connected by the glue injection sleeves; Grouting material is injected into the grouting sleeve, and glue is injected into the glue injection sleeve to complete the construction of the assembled core tube structure.