A high temperature calcining magnesium oxide device and calcining method thereof

By designing a high-temperature calcined magnesium oxide device and using multi-stage preheating and thermal insulation quenching and tempering processes, the problem that existing technology cannot produce magnesium oxide that meets the needs of new building materials has been solved, and efficient and energy-saving magnesium oxide production has been achieved to meet the needs of building materials. quality indicators.

CN111302673BActive Publication Date: 2024-10-15LIAONING DONGDA POWDER ENG TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201911321682.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-12-20
Publication Date
2024-10-15
Estimated Expiration
2039-12-20

AI Technical Summary

Technical Problem

The existing magnesium oxide calcination technology cannot effectively produce high-quality magnesium oxide that meets the needs of new building materials, and there is a lack of industrial kiln equipment and methods suitable for magnesite powder or light-burned magnesia powder.

Method used

A high-temperature calcined magnesium oxide device is designed, including a feeder, an airflow dryer, a multi-stage cyclone preheater, a calcining furnace, an insulation quenching and tempering furnace and a cooling system. Through a multi-stage preheating and insulation quenching and tempering process, the calcining The exhaust gas realizes material drying and heat recycling to produce magnesium oxide products suitable for building materials.

Benefits of technology

It achieves efficient magnesium oxide production, meets the quality index requirements of building materials, improves the heat energy utilization rate of the calcination system, reduces production costs, and ensures the stable performance of the product.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111302673B_ABST
    Figure CN111302673B_ABST
Patent Text Reader

Abstract

A high-temperature calcining magnesium oxide device and a calcining method thereof, belonging to the field of magnesium oxide calcining technology, the device includes a feeder, an airflow dryer, a first-stage cyclone preheater, a second-stage cyclone preheater, a third-stage cyclone preheater, a dust collector, an induced draft fan, a calcining furnace, an automatic gas burner, a heat preservation and tempering furnace, a discharge device, a material collector and a cooling system. The present invention uses magnesite powder or light-burned magnesium oxide powder as raw material, adopts a three-stage cyclone preheater group to complete the preheating treatment of the material, and performs high-temperature calcination and heat preservation and tempering, wherein the calcination tail gas is used to achieve material drying and preheating process treatment, which is a dynamic material carrier mass transfer and heat transfer process, and while producing high-quality magnesium oxide, effectively utilizes heat energy and saves costs; and can realize the production of magnesium oxide products with different quality indicators required in the field of building materials.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of magnesium oxide calcination, and particularly relates to a device for producing magnesium oxide by high-temperature calcination using magnesite powder or light-burned magnesium powder as raw materials, and a calcination method thereof. Background Art

[0002] Magnesium-based cement produced with magnesium oxide as the base material is widely used in building materials, decorative materials and packaging materials, etc. Due to different application fields, the physical and chemical properties of the base material magnesium oxide are also different in different fields. By using magnesia ore powder or light-burned magnesium oxide powder rich in magnesium oxide as raw materials, by adjusting the temperature of the high-temperature calcination process and the insulation time of the quenched and tempered materials, magnesium oxide of different quality categories can be produced to meet the application index requirements of different fields.

[0003] Among them, calcining magnesium oxide with powder material at high temperature, the calcination temperature is close to that of dead-burned magnesium, so as to minimize the activity of the material and meet the use index requirements of new building materials. At present, there is no industrial case for the equipment and production method of high-temperature calcination directly using magnesite powder or light-burned magnesium oxide powder as production raw materials. Therefore, developing an industrial kiln to meet the production needs of new building materials has become another important research project in the industry. Summary of the invention

[0004] In order to solve the above technical problems, the present invention proposes a high-temperature calcining magnesium oxide device and a calcining method thereof, which uses magnesite powder or light-burned magnesium oxide powder as raw materials, and is subjected to high-temperature calcination and heat preservation quenching and tempering, wherein the calcination tail gas is used to realize material drying and preheating process treatment, which is a dynamic material carrier mass transfer and heat transfer process, and while producing high-quality magnesium oxide, effectively utilizes heat energy and saves costs; and can realize the production of magnesium oxide products with different quality indicators required in the field of building materials, and its specific technical scheme is as follows:

[0005] A high-temperature calcining magnesium oxide device comprises a feeder 1, an airflow dryer 2, a first-stage cyclone preheater 3, a second-stage cyclone preheater 4, a third-stage cyclone preheater 5, a dust collector 6, an induced draft fan 7, a calcining furnace 8, an automatic gas burner 9, a heat-insulating quenching and tempering furnace 10, a discharge device 11, a material collector 12 and a cooling system 13;

[0006] The feeder 1 is connected to the side wall feed port of the airflow dryer 2; the top upper air port of the airflow dryer 2 is connected to the side wall feed port of the first-stage cyclone preheater 3 through a pipeline; the side wall lower air port of the airflow dryer 2 is connected to the top air outlet of the second-stage cyclone preheater 4 through a pipeline; the top air outlet of the first-stage cyclone preheater 3 is connected to the side wall air inlet of the dust collector 6 through a pipeline; the top air outlet of the dust collector 6 is connected to the induced draft fan 7 through a pipeline;

[0007] The bottom discharge port of the first-stage cyclone preheater 3 is connected to the side wall feed port of the second-stage cyclone preheater 4 and the top air outlet of the third-stage cyclone preheater 5 through pipelines; the pipeline of the bottom discharge port of the first-stage cyclone preheater 3 is connected to the bottom discharge port of the dust collector 6 through a pipeline;

[0008] The bottom discharge port of the third-stage cyclone preheater 5 is connected to the top feed port of the calcining furnace 8 through a pipeline; the upper part of the side wall of the calcining furnace 8 is connected to an automatic gas burner 9;

[0009] The calcining furnace 8 is connected to a heat preservation and tempering furnace 10 below; a discharge device 11 is provided below the heat preservation and tempering furnace 10, and a discharge port at a lower end of the discharge device 11 is connected to a cooling system 13 through a pipeline;

[0010] The side wall air outlet of the heat preservation and tempering furnace 10 is connected to the side wall air inlet of the material collector 12 through a pipeline; the top air outlet of the material collector 12 is connected to the side wall feed port of the third-stage cyclone preheater 5 through a pipeline; the pipeline connecting the material collector 12 and the third-stage cyclone preheater 5 is connected to the bottom discharge port of the second-stage cyclone preheater 4 through a pipeline;

[0011] The pneumatic dryer 2 is provided with a dispersing device inside;

[0012] The calcining furnace 8 is connected to the combustion flue gas outlet of the automatic gas burner 9 via a flange;

[0013] The calcining furnace 8 is connected to the heat preservation and tempering furnace 10 via a flange;

[0014] The cooling system 13 is prior art;

[0015] The above-mentioned calcination method of a high-temperature calcination magnesium oxide device comprises the following stages:

[0016] Stage 1: Use the feeder 1 to feed the magnesite powder or light-burned magnesium oxide powder raw material into the airflow dryer 2, turn on the dispersing device and the second-stage cyclone preheater 4, and under the mechanical force of the dispersing device and the hot air from the air outlet of the second-stage cyclone preheater 4, the free moisture of the material is dispersed and dried to form a dry material;

[0017] Stage 2: Turn on the induced draft fan 7, and the dry material is carried by the air flow into the first-stage cyclone preheater 3 to perform the first-stage preheating treatment of the material and perform gas-solid separation; wherein, the gas separated by the first-stage cyclone preheater 3 is mixed with a small amount of material and enters the dust collector 6 through the air outlet at the top of the first-stage cyclone preheater 3. After dust removal by the dust collector 6, the clean gas enters the induced draft fan 7 through the air outlet at the top of the dust collector 6, and the exhaust gas is discharged through the induced draft fan 7, and a small amount of material is recovered through the discharge port at the lower end of the dust collector 6 and enters the second-stage cyclone preheater 4; the material separated by the first-stage cyclone preheater 3 enters the second-stage cyclone preheater 4 through the discharge port at the lower end of the first-stage cyclone preheater 3, and the material undergoes the second-stage preheating treatment in the second-stage cyclone preheater 4;

[0018] Stage 3: the material after the second stage preheating treatment is discharged from the lower end discharge port of the second stage cyclone preheater 4 and enters the third stage cyclone preheater 5 through the pipeline for third stage preheating treatment and gas-solid separation; wherein, the hot gas separated by the third stage cyclone preheater 5 circulates into the second stage cyclone preheater 4 through the top air outlet of the third stage cyclone preheater 5, and the hot gas is used to preheat and carry the material entering the second stage cyclone preheater 4 after the gas-solid separation of the first stage cyclone preheater 3; the material separated by the third stage cyclone preheater 5 enters the calcining furnace 8 through the lower end discharge port of the third stage cyclone preheater 5, and the automatic gas burner 9 is turned on at the same time, so that the material is atomized and heated under the action of the combustion hot flue gas, and the material calcination and decomposition treatment is completed during the flow-carrying operation in the calcining furnace 8 to form the calcined material;

[0019] Stage 4: After the calcination treatment, the material falls into the heat preservation and tempering furnace 10 by gravity, and the material is heat-insulated, homogenized, and tempered. The heat required for the heat preservation and tempering of the material comes from the material calcination gas entering the heat preservation and tempering furnace 10 from the calcination furnace 8 and the radiant heat of the gas combustion of the automatic gas burner 9; the material after the heat preservation, homogenization, and tempering treatment is discharged from the discharge port at the lower end of the heat preservation and tempering furnace 10 into the discharge device 11;

[0020] Stage 5: The gas discharged from the heat-insulating and tempering furnace 10 and a small amount of entrained materials enter the material collector 12 through the side wall pipe of the heat-insulating and tempering furnace 10, and gas-solid separation is performed in the material collector 12; wherein, the small amount of materials separated by the material collector 12 are returned to the heat-insulating and tempering furnace 10 through the discharge port at the lower end of the material collector 12; the gas separated by the material collector 12 enters the third-stage cyclone preheater 5 through the air outlet at the top of the material collector 12, providing carrier gas and required heat for the third-stage preheating treatment in stage 3 and the drying material in stage 1; the heat energy is used for cyclic calcination;

[0021] Stage 6: The material in the discharge device 11 enters the cooling system 13 through a pipeline for cooling to obtain a magnesium oxide product;

[0022] The drying temperature of the material in the air flow dryer 2 is 450°C to 1000°C;

[0023] The preheating temperature of the material in the first stage cyclone preheater 3 is 350°C to 900°C;

[0024] The preheating temperature of the material in the second stage cyclone preheater 4 is 500°C~1250°C;

[0025] The preheating temperature of the material in the third-stage cyclone preheater 5 is 600°C to 1350°C;

[0026] The calcination temperature of the material in the calcination furnace 8 is 1000~1750℃;

[0027] The material is heat-treated at a temperature of 800 to 1550° C. in the heat-treated furnace 10, and the material temperature is 30 to 120 minutes.

[0028] The temperature of the magnesium oxide product after being cooled by the cooling system is 70°C to 80°C;

[0029] The magnesium oxide product particles are smaller than 150 meshes.

[0030] Compared with the prior art, the high-temperature calcining magnesium oxide device and calcining method of the present invention have the following beneficial effects:

[0031] 1. The present invention is a new type of kiln for calcining powdered materials (magnesite powder or light-burned magnesium oxide powder), which is used for high-temperature calcination of powdered materials to produce magnesium oxide. The materials are atomized and heated under the action of combustion gas, and the calcination and decomposition process of the materials is completed during the operation of the calcination gas carrier flow. The atomized and dispersed materials have a large specific surface area, are fully heated during the calcination process, have a fast heat transfer rate, and are evenly calcined.

[0032] 2. The heat preservation and tempering furnace of the present invention can set the heat preservation and tempering process parameters according to the material properties and product application performance index requirements, and can produce a variety of standard specifications of magnesium oxide required for building materials to meet the market demand for building materials.

[0033] 3. The present invention is provided with an airflow dryer, and a dispersing device is arranged inside the airflow dryer, which is beneficial to the dispersion of powdered materials in the carrier gas and the drying process of the materials.

[0034] Fourth, the present invention adopts a three-stage cyclone preheater group to complete the preheating treatment of the material. The heat required for material drying and preheating treatment is taken from the recycling of the heat of material calcination and the recycling of the heat of the tail gas discharged after the quenching and tempering process. It can maximize the effective utilization rate of the heat of the calcining furnace system to achieve the purpose of energy saving and high efficiency of the device.

[0035] 5. The material after heat preservation and tempering out of the furnace is subjected to a closed cooling treatment, the purpose of which is to stabilize product performance and ensure product quality to avoid qualitative changes caused by the contact of high-temperature materials with moist air. BRIEF DESCRIPTION OF THE DRAWINGS

[0036] Figure 1 This is a schematic diagram of a high-temperature calcining magnesium oxide device of the present invention: 1-feeder, 2-air flow dryer, 3-first stage cyclone preheater, 4-second stage cyclone preheater, 5-third stage cyclone preheater, 6-dust collector, 7-induced draft fan, 8-calcining furnace, 9-automatic gas burner, 10-insulation tempering furnace, 11-discharging device, 12-material collector, 13-cooling system. DETAILED DESCRIPTION

[0037] The present invention is further described below in conjunction with specific implementation cases, but the present invention is not limited to these embodiments.

[0038] Example 1

[0039] A high-temperature calcining magnesium oxide device comprises a feeder 1, an airflow dryer 2, a first-stage cyclone preheater 3, a second-stage cyclone preheater 4, a third-stage cyclone preheater 5, a dust collector 6, an induced draft fan 7, a calcining furnace 8, an automatic gas burner 9, a heat-insulating quenching and tempering furnace 10, a discharge device 11, a material collector 12 and a cooling system 13, such as Figure 1 As shown;

[0040] The feeder 1 is connected to the side wall feed port of the airflow dryer 2; the top upper air port of the airflow dryer 2 is connected to the side wall feed port of the first-stage cyclone preheater 3 through a pipeline; the side wall lower air port of the airflow dryer 2 is connected to the top air outlet of the second-stage cyclone preheater 4 through a pipeline; the top air outlet of the first-stage cyclone preheater 3 is connected to the side wall air inlet of the dust collector 6 through a pipeline; the top air outlet of the dust collector 6 is connected to the induced draft fan 7 through a pipeline;

[0041] The bottom discharge port of the first-stage cyclone preheater 3 is connected to the side wall feed port of the second-stage cyclone preheater 4 and the top air outlet of the third-stage cyclone preheater 5 through pipelines; the pipeline of the bottom discharge port of the first-stage cyclone preheater 3 is connected to the bottom discharge port of the dust collector 6 through a pipeline;

[0042] The bottom discharge port of the third-stage cyclone preheater 5 is connected to the top feed port of the calcining furnace 8 through a pipeline; the upper part of the side wall of the calcining furnace 8 is connected to an automatic gas burner 9;

[0043] The calcining furnace 8 is connected to a heat preservation and tempering furnace 10 below; a discharge device 11 is provided below the heat preservation and tempering furnace 10, and a discharge port at a lower end of the discharge device 11 is connected to a cooling system 13 through a pipeline;

[0044] The side wall air outlet of the heat preservation and tempering furnace 10 is connected to the side wall air inlet of the material collector 12 through a pipeline; the top air outlet of the material collector 12 is connected to the side wall feed port of the third-stage cyclone preheater 5 through a pipeline; the pipeline connecting the material collector 12 and the third-stage cyclone preheater 5 is connected to the bottom discharge port of the second-stage cyclone preheater 4 through a pipeline;

[0045] The pneumatic dryer 2 is provided with a dispersing device inside;

[0046] The calcining furnace 8 is connected to the combustion flue gas outlet of the automatic gas burner 9 via a flange;

[0047] The calcining furnace 8 is connected to the heat preservation and tempering furnace 10 via a flange;

[0048] The cooling system 13 is prior art.

[0049] The above-mentioned calcination method of a high-temperature calcination magnesium oxide device comprises the following stages:

[0050] The pilot production line processes raw materials such as magnesite powder. The particles of magnesite powder are 180 mesh, 8% water content, 40.5% MgO content, and the pilot production capacity is 500kg overburned magnesium oxide / hour. The fuel is natural gas (8500kcal / Nm 3 ).

[0051] Stage 1: Use the feeder 1 to feed the magnesite powder or light-burned magnesium oxide powder raw material into the airflow dryer 2, turn on the dispersing device and the second-stage cyclone preheater 4, and under the mechanical force of the dispersing device and the hot air from the air outlet of the second-stage cyclone preheater 4, the free moisture of the material is dispersed and dried to form a dry material;

[0052] Stage 2: Turn on the induced draft fan 7, and the dry material is carried by the air flow into the first-stage cyclone preheater 3 to perform the first-stage preheating treatment of the material and perform gas-solid separation; wherein, the gas separated by the first-stage cyclone preheater 3 is mixed with a small amount of material and enters the dust collector 6 through the air outlet at the top of the first-stage cyclone preheater 3. After dust removal by the dust collector 6, the clean gas enters the induced draft fan 7 through the air outlet at the top of the dust collector 6, and the exhaust gas is discharged through the induced draft fan 7, and a small amount of material is recovered through the discharge port at the lower end of the dust collector 6 and enters the second-stage cyclone preheater 4; the material separated by the first-stage cyclone preheater 3 enters the second-stage cyclone preheater 4 through the discharge port at the lower end of the first-stage cyclone preheater 3, and the material undergoes the second-stage preheating treatment in the second-stage cyclone preheater 4;

[0053] Stage 3: the material after the second stage preheating treatment is discharged from the lower end discharge port of the second stage cyclone preheater 4 and enters the third stage cyclone preheater 5 through the pipeline for third stage preheating treatment and gas-solid separation; wherein, the hot gas separated by the third stage cyclone preheater 5 circulates into the second stage cyclone preheater 4 through the top air outlet of the third stage cyclone preheater 5, and the hot gas is used to preheat and carry the material entering the second stage cyclone preheater 4 after the gas-solid separation of the first stage cyclone preheater 3; the material separated by the third stage cyclone preheater 5 enters the calcining furnace 8 through the lower end discharge port of the third stage cyclone preheater 5, and the automatic gas burner 9 is turned on at the same time, so that the material is atomized and heated under the action of the combustion hot flue gas, and the material calcination and decomposition treatment is completed during the flow-carrying operation in the calcining furnace 8 to form the calcined material;

[0054] Stage 4: After the calcination treatment, the material falls into the heat preservation and tempering furnace 10 by gravity, and the material is heat-insulated, homogenized, and tempered. The heat required for the heat preservation and tempering of the material comes from the material calcination gas entering the heat preservation and tempering furnace 10 from the calcination furnace 8 and the radiant heat of the gas combustion of the automatic gas burner 9; the material after the heat preservation, homogenization, and tempering treatment is discharged from the discharge port at the lower end of the heat preservation and tempering furnace 10 into the discharge device 11;

[0055] Stage 5: The gas discharged from the heat-insulating and tempering furnace 10 and a small amount of entrained materials enter the material collector 12 through the side wall pipe of the heat-insulating and tempering furnace 10, and gas-solid separation is performed in the material collector 12; wherein, the small amount of materials separated by the material collector 12 are returned to the heat-insulating and tempering furnace 10 through the discharge port at the lower end of the material collector 12; the gas separated by the material collector 12 enters the third-stage cyclone preheater 5 through the air outlet at the top of the material collector 12, providing carrier gas and required heat for the third-stage preheating treatment in stage 3 and the drying material in stage 1; the heat energy is used for cyclic calcination;

[0056] Stage 6: The material in the discharge device 11 enters the cooling system 13 through a pipeline for cooling to obtain a magnesium oxide product;

[0057] The drying temperature of the material in the air flow dryer 2 is 750°C;

[0058] The preheating temperature of the material in the first stage cyclone preheater 3 is 550°C;

[0059] The preheating temperature of the material in the second stage cyclone preheater 4 is 850°C;

[0060] The preheating temperature of the material in the third-stage cyclone preheater 5 is 950°C;

[0061] The calcination temperature of the material in the calcination furnace 8 is 1300±30°C;

[0062] The material is heat-insulated and tempered at a temperature of 1100±30°C in the heat-insulated and tempered furnace 10, and the material tempering residence time is 2h;

[0063] The temperature of the magnesium oxide product after being cooled by the cooling system is 80°C.

[0064] The magnesium oxide product indicators produced by calcination in this example are: magnesium oxide content of 81%, activity of 3%, loss on ignition of ≤1%, and density of 3.2 g / cm 3 , the particle size is 180 mesh.

[0065] Example 2

[0066] A high-temperature calcining magnesium oxide device comprises a feeder 1, an airflow dryer 2, a first-stage cyclone preheater 3, a second-stage cyclone preheater 4, a third-stage cyclone preheater 5, a dust collector 6, an induced draft fan 7, a calcining furnace 8, an automatic gas burner 9, a heat-insulating quenching and tempering furnace 10, a discharge device 11, a material collector 12 and a cooling system 13, such as Figure 1 As shown;

[0067] The feeder 1 is connected to the side wall feed port of the airflow dryer 2; the top upper air port of the airflow dryer 2 is connected to the side wall feed port of the first-stage cyclone preheater 3 through a pipeline; the side wall lower air port of the airflow dryer 2 is connected to the top air outlet of the second-stage cyclone preheater 4 through a pipeline; the top air outlet of the first-stage cyclone preheater 3 is connected to the side wall air inlet of the dust collector 6 through a pipeline; the top air outlet of the dust collector 6 is connected to the induced draft fan 7 through a pipeline;

[0068] The bottom discharge port of the first-stage cyclone preheater 3 is connected to the side wall feed port of the second-stage cyclone preheater 4 and the top air outlet of the third-stage cyclone preheater 5 through pipelines; the pipeline of the bottom discharge port of the first-stage cyclone preheater 3 is connected to the bottom discharge port of the dust collector 6 through a pipeline;

[0069] The bottom discharge port of the third-stage cyclone preheater 5 is connected to the top feed port of the calcining furnace 8 through a pipeline; the upper part of the side wall of the calcining furnace 8 is connected to an automatic gas burner 9;

[0070] The calcining furnace 8 is connected to a heat preservation and tempering furnace 10 below; a discharge device 11 is provided below the heat preservation and tempering furnace 10, and a discharge port at a lower end of the discharge device 11 is connected to a cooling system 13 through a pipeline;

[0071] The side wall air outlet of the heat preservation and tempering furnace 10 is connected to the side wall air inlet of the material collector 12 through a pipeline; the top air outlet of the material collector 12 is connected to the side wall feed port of the third-stage cyclone preheater 5 through a pipeline; the pipeline connecting the material collector 12 and the third-stage cyclone preheater 5 is connected to the bottom discharge port of the second-stage cyclone preheater 4 through a pipeline;

[0072] The pneumatic dryer 2 is provided with a dispersing device inside;

[0073] The calcining furnace 8 is connected to the combustion flue gas outlet of the automatic gas burner 9 via a flange;

[0074] The calcining furnace 8 is connected to the heat preservation and tempering furnace 10 via a flange;

[0075] The cooling system 13 is a conventional cooling technology.

[0076] The above-mentioned calcination method of a high-temperature calcination magnesium oxide device comprises the following stages:

[0077] The pilot production line processes raw materials for light-burned magnesium oxide powder. The particles of light-burned magnesium oxide powder are 180 mesh, 8% water content, 40.5% MgO content, and the pilot production capacity is 500kg over-burned magnesium oxide / hour. The fuel is natural gas (8500kcal / Nm 3 ).

[0078] Stage 1: Use the feeder 1 to feed the magnesite powder or light-burned magnesium oxide powder raw material into the airflow dryer 2, turn on the dispersing device and the second-stage cyclone preheater 4, and under the mechanical force of the dispersing device and the hot air from the air outlet of the second-stage cyclone preheater 4, the free moisture of the material is dispersed and dried to form a dry material;

[0079] Stage 2: Turn on the induced draft fan 7, and the dry material is carried by the air flow into the first-stage cyclone preheater 3 to perform the first-stage preheating treatment of the material and perform gas-solid separation; wherein, the gas separated by the first-stage cyclone preheater 3 is mixed with a small amount of material and enters the dust collector 6 through the air outlet at the top of the first-stage cyclone preheater 3. After dust removal by the dust collector 6, the clean gas enters the induced draft fan 7 through the air outlet at the top of the dust collector 6, and the exhaust gas is discharged through the induced draft fan 7, and a small amount of material is recovered through the discharge port at the lower end of the dust collector 6 and enters the second-stage cyclone preheater 4; the material separated by the first-stage cyclone preheater 3 enters the second-stage cyclone preheater 4 through the discharge port at the lower end of the first-stage cyclone preheater 3, and the material undergoes the second-stage preheating treatment in the second-stage cyclone preheater 4;

[0080] Stage 3: the material after the second stage preheating treatment is discharged from the lower end discharge port of the second stage cyclone preheater 4 and enters the third stage cyclone preheater 5 through the pipeline for third stage preheating treatment and gas-solid separation; wherein, the hot gas separated by the third stage cyclone preheater 5 circulates into the second stage cyclone preheater 4 through the top air outlet of the third stage cyclone preheater 5, and the hot gas is used to preheat and carry the material entering the second stage cyclone preheater 4 after the gas-solid separation of the first stage cyclone preheater 3; the material separated by the third stage cyclone preheater 5 enters the calcining furnace 8 through the lower end discharge port of the third stage cyclone preheater 5, and the automatic gas burner 9 is turned on at the same time, so that the material is atomized and heated under the action of the combustion hot flue gas, and the material calcination and decomposition treatment is completed during the flow-carrying operation in the calcining furnace 8 to form the calcined material;

[0081] Stage 4: After the calcination treatment, the material falls into the heat preservation and tempering furnace 10 by gravity, and the material is heat-insulated, homogenized, and tempered. The heat required for the heat preservation and tempering of the material comes from the material calcination gas entering the heat preservation and tempering furnace 10 from the calcination furnace 8 and the radiant heat of the gas combustion of the automatic gas burner 9; the material after the heat preservation, homogenization, and tempering treatment is discharged from the discharge port at the lower end of the heat preservation and tempering furnace 10 into the discharge device 11;

[0082] Stage 5: The gas discharged from the heat-insulating and tempering furnace 10 and a small amount of entrained materials enter the material collector 12 through the side wall pipe of the heat-insulating and tempering furnace 10, and gas-solid separation is performed in the material collector 12; wherein, the small amount of materials separated by the material collector 12 are returned to the heat-insulating and tempering furnace 10 through the discharge port at the lower end of the material collector 12; the gas separated by the material collector 12 enters the third-stage cyclone preheater 5 through the air outlet at the top of the material collector 12, providing carrier gas and required heat for the third-stage preheating treatment in stage 3 and the drying material in stage 1; the heat energy is used for cyclic calcination;

[0083] Stage 6: The material in the discharge device 11 enters the cooling system 13 through a pipeline for cooling to obtain a magnesium oxide product;

[0084] The drying temperature of the material in the air flow dryer 2 is 850°C;

[0085] The preheating temperature of the material in the first stage cyclone preheater 3 is 750°C;

[0086] The preheating temperature of the material in the second stage cyclone preheater 4 is 1150°C;

[0087] The preheating temperature of the material in the third stage cyclone preheater 5 is 1250°C;

[0088] The calcination temperature of the material in the calcination furnace 8 is 1600±30°C;

[0089] The material is heat-insulated and tempered at a temperature of 1400±30°C in the heat-insulated and tempered furnace 10, and the material tempering residence time is 2h;

[0090] The temperature of the magnesium oxide product after being cooled by the cooling system is 80°C;

[0091] The magnesium oxide product indicators produced by calcination in this example are: magnesium oxide content of 81%, activity of 0%, loss on ignition of ≤0.5%, and density of 3.2 g / cm 3 , the particle size is 180 mesh.

Claims

1. A calcination method for high temperature calcined magnesium oxide, characterized in that: The method is implemented by using a high-temperature calcining magnesium oxide device, comprising a feeder (1), an air flow dryer (2), a first-stage cyclone preheater (3), a second-stage cyclone preheater (4), a third-stage cyclone preheater (5), a dust collector (6), an induced draft fan (7), a calcining furnace (8), an automatic gas burner (9), a heat-insulating quenching and tempering furnace (10), a discharge device (11), a material collector (12) and a cooling system (13); The feeder (1) is connected to the side wall feed port of the air flow dryer (2); the top upper air port of the air flow dryer (2) is connected to the side wall feed port of the first-stage cyclone preheater (3) through a pipeline; the side wall lower air port of the air flow dryer (2) is connected to the top air outlet of the second-stage cyclone preheater (4) through a pipeline; the top air outlet of the first-stage cyclone preheater (3) is connected to the side wall air inlet of the dust collector (6) through a pipeline; the top air outlet of the dust collector (6) is connected to the induced draft fan (7) through a pipeline; The bottom discharge port of the first-stage cyclone preheater (3) is connected to the side wall feed port of the second-stage cyclone preheater (4) and the top air outlet of the third-stage cyclone preheater (5) through pipelines; the pipeline of the bottom discharge port of the first-stage cyclone preheater (3) is connected to the bottom discharge port of the dust collector (6) through a pipeline; The bottom discharge port of the third-stage cyclone preheater (5) is connected to the top feed port of the calcining furnace (8) through a pipeline; the upper part of the side wall of the calcining furnace (8) is connected to an automatic gas burner (9); The calcining furnace (8) is connected to a heat preservation and tempering furnace (10) below; a discharge device (11) is provided below the heat preservation and tempering furnace (10), and a discharge port at a lower end of the discharge device (11) is connected to a cooling system (13) via a pipeline; The side wall air outlet of the heat-insulating quenching and tempering furnace (10) is connected to the side wall air inlet of the material collector (12) via a pipeline; the top air outlet of the material collector (12) is connected to the side wall feed port of the third-stage cyclone preheater (5) via a pipeline; the pipeline connecting the material collector (12) and the third-stage cyclone preheater (5) is connected to the bottom discharge port of the second-stage cyclone preheater (4) via a pipeline; The calcination method of high temperature calcined magnesium oxide comprises the following stages: Stage 1: using a feeder (1) to feed magnesite powder or light-burned magnesium oxide powder raw material into an airflow dryer (2), turning on a dispersing device and a second-stage cyclone preheater (4), and under the action of the mechanical force of the dispersing device and the hot air from the air outlet of the second-stage cyclone preheater (4), the free moisture of the material is dispersed and dried to form a dry material; Stage 2: The induced draft fan (7) is turned on, and the dry material is carried by the air flow into the first-stage cyclone preheater (3), where the material is subjected to the first-stage preheating treatment and gas-solid separation is performed; wherein the gas separated by the first-stage cyclone preheater (3) is mixed with a small amount of material and enters the dust collector (6) through the air outlet at the top of the first-stage cyclone preheater (3); after dust removal by the dust collector (6), the clean gas enters the induced draft fan (7) through the air outlet at the top of the dust collector (6); the exhaust gas is discharged through the induced draft fan (7), and a small amount of material is recovered through the lower end discharge port of the dust collector (6) and enters the second-stage cyclone preheater (4); the material separated by the first-stage cyclone preheater (3) enters the second-stage cyclone preheater (4) through the lower end discharge port of the first-stage cyclone preheater (3), and the material is subjected to the second-stage preheating treatment in the second-stage cyclone preheater (4); Stage 3: the material after the second stage preheating treatment is discharged from the lower end discharge port of the second stage cyclone preheater (4) and enters the third stage cyclone preheater (5) through a pipeline for third stage preheating treatment and gas-solid separation; wherein the hot gas separated by the third stage cyclone preheater (5) circulates into the second stage cyclone preheater (4) through the top air outlet of the third stage cyclone preheater (5), and the hot gas is used to preheat and carry the material entering the second stage cyclone preheater (4) after gas-solid separation in the first stage cyclone preheater (3); the material separated by the third stage cyclone preheater (5) enters the calcining furnace (8) through the lower end discharge port of the third stage cyclone preheater (5), and the automatic gas burner (9) is turned on at the same time, so that the material is atomized and heated under the action of the combustion hot flue gas, and the material is calcined and decomposed during the flow-carrying operation in the calcining furnace (8) to form calcined material; Stage 4: After the calcination treatment, the material falls into the heat preservation and tempering furnace (10) by gravity, and the material is heat-insulated, homogenized, and tempered. The heat required for the heat preservation and tempering of the material comes from the material calcination gas entering the heat preservation and tempering furnace (10) from the calcination furnace (8) and the radiation heat of the gas combustion of the automatic gas burner (9); the material after the heat preservation, homogenization, and tempering treatment is discharged from the discharge port at the lower end of the heat preservation and tempering furnace (10) and enters the discharge device (11); Stage 5: the exhaust gas and a small amount of material from the heat-insulating and tempering furnace (10) enter the material collector (12) through the side wall pipe of the heat-insulating and tempering furnace (10), and undergo gas-solid separation in the material collector (12); the small amount of material separated by the material collector (12) is returned to the heat-insulating and tempering furnace (10) through the discharge port at the lower end of the material collector (12); the gas separated by the material collector (12) enters the third-stage cyclone preheater (5) through the air outlet at the top end of the material collector (12), providing carrier gas and required heat for the third-stage preheating treatment in stage 3 and the drying of the material in stage 1; the heat energy is cyclically calcined and utilized; Stage 6: the material in the discharge device (11) enters the cooling system (13) through a pipeline and is cooled to obtain a magnesium oxide product; The material is heat-treated and tempered at a temperature of 800° C. to 1550° C. in the heat-treated and tempered furnace (10), and the material tempering residence time is 30 min to 120 min. The calcination temperature of the material in the calcination furnace (8) is 1000°C to 1750°C.

2. The calcination method of a high temperature calcined magnesium oxide according to claim 1, characterized in that: A dispersing device is provided inside the pneumatic dryer (2).

3. The calcination method of a high temperature calcined magnesium oxide according to claim 1, characterized in that: The calcining furnace (8) is connected to the combustion flue gas outlet of the automatic gas burner (9) via a flange; and the calcining furnace (8) is connected to the heat-insulating quenching and tempering furnace (10) via a flange.

4. The calcination method of a high temperature calcined magnesium oxide according to claim 1, characterized in that: The drying temperature of the material in the air flow dryer (2) is 450°C to 1000°C.

5. The calcination method of high temperature calcined magnesium oxide according to claim 1, characterized in that: The preheating temperature of the material in the first-stage cyclone preheater (3) is 350°C to 900°C; the preheating temperature of the material in the second-stage cyclone preheater (4) is 500°C to 1250°C; and the preheating temperature of the material in the third-stage cyclone preheater (5) is 600°C to 1350°C.

6. The calcination method of high temperature calcined magnesium oxide according to claim 1, characterized in that: The temperature of the magnesium oxide product after being cooled by the cooling system is 70°C to 80°C.

7. The calcination method of high temperature calcined magnesium oxide according to claim 1, characterized in that: The magnesium oxide product particles are smaller than 150 meshes.