A double hoop support system for single column cap beam construction
Through the double-hook hoop support system, including the upper hook hoop, the lower hook hoop and the auxiliary hook hoop, combined with the support components and the connecting plate, the problems of deflection and elevation error of the cantilever section in the construction of single-column cover beams are solved, and construction speed and safety are achieved Improved performance and simplified the removal process.
Patent Information
- Application Number
- CN202010317596.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-04-21
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2040-04-21
AI Technical Summary
In the construction of single-column cover beams, the prior art has problems such as excessive deflection of the cantilever section and large installation elevation error, resulting in slow construction speed, high cost and difficulty in demolition, and construction risks.
The double clamp support system is adopted, including the upper clamp, the lower clamp and the auxiliary clamp. It is fixed by connecting plates and bolt components. The auxiliary clamp is used to adjust the elevation, the supporting component is used to enhance stability, and it is passed through when dismantling. The reverse chain and the car crane are subject to force conversion and removal.
It effectively solves the problems of deflection and elevation errors in the cantilever section, reduces construction period and costs, improves construction convenience and safety, ensures the stability and demolition space of single-column cover beams, and reduces construction risks.
Smart Images

Figure CN111335183B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of single-column cap beams, and in particular is a double-hoop support system for the construction of single-column cap beams. Background Art
[0002] During the construction of intercity rail transit viaducts, cap beam construction is an aerial operation with an operation height of more than 8m. During construction, formwork support and working platform need to be set up. The existing construction forms are mainly divided into: ground-type support, steel pipe Bailey support, and hoop support system.
[0003] Nowadays, the ground-based support is still widely used, but it has very high requirements for foundation treatment; the steel pipe Bailey support is more expensive; the clamp support system has a fast construction speed and does not require foundation treatment, which is very convenient. However, this method is more commonly used in double-column cap beams. The single-column cap beam has more cantilevers on both sides, which is a great test for the deflection and stability of the clamp support platform. On the other hand, it is also difficult to control the construction elevation of the clamp support system. It is commonly used to reserve holes during the construction of the piers and insert steel rods for positioning. This method is difficult to implement in an environment where urban rail transit is directly facing citizens.
[0004] In addition, after the cap beam concrete is poured, the bottom formwork and hoop support system are tightly combined with the concrete formwork, and the force transmitted directly from the upper part makes it very difficult to remove it directly. The general existing construction method is to install a jack or sand box between the hoop and the upper support main beam, and unload the upper support main beam before removal when it needs to be removed. However, only a 5-10cm gap is guaranteed after unloading, and it is inevitable that the existing cap beam will be bumped during removal, damaging the finished product. It is also not convenient for personnel to carry out construction, and it is also very dangerous. In particular, the double hoop needs to be unloaded twice, which is even more difficult. Summary of the invention
[0005] In view of the technical problems existing in the prior art, the present invention provides a double-hoop support system for the construction of a single-column cap beam, so as to solve the problems of excessive deflection of the cantilever section of the single-column cap beam and excessive error in installation elevation.
[0006] The present invention provides a double hoop support system for single column cap beam construction, the support system comprising: a hoop assembly, comprising an upper hoop, a lower hoop and an auxiliary hoop; the upper hoop and the lower hoop are respectively fixed to the upper part and the lower part of the single column, the auxiliary hoop is placed at the lower end of the upper hoop; the volume of the auxiliary hoop is smaller than that of the upper hoop;
[0007] The support assembly is placed on both sides of a single column; the single-side support assembly includes an upper support, an oblique support, a middle support and a support seat; the upper support is placed on the upper end of an upper clamp, the support seat is placed on the upper end of a lower clamp, the two sides of the upper support are respectively connected to the support seat through oblique supports, and a middle support is installed between the two oblique supports.
[0008] Preferably, the clamp assembly and the support assembly are connected and fixed by a connecting plate and a bolt assembly.
[0009] Preferably, a geotextile is provided between the clamp assembly and the single column.
[0010] Preferably, the installation method of the double hoop support system is as follows:
[0011] S1. On the ground, the lower clamps, support seats, oblique supports, upper supports and middle supports on two sides are connected and fixed respectively through connecting plates and bolt assemblies to obtain two support assemblies on one side;
[0012] S2. Connect the auxiliary clamps with bolt assemblies, clamp the middle of the connection with wooden planks, and then hoist the auxiliary clamps onto the single column as a whole. Re-measure the elevation. If the requirements are met, remove the wooden planks and tighten the bolt assemblies. If the requirements are not met, adjust the elevation until the requirements are met.
[0013] S3, connecting the upper hoop through a bolt assembly, then hoisting the upper hoop as a whole onto the single column, placing it on the upper end of the auxiliary hoop, and tightening the bolt assembly of the upper hoop;
[0014] S4. The two single-sided support assemblies installed in step 1 are hoisted onto the single column in two steps. The upper support is placed on the upper end of the upper clamp, and the lower clamp is connected and fixed by a bolt assembly.
[0015] Preferably, the disassembly method of the double-hoop support system is as follows:
[0016] S1. Install the auxiliary clamp 30-50 cm below the upper clamp;
[0017] S2. Take four fall chains and place them on both sides of the cap beam in pairs. The two opposite fall chains are connected by ropes across the cap beam. The lower hooks of the fall chains are connected to the double hoop support system through high-strength bandages.
[0018] S3, loosening the bolts of the upper hoop and the lower hoop to transfer the force of the double hoop support system to the fall chain;
[0019] S4, operating the four fall chains to drop the double-hoop support system obliquely onto the auxiliary hoop, and transferring the force of the double-hoop support system to the auxiliary hoop;
[0020] S5. Finally, a truck crane is used for dismantling.
[0021] Preferably, a leather gasket is provided between the rope member and the cap beam.
[0022] Preferably, the rope member is a steel wire rope.
[0023] Compared with the prior art, the beneficial effects of the present invention are as follows: the present invention solves the problem of excessive deflection of the cantilever section of the single-column cap beam and the problem of excessive installation elevation error; compared with the floor-standing bracket, the construction period and cost are greatly reduced. In addition, the present invention performs two force conversions during dismantling, and then dismantles in sequence after reserving 30-50cm of operating space, which greatly improves the convenience of construction and solves the problems of difficulty in dismantling the double hoop support system for the bottom formwork of the single-column cap beam, small dismantling space, and high construction risk. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a front view of an embodiment of the present invention.
[0025] Figure 2 is a side view of an embodiment of the present invention.
[0026] Figure 3 It is a structural diagram of an upper or lower clamp in an embodiment of the present invention.
[0027] Figure 4 1 is a structural diagram of an auxiliary clamp in an embodiment of the present invention.
[0028] Figure 5 It is an implementation diagram of disassembly in an embodiment of the present invention.
[0029] In the figure, 1. upper clamp; 2. lower clamp; 3. upper support; 4. oblique support; 5. middle support; 6. connecting plate and ordinary bolts; 7. support seat; 8. high-strength bolts; 9. cap beam; 10. auxiliary clamp; 11. wooden square; 12. single column; 13. fall chain; 14. wire rope; 15. high-strength bandage; 16. leather gasket. DETAILED DESCRIPTION
[0030] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below with reference to specific diagrams.
[0031] Figure 1-5 This is an implementation mode of the present invention.
[0032] like Figure 1-5 As shown, the support system described in this embodiment includes: a clamp assembly and a support assembly.
[0033] The clamp assembly includes an upper clamp 1 made of 16mm thick steel plate, a lower clamp 2 made of 16mm thick steel plate and an auxiliary clamp 10 made of a 20cm high 12mm thick panel. The upper clamp 1 and the lower clamp 2 are respectively fixed to the upper and lower parts of the single column 12, and the auxiliary clamp 10 is placed at the lower end of the upper clamp 1.
[0034] The support components are placed on both sides of the single column 12; the support components on one side include an upper support 3 made of double-piece 32 I-beams, two oblique supports 4 made of double-piece 25 channel steels, a middle support 5 made of double-piece 25 channel steels, and a support seat 7; the upper support 3 is placed on the upper end of the upper clamp 1, and the support seat 7 is installed on the upper end of the lower clamp 2. The two sides of the upper support 3 are respectively connected to the support seat 7 through the oblique supports 4, and the middle support 5 is installed between the two oblique supports 4.
[0035] Furthermore, a white geotextile is provided between the clamp assembly and the single column 12 to prevent the steel clamp from rusting and affecting the appearance. The white geotextile is padded inside to increase the friction between the clamp and the single column 12.
[0036] The installation method of the double hoop support system is as follows:
[0037] S1. On the ground, connect and fix the two unilateral lower hoops 2, the support seat 7, the oblique support 4, the upper support 3 and the middle support 5 respectively through the connecting plate and the ordinary bolts 6 to obtain two unilateral support assemblies;
[0038] S2. Connect the auxiliary clamp 10 with M27 (10.9 grade) high-strength bolts 8, and clamp the middle of the connection with a wooden square 11 to reserve a certain space. Then hoist the auxiliary clamp 10 onto the single column 12 as a whole, and re-measure the elevation. If the requirements are met, two construction lifting vehicles with a total of four workers on both sides are arranged to remove the wooden square 11 and tighten the high-strength bolts 8. If the requirements are not met, adjustments are made until the requirements are met.
[0039] S3, connect the upper hoop 1 with the high-strength bolts 8, then hoist the upper hoop 1 as a whole onto the single column 12, place it on the upper end of the auxiliary hoop 10, and tighten the high-strength bolts 8;
[0040] S4. The two single-sided support assemblies installed in step 1 are hoisted onto the single column 12 in two steps. The upper support 3 is placed on the upper end of the upper clamp 1, and the lower clamp 2 is connected and fixed by high-strength bolts 8.
[0041] Among them, the force of the clamp assembly comes from the tightening force of the high-strength bolt 8. Finally, the tightening force needs to be fully checked, and the auxiliary clamp 10 needs to be able to withstand the total weight of the support system of 8.2t.
[0042] The disassembly method of the double hoop support system is as follows:
[0043] S1. Install the auxiliary clamp 10 40 cm below the upper clamp;
[0044] S2. Take four fall chains 13 and place them on both sides of the cap beam 9 in pairs. The two opposite fall chains 13 are connected across the cap beam by steel wire ropes 14. The lower hooks of the fall chains 13 are connected to the double hoop support system through high-strength bandages 15.
[0045] S3, two construction hoists each with two workers loosen the high-strength bolts 8 of the upper clamp 1 and the lower clamp 2, and transfer the force of the double clamp support system to the fall chain 13;
[0046] S4, four workers simultaneously operate four fall chains 13 to tilt the entire double-hoop support system onto the auxiliary hoop 10, and transfer the force of the double-hoop support system to the auxiliary hoop 10;
[0047] S5. Finally, a truck crane is used for dismantling.
[0048] Among them, a leather gasket 16 is provided between the steel wire rope 14 and the cap beam 9 for protection to prevent the finished cap beam 9 from being damaged.
[0049] The auxiliary clamp 10 and the four fall chains 13 need to be able to bear the total weight of the bottom mold and the double clamp support system.
[0050] This embodiment adopts a double load-bearing clamp setting, the upper clamp 1 directly receives the force transmitted from the upper support 3, and the upper support 3 is provided with two diagonal braces to transmit the force to the lower clamp 2, forming a stable triangular structure. In order to solve the deflection problem of the cantilever being too long, a middle support 5 is set in the middle of the diagonal brace to form an over-static structure, which greatly increases the stability problem. During installation and disassembly, a small auxiliary clamp 10 is used for auxiliary construction to perform temporary height positioning, which greatly reduces the construction period and cost compared with the floor-standing bracket. In addition, this embodiment solves the problems of difficult dismantling of the double clamp support system, small dismantling space, and high construction risk through safe force conversion and temporary fixing of the double clamp support system on the auxiliary clamp 10. 40 cm of operating space is freed up for dismantling of the double clamp support system and the bottom mold.
[0051] The above are only implementation modes of the present invention, and are not intended to limit the patent scope of the present invention. Any equivalent structure made using the contents of the present invention's specification and drawings, directly or indirectly used in other related technical fields, are also within the patent protection scope of the present invention.
Claims
1. A double hoop support system for single column cap beam construction, characterized in that: The double hoop support system comprises: The clamp assembly comprises an upper clamp, a lower clamp and an auxiliary clamp; the upper clamp and the lower clamp are respectively fixed to the upper part and the lower part of the single column, and the auxiliary clamp is placed at the lower end of the upper clamp; the volume of the auxiliary clamp is smaller than that of the upper clamp; Support components are placed on both sides of a single column; the support components on one side include an upper support, an oblique support, a middle support and a support seat; the upper support is placed on the upper end of the upper clamp, the support seat is placed on the upper end of the lower clamp, the two sides of the upper support are respectively connected to the support seat through oblique supports, and the middle support is installed between the two oblique supports; The installation method of the double hoop support system is as follows: S1. On the ground, connect and fix the lower hoops, support seats, oblique supports, upper supports and middle supports on two sides through connecting plates and bolt assemblies to obtain two support assemblies on one side; S2. Connect the auxiliary clamps with bolt assemblies, clamp the middle of the connection with wooden planks, and then hoist the auxiliary clamps onto the single column as a whole. Re-measure the elevation. If the requirements are met, remove the wooden planks and tighten the bolt assemblies. If the requirements are not met, adjust the elevation until the requirements are met. S3, connecting the upper hoop through a bolt assembly, then hoisting the upper hoop as a whole onto the single column, placing it on the upper end of the auxiliary hoop, and tightening the bolt assembly of the upper hoop; S4, hoisting the two single-sided support assemblies installed in step 1 onto the single column twice, the upper support is placed on the upper end of the upper clamp, and the lower clamp is connected and fixed by a bolt assembly; The disassembly method of the double hoop support system is as follows: S1. Install the auxiliary clamp 30-50 cm below the upper clamp; S2. Take four fall chains and place them on both sides of the cap beam in pairs. The two opposite fall chains are connected by ropes across the cap beam. The lower hooks of the fall chains are connected to the double hoop support system through high-strength bandages. S3, loosening the bolts of the upper hoop and the lower hoop to transfer the force of the double hoop support system to the fall chain; S4, operating the four fall chains to drop the double-hoop support system obliquely onto the auxiliary hoop, and transferring the force of the double-hoop support system to the auxiliary hoop; S5. Finally, a truck crane is used for dismantling.
2. The double-hoop support system according to claim 1, characterized in that: A leather gasket is provided between the rope member and the cap beam.
3. The double-hoop support system according to claim 1, characterized in that: The rope member is a steel wire rope.
Citation Information
Patent Citations
The construction method for single-column cap beams adopts a combination system of clamps and triangular supports.
CN102277835A
Hoop type tool suspender device for changing steel pipe truss concrete arch bridge suspender
CN106087770A
Hold hoop type automatic leveling and anchoring device for replacement of steel pipe concrete arch bridge suspenders and suspender replacing method thereof
CN106758882A
Two cantilever bent cap staple bolts construction braced system of only post
CN204589822U
Hoop type support for single-column pier bent cap construction
CN210134352U