Model test of beach scour stability Upstream flow steady automatic regulation device

By designing automatic adjustment devices for water supply, energy dissipation and diversion components, the problem of upstream flow stability control in the beach protection scour stability model test was solved, improving test accuracy and efficiency and reducing costs.

CN111176341BActive Publication Date: 2024-10-22TIANJIN RES INST FOR WATER TRANSPORT ENG M O T
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010075248.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-01-22
Publication Date
2024-10-22
Estimated Expiration
2040-01-22

AI Technical Summary

Technical Problem

In the beach protection scour stability model test, it is difficult to control the stability of the upstream flow, which affects the test accuracy and cycle, and the cost of existing equipment is high.

Method used

An automatic adjustment device is designed that includes a water supply component, an energy dissipation smooth component, and a rapid and stable flow diversion component. Through components such as a pump, shower head, overflow pool, and diverter wall, the control center is used to achieve precise flow adjustment and smooth control of water flow. Form a complete model automatic adjustment control system.

Benefits of technology

It achieves fast and smooth automatic adjustment of flow rate, improves test accuracy, shortens test cycle, reduces cost, and ensures test quality through wireless communication and high-precision flow data collection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111176341B_ABST
    Figure CN111176341B_ABST
Patent Text Reader

Abstract

The present invention provides an upstream flow smooth automatic regulating device for a beach protection scour stability model test, which belongs to the field of ecological improvement and restoration engineering, and includes a water supply component, an energy dissipation smooth component, and a diversion fast and smooth component arranged in sequence along the water flow direction; the water supply component realizes the continuous supply and pumping of water; the energy dissipation smooth component realizes the collection and stabilization after the horizontal impact, and the diversion fast and smooth component includes an overflow pool, the front end of the overflow pool is provided with an overflow dam, the rear end of the overflow pool is provided with a diversion wall, and a control center controls the opening and closing of electrical components and receives signals fed back by the electrical components. The present invention has an ingenious concept, a simple structure, and flexible assembly and disassembly, and meets the range adjustment of different flow sizes during the test process, so as to achieve the purpose of fast and stable flow during the entire test process, improve the test accuracy and shorten the test cycle, save the test cost, and improve the measurement and control accuracy. The whole device has high reliability, good stability, and improved work efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of beach or river beach ecological improvement and restoration engineering, and relates to an upstream flow stabilization automatic regulating device for a beach protection scouring stability model test. Background Art

[0002] The Yangtze River runs through the eastern, central and western regions of my country, and 35% of my country's total economic output is gathered along the Yangtze River. Using the Yangtze River's golden waterway, about 35% of the country's steel production capacity, 28% of crude oil processing capacity, and 7% of thermal power generation are laid out along the river. It is a dense belt for my country's economic development. In the past 50 years, the bank protection engineering technology in the middle and lower reaches of the Yangtze River has been in a process of continuous development and exploration, and has accumulated rich experience in practice. Judging from the engineering effects that have been applied so far, although it plays an important role in stabilizing the local river flow, due to the use of a single beach protection building or improper plane layout, severe deformation occurs at the beach head and edge, and local damage is serious, and its stability is worrying. Analysis shows that the main beach protection structures currently used are as follows: soft-body beach protection structure (geotextile bottom protection, block stone ballast, concrete, block hinge row); scattered block beach protection structure (stone or concrete artificial block); dam body beach protection structure (construction of spur dike group, submerged dam, backflow dam). However, each type of beach protection block has certain defects. Soft-type beach protection is prone to scouring and collapse, tearing, exposure and even hanging in the air. The effect of using scattered riprap on sandy riverbeds is poor; the riprap dam is built with a loose structure and poor integrity, which is prone to water damage. The engineering technology of beach protection needs further research and practice. The biggest influence on the stability of the bank and beach in the mainstream of the Yangtze River is still the scouring effect of the flow. Since the magnitude of the water flow velocity determines whether the sediment starts to move, it also determines the magnitude of local scouring. Therefore, based on the previous research work on channel regulation, a physical model test of physical water flow scouring was carried out, focusing on the water damage mechanism and stability analysis of typical beach protection buildings in the middle reaches of the Yangtze River. Physical model testing is an important research method and specialized technology in scientific experiments. It uses river dynamics knowledge, based on the mechanical similarity principle of water flow and sediment movement, and the boundary conditions and dynamic conditions similar to the prototype, to study the flow structure, riverbed evolution process and engineering scheme effect of the river in natural river conditions or with hydraulic structures. The research results will be promoted and applied to waterway regulation projects in the middle reaches of the Yangtze River and other similar river sections, providing technical support for common beach protection projects, which will help enhance the stability of beach protection buildings and improve the level of design technology. At the same time, the research results will enrich the content of waterway regulation disciplines and promote innovation and technological progress in waterway regulation technology.

[0003] In physical model tests, whether the upstream inlet flow is fast and stable and effectively controlled directly affects the accuracy and test cycle of the test. Therefore, a complete set of corresponding measurement and control instruments and equipment and advanced measurement technology are required to improve the measurement and control accuracy and work efficiency of the model test and shorten the model test cycle. However, the price of purchasing equipment based on the above system development is relatively expensive. Summary of the invention

[0004] The problem to be solved by the present invention is to provide an upstream flow smooth automatic regulating device for a beach scouring stability model test, so as to meet the flow accuracy and work efficiency during the test, shorten the model test cycle and ensure the quality of the model test.

[0005] In order to solve the above technical problems, the technical solution adopted by the present invention is: an upstream flow stabilization automatic regulating device for the beach protection scour stability model test, comprising a water supply component, an energy dissipation stabilization component and a diversion fast stabilization component arranged in sequence along the water flow direction;

[0006] The water supply assembly includes a pump, a base and a water outlet pipe, the base is arranged in a water reservoir, the pump is arranged on the base and pumps water to supply water to the water outlet pipe, the water outlet pipe includes three branches, a 2# exhaust pipe at the upper end, a 3# diversion pipe at the lower end and a 1# branch pipe at the front end, and the water outlet end of the 3# diversion pipe is arranged at the upper end of the water reservoir;

[0007] The energy dissipation and stabilization component includes a flat water pool, the water outlet end of the 1# branch pipe is provided with a shower head, the shower head is provided with a plurality of first diversion holes, and the shower head is arranged at the upper end of the flat water pool;

[0008] The fast and smooth diversion component comprises an overflow pool, an overflow dam is arranged between the overflow pool and the level water pool, and a diversion wall is arranged at the water outlet end of the overflow pool;

[0009] The control center controls the opening and closing of electrical components and receives feedback signals from electrical components.

[0010] Furthermore, the pump is a vertical axial flow pump, a 1# artificial emergency valve is provided at one end of the 2# exhaust pipe away from the water outlet pipe, and a 2# artificial emergency valve is provided at one end of the 3# diversion pipe away from the water outlet pipe.

[0011] Furthermore, a support seat for supporting the 1# branch pipe is provided between the 1# branch pipe and the water reservoir, and the 1# branch pipe is inclined downward from one end of the water reservoir to the flat water tank with a slope of 1 to 5 degrees.

[0012] Furthermore, one end of the 1# branch pipeline from the water storage tank to the leveling tank is provided with a 1# electromagnetic flowmeter, a 1# electric butterfly valve and a 3# manual emergency valve electrically connected to the control center in sequence, and both ends of the 1# electromagnetic flowmeter, the 1# electric butterfly valve and the 3# manual emergency valve are provided with a 4# shunt pipeline arranged in parallel therewith, and the 4# shunt pipeline is provided with a 2# electromagnetic flowmeter and a 2# electric butterfly valve electrically connected to the control center.

[0013] Furthermore, the 4# diversion pipe is arranged to be inclined downward from one end of the water reservoir to the level water tank with a slope of 1 to 5 degrees, and the slope of the 4# diversion pipe is greater than the slope of the 1# branch pipe.

[0014] Furthermore, the leveling water tank and the overflow tank are connected as an integral whole and are arranged in parallel with the water reservoir, and the 1# branch pipe is erected between the water reservoir and the leveling water tank.

[0015] Furthermore, the first diversion holes are arranged in multiple circles from inside to outside with the center of the shower head as the center, and the first diversion holes in each circle are evenly distributed relative to the center of the shower head, and the center angle between two adjacent first diversion holes is 30 degrees.

[0016] Furthermore, the inner walls of the flat water pool and the overflow pool are both provided with wave-breaking layers, the upper end of the overflow dam close to the overflow pool is provided with an overflow chamfer slanting downward, the water outlet end of the overflow pool is provided with a diversion wall, and the diversion wall is provided with multiple second diversion holes.

[0017] Furthermore, the diversion wall is a grid steel frame structure, wave-breaking layers are arranged on both sides of the diversion wall in the thickness direction, the second diversion hole is arranged through the wave-breaking layer, organic glass material blocks are arranged at the grid of the overflow dam, and second diversion holes of different numbers and cross-sectional areas are arranged at 0.2H, 0.4H, 0.6H, 0.8H and left, middle and right of the overflow dam, where H is the height of the overflow dam.

[0018] Furthermore, the side of the diversion wall away from the overflow pool is a steady flow zone, the width of the steady flow zone is 5m to 10m, the dimensions of the flat water pool are as follows: length L is 8m to 10m, width B is 4m to 6m, height H is 1.5m to 3.0m, and the thickness of the wave-breaking layer is 0.5m.

[0019] Compared with the prior art, the present invention has the following advantages and positive effects.

[0020] 1. The present invention is provided with a water supply component, an energy dissipation and smooth component and a fast and smooth diversion component. The water supply component realizes the functions of water supply, exhaust and diversion. The energy dissipation and smooth component can realize flow regulation under the action of the control center, and can accurately and automatically adjust the flow required by the test, as well as the function of smooth water flow. The fast and smooth diversion component realizes the functions of smooth water flow acceleration and uniform flow distribution. The whole layout is ingeniously conceived, simple in structure, and flexible in assembly and disassembly, forming a complete set of model automatic adjustment control system, which can quickly reach the flow and velocity values ​​required by the test, meet the goal of fast, smooth and automatic adjustment of the flow, improve the test accuracy, shorten the test cycle, and save the test cost.

[0021] 2. The control center uses wireless communication to communicate with the computer in the main control room, and uses a dual-integral high-precision A / D conversion chip to collect flow data. The high-brightness LED data is displayed. Through the comparison and verification of the measured and target curves of two different colors, the laboratory issues a command to quickly start the automatic flow adjustment work, and finally achieves the goal of rapid and stable flow. In addition, the electrical components in this application are all composed of existing accessories on the market, with ingenious design, simple structure, and flexible assembly and disassembly;

[0022] 3. Multiple first diversion holes and second diversion holes are set to achieve the effect of steady flow and pressure reduction before the water flows into the flat water pool. After the water flows through the diversion wall, it achieves sufficient diversion effect again, further improving the stability of the water flow and the test accuracy. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] The accompanying drawings constituting a part of the present invention are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the accompanying drawings:

[0024] Figure 1 It is a structural schematic diagram of an upstream flow rate stabilization automatic regulating device for a beach protection scour stability model test of the present invention;

[0025] Figure 2 The present invention Figure 1 AA section view;

[0026] Figure 3 The present invention Figure 1 BB cross-sectional view;

[0027] Figure 4 The present invention Figure 1 CC section view;

[0028] Figure 5 The present invention Figure 2 Detail of Section D.

[0029] Reference numerals:

[0030] 1. Pump; 2. Reservoir; 3. Base; 4. Outlet pipe; 5. 1# branch pipe; 6. 2# exhaust pipe; 7. 3# diversion pipe; 8. 1# artificial emergency valve; 9. 2# artificial emergency valve; 10. Support seat; 11. 4# diversion pipe; 12. 1# electromagnetic flowmeter; 13. 1# electric butterfly valve; 14. 2# electromagnetic flowmeter; 15. 2# electric butterfly valve; 16. Control center; 17. 3# artificial emergency valve; 18. 4# artificial emergency valve; 19. Shower head; 191. First diversion hole; 20. Flat water pool; 21. Wave-breaking layer; 22. Overflow dam; 221. Overflow chamfer; 23. Diversion wall; 24. Second diversion hole; 25. Overflow pool; 26. Steady flow area. DETAILED DESCRIPTION

[0031] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments may be combined with each other.

[0032] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and the like are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, features defined as "first", "second", and the like may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.

[0033] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.

[0034] The specific embodiments of the present invention are described in detail below with reference to the accompanying drawings.

[0035] like Figure 1 to Figure 5As shown, the present invention is an upstream flow stabilization automatic regulating device for a beach protection scour stability model test, comprising a water supply component, an energy dissipation stabilization component and a diversion fast stabilization component sequentially arranged along the water flow direction;

[0036] The water supply assembly supplies water, air and flow, and includes a pump 1, a base 3 and a water outlet pipe 4. The base 3 is arranged in the water reservoir 2. The pump 1 is arranged on the base 3 and pumps water to supply water to the water outlet pipe 4. The water outlet pipe 4 includes three branches, a 2# exhaust pipe 6 at the upper end, a 3# flow diversion pipe 7 at the lower end and a 1# branch pipe 5 at the front end. The water outlet end of the 3# flow diversion pipe 7 is arranged at the upper end of the water reservoir 2.

[0037] The energy dissipation and stabilization component includes a water leveling pool 20. A shower head 19 is provided at the water outlet of the 1# branch pipe 5. The shower head 19 is provided with a plurality of first diversion holes 191. The shower head 19 is provided at the upper end of the water leveling pool 20, and its function is to dissipate energy and stabilize the water body.

[0038] The fast and smooth diversion component includes an overflow pool 25, an overflow dam 22 is provided between the overflow pool 25 and the leveling pool 20, and a diversion wall 23 is provided at the outlet end of the overflow pool 25, so that the water flow is homogenized and accelerated smoothly;

[0039] The control center 16 controls the opening and closing of the electrical components and receives the feedback signals from the electrical components to control the total flow and perform fine adjustment of the flow.

[0040] Preferably, the pump 1 is a vertical axial flow pump 1 , a 1# artificial emergency valve 8 is provided at one end of the 2# exhaust pipe 6 away from the outlet pipe 4 , and a 2# artificial emergency valve 9 is provided at one end of the 3# diversion pipe 7 away from the outlet pipe 4 .

[0041] Preferably, a support seat 10 for supporting the 1# branch pipe 5 is provided between the 1# branch pipe 5 and the water reservoir 2. The 1# branch pipe 5 is inclined downward from one end of the water reservoir 2 to the level water pool 20 with a slope of 1 to 5 degrees, preferably 2 degrees, and the principle of gravity is used to realize automatic discharge of water flow, thereby saving energy.

[0042] Preferably, one end of the 1# branch pipe 5 from the water reservoir 2 to the leveling pool 20 is provided with a 1# electromagnetic flowmeter 12, a 1# electric butterfly valve 13 and a 3# artificial emergency valve 17 electrically connected to the control center 16 in sequence, and both ends of the 1# electromagnetic flowmeter 12, the 1# electric butterfly valve 13 and the 3# artificial emergency valve 17 are provided with a 4# shunt pipe 11 arranged in parallel therewith, and the 4# shunt pipe 11 is provided with a 2# electromagnetic flowmeter 14 and a 2# electric butterfly valve 15 electrically connected to the control center 16, so as to realize automatic control of the flow rate conveniently.

[0043] Preferably, the 4# diversion pipe 11 is inclined downward from one end of the water reservoir 2 to the leveling pool 20 with a slope of 1 to 5 degrees, preferably 3 degrees. The slope of the 4# diversion pipe 11 is greater than the slope of the 1# branch pipe 5, making full use of the principle of gravity to make the level relatively flat but continuous, without the need for additional driving force, thus saving energy consumption.

[0044] Preferably, the leveling tank 20 and the overflow tank 25 are connected as an integral unit and are arranged in parallel with the water reservoir 2, and the 1# branch pipe 5 is erected between the water reservoir 2 and the leveling tank 20. This structural layout can save structural space and make the entire structure more compact.

[0045] Preferably, the first diversion holes 191 are arranged in multiple circles from the inside to the outside with the center of the shower head 19 as the center. The first diversion holes 191 in each circle are evenly distributed relative to the center of the shower head 19. The center angle between two adjacent first diversion holes 191 is 30 degrees. They are evenly distributed and dispersed to spray water, thereby reducing the pressure when the water is sprayed out, making the water flow more stable and improving the stability of the water level.

[0046] Preferably, the inner walls of the flat water pool 20 and the overflow pool 25 are both provided with a wave-breaking layer, and the upper end of the overflow dam 22 close to the overflow pool 25 is provided with an overflow chamfer 221 inclined downward. In order to ensure that the water in the flat water pool 20 enters the overflow pool 25 smoothly and prevent the water from passing through the overflow dam 22 and causing water surface fluctuations in the overflow pool 25 due to the water level difference inside and outside, the overflow dam 22 is set with a 0.2m gear, and a total of 10 gears are set. A 2m high steel frame automatic adjustable structure is adopted to meet the test adjustment under different circumstances. During the test, as the water level in the flat water pool 20 increases, 0.2m high strip plexiglass material blocks are evenly added each time to reduce the water level difference. At the same time, the present application can achieve rapid assembly, disassembly and environmental protection requirements, and reduce the test cost. A diversion wall 23 is provided at the outlet of the overflow pool 25, and a plurality of second diversion holes 24 are provided on the diversion wall 23 to further improve the stability during horizontal discharge.

[0047] Preferably, the diversion wall 23 is a grid steel frame structure, which can be quickly disassembled, conveniently reused, energy-saving and environmentally friendly, and can be used multiple times, reducing the test cost. Wave-breaking layers are arranged on both sides of the diversion wall 23 in the thickness direction, and the second diversion hole 24 is arranged through the wave-breaking layer. Organic glass material blocks are arranged at the grid of the overflow dam 22, and second diversion holes 24 of different numbers and cross-sectional areas are arranged at 0.2H, 0.4H, 0.6H, 0.8H and left, middle and right of the overflow dam 22, where H is the height of the overflow dam 22. In the present application, the thickness of the wave-breaking layer is 0.5m, and the wave-breaking layer is composed of wave-breaking material, which can be sponge, cotton or other elastic or highly adsorbent materials, thereby achieving the stability of the water flow and improving the test accuracy.

[0048] Preferably, the side of the diversion wall 23 away from the overflow pool 25 is a steady flow zone 26, and the width of the steady flow zone 26 is 5m to 10m, which further ensures the smooth outflow of water. The dimensions of the flat water pool 20 are as follows: length L is 8m to 10m, width B is 4m to 6m, height H is 1.5m to 3.0m, and the thickness of the wave-breaking layer is 0.5m. The dimensions of the flat water pool 20 are set according to the wave period T generated by the water waves in the pool, the actual flow rate Q1 required for the test, and the size of the laboratory site S. They are generally within the above parameter range, thereby ensuring that the water entering the flat water pool 20 is fully stable.

[0049] In the actual working process, in the water supply component, pump 1 provides a total flow rate Q. Pump 1 adopts the existing ZLB pump 1 series single-stage vertical axial flow pump 1 on the market, model 20ZLB, flow rate Q = 1610m 3 / h, head H = 3.48m, number of revolutions n = 730, efficiency η = 80.1%, power P = 30kw, pipe diameter Φ = 500mm, the water supply assembly is divided into a pump body part and a transmission part. The pump body parts include a horn pipe, an impeller part, a guide vane body, a bend pipe, a bearing, a stuffing box and a coupling, etc. The transmission part has one end of a transmission shaft connected to the motor through a coupling, and the other end connected to the water pump 1. The axial force of the pump 1 is borne by the bearing installed in the base 3. The shaft seal adopts a packing seal. The impeller of the moving pump 1 is turned counterclockwise when viewed from the suction port. At the same time, three branch pipes are designed at the end of the outlet pipe 4 of the pump 1, namely, the main branch pipe 1# branch pipe 5 Φ=450mm, the 2# exhaust pipe 6 Φ=50mm, and the 3# branch pipe, whose diameter is Φ=100mm, which meets the actual flow rate Q1 of the test. At the same time, in order to ensure safety, the 1# artificial emergency valve 8 and the 2# artificial emergency valve 9 are installed at the head of the 2# exhaust pipe 6 and the 3# branch pipe;

[0050] The control center 16 realizes the control of the actual flow Q1 of the 1# branch pipeline 5. The entire flow control system mainly includes an electromagnetic flowmeter, an electric regulating butterfly valve, a pipeline, a lotus-shaped water outlet, and a computer flow control system. In order to more precisely control the test flow Q1, a branch pipe is designed on the 1# branch pipeline 5, that is, the 4# branch pipeline 11, with a pipe diameter of Φ=50mm to fine-tune the flow Q2. At the same time, a 1# electromagnetic flowmeter 12 and a 1# electric butterfly valve 13 are set on the 1# branch pipeline 5; a 2# electromagnetic flowmeter 14 and a 2# electric butterfly valve 15 are set on the 4# branch pipeline 11 to realize automatic adjustment of the actual flow value of the test by the control center 16. The entire control center 16 is connected by a 485 field bus, and then communicates with the computer in the main control room by wireless communication to form a complete model test monitoring, measurement and control trinity system. The control center 16 is based on a single-chip microcomputer, and adopts a dual-integral high-precision A / D conversion chip for flow data acquisition, high-brightness LED data display, supplemented by monitoring circuits, and large-capacity Flash Rom storage circuit ensures the reliability and stability of the controller, and can adapt to various complex and harsh working environments; at the same time, high-precision D / A conversion chip is used to control the electric control valve, and it communicates with the main control computer through the 232 interface to transmit various system data to the main control computer to realize centralized control of the entire system. The control center 16 adopts an embedded operating system and a self-tuning PID operation unit, which greatly facilitates system debugging. The control center 16 uses the DELIPH development toolkit for secondary development and uses Microsoft's SGL2 large database system as background service to save various system data. The monitoring software runs in the Windows system environment. The system provides two monitoring curves, measured and target, for comparison and verification. Users can also adjust the system according to their needs. The parameters are displayed in the same screen with curves of different colors, and the curve data is saved in the historical database. The system runs according to the target flow set before the test and the measured flow results using the approximation method. Finally, the command is issued by the laboratory to start the automatic multi-group adjustment task. At the same time, in order to ensure safety, 3# artificial emergency valve 17 and 4# artificial emergency valve 18 are installed at the head of 1# branch pipe 5 and 4# diversion pipe 11. In order to reduce the concentrated water flow entering the flat water tank 20 and the water surface fluctuation, a shower head 19 is installed at the end of 1# branch pipe 5. The circular diameter of the head is Φ=500mm. The entire water outlet circular surface is divided into 4 concentric circles at every 30° angle and the outlet hole is set at the intersection of the 4 concentric circles. The hole diameter is Φ=25mm, so that the water body enters the flat water tank 20 evenly, ensuring that the water flows smoothly into the next process.

[0051] Then the water enters the leveling pool 20, gets fully stabilized, and finally enters the overflow pool 25 through the overflow dam 22, and then enters the front of the experimental section through the diversion wall 23, achieving rapid and stable water flow. The whole process not only ensures the precise control of the actual flow of the test, but also ensures the uniform and stable rapid water flow before reaching the test section. Therefore, the test accuracy is guaranteed, the work efficiency is improved, and the test cost is saved. This application utilizes the existing single equipment and related control technologies in the laboratory to independently develop the flow stabilization automatic control system required for the model test, which not only improves the experimental methods and means, and increases the scientific and technological content, but also has good economic and social benefits, and has played an important role in teaching and scientific research experiments. The rapid flow balance control device developed this time is ingeniously conceived, simple in structure, and flexible in assembly and disassembly. It is composed of the existing high-precision electromagnetic flowmeter, electric regulating butterfly valve, and flow controller on the market. It is composed of a main control computer and communicates with the computer in the main control room by wireless communication to form a complete model automatic adjustment control system. This application fully meets the range of different flow rates during the test, and can calculate the test flow rate based on the time scale relationship of the test simulation. By adjusting the electromagnetic flowmeter, the electric regulating butterfly valve, and the design of the flow pipe diameter and the diversion hole size, the purpose of fast and stable flow rate in the whole test process can be achieved, the test accuracy is improved, the test cycle is shortened, and the test cost is saved. The control center 16 is provided with a friendly human-computer interface and multi-window, multi-functional detection functions; the experimental methods and means have been developed and improved, the measurement and control accuracy have been improved, the whole system has high reliability, good stability, and improved work efficiency, and has been successfully applied to laboratory scientific research and production projects, generating certain economic benefits, and can be promoted and applied in other hydraulic and river engineering model tests.

[0052] The above is a detailed description of an embodiment of the present invention, but the content is only a preferred embodiment of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made within the scope of the present invention should still fall within the scope of the patent coverage of the present invention.

Claims

1. The upstream flow stability automatic regulating device for the beach protection scour stability model test is characterized by: It includes a water supply component, an energy dissipation and stabilization component, and a diversion and rapid stabilization component which are sequentially arranged along the water flow direction; The water supply assembly includes a pump, a base and a water outlet pipe, the base is arranged in the water reservoir, the pump is arranged on the base and pumps water to supply water flow to the water outlet pipe, the water outlet pipe includes three branches, a 2# exhaust pipe at the upper end, a 3# diversion pipe at the lower end and a 1# branch pipe at the front end, and the water outlet end of the 3# diversion pipe is arranged at the upper end of the water reservoir; The energy dissipation and stabilization component includes a flat water pool, the water outlet end of the 1# branch pipe is provided with a shower head, the shower head is provided with a plurality of first diversion holes, and the shower head is arranged at the upper end of the flat water pool; The fast and smooth diversion component comprises an overflow pool, an overflow dam is arranged between the overflow pool and the level water pool, and a diversion wall is arranged at the water outlet end of the overflow pool; The control center controls the opening and closing of electrical components and receives feedback signals from them; A support base for supporting the 1# branch pipe is provided between the 1# branch pipe and the water reservoir, and the 1# branch pipe is arranged obliquely downward from one end of the water reservoir to the flat water tank with an inclination of 1 to 5 degrees; The inner walls of the flat water pool and the overflow pool are both provided with wave-breaking layers, the upper end of the overflow dam close to the overflow pool is provided with an overflow chamfer inclined downward, the outlet end of the overflow pool is provided with a diversion wall, and the diversion wall is provided with a plurality of second diversion holes.

2. The device for automatically regulating the upstream flow rate during the beach scour stability model test according to claim 1 is characterized by: The pump is a vertical axial flow pump, a 1# artificial emergency valve is provided at one end of the 2# exhaust pipe away from the water outlet pipe, and a 2# artificial emergency valve is provided at one end of the 3# diversion pipe away from the water outlet pipe.

3. The device for automatically regulating the upstream flow rate during the beach scouring stability model test according to claim 1 is characterized by: The 1# branch pipeline is provided with a 1# electromagnetic flowmeter, a 1# electric butterfly valve and a 3# manual emergency valve electrically connected to the control center at one end from the water storage tank to the leveling tank in sequence, and both ends of the 1# electromagnetic flowmeter, the 1# electric butterfly valve and the 3# manual emergency valve are provided with a 4# shunt pipeline arranged in parallel therewith, and the 4# shunt pipeline is provided with a 2# electromagnetic flowmeter and a 2# electric butterfly valve electrically connected to the control center.

4. The device for automatically regulating the upstream flow rate during the beach scouring stability model test according to claim 3 is characterized by: The 4# diversion pipeline is inclined downward from one end of the water reservoir to the level water tank with a slope of 1 to 5 degrees. The slope of the 4# diversion pipeline is greater than the slope of the 1# branch pipeline.

5. The device for automatically regulating the upstream flow rate during the beach scouring stability model test according to claim 1 is characterized by: The leveling water tank and the overflow tank are connected as one body and are arranged in parallel with the water reservoir, and the 1# branch pipe is erected between the water reservoir and the leveling water tank.

6. The device for automatically regulating the upstream flow rate during the beach scour stability model test according to claim 1 is characterized by: The first diversion holes are arranged in multiple circles from the inside to the outside with the center of the shower head as the center. The first diversion holes in each circle are evenly distributed relative to the center of the shower head, and the center angle between two adjacent first diversion holes is 30 degrees.

7. The device for automatically regulating the upstream flow rate during the beach scouring stability model test according to claim 1 is characterized by: The diversion wall is a grid steel frame structure, wave-breaking layers are arranged on both sides of the diversion wall in the thickness direction, the second diversion hole is arranged through the wave-breaking layer, organic glass material blocks are arranged at the grid of the overflow dam, and second diversion holes of different numbers and different cross-sectional areas are arranged at 0.2H, 0.4H, 0.6H, 0.8H and on the left, middle and right of the overflow dam, where H is the height of the overflow dam.

8. The device for automatically regulating the upstream flow rate during the beach scouring stability model test according to claim 1 is characterized by: The side of the diversion wall away from the overflow pool is a steady flow zone, the width of the steady flow zone is 5m to 10m, the dimensions of the flat water pool are as follows: length L is 8m to 10m, width B is 4m to 6m, height H is 1.5m to 3.0m, and the thickness of the wave-breaking layer is 0.5m.