Bottom backfill structure of common wall tunnel group and construction method thereof
By using self-contained materials and sealed wall structures in the construction of open-cut tunnel groups, combined with large and small backfill machinery, the extrusion and construction period problems in cavity backfill construction are solved, and efficient filling and waterproofing performance of cavity is improved. .
Patent Information
- Application Number
- CN201911305071.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2019-12-17
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2039-12-17
AI Technical Summary
In the construction of open-dig tunnel groups, the backfilling construction of cavity between adjacent tunnels has problems such as extrusion causing cracking of common walls, long construction period and poor waterproofing performance. The existing technology is difficult to effectively fill the cavity through backfilling machinery, and it is impossible to Ensure construction period requirements.
The self-contained material filling structure is used to build a sealing wall at one end and the other end of the cavity, and the bottom backfill layer structure is filled with backfill machinery, and the top backfill layer structure is filled with the top backfill structure through the top entrance of the cavity, combining large and small backfill machinery. , realize efficient filling of the cavity.
It reduces construction difficulty, shortens construction period, ensures construction progress, and improves the waterproof performance at the junction, avoiding the hidden dangers of common wall cracks and water leakage.
Smart Images

Figure CN110863515B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of open-cut tunnel group construction, in particular to a bottom backfill structure of a common wall tunnel group and a construction method thereof. Background Art
[0002] In the construction process of open-cut tunnel groups, the construction is generally to use the bottom of the lowest tunnel as the bottom base of the foundation pit to excavate the foundation pit, then construct the main structure of the tunnel in the foundation pit, and at the same time, fill the corresponding backfill area.
[0003] In this process, due to limited construction space, adjacent tunnels often adopt a common wall design to save space and construction costs. However, when the internal height difference between adjacent tunnels is large, in order to avoid excessive pressure on the upper part of the shorter tunnel, the floor of the shorter tunnel is generally raised relative to the floor of the adjacent tunnel during design. At this time, a cavity surrounded by the shorter tunnel floor, the bottom of the foundation pit and the common side wall will be formed under the shorter tunnel floor.
[0004] like Figure 1 As shown, a common side wall 61 is provided between the shorter tunnel 5 and the side tunnel 6. When the difference in the internal space height between the shorter tunnel 5 and the side tunnel 6 is large, a cavity 1 surrounded by the shorter tunnel floor 51, the foundation pit bottom 8 and the common side wall 61 will be formed under the shorter tunnel floor 51.
[0005] In order to prevent the cavity 1 from forming a water bag due to water seepage, the water pressure inside the cavity 1 may cause deformation of the short tunnel floor 51 or the common side wall 61, thereby affecting the waterproofing or use of the PRT (Personal Rapid Transit) channel and the side tunnel 6. Therefore, the cavity 1 needs to be filled during construction.
[0006] During the construction process, in order to ensure the construction progress and convenience, the filling material is generally filled into the cavity 1 by a backfilling machine, and then the shorter tunnel floor 51 structure is constructed, and the shorter tunnel floor 51 is connected to the common side wall 61 to make it a whole, and then the common side wall 61 is extended upward to be used as the shorter tunnel side wall 52.
[0007] However, in the above construction, there are the following disadvantages:
[0008] 1. If Figure 2 As shown, during the backfilling construction of cavity 1, the common side wall 61 is in a cantilever state. If a backfilling machine is used for the backfilling operation, the backfilling machine will squeeze the already filled filler, causing the already filled filler to shift sideways, exerting squeezing force on the side of the common side wall 61, which can easily cause the common wall to crack or even break. If manual filling is used, the construction period is too long, the construction cost is very high, and the solution is unrealistic.
[0009] 2. Since the shorter tunnel floor 51 and the shared side wall 61 cannot be constructed simultaneously, the waterproof performance at their junction is poor, increasing the potential safety hazard of water leakage in the shorter tunnel 5 and the side tunnel 6 during later use.
[0010] 3. This plan requires waiting until the filling construction of cavity 1 is completed before carrying out the construction of the main structure of the shorter tunnel 5. This will extend the construction period of the main structure of the entire tunnel group, thereby delaying the construction period of the later internal decoration of the main structure and electrical construction, resulting in a longer overall construction period.
[0011] If it is chosen to construct the main structure of the shorter tunnel 5 first and then fill the cavity 1, it can greatly reduce the probability of cracking or even breaking the common wall, and can ensure the waterproof performance of the junction between the shorter tunnel floor 51 and the common side wall 61. However, in this solution, the cavity 1 cannot be filled by backfilling machinery, the construction is difficult, and the construction period requirements cannot be guaranteed.
[0012] Therefore, based on the above, there is a need for a bottom backfill structure of a common wall tunnel group to solve the above problems. Summary of the invention
[0013] The purpose of the present invention is to provide a bottom backfill structure of a common wall tunnel group and a construction method thereof, in view of the problems in the prior art that the main structure of a shorter tunnel is constructed first and then the cavity is filled, the cavity cannot be filled by a backfilling machine, the construction is difficult, and the construction period cannot be guaranteed. The main structure of the shorter tunnel is constructed first and then the cavity is filled, the cavity can be conveniently filled, the construction difficulty is low, and the construction period can be guaranteed.
[0014] In order to achieve the above object, the technical solution adopted by the present invention is:
[0015] A bottom backfill structure of a common wall tunnel group, comprising a cavity, the cavity having an inner top surface, one end of the cavity being sealedly connected to a first blocking wall, the other end of the cavity being sealedly connected to a second blocking wall, a top backfill layer structure and a bottom backfill layer structure being arranged in the cavity from top to bottom, the top backfill layer structure and the bottom backfill layer structure filling the cavity together, the top backfill layer structure being a structural member made of self-compacting material, the bottom backfill layer structure having a first top surface in contact with the top backfill layer structure, a first gap being provided between the first top surface and the inner top surface, and at least one inlet connected to the cavity being further arranged at the top of the cavity, the inlet being used to fill the cavity with a filler made of self-compacting material.
[0016] The self-compacting material refers to a filling material that can flow and compact under the action of its own gravity, can completely fill the formwork even in the presence of dense steel bars, and has good homogeneity and does not require additional vibration compaction to meet the filling requirements. The self-compacting material includes self-compacting concrete or foam concrete.
[0017] There is a first gap between the first top surface and the inner top surface, and the first gap is used to allow a backfilling machine to operate therein, and the backfilling machine in the present invention includes a transporting machine for transporting fillers.
[0018] The specific transport machinery includes: bulldozers and earth-moving trucks.
[0019] The bottom backfill structure of a common wall tunnel group described in the present invention has a common side wall between the shorter tunnel and the side tunnel. When the difference in internal space height between the shorter tunnel and the side tunnel is large, a cavity surrounded by the shorter tunnel bottom plate, the foundation pit bottom and the common side wall will be formed under the shorter tunnel bottom plate.
[0020] During the backfilling construction of the cavity, the first blocking wall is first built at one end of the cavity, and the first blocking wall is sealed and connected to the end of the cavity, thereby closing one end of the cavity;
[0021] Afterwards, the second blocking wall is built at the other end of the cavity, the shortest distance between the upper end surface of the second blocking wall and the inner top surface is matched to the first gap as much as possible, and the upper end surface of the second blocking wall is as close to the inner top surface as possible while ensuring that the backfilling machine enters the cavity through the second blocking wall;
[0022] Afterwards, a backfilling machine is used to transport the filler into the cavity and fill it to the bottom of the cavity, finally forming a bottom backfill layer structure. At this time, there is a first gap between the first top surface and the inner top surface, which can meet the needs of the backfilling machine to operate and construct therein. In actual work, the shortest distance between the first top surface and the inner top surface is substantially equal to the shortest distance between the upper end surface of the second blocking wall and the inner top surface at this time.
[0023] Afterwards, continue to construct the second blocking wall until the second blocking wall is sealed and connected to one end of the cavity;
[0024] Afterwards, the self-compacting material is filled into the cavity through an entrance connected to the cavity at the top of the cavity until the cavity is full, and finally a top backfill layer structure is formed. The backfilling is completed, and the self-compacting material can flow and compact, and can be completely filled even in the presence of dense steel bars, while achieving good homogeneity. It only needs to open several entrances at the top of the cavity, and the purpose of filling the cavity can be simply and effectively achieved without affecting the overall strength of the main frame. Among them, at least one entrance connected to the cavity can be drilled at the top of the cavity while or before the construction of all the above-mentioned processes.
[0025] In the above scheme, the filling operation of the self-compacting material can be completed by using existing machinery such as concrete delivery pumps.
[0026] During the actual construction process, on-site inspection ports or openings left when tower cranes and other construction machinery are dismantled can be used as entrances, thereby reducing the number of drilling entrances and lowering construction costs.
[0027] To summarize, the bottom backfill structure of a common wall tunnel group described in the present application first fills the bottom backfill layer structure by a backfilling machine, and then fills the top backfill layer structure by injecting a filler of self-compacting material from the upper end of the cavity, so as to achieve the purpose of filling the cavity. When the construction of the shorter tunnel main structure is carried out first and then the cavity filling construction is carried out, the construction difficulty is low and the entire process is carried out by mechanical construction, which can ensure the construction period.
[0028] Preferably, the shortest distance between the first top surface and the inner top surface is greater than or equal to 3.3 m.
[0029] The minimum operating height of existing backfill machinery is 3.3m.
[0030] Preferably, the bottom backfill layer structure comprises at least two backfill areas arranged from top to bottom, wherein the shortest distance between the upper surface of one backfill area and the inner top surface is greater than or equal to 6.6 m.
[0031] During construction, the second blocking wall is first built until the shortest distance between the upper end surface of the second blocking wall and the inner top surface is close to or equal to 6.6m, so as to ensure that large backfilling machinery can enter the cavity from above the second blocking wall, and the contact between the second blocking wall and the cavity is sealed, wherein large backfilling machinery refers to backfilling machinery whose operating height is greater than or equal to 6.6m;
[0032] Afterwards, a large backfilling machine passes over the second blocking wall and transports fillers into the cavity, and fills the fillers into and fills the cavity to the bottom surface, finally forming at least one layer of the backfill area, wherein the shortest distance between the upper surface of the uppermost backfill area and the inner top surface is close to or equal to 6.6m;
[0033] Afterwards, continue to build the second blocking wall until the shortest distance between the upper end surface of the second blocking wall and the inner top surface is close to or equal to 3.3m, so as to ensure that a small backfilling machine can enter the cavity from above the second blocking wall, and the contact between the second blocking wall and the cavity is sealed, wherein the small backfilling machine is a backfilling machine with a minimum operating height greater than or equal to 3.3m and less than 6.6m;
[0034] Afterwards, a small backfilling machine passes over the second blocking wall and transports the filler into and fills it over the filled backfill area, so that all backfill areas finally form the bottom backfill layer structure together. At this time, the shortest distance between the first top surface and the inner top surface is close to or equal to 3.3m.
[0035] By coordinating large-scale backfilling machinery with small-scale backfilling machinery, the construction machinery is optimally utilized under the conditions of this construction method, which saves backfilling time better and shortens the construction period compared to backfilling operations using only small-scale backfilling machinery.
[0036] The minimum operating height of small backfill machinery is greater than or equal to 3.3m; the minimum operating height of large backfill machinery is greater than or equal to 6.6m.
[0037] Preferably, the bottom backfill layer structure is a structural member filled with earth and stone materials.
[0038] Preferably, at least one layer of the backfill area is a structural member filled with concrete material.
[0039] Preferably, all of the entrances are arranged on a relatively short tunnel floor.
[0040] Preferably, the top backfill layer structure is a structural member filled with self-compacting concrete or foamed concrete.
[0041] Self-compacting concrete or foamed concrete is a preferred self-compacting material, which has the characteristic of low cost compared with other self-compacting materials, thereby reducing construction costs.
[0042] The present invention also discloses a construction method for forming a bottom backfill structure of the common wall tunnel group described in the present application, comprising the following steps:
[0043] S1. Constructing the first blocking wall at one end of the cavity, wherein the first blocking wall closes one end of the cavity;
[0044] S2. Build the second blocking wall at the other end of the cavity until a second gap exists between the upper end surface of the second blocking wall and the inner top surface, and seal the contact between the second blocking wall and the cavity, and then transport the filler from above the second blocking wall to fill the cavity until the bottom backfill layer structure is formed, at which point a first gap exists between the first top surface and the inner top surface;
[0045] S3. Continue to build the second blocking wall until the second blocking wall seals the cavity and one end of the second blocking wall;
[0046] S4. Filling the self-compacting material into the cavity through the inlet until the cavity is full.
[0047] There is a first gap between the first top surface and the inner top surface, and the first gap is used to allow a backfilling machine to operate and construct therein;
[0048] There is a second gap between the upper end surface of the second sealing wall and the inner top surface, and the second gap is used to allow a backfilling machine to enter the cavity through the second sealing wall.
[0049] The construction method of the bottom backfill structure of the common wall tunnel group described in the present application adopts, during the cavity backfill construction, firstly build the first blocking wall at one end of the cavity, and seal the first blocking wall with the cavity, so as to close one end of the cavity;
[0050] Afterwards, the second blocking wall is built at the other end of the cavity, the shortest distance between the upper end surface of the second blocking wall and the inner top surface is matched to the first gap as much as possible, and the upper end surface of the second blocking wall is as close to the inner top surface as possible while ensuring that the backfilling machine enters the cavity through the second blocking wall;
[0051] Afterwards, a backfilling machine is used to transport the filler into the cavity and fill it to the bottom of the cavity, finally forming a bottom backfill layer structure. At this time, there is a first gap between the first top surface and the inner top surface, which can meet the needs of the backfilling machine to operate and construct therein. In actual work, the shortest distance between the first top surface and the inner top surface is substantially equal to the shortest distance between the upper end surface of the second blocking wall and the inner top surface at this time.
[0052] Afterwards, continue to construct the second blocking wall until the second blocking wall is sealed and connected to one end of the cavity;
[0053] Afterwards, the self-compacting material is filled into the cavity through an inlet at the top of the cavity connected to the cavity until the cavity is filled, and finally a top backfill layer structure is formed, and the backfilling is completed.
[0054] The self-compacting material can flow and compact, and can be completely filled even in the presence of dense steel bars, while achieving good homogeneity. Therefore, it is only necessary to open several entrances at the top of the cavity. The purpose of filling the cavity can be simply and effectively achieved without affecting the overall strength of the main frame. Among them, at least one entrance connected to the cavity can be drilled at the top of the cavity while or before all the above-mentioned processes are constructed.
[0055] In the above scheme, the filling operation of the self-compacting material can be completed by using existing machinery such as concrete delivery pumps.
[0056] During the actual construction process, on-site inspection ports or openings left when tower cranes and other construction machinery are dismantled can be used as entrances, thereby reducing the number of drilling entrances and lowering construction costs.
[0057] To summarize, the filler is first filled into the cavity from the side of the cavity by a backfilling machine, and then the filler made of self-compacting material is injected from the upper end of the cavity to achieve the purpose of filling the cavity. The construction of the shorter tunnel main structure is carried out first, and then the cavity filling construction is carried out. The cavity can be filled conveniently, the construction difficulty is low, and at the same time, the entire process is carried out by mechanical construction, which can ensure the construction period.
[0058] Preferably, the bottom backfill layer structure includes at least two backfill areas arranged from top to bottom, and the step S2 specifically includes the following construction steps:
[0059] S21, constructing the second blocking wall until the shortest distance between the upper end surface of the second blocking wall and the inner top surface (11) is greater than or equal to 6.6 m;
[0060] S22, using a large backfilling machine to transport fillers from above the second blocking wall and fill the cavity until at least one layer of backfill area is formed, wherein the shortest distance between the upper surface of the uppermost backfill area and the inner top surface is greater than or equal to 6.6 m;
[0061] S23, continue to build the second blocking wall until the shortest distance between the upper end surface of the second blocking wall and the inner top surface is greater than or equal to 3.3 m, and seal the contact between the second blocking wall and the cavity;
[0062] S24, using a small backfilling machine to continue to transport the filler into the cavity and fill the remaining backfill area until the bottom backfill layer structure is formed.
[0063] Large backfill machinery refers to backfill machinery with a minimum operating height greater than or equal to 6.6m.
[0064] During construction, the second blocking wall is first built until the shortest distance between the upper end surface of the second blocking wall and the inner top surface is close to or equal to 6.6m, so as to ensure that large backfill machinery can enter the cavity from above the second blocking wall, and the contact between the second blocking wall and the cavity is sealed, wherein large backfill machinery refers to backfill machinery whose operating height is greater than or equal to 6.6m;
[0065] Afterwards, a large backfilling machine passes over the second blocking wall and transports fillers into the cavity, and fills the fillers into the cavity to the bottom surface, finally forming at least one layer of the backfill area, wherein the shortest distance between the upper surface of the uppermost backfill area and the inner top surface is greater than or equal to 6.6 m;
[0066] Afterwards, continue to build the second blocking wall until the shortest distance between the upper end surface of the second blocking wall and the inner top surface is close to or equal to 3.3m, so as to ensure that a small backfilling machine can enter the cavity from above the second blocking wall, and the contact between the second blocking wall and the cavity is sealed, wherein the small backfilling machine is a backfilling machine with a minimum operating height greater than or equal to 3.3m and less than 6.6m;
[0067] Afterwards, a small backfilling machine passes over the second blocking wall and transports the filler into and fills it over the filled backfill area, so that all backfill areas finally form the bottom backfill layer structure together. At this time, the shortest distance between the first top surface and the inner top surface is close to or equal to 3.3m.
[0068] By coordinating large-scale backfilling machinery with small-scale backfilling machinery, the construction machinery is optimally utilized under the conditions of this construction method, which saves backfilling time better and shortens the construction period compared to backfilling operations using only small-scale backfilling machinery.
[0069] The minimum operating height of small backfill machinery is greater than or equal to 3.3m; the minimum operating height of large backfill machinery is greater than or equal to 6.6m.
[0070] Preferably, in step S2, after constructing the second blocking wall, slopes are respectively constructed on both sides of the second blocking wall, and the slopes and the second blocking wall together form a trapezoidal structural member.
[0071] After the second sealing wall is constructed, slopes are constructed on both sides of the second sealing wall so that backfilling machinery can easily pass over the second sealing wall.
[0072] Preferably, the slope of the trapezoidal structural member is less than 30°
[0073] Preferably, step S4 can be performed while any one of steps S1 to S3 is being performed.
[0074] Preferably, before step S1, waterproofing construction is performed on the inner surface of the cavity (1) to prevent water in the cavity from flowing back into the shorter tunnel and the side tunnel.
[0075] Preferably, the shorter tunnel floor, the foundation pit bottom and the common side wall enclose the cavity, and all the entrances are arranged on the shorter tunnel floor.
[0076] In summary, due to the adoption of the above technical solution, the beneficial effects of the present invention are:
[0077] 1. The bottom backfill structure of a common wall tunnel group of the present application first fills the filler into the cavity from the side of the cavity by a backfilling machine, and then injects the filler of self-compacting material from the upper end of the cavity to achieve the purpose of filling the cavity. The construction of the shorter tunnel main structure is carried out first, and then the cavity filling construction is carried out. The cavity can be filled conveniently, the construction difficulty is low, and at the same time, the whole process is carried out by mechanical construction, which can ensure the construction period.
[0078] 2. The bottom backfill structure of a common wall tunnel group of the present application uses large backfill machinery and small backfill machinery to optimize the use of construction machinery under the conditions of the present construction method, thereby better saving backfill time and shortening the construction period compared to backfill operations using only small backfill machinery.
[0079] 3. The present application discloses a construction method for forming a bottom backfill structure of the common wall tunnel group. The method first uses a backfilling machine to fill the cavity from the side of the cavity, and then injects a self-compacting material filler from the upper end of the cavity to achieve the purpose of filling the cavity. The main structure of the shorter tunnel is constructed first, and then the cavity is filled. The cavity can be easily filled, the construction difficulty is low, and the entire process is carried out by mechanical construction, which can ensure the construction period.
[0080] 4. The present application discloses a construction method for forming a bottom backfill structure of the common wall tunnel group. By coordinating large-scale backfill machinery with small-scale backfill machinery, the construction machinery is optimally utilized under the conditions of the present construction method, thus better saving backfill time and shortening the construction period compared to backfill operations using only small-scale backfill machinery. BRIEF DESCRIPTION OF THE DRAWINGS
[0081] Figure 1 It is a schematic diagram of the structure of a common wall tunnel group in the prior art;
[0082] Figure 2 It is a schematic diagram of backfilling construction of the cavity below the common wall tunnel group in the prior art;
[0083] Figure 3 A schematic cross-sectional view of a bottom backfill structure of a common wall tunnel group described in the present application;
[0084] Figure 4 A construction cross-sectional schematic diagram of a construction method for forming a bottom backfill structure of a common wall tunnel group described in the present application (filling backfill area);
[0085] Figure 5 A construction cross-sectional schematic diagram of a construction method for forming a bottom backfill structure of a common wall tunnel group described in the present application (filling the bottom backfill layer structure);
[0086] Figure 6 A schematic diagram of a construction section of a construction method for forming a bottom backfill structure of a common wall tunnel group described in the present application (filling the top backfill layer structure);
[0087] Figure 7 A schematic cross-sectional view of a construction method for forming a bottom backfill structure of a common wall tunnel group described in the present application (filling the top backfill layer structure);
[0088] Markings in the figure: 1-cavity, 11-inner top surface, 12-entrance, 2-first blocking wall, 3-bottom backfill layer structure, 31-backfill area, 311-upper surface, 312-first top surface, 4-second blocking wall, 5-shorter tunnel, 51-shorter tunnel floor, 52-shorter tunnel side wall, 6-side tunnel, 61-common side wall, 7-top backfill layer structure, 8-bottom of foundation pit. DETAILED DESCRIPTION
[0089] The present invention will be described in detail below in conjunction with the accompanying drawings.
[0090] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.
[0091] Example 1
[0092] like Figure 4-6As shown, a bottom backfill structure of a common wall tunnel group includes a cavity 1, wherein the cavity 1 has an inner top surface 11, one end of the cavity 1 is sealedly connected to a first blocking wall 2, and the other end of the cavity 1 is sealedly connected to a second blocking wall 4, a top backfill layer structure 7 and a bottom backfill layer structure 3 are arranged from top to bottom in the cavity 1, the top backfill layer structure 7 and the bottom backfill layer structure 3 together fill the cavity 1, the top backfill layer structure 7 is a structural member made of self-compacting material, the bottom backfill layer structure 3 has a first top surface 312 in contact with the top backfill layer structure 7, there is a first gap between the first top surface 312 and the inner top surface 11, the first gap is used to meet the working conditions of the backfilling machinery therein, and at least one inlet 12 connected to the cavity 1 is also arranged at the top of the cavity 1, the inlet 12 is used to fill the self-compacting material filler into the cavity 1.
[0093] The tunnel in this embodiment includes a pipe-type tunnel, a tunnel with an upper opening, or a tunnel with a side opening.
[0094] The self-compacting material refers to a filling material that can flow and compact under the action of its own gravity, can completely fill the formwork even in the presence of dense steel bars, and has good homogeneity and does not require additional vibration compaction to meet the filling requirements. The self-compacting material includes self-compacting concrete or foam concrete.
[0095] The first threshold is the minimum working height of the backfilling machinery, and the backfilling machinery in the present invention includes a transporting machinery for transporting filling materials.
[0096] The specific transport machinery includes: bulldozers and earth-moving trucks.
[0097] The bottom backfill structure of a common wall tunnel group described in the present application is a common side wall 61 arranged between the shorter tunnel 5 and the side tunnel 6. When the difference in the internal space height between the shorter tunnel 5 and the side tunnel 6 is large, a cavity 1 surrounded by the shorter tunnel bottom plate 51, the foundation pit bottom 8 and the common side wall 61 will be formed under the shorter tunnel bottom plate 51.
[0098] During the backfilling construction of the cavity 1, the first blocking wall 2 is first built at one end of the cavity 1, and the first blocking wall 2 is sealed and connected to the end of the cavity 1, so as to close one end of the cavity 1;
[0099] Afterwards, the second blocking wall 4 is built at the other end of the cavity 1, and the shortest distance between the upper end surface of the second blocking wall 4 and the inner top surface 11 is adapted to the first gap as much as possible, so that the upper end surface of the second blocking wall 4 is as close to the inner top surface 11 as possible while ensuring that the backfilling machine passes through the second blocking wall 4 to enter the cavity 1;
[0100] Afterwards, a backfilling machine is used to transport the filler into the cavity 1 and fill it to the bottom of the cavity 1, finally forming a bottom backfill layer structure 3. At this time, there is a first gap between the first top surface 312 and the inner top surface 11, which can meet the needs of the backfilling machine for operation and construction. In actual work, the shortest distance between the first top surface 312 and the inner top surface 11 is substantially equal to the shortest distance between the upper end surface of the second blocking wall 4 and the inner top surface 11.
[0101] Afterwards, continue to construct the second sealing wall 4 until the second sealing wall 4 is sealed and connected to one end of the cavity 1;
[0102] Afterwards, the self-compacting material is filled into the cavity 1 through the inlet 12 connected to the cavity 1 at the top of the cavity 1 until the cavity 1 is filled, and finally a top backfill layer structure 7 is formed. The backfilling is completed, and the self-compacting material can flow and compact, and can be completely filled even in the presence of dense steel bars, while obtaining good homogeneity. It is only necessary to open a number of inlets 12 at the top of the cavity 1, and the purpose of filling the cavity 1 can be simply and effectively achieved without affecting the overall strength of the main frame. Among them, at least one inlet 12 connected to the cavity 1 can be drilled at the top of the cavity 1 while or before the construction of all the above-mentioned processes.
[0103] In the above scheme, the filling operation of the self-compacting material can be completed by using existing machinery such as concrete delivery pumps.
[0104] In the actual construction process, the on-site inspection port or the opening left when the construction machinery such as the tower crane is dismantled can be used as the entrance 12, thereby reducing the number of drilling entrances 12 and reducing the construction cost.
[0105] In summary, the filler is first filled into the cavity 1 from the side of the cavity 1 by a backfilling machine, and then the filler made of self-compacting material is injected from the upper end of the cavity 1 to achieve the purpose of filling the cavity 1. The construction of the shorter tunnel main structure is carried out first, and then the cavity filling construction is carried out. The cavity can be filled conveniently, the construction difficulty is low, and at the same time, the whole process is carried out by mechanical construction, which can ensure the construction period.
[0106] On the basis of the above, in a further preferred manner, the shortest distance between the first top surface 312 and the inner top surface 11 is greater than or equal to 3.3 m.
[0107] The minimum operating height of existing backfill machinery is 3.3m.
[0108] On the basis of the above, in a further preferred manner, the bottom backfill layer structure 3 includes at least two backfill areas 31 arranged from top to bottom, wherein the shortest distance between the upper surface 311 of one backfill area 31 and the inner top surface 11 is greater than or equal to 6.6 m.
[0109] The second threshold is the minimum working height of a large-scale backfilling machine, and the large-scale backfilling machine is a backfilling machine whose minimum working height is greater than or equal to 6.6 m.
[0110] During construction, the second blocking wall 4 is first built until the shortest distance between the upper end surface of the second blocking wall 4 and the inner top surface 11 is close to or equal to 6.6m, so as to ensure that large backfilling machinery can enter the cavity 1 from above the second blocking wall 4. Slopes for large backfilling machinery to pass through the second blocking wall 4 are built on both sides of the second blocking wall 4, and the contact between the second blocking wall 4 and the cavity 1 is sealed. Among them, large backfilling machinery refers to backfilling machinery whose operating height is greater than or equal to 6.6m;
[0111] Afterwards, a large backfilling machine passes over the second blocking wall 4 and transports fillers into the cavity 1, and fills the fillers into and fills the cavity 1 to the bottom surface, finally forming at least one layer of the backfilling area 31, wherein the shortest distance between the upper surface 311 of the uppermost backfilling area 31 and the inner top surface 11 is close to or equal to 6.6m;
[0112] Afterwards, continue to build the second blocking wall 4 until the shortest distance between the upper end surface of the second blocking wall 4 and the inner top surface 11 is close to or equal to 3.3m, so as to ensure that small backfilling machinery can enter the cavity 1 from above the second blocking wall 4, and build slopes on both sides of the second blocking wall 4 for small backfilling machinery to pass through the second blocking wall 4, and the contact between the second blocking wall 4 and the cavity 1 is sealed, wherein the small backfilling machinery is a backfilling machinery with a minimum operating height greater than or equal to 3.3m and less than 6.6m;
[0113] Afterwards, a small backfilling machine passes over the second blocking wall 4, and transports the filler into and fills it over the filled backfill area 31, so that all the backfill areas 31 eventually form the bottom backfill layer structure 3 together. At this time, the shortest distance between the first top surface 312 and the inner top surface 11 is close to or equal to 3.3m.
[0114] By coordinating large-scale backfilling machinery with small-scale backfilling machinery, the construction machinery is optimally utilized under the conditions of this construction method, which saves backfilling time better and shortens the construction period compared to backfilling operations using only small-scale backfilling machinery.
[0115] The minimum operating height of small backfill machinery is greater than or equal to 3.3m; the minimum operating height of large backfill machinery is greater than or equal to 6.6m.
[0116] On the basis of the above, in a further preferred manner, the bottom backfill layer structure 3 is a structural member filled with earth and stone materials.
[0117] On the basis of the above, in a further preferred manner, at least one layer of the backfill area 31 is a structural member filled with concrete material.
[0118] On the basis of the above, in a further preferred manner, all the entrances 12 are arranged on a relatively short tunnel floor 51 .
[0119] On the basis of the above, in a further preferred manner, the top backfill layer structure 7 is a structural member filled with self-compacting concrete or foamed concrete.
[0120] Self-compacting concrete or foamed concrete is a preferred self-compacting material, which has the characteristic of low cost compared with other self-compacting materials, thereby reducing construction costs.
[0121] Example 2
[0122] like Figure 3-7 As shown, a construction method for forming a bottom backfill structure of a common wall tunnel group as described in Example 1 of the present invention comprises the following steps:
[0123] S1. Constructing the first blocking wall 2 at one end of the cavity 1, wherein the first blocking wall 2 closes one end of the cavity 1;
[0124] S2. Build the second blocking wall 4 at the other end of the cavity 1 until there is a second gap between the upper end surface of the second blocking wall 4 and the inner top surface 11, the second gap is used to allow the backfilling machinery to pass through the second blocking wall 4 and enter the cavity 1, the second blocking wall 4 and the cavity 1 are sealed at the contact point, and then the filler is transported from the second blocking wall 4 to fill the cavity 1 until the bottom backfill layer structure 3 is formed, at this time, there is a first gap between the first top surface 312 and the inner top surface 11, the first gap is used to allow the backfilling machinery to operate and construct therein;
[0125] S3. Continue to build the second blocking wall 4 until the second blocking wall 4 closes the cavity and one end of the second blocking wall 4;
[0126] S4. Fill the self-compacting material into the cavity 1 through the inlet 12 until the cavity 1 is full.
[0127] The first threshold is the minimum working height of the backfilling machinery, and the backfilling machinery in the present invention includes a transporting machinery for transporting filling materials.
[0128] like Figure 4As shown, the construction method of the bottom backfill structure of the common wall tunnel group described in the present application adopts, when the cavity 1 is backfilled, the first blocking wall 2 is first built at one end of the cavity 1, and the first blocking wall 2 is sealed and connected to the end of the cavity 1, so as to close one end of the cavity 1;
[0129] like Figure 5 As shown, after that, the second blocking wall 4 is built at the other end of the cavity 1, and the shortest distance between the upper end surface of the second blocking wall 4 and the inner top surface 11 is adapted to the first gap as much as possible, while ensuring that the backfilling machine passes through the second blocking wall 4 to enter the cavity 1, and the upper end surface of the second blocking wall 4 is as close to the inner top surface 11 as possible;
[0130] like Figure 5 As shown, after that, a backfilling machine is used to transport the filler into the cavity 1 and fill it to the bottom surface of the cavity 1, and finally a bottom backfill layer structure 3 is formed. At this time, there is a first gap between the first top surface 312 and the inner top surface 11, which can meet the needs of the backfilling machine to operate and construct therein. In actual work, the shortest distance between the first top surface 312 and the inner top surface 11 is substantially equal to the shortest distance between the upper end surface of the second blocking wall 4 and the inner top surface 11 at this time.
[0131] like Figure 6 As shown, after that, the second sealing wall 4 is continuously constructed until the second sealing wall 4 is sealed and connected to one end of the cavity 1;
[0132] Afterwards, the self-compacting material is filled into the cavity 1 through the inlet 12 at the top of the cavity 1 which is connected to the cavity 1 until the cavity 1 is filled, and finally a top backfill layer structure 7 is formed, and the backfilling is completed.
[0133] The self-compacting material can flow and compact, and can be completely filled even in the presence of dense steel bars, while achieving good homogeneity. Therefore, it is only necessary to open a plurality of entrances 12 at the top of the cavity 1. The purpose of filling the cavity 1 can be simply and effectively achieved without affecting the overall strength of the main frame. At least one entrance 12 connected to the cavity 1 can be drilled at the top of the cavity 1 at the same time or before all the above-mentioned steps are carried out.
[0134] In the above scheme, the filling operation of the self-compacting material can be completed by using existing machinery such as concrete delivery pumps.
[0135] In the actual construction process, the on-site inspection port or the opening left when the construction machinery such as the tower crane is dismantled can be used as the entrance 12, thereby reducing the number of drilling entrances 12 and reducing the construction cost.
[0136] In summary, the filler is first filled into the cavity 1 from the side of the cavity 1 by a backfilling machine, and then the filler made of self-compacting material is injected from the upper end of the cavity 1 to achieve the purpose of filling the cavity 1. The construction of the shorter tunnel main structure is carried out first, and then the cavity filling construction is carried out. The cavity can be filled conveniently, the construction difficulty is low, and at the same time, the whole process is carried out by mechanical construction, which can ensure the construction period.
[0137] On the basis of the above, in a further preferred manner, the bottom backfill layer structure 3 includes at least two backfill areas 31 arranged from top to bottom, and the step S2 specifically includes the following construction steps:
[0138] S21, constructing the second blocking wall 4 until the shortest distance between the upper end surface of the second blocking wall 4 and the inner top surface 11 is greater than or equal to 6.6 m;
[0139] S22, using a large backfilling machine to transport fillers from above the second blocking wall 4 and fill the cavity 1 until at least one layer of backfill area 31 is formed, wherein the shortest distance between the upper surface 311 of the uppermost backfill area 31 and the inner top surface 11 is greater than or equal to 6.6 m;
[0140] S23, continue to build the second blocking wall 4 until the shortest distance between the upper end surface of the second blocking wall 4 and the inner top surface 11 is greater than or equal to 3.3 m, and seal the contact between the second blocking wall 4 and the cavity 1;
[0141] S24, using a small backfilling machine to continue to transport fillers into the cavity 1, and fill the remaining backfill area 31, until the bottom backfill layer structure 3 is formed.
[0142] The minimum working height of large-scale backfill machinery is 6.6m, and the large-scale backfill machinery is a backfill machinery whose minimum working height is greater than or equal to 6.6m.
[0143] like Figure 5 As shown, during construction, the second blocking wall 4 is first built until the shortest distance between the upper end surface of the second blocking wall 4 and the inner top surface 11 is close to or equal to 6.6m, so as to ensure that large backfilling machinery can enter the cavity 1 from above the second blocking wall 4, and slopes for large backfilling machinery to pass through the second blocking wall 4 are built on both sides of the second blocking wall 4, and the contact between the second blocking wall 4 and the cavity 1 is sealed, wherein large backfilling machinery refers to backfilling machinery whose operating height is greater than or equal to 6.6m;
[0144] Afterwards, a large backfilling machine passes over the second blocking wall 4 and transports fillers into the cavity 1, and fills the fillers into and fills the cavity 1 to the bottom surface, finally forming at least one layer of the backfilling area 31, wherein the shortest distance between the upper surface 311 of the uppermost backfilling area 31 and the inner top surface 11 is close to or equal to 6.6m;
[0145] like Figure 5 As shown, after that, continue to build the second blocking wall 4 until the shortest distance between the upper end surface of the second blocking wall 4 and the inner top surface 11 is close to or equal to 3.3m, so as to ensure that small backfilling machinery can enter the cavity 1 from above the second blocking wall 4, and build slopes for small backfilling machinery to pass through the second blocking wall 4 on both sides of the second blocking wall 4, and the contact between the second blocking wall 4 and the cavity 1 is sealed, wherein the small backfilling machinery is a backfilling machinery with a minimum operating height greater than or equal to 3.3m and less than 6.6m;
[0146] Afterwards, a small backfilling machine passes over the second blocking wall 4, and transports the filler into and fills it over the filled backfill area 31, so that all the backfill areas 31 eventually form the bottom backfill layer structure 3 together. At this time, the shortest distance between the first top surface 312 and the inner top surface 11 is close to or equal to 3.3m.
[0147] By coordinating large-scale backfilling machinery with small-scale backfilling machinery, the construction machinery is optimally utilized under the conditions of this construction method, which saves backfilling time better and shortens the construction period compared to backfilling operations using only small-scale backfilling machinery.
[0148] The minimum operating height of small backfill machinery is greater than or equal to 3.3m; the minimum operating height of large backfill machinery is greater than or equal to 6.6m.
[0149] On the basis of the above, a further preferred manner is that in step S2, after constructing the second blocking wall 4, slopes are respectively constructed on both sides of the second blocking wall 4, and the slopes and the second blocking wall 4 together form a trapezoidal structural member.
[0150] After the second sealing wall 4 is constructed, slopes are constructed on both sides of the second sealing wall 4 so that a backfilling machine can easily pass over the second sealing wall 4 .
[0151] On the basis of the above, in a further preferred embodiment, the slope of the trapezoidal structural member is less than 30°
[0152] On the basis of the above, a further preferred method is that step S4 can be performed when any one of steps S1-S3 is performed.
[0153] On the basis of the above, a further preferred manner is that before step S1 , waterproofing construction is performed on the inner surface of the cavity 1 to prevent water in the cavity 1 from flowing back into the shorter tunnel 5 and the side tunnel 6 .
[0154] On the basis of the above, in a further preferred manner, the shorter tunnel floor 51 , the foundation pit bottom 8 and the common side wall 61 enclose the cavity 1 , and all the entrances 12 are arranged on the shorter tunnel floor 51 .
[0155] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A construction method for forming a bottom backfill structure of a common wall tunnel group, Features: The bottom backfill structure of the common wall tunnel group comprises a cavity (1), the cavity (1) having an inner top surface (11), one end of the cavity (1) being sealedly connected to a first blocking wall (2), and the other end of the cavity (1) being sealedly connected to a second blocking wall (4), a top backfill layer structure (7) and a bottom backfill layer structure (3) being arranged from top to bottom in the cavity (1), the top backfill layer structure (7) and the bottom backfill layer structure (3) filling the cavity (1) together, the top backfill layer structure (7) being a structural member made of self-compacting material, the bottom backfill layer structure (3) having a first top surface (312) in contact with the top backfill layer structure (7), a first gap being present between the first top surface (312) and the inner top surface (11), The inner top surface (11) is provided with at least one inlet (12) connected to the cavity (1), and the inlet (12) is used to fill a filler of a self-compacting material into the cavity (1); The common wall tunnel group further comprises a shorter tunnel floor (51), a foundation pit bottom (8) and a common side wall (61), the shorter tunnel floor (51), the foundation pit bottom (8) and the common side wall (61) enclosing the cavity (1), and all the entrances (12) are arranged on the shorter tunnel floor (51); The construction method comprises the following steps: S1. constructing the first blocking wall (2) at one end of the cavity (1), wherein the first blocking wall (2) closes one end of the cavity (1); S2. construct the second blocking wall (4) at the other end of the cavity (1) until a second gap exists between the upper end surface of the second blocking wall (4) and the inner top surface (11), and seal the contact between the second blocking wall (4) and the cavity (1), and then transport the filler from above the second blocking wall (4) to fill the cavity (1) until the bottom backfill layer structure (3) is formed, at which point a first gap exists between the first top surface (312) and the inner top surface (11); S3. Continue to build the second blocking wall (4) until the second blocking wall (4) closes one end of the cavity; S4. Filling the self-compacting material into the cavity (1) through the inlet (12) until the cavity (1) is filled; The bottom backfill layer structure (3) includes at least two backfill areas (31) arranged from top to bottom, and the step S2 specifically includes the following construction steps: S21, constructing the second blocking wall (4) until the shortest distance between the upper end surface of the second blocking wall (4) and the inner top surface (11) is greater than or equal to 6.6 m; S22, using a large backfilling machine to transport fillers from above the second blocking wall (4) and fill the cavity (1) until at least one layer of backfill area (31) is formed, wherein the shortest distance between the upper surface (311) of the uppermost backfill area (31) and the inner top surface (11) is greater than or equal to 6.6 m; S23, continue to construct the second blocking wall (4) until the shortest distance between the upper end surface of the second blocking wall (4) and the inner top surface (11) is greater than or equal to 3.3 m, and seal the contact point between the second blocking wall (4) and the cavity (1); S24, using a small backfilling machine to continue to transport the filler into the cavity (1), and fill the remaining backfilling area (31), until the bottom backfilling layer structure (3) is formed.
2. A construction method for forming a bottom backfill structure of a common wall tunnel group according to claim 1, Features: The bottom backfill layer structure is a structural member filled with earth and stone materials.
3. A construction method for forming a bottom backfill structure of a common wall tunnel group according to any one of claims 1 to 2, Features: The top backfill layer structure (7) is a structural member filled with self-compacting concrete or foamed concrete.
4. A construction method for forming a bottom backfill structure of a common wall tunnel group according to claim 1, Features: In step S2, after constructing the second blocking wall (4), slopes are respectively constructed on both sides of the second blocking wall (4), and the slopes and the second blocking wall (4) together form a trapezoidal structural member.
5. A construction method for forming a bottom backfill structure of a common wall tunnel group according to claim 1, Features: Before step S1, waterproofing construction is performed on the inner surface of the cavity (1).
Citation Information
Patent Citations
Co-building method and co-building structure of comprehensive pipe gallery and metro station
CN110424454A
Open trench tunnel special -shaped structure's basement system of consolidating
CN207003483U
Bottom backfill structure of common-wall tunnel group
CN212153449U
Tunnel construction process
EP0242497A1
Tunnel lining method and tunnel lining body
JP1994010597A