A device and method for restoring the pile bearing capacity after the pile is cut and corrected

Vertical pressure is exerted on the pile bodies of the cut piles by jacks and pressure-bearing components to restore the pile bearing capacity of the building after the piles are cut and corrected. This solves the problems of large construction space, long construction period, and high cost, and achieves convenient construction, short construction period, and high cost. Low cost and simultaneous construction of multiple pile positions.

CN111188373BActive Publication Date: 2024-10-15JIANGSU SOUTHEAST SPECIAL TECH ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010176528.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-03-13
Publication Date
2024-10-15
Estimated Expiration
2040-03-13

AI Technical Summary

Technical Problem

When the existing technology is used to restore the pile bearing capacity of buildings after pile cutting and correction, the construction space is large, the construction period is long, and the cost is high. It is difficult to transport large machinery to the pile edge, and the additional reinforced concrete cap will cause damage to the original pile body, which is not ideal. Mechanical equipment for pressure recovery.

Method used

Jacks and pressure-bearing components are used to apply vertical pressure to the lower pile body after the pile has been cut. Through the design of steel corbels and pressure-bearing curved steel plates, the rebound displacement of the pile body is offset, the internal stress state of the pile is restored, and the reinforced concrete reaches Remove the device after specifying the strength.

Benefits of technology

It achieves convenient construction, short construction period, low cost, can construct multiple pile positions at the same time, and the device can be disassembled and reused, which solves the problem of small construction space and transportation of large machinery without damaging the original pile body.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111188373B_ABST
    Figure CN111188373B_ABST
Patent Text Reader

Abstract

The present invention discloses a device and method for restoring the pile bearing capacity after the pile is cut and corrected. The device adopts the relationship between friction resistance and vertical pressure in the principle of mechanics to design the device of the present invention. The device includes a pressure-applying component and a pressure-bearing component; the pressure-bearing component includes two steel brackets, a pile top horizontal steel plate and two pressure-bearing curved steel plates; the pile top horizontal steel plate is horizontally placed on the top of the lower pile body of the cut pile, the two steel brackets are detachably mounted on the two ends of the pile top horizontal steel plate, the two pressure-bearing curved steel plates are respectively located on the inner sides of the two steel brackets and close to the surface of the lower pile body of the cut pile; the pressure-applying component is two self-locking jacks, which are used to apply vertical pressure to the pressure-bearing component. The device of the present invention has an ingenious structure, is simple to manufacture, and has the advantages of being reusable, short construction period, and low cost. It greatly improves the work efficiency of restoring the bearing capacity of the cut pile and has a good application prospect.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a device and a method for restoring the pile bearing capacity of a building after the pile is cut and corrected. Background Art

[0002] With the development of building structures, the height of residential buildings, office buildings and other buildings is getting higher and higher. High-rise buildings have large loads and are mostly built with pile foundation technology. However, due to geological surveys or construction problems, accidents of high-rise building tilting are common. At present, the domestic correction technology is relatively mature. For buildings with tilted pile foundations, the pile cutting correction method is a commonly used correction method.

[0003] The principle of pile cutting and correction is to ensure the overall safety of the building, and symmetrically cut the piles on the side with higher height of the house foundation in batches, so as to increase the vertical load of the piles on the side of the house foundation that have not been cut, accelerate its settlement, and make the house foundation tilt back to the higher side as a whole. When the pile cutting method is used to correct the deviation of the building, after the correction of the building is completed, the bearing capacity of the cut piles needs to be restored. The general recovery method is to pour high-strength concrete or reinforced concrete at the location of the cut piles. After the pile is cut, the lower pile body has an upward rebound displacement, and the stress in the pile body is released. Therefore, before restoring the bearing capacity of the pile and pouring high-strength concrete or reinforced concrete, it is necessary to offset the rebound displacement of the lower pile body and restore the stress state in the pile, that is, the bearing capacity of the pile. That is, measures need to be taken to apply pressure to the lower pile body, and it is required to pour reinforced concrete under pressure to connect the piles.

[0004] The method currently used in the project is to cast an additional reinforced concrete cap at the original position of the cut pile as a force transmission structure to restore the pile's bearing capacity. This method requires a large construction space, a long construction period, and a high project cost. In addition, the additional reinforced concrete cap will cause certain damage to the original pile body due to the need for planting reinforcement. Moreover, the pile is usually cut at the bottom of the cap, and the working surface is very small, so it is difficult for large machinery to be transported to the side of the pile for pressure application. Therefore, there is currently no ideal mechanical equipment to complete the above work. Summary of the invention

[0005] In order to solve the above-mentioned problem of restoring the bearing capacity of piles after pile cutting and correction, the present invention proposes a device and method for restoring the bearing capacity of piles after pile cutting and correction of a building. The device uses the relationship between friction resistance and vertical pressure in the principle of mechanics to design the device of the present invention. A vertical pressure is applied to the lower pile body after the pile is cut by a jack and a pressure-bearing component to offset the rebound displacement of the pile body after the pile is cut, and the stress state inside the pile is restored, i.e., the bearing capacity of the pile. Reinforced concrete is poured under pressure and removed after the reinforced concrete reaches the specified strength. The specific technical scheme is as follows:

[0006] A device for restoring the bearing capacity of a pile after pile cut and deviation correction in a building, comprising a pressure-applying component and a pressure-bearing component; the pressure-bearing component comprises two steel corbels, a pile top horizontal steel plate and two pressure-bearing curved steel plates; the pile top horizontal steel plate is horizontally placed on the top of the lower pile body of the cut pile, the two steel corbels are detachably mounted at the two ends of the pile top horizontal steel plate, the two pressure-bearing curved steel plates are respectively located on the inner sides of the two steel corbels and close to the surface of the lower pile body of the cut pile; the pressure-applying component is two jacks, which are used to apply vertical pressure to the pressure-bearing component.

[0007] The aforementioned device for restoring the pile bearing capacity after the pile is cut and corrected, both ends of the horizontal steel plate on the pile top are provided with baffles to prevent the steel corbels from falling off.

[0008] Preferably, the baffles are arranged on both ends of the pile top horizontal steel plate, have a thickness equivalent to that of the pile top horizontal steel plate, and are fixed to the pile top horizontal steel plate by welding or pin connection.

[0009] Preferably, the pin connection method is to pre-set pin holes at corresponding positions at both ends of the baffle and the horizontal steel plate at the top of the pile, and fix them by inserting pins.

[0010] Further preferably, a baffle is also welded to the bottom surface of one end of the pile top horizontal steel plate.

[0011] The aforementioned device for restoring the bearing capacity of piles after pile cutting and deviation correction of a building, the steel corbels all include an upper steel plate, a lower steel plate; two side plates welded between the upper and lower steel plates and an end plate welded at the end; the upper part of the end plate is provided with a mounting square hole for connecting to the horizontal steel plate at the top of the pile, and the upper edge of the mounting square hole is in the same plane as the bottom surface of the upper steel plate.

[0012] Preferably, the size of the installation square hole corresponds to the size of the pile top horizontal steel plate, or corresponds to the size of the pile top horizontal steel plate plus the baffle, so as to facilitate the installation or removal of the pile top horizontal steel plate and the baffle.

[0013] In the aforementioned device for restoring the bearing capacity of a pile after pile cutting and deviation correction, the upper edges of the two pressure-bearing curved steel plates are both provided with engaging notches that match the width of the horizontal steel plate on the top of the pile.

[0014] The aforementioned device for restoring the pile bearing capacity after the building pile is cut and corrected, the two jacks are respectively located above the two steel brackets, and their upper ends are supported on the building pedestal foundation above the pile body to apply vertical pressure to the pressure-bearing component.

[0015] The method for restoring the pile bearing capacity of a building after the pile is cut and corrected using the aforementioned device comprises the following specific steps:

[0016] Step 1: Install the device: first place the pile top horizontal steel plate in the pressure-bearing assembly on the top of the lower pile body of the cut pile, and install two steel brackets at the two ends of the pile top horizontal steel plate, with the end plates of the steel brackets with installation square holes facing outward; then push the pressure-bearing curved steel plate upward from the bottom along the pile body until the engaging notch and the pile top horizontal steel plate are completely engaged; finally, install two jacks above the two steel brackets, with the upper ends of the jacks supported on the building cap foundation above the pile body, so as to apply vertical pressure;

[0017] Step 2: Pressurize and restore the bearing capacity of the pile: Apply vertical pressure to the pressure-bearing component by adjusting the jack. The pressure is applied to the cut pile through the horizontal steel plate at the top of the pile and the pressure-bearing curved steel plate, so that its internal stress state meets the design requirements;

[0018] Step 3: pouring reinforced concrete: maintain the pressure on the cut pile, pour reinforced concrete at the cut pile, so that the upper and lower pile bodies of the cut pile are connected into one;

[0019] Step 4: Dismantle the device: After the reinforced concrete reaches the set strength, dismantle the device. The specific operation is: first remove the jack, then remove the steel bracket and the pressure-bearing curved steel plate, and finally pull out the horizontal steel plate on the top of the pile;

[0020] Step 5: Fill the gap: Use reinforced concrete to fill the gap formed by pulling out the horizontal steel plate on the top of the pile. After the reinforced concrete solidifies and reaches a certain strength, the cut pile will be restored.

[0021] The beneficial effects of the present invention are as follows:

[0022] 1) The device for restoring the pile bearing capacity after the pile is cut and corrected in the building proposed by the present invention applies vertical pressure to the pile body through a jack and a pressure-bearing component, and can be immediately removed after the reinforced concrete is poured. The design is ingenious and the manufacturing process is simple.

[0023] 2) After the device of the present invention is disassembled, each component is small in size and easy to transport. It can be moved to the next pile position for installation and use at will. It is convenient, fast, reusable, green, environmentally friendly, economical and safe.

[0024] 3) The device of the present invention uses a jack as a pressure component, and its upper part can be directly pressed against the lower part of the pile top pedestal, without the need for a special reaction frame. The device requires a small operating space, which solves the problem that the pile cutting operation generally requires digging and cutting the pile at the lower part of the pedestal, the working surface is very small, and large machinery is difficult to transport to the side of the pile; and the remaining components are very small in size and can be installed in a narrow space, which is very flexible and can exert a large vertical pressure to achieve the ideal purpose.

[0025] 4) The device of the present invention requires very little steel, is easy to manufacture, and is low in cost. In the case of a large-scale project, multiple devices can be manufactured and each pile position can be constructed at the same time, which greatly shortens the construction period. In particular, it has obvious construction period advantages for large-scale buildings.

[0026] In short, the device of the present invention has the advantages of convenient construction, clear force, detachable and reusable, convenient transportation, short construction period, low cost, and simultaneous construction of multiple pile positions, and has a good application prospect. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 It is a front view of the device for restoring the pile bearing capacity of a building after the pile is cut and corrected according to the present invention;

[0028] Figure 2 A top view of the pressure-bearing assembly of the present invention installed on a cut pile;

[0029] Figure 3 It is a schematic diagram of the structure of the pressure-bearing component after assembly of the present invention;

[0030] Figure 4 It is a structural schematic diagram of the pile top horizontal steel plate and baffle of the present invention;

[0031] Figure 5 It is a schematic diagram of the steel bracket structure of the present invention;

[0032] Figure 6 It is a schematic diagram of the structure of the pressure-bearing curved steel plate of the present invention.

[0033] In the figure: 1. Steel corbel; 11. Upper steel plate; 12. Lower steel plate; 13. Side plate; 14. End plate; 2. Horizontal steel plate on top of pile; 3. Pressure-bearing curved steel plate; 4. Lower part of the cut pile; 5. Jack; 6. Baffle; 7. Installation square hole; 8. Engaging notch; 9. Building cap foundation. DETAILED DESCRIPTION

[0034] The following will be combined with the embodiments and drawings to clearly and completely describe the technical solution of the present invention. Obviously, the described embodiments are only preferred embodiments of the present invention, not all embodiments, and are not intended to limit the present invention in other forms. Any technician familiar with the profession may use the disclosed technical content to make changes or modifications. However, any simple modification, equivalent change and modification made to the above embodiments based on the technical essence of the present invention without departing from the content of the technical solution of the present invention still belongs to the protection scope of the technical solution of the present invention.

[0035] Example 1

[0036] This embodiment is a device for restoring the bearing capacity of a pile after the pile is cut and corrected, and a method for using the device. Figures 1 to 6The device for restoring the pile bearing capacity after the building pile is cut and corrected comprises a pressure-applying component and a pressure-bearing component; the pressure-bearing component comprises two steel brackets 1, a pile top horizontal steel plate 2 and two pressure-bearing curved steel plates 3; the pile top horizontal steel plate 2 is horizontally placed on the top of the lower pile body 4 of the cut pile, the two steel brackets 1 are detachably mounted at the two ends of the pile top horizontal steel plate 2, the two pressure-bearing curved steel plates 3 are respectively located on the inner sides of the two steel brackets 1 and close to the surface of the lower pile body 4 of the cut pile; the pressure-applying component is two self-locking jacks 5; when the jack 5 is used to apply vertical pressure to the pressure-bearing component, the pressure-bearing component transfers the pressure to the lower pile body 4 of the cut pile below it, thereby solving the problem of restoring the pile bearing capacity after the building pile is cut and corrected; the construction is convenient, the force is clear, and the purpose is effectively achieved.

[0037] The device for restoring the pile bearing capacity after the pile is cut and corrected in this embodiment, the steel corbel 1 includes an upper steel plate 11, a lower steel plate 12, two side plates 13 and an end plate 14; the side plate 13 is welded between the upper and lower steel plates, and the end plate 14 is welded to the end of the frame formed by the upper steel plate 11, the lower steel plate 12, and the side plate 13. A mounting square hole 7 for connecting with the pile top horizontal steel plate 2 is provided on the upper part of the end plate 14 of the steel corbel 1, and baffles 6 are provided at both ends of the pile top horizontal steel plate 2 to prevent the steel corbel 1 from falling off. The size of the mounting square hole 7 corresponds to the size of the pile top horizontal steel plate 2, or corresponds to the size of the pile top horizontal steel plate 2 plus the baffle 6, so as to facilitate the installation and disassembly between the steel corbel 1 and the pile top horizontal steel plate 2.

[0038] In this embodiment, the pile top horizontal steel plate 2 may be provided with baffles 6 only on the upper side at both ends, or may be provided with baffles 6 only on the upper side at one end, and baffles 6 on the upper and lower sides at the other end. The thickness of the baffle 6 is equivalent to the thickness of the pile top horizontal steel plate 2, and is fixed to the pile top horizontal steel plate 2 by welding. In other embodiments, the baffle 6 may also be fixed to the pile top horizontal steel plate 2 by a pin connection method, and the pin connection method is to pre-set pin holes at the corresponding positions of the baffle 6 and the pile top horizontal steel plate 2 at both ends, and there may be multiple groups of pin holes on the pile top horizontal steel plate 2, which is convenient for adjusting the position of the baffle 6. The pressure-bearing curved steel plate 3 is clamped and fixed between the cut pile and the corbel by inserting and fixing the pin rod, and this connection method is also convenient for disassembly and assembly of the entire device, and is more convenient to use.

[0039] In this embodiment, the curved surface steel plate 3 is made according to the shape of the cut pile, and can fit well with its surface, and its upper edge is provided with a snap-fitting notch 8 that matches the width of the horizontal steel plate 2 at the top of the pile. When in use, it is pushed upward along the pile body until the snap-fitting notch 8 and the horizontal steel plate 2 at the top of the pile are fully snap-fitted, so that the entire device is in close contact with the cut pile, so that the pile body can be better stressed. The two jacks 5 as pressure-applying components are respectively located above the two steel legs 1, and the upper ends of the jacks 5 are supported on the building foundation 9 on the upper part of the pile body to apply vertical pressure to the pressure-bearing component. In addition, in order to ensure uniform force, the upper side of the mounting square hole 7 and the bottom surface of the upper steel plate 11 are in the same plane. When the jack 5 applies a vertical concentrated force, the force is evenly transmitted to the body of the cut pile through the pressure-bearing component, increasing the internal stress of the pile body 4 at the lower part of the cut pile, and achieving the ideal purpose. In the present embodiment, the jack 5 is used as a pressure component, and its upper part is directly pressed against the lower part of the pile top pedestal. There is no need to specially set up a reaction frame, which is suitable for the working environment with a small space for pile cutting operation. It solves the problem that the pile cutting operation generally requires digging and cutting the pile at the lower part of the pedestal, the working surface is very small, and large machinery is difficult to transport to the side of the pile. It can also apply a large vertical pressure, which can achieve the ideal purpose.

[0040] The method for using the device for restoring the pile bearing capacity after the pile is cut and corrected comprises the following steps:

[0041] Step 1: Installation device: first place the pile top horizontal steel plate 2 in the pressure-bearing assembly on the top of the lower pile body 4 of the cut pile, and install two steel corbels 1 at the two ends of the pile top horizontal steel plate 2, with the end plate 14 of the steel corbel 1 with the installation square hole 7 facing outward; if a baffle is provided under one end of the pile top horizontal steel plate 2, then it is directly connected to one side of the steel corbel 1 when placed on the top of the lower pile body 4 of the cut pile, and the pile top horizontal steel plate 2 passes through the installation square hole 7 and then welds the baffle 6 below, and then places it on the top of the lower pile body 4 of the cut pile; then push the two pressure-bearing curved steel plates 3 upward from the bottom along the pile body until the engaging notch 8 is completely engaged with the pile top horizontal steel plate 2; finally, install two jacks 5 above the two steel corbels 1, and the upper ends of the jacks 5 are supported on the building cap foundation 9 on the upper part of the pile body to apply vertical pressure;

[0042] Step 2: Pressurize and restore the bearing capacity of the pile: Apply vertical pressure to the pressure-bearing component by adjusting the jack 5. The pressure is applied to the cut pile through the pile top horizontal steel plate 2 and the pressure-bearing curved steel plate 3, so that its internal stress state meets the design requirements;

[0043] Step 3: pouring reinforced concrete: maintain the pressure on the cut pile, pour reinforced concrete at the cut pile, so that the upper and lower pile bodies of the cut pile are connected into one;

[0044] Step 4: Dismantle the device: After the reinforced concrete reaches the set strength, dismantle the device; the specific operation is: first remove the jack 5, then remove the steel bracket 1 and the pressure-bearing curved steel plate 3, and finally pull out the pile top horizontal steel plate 2; if a baffle is provided under one end of the pile top horizontal steel plate 2, only remove the steel bracket 1 and the pressure-bearing curved steel plate 3 at the end without the lower baffle, and finally pull out the pile top horizontal steel plate 2 from the other end;

[0045] Step 5: Fill the gap: Use reinforced concrete to fill the gap formed by pulling out the horizontal steel plate 2 on the top of the pile. After the reinforced concrete solidifies and reaches the strength, the cut pile is restored.

[0046] The device is easy to install, and its components are independent of each other and can be manufactured separately. After the reinforced concrete at the cut pile site hardens, the device can be completely disassembled and is easy to operate, which greatly improves the convenience of restoring the cut pile and has very good application value.

Claims

1. A device for restoring the bearing capacity of a pile after the pile is cut and corrected, characterized in that: It comprises a pressure-applying component and a pressure-bearing component; the pressure-bearing component comprises two steel brackets (1), a pile top horizontal steel plate (2) and two pressure-bearing curved steel plates (3); the pile top horizontal steel plate (2) is horizontally placed on the top of the lower pile body (4) of the cut pile, the two steel brackets (1) are detachably mounted on the two ends of the pile top horizontal steel plate (2), and the two pressure-bearing curved steel plates (3) are respectively located on the inner sides of the two steel brackets (1) and are closely attached to the surface of the lower pile body (4) of the cut pile; the pressure-applying component is two jacks (5) used to apply vertical pressure to the pressure-bearing component; The steel bracket (1) comprises an upper steel plate (11), a lower steel plate (12); two side plates (13) welded between the upper and lower steel plates and an end plate (14) welded to the end; the upper part of the end plate (14) is provided with a mounting square hole (7) for connecting with the pile top horizontal steel plate (2), and the upper side of the mounting square hole (7) is in the same plane as the bottom surface of the upper steel plate (11); The upper edges of the two pressure-bearing curved steel plates (3) are both provided with engaging notches (8) that match the width of the pile top horizontal steel plate (2).

2. The device for restoring the pile bearing capacity after the pile is cut and corrected according to claim 1, characterized in that: Both ends of the pile top horizontal steel plate (2) are provided with baffles (6) for preventing the steel corbels (1) from falling off.

3. The device for restoring the pile bearing capacity after the pile is cut and corrected according to claim 2, characterized in that: The baffles (6) are arranged on both ends of the pile top horizontal steel plate (2), have a thickness equivalent to that of the pile top horizontal steel plate (2), and are fixed to the pile top horizontal steel plate (2) by welding or pin connection.

4. The device for restoring the pile bearing capacity after the pile is cut and corrected according to claim 3, characterized in that: The pin connection method is that pin holes are preset at corresponding positions at both ends of the baffle (6) and the pile top horizontal steel plate (2), and the pin rods are inserted and fixed.

5. The device for restoring the pile bearing capacity after the pile is cut and corrected according to claim 3, characterized in that: A baffle (6) is also welded to the bottom surface of one end of the pile top horizontal steel plate (2).

6. The device for restoring the pile bearing capacity after the pile is cut and corrected according to claim 4, characterized in that: The size of the installation square hole (7) corresponds to the size of the pile top horizontal steel plate (2), or corresponds to the size of the pile top horizontal steel plate (2) plus the baffle (6), so as to facilitate the installation or removal of the pile top horizontal steel plate (2) and the baffle (6).

7. The device for restoring the pile bearing capacity after the pile is cut and corrected according to claim 1, characterized in that: The two jacks (5) are respectively located above the two steel brackets (1), and their upper ends are supported on the building cap foundation (9) above the pile body to apply vertical pressure to the pressure-bearing component.

8. A method for restoring the pile bearing capacity of a building after pile cutting and deviation correction, characterized in that: Using the device described in any one of claims 1 to 7 to restore the pile bearing capacity of a building after the pile is cut and corrected, specifically comprises the following steps: Step 1: Install the device: first place the pile top horizontal steel plate (2) in the pressure-bearing assembly on the top of the pile body (4) at the bottom of the cut pile, and install two steel brackets (1) at the two ends of the pile top horizontal steel plate (2), respectively, with the end plate (14) of the steel bracket (1) having the installation square hole (7) facing outward; then push the pressure-bearing curved steel plate (3) upward from the bottom along the pile body until the engaging notch (8) is completely engaged with the pile top horizontal steel plate (2); finally, install two jacks (5) above the two steel brackets (1), with the upper ends of the jacks (5) supported on the building cap foundation (9) above the pile body, so as to apply vertical pressure; Step 2: Pressurizing to restore the bearing capacity of the pile: vertical pressure is applied to the pressure-bearing component by adjusting the jack (5). The pressure is applied to the cut pile through the pile top horizontal steel plate (2) and the pressure-bearing curved steel plate (3), so that the internal stress state of the pile meets the design requirements; Step 3: pouring reinforced concrete: maintain the pressure on the cut pile, pour reinforced concrete at the cut pile, so that the upper and lower pile bodies of the cut pile are connected into one; Step 4: Dismantle the device: After the reinforced concrete reaches the set strength, dismantle the device. The specific operation is: first remove the jack (5), then remove the steel bracket (1) and the pressure-bearing curved steel plate (3), and finally pull out the pile top horizontal steel plate (2); Step 5: Filling the gap: Use reinforced concrete to fill the gap formed by pulling out the horizontal steel plate (2) on the top of the pile. After the reinforced concrete solidifies and reaches a certain strength, the cut pile is restored.