An assembled recyclable crown beam and a supporting method thereof

The prefabricated recyclable crown beam structure solves the complex and non-recyclable construction problems of traditional crown beams, achieves rapid installation, flexible configuration and resource saving, and improves the construction efficiency and safety of foundation pit projects.

CN111456026BActive Publication Date: 2024-10-29CHINA JK INST OF ENG INVESTIGATION & DESIGN
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202010294926.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-04-15
Publication Date
2024-10-29
Estimated Expiration
2040-04-15

AI Technical Summary

Technical Problem

The construction of traditional reinforced concrete crown beams is complicated and takes a long time, which cannot give full play to the stiffness, and cannot be recycled after construction, resulting in resource waste and environmental pollution, affecting the safety of foundation pits.

Method used

It adopts a prefabricated recyclable crown beam structure, including supporting piles and steel composite beams set up in the rock and soil body. Quick installation and disassembly are achieved through components such as double-limb steel ferrules, anchor cables, and steel strands. Steel angle pads and The wedge-shaped steel plates are adjusted and fixed to achieve flexible configuration and recycling of the crown beam.

Benefits of technology

It simplifies the construction process, improves the stiffness utilization rate of the crown beam, reduces the pile top displacement, realizes the recyclability of the crown beam, saves resources, and ensures the stability of the structure and clear force transmission.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111456026B_ABST
    Figure CN111456026B_ABST
Patent Text Reader

Abstract

The present invention discloses an assembled recyclable crown beam, comprising a plurality of vertically arranged support piles, a steel composite beam is horizontally placed at the upper position of the corresponding support pile on the side of the plurality of support piles away from the rock and soil body, a plurality of double-limb steel hoops are evenly penetrated in the gap of the steel composite beam, the double-limb steel hoops are sleeved on the corresponding support piles, an anchor cable is anchored at the position between two adjacent support piles, a plurality of steel strands are fixed in the anchor cable, the other ends of the plurality of steel strands are connected to the gap of the steel composite beam; the double-limb steel hoop comprises an annular steel hoop, one side of the annular steel hoop is connected to two parallel limbs, the annular steel hoop is sleeved on the corresponding support pile, and the two limbs extend into the gap of the steel composite beam. The problem of complex crown beam construction and non-recyclability after construction in the prior art is solved. The present invention also discloses a support method for the above-mentioned crown beam.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of foundation pit engineering support, relates to an assembled recyclable crown beam, and further relates to a supporting method for the assembled recyclable crown beam. Background Art

[0002] The cap beam is a beam installed on the top of the retaining structure to connect the retaining structure as a whole. It is widely used in the field of foundation pit engineering support technology. The cap beam is crucial to the integrity of the retaining structure. Its common form is reinforced concrete cap beam, which has the following problems:

[0003] 1. The traditional reinforced concrete crown beam construction process is complex and the construction period is long. It requires multiple processes such as breaking the pile head, making the steel cage, supporting the formwork, pouring concrete, etc. The construction is complicated and the construction period is long.

[0004] 2. The rigidity of traditional reinforced concrete crown beams is often unable to be fully utilized due to the excessive length of the supporting side. Some projects also set anchor cables at the crown beam position to effectively utilize the rigidity of the crown beam and limit the displacement of the pile top. However, since the anchor cables need to pass through the crown beam, it is difficult to support the crown beam and construct the anchor cables, thereby reducing the feasibility.

[0005] 3. Traditional reinforced concrete crown beams cannot be recycled after construction, which wastes resources and pollutes the environment.

[0006] 4. The low stiffness of traditional reinforced concrete cap beams leads to large displacement of pile tops, affecting the safety of foundation pits.

[0007] 5. Often due to construction errors in the retaining structure, the center lines of the crown beams are not on the same straight line, affecting the stress-bearing performance of the crown beams. Summary of the invention

[0008] The purpose of the present invention is to provide an assembled recyclable crown beam, which solves the problems in the prior art that the crown beam is complex in construction and cannot be recycled after construction.

[0009] Another object of the present invention is to provide a method for supporting an assembled recyclable crown beam.

[0010] The technical solution adopted by the present invention is an assembled recyclable crown beam, including multiple supporting piles vertically arranged in the rock and soil body, a steel composite beam is horizontally placed at the upper position of the supporting piles corresponding to the side of the multiple supporting piles away from the rock and soil body, and a plurality of double-limb steel hoops are evenly penetrated in the gap of the steel composite beam. The double-limb steel hoops are arranged one by one corresponding to the supporting piles, and the double-limb steel hoops are sleeved on the supporting piles corresponding to them. An anchor cable is arranged between two adjacent supporting piles, and multiple steel strands are fixed in the anchor cable. The other ends of the multiple steel strands pass through the gap of the steel composite beam and are connected to an anchor; the double-limb steel hoop includes an annular steel hoop, and two parallel legs are connected to one side of the annular steel hoop, and the annular steel hoop is sleeved on the supporting piles corresponding to it, and the two legs extend into the gap of the steel composite beam.

[0011] The present invention is also characterized in that

[0012] The steel composite beam comprises two steel sections which are arranged in parallel and with a certain gap, and a plurality of steel tie plates are welded to the two steel sections along the length.

[0013] The upper and lower surfaces of the two steel sections are welded by steel tie plates.

[0014] A steel angle pad is also provided between the anchor and the steel composite beam. A hole is opened on the steel angle pad at the position corresponding to the gap of the steel composite beam. The end of the steel strand away from the rock and soil body passes through the gap and hole of the steel composite beam in sequence and is fixed to the anchor.

[0015] The steel angle pad is arranged in a right-angle trapezoidal shape, and the inclined surface of the steel angle pad is away from the steel composite beam and is arranged perpendicular to the steel strand.

[0016] A hook is arranged on one side of the steel angle pad close to the steel composite beam, and the hook is hooked on the steel composite beam.

[0017] A rectangular gap is formed between the two legs and the steel composite beam, and a wedge-shaped steel plate is embedded in the rectangular gap. The wedge-shaped steel plate is provided with a reserved hole. Multiple wedge-shaped steel plates embedded in each double-leg steel hoop are connected in sequence into a whole by passing steel wires through the reserved holes.

[0018] Another technical solution adopted by the present invention is a method for supporting an assembled recyclable crown beam. The structure of the assembled recyclable crown beam is as described above, and is specifically implemented according to the following steps:

[0019] Step 1, placing the annular steel hoop of the double-limb steel hoop at the predetermined position of the pile top of the supporting pile and then pouring the concrete supporting pile, or after the supporting pile construction is completed, breaking the pile head and then sleeve the double-limb steel hoop at the predetermined position of the pile top;

[0020] Step 2: After the support piles and anchor cables are constructed and meet the design strength requirements, place the steel composite beam horizontally at the design position, insert the two legs of the double-legged steel hoop into the gap between the two steel sections in the steel composite beam, hang the steel angle pad on the steel composite beam through the hook, and adjust the positions of the double-legged steel hoop and the steel angle pad to align them with the support piles and anchor cables respectively;

[0021] Step 3, placing the wedge-shaped steel plate into and filling the rectangular gap between the two legs of the double-leg steel hoop and the steel composite beam, and connecting the wedge-shaped steel plate into a whole by using steel wire through the reserved holes;

[0022] Step 4, after fixing the steel strand with an anchor through a steel angle pad, apply prestress to the anchor cable through a jack, and lock the anchor head to complete the tensioning and locking of the anchor cable;

[0023] Step 5, unloading the jack, completing the support of an assembled recyclable crown beam.

[0024] The beneficial effects of the present invention are:

[0025] 1. The present invention adopts assembled steel components, which are ready for use and can function immediately after installation;

[0026] 2. The present invention can adjust the anchor position of the crown beam and flexibly configure the actual required crown beam stiffness in combination with the material strength of the steel component itself, thereby giving full play to the role of the crown beam;

[0027] 3. The crown beam of the present invention can be disassembled and recycled, thus saving resources;

[0028] 4. By supporting the crown beam and fully utilizing the crown beam's rigidity, the displacement of the pile top can be reduced.

[0029] 5. The center lines of the crown beams are on the same straight line, and the structural force transmission is clear. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 It is a structural schematic diagram of an assembled recyclable crown beam of the present invention;

[0031] Figure 2 yes Figure 1 A top view of

[0032] Figure 3 It is a cross-sectional view of the anchor cable position in an assembled recyclable crown beam of the present invention;

[0033] Figure 4 It is a structural schematic diagram of an assembled recyclable crown beam medium steel composite beam of the present invention;

[0034] Figure 5 It is a structural schematic diagram of a prefabricated recyclable crown beam medium-shaped steel angle pad of the present invention;

[0035] Figure 6 yes Figure 5 Left view of

[0036] Figure 7 It is a structural schematic diagram of a double-limb steel hoop in an assembled recyclable crown beam of the present invention;

[0037] Figure 8 It is a cross-sectional view of the position of the supporting piles in an assembled recyclable crown beam of the present invention;

[0038] Fig. 9 This is a diagram showing an embodiment of a wedge-shaped steel plate in an assembled recyclable crown beam of the present invention;

[0039] Fig.10 This is a second embodiment diagram of a wedge-shaped steel plate in an assembled recyclable crown beam of the present invention;

[0040] Fig.11 This is a third embodiment diagram of a wedge-shaped steel plate in an assembled recyclable crown beam of the present invention.

[0041] In the figure, 1. support pile, 2. double-leg steel hoop, 3. steel composite beam, 4. steel strand, 5. anchor, 6. steel angle pad, 7. steel tie plate, 8. wedge-shaped steel plate, 9. steel, 10. anchor cable, 11. reserved hole;

[0042] 2-1. Annular steel hoop, 2-2. Limbs;

[0043] 6-1. Hole, 6-2. Hook. DETAILED DESCRIPTION

[0044] The present invention is described in detail below with reference to the accompanying drawings and specific embodiments.

[0045] The present invention provides an assembled recyclable crown beam, the structure of which is as follows Figure 1 As shown, it includes multiple supporting piles 1 vertically arranged in the rock and soil body, and a steel composite beam 3 is horizontally placed at the upper position of the supporting pile 1 corresponding to the side of the multiple supporting piles 1 away from the rock and soil body, and a plurality of double-limb steel hoops 2 are evenly penetrated in the gap of the steel composite beam 3. The double-limb steel hoops 2 are arranged one by one corresponding to the supporting piles 1, and the double-limb steel hoops 2 are sleeved on the corresponding supporting piles 1, and an anchor cable 10 is arranged between two adjacent supporting piles 1. Multiple steel strands 4 are fixed in the anchor cable 10, and the other ends of the multiple steel strands 4 pass through the gap of the steel composite beam 3 and are connected to an anchor 5; the double-limb steel hoop 2 includes an annular steel hoop 2-1, and two parallel legs 2-2 are connected to one side of the annular steel hoop 2-1, and the annular steel hoop 2-1 is sleeved on the corresponding supporting pile 1, and the two legs 2-2 extend into the gap of the steel composite beam 3.

[0046] The steel composite beam 3 comprises two steel sections 9 which are arranged in parallel and with a certain gap therebetween, and a plurality of steel tie plates 7 are welded to the two steel sections 9 along the length direction.

[0047] The upper and lower surfaces of the two steel sections 9 are welded by steel tie plates 7 .

[0048] A steel angle pad 6 is also arranged between the anchor 5 and the steel composite beam 3. A hole 6-1 is opened on the steel angle pad 6 at the gap corresponding to the steel composite beam 3. The end of the steel strand 4 away from the rock and soil body passes through the gap of the steel composite beam 3 and the hole 6-1 in sequence and is fixed to the anchor 5.

[0049] The steel angle pad 6 is arranged in a right-angle trapezoidal shape, and the inclined surface of the steel angle pad 6 is away from the steel composite beam 3 and is arranged perpendicular to the steel strand 4 .

[0050] A hook 6 - 2 is provided on one side of the steel angle pad 6 close to the steel composite beam 3 , and the hook 6 - 2 is hooked on the steel composite beam 3 .

[0051] A rectangular gap is formed between the two legs 2-2 and the steel composite beam 3, and a wedge-shaped steel plate 8 is embedded in the rectangular gap. A reserved hole 11 is provided on the wedge-shaped steel plate 8. The multiple wedge-shaped steel plates 8 embedded in each double-leg steel hoop 2 are connected in sequence as a whole by passing steel wires through the reserved holes 11.

[0052] A method for supporting an assembled recyclable crown beam, wherein the structure of the assembled recyclable crown beam is as described above, is specifically implemented according to the following steps:

[0053] Step 1, placing the annular steel hoop 2-1 of the double-limb steel hoop 2 at a predetermined position on the top of the supporting pile 1 and then pouring the concrete supporting pile 1, or after the supporting pile 1 is constructed, breaking the pile head and then putting the double-limb steel hoop 2 at the predetermined position on the top of the pile;

[0054] Step 2, after the support pile 1 and the anchor cable 10 are constructed and meet the design strength requirements, the steel composite beam 3 is placed horizontally at the design position, the two legs 2-2 of the double-leg steel hoop 2 are inserted into the gap between the two steel sections 9 in the steel composite beam 3, the steel angle pad 6 is hung on the steel composite beam 3 through the hook 6-2, and the positions of the double-leg steel hoop 2 and the steel angle pad 6 are adjusted to align with the support pile 1 and the anchor cable 10 respectively;

[0055] Step 3, inserting and filling the wedge-shaped steel plate 8 into the rectangular gap between the two legs 2-2 of the double-leg steel hoop 2 and the steel composite beam 3, and connecting the wedge-shaped steel plate 8 into a whole with a steel wire through the reserved hole 11;

[0056] Step 4, after fixing the steel strand 4 with the anchor 5 through the steel angle pad 6, applying prestress to the anchor cable 10 through the jack, and locking the anchor head to complete the tensioning and locking of the anchor cable 10;

[0057] Step 5, unloading the jack, completing the support of an assembled recyclable crown beam.

Claims

1. An assembled recyclable crown beam, characterized in that: The invention comprises a plurality of support piles (1) vertically arranged in a rock and soil body, a steel composite beam (3) being horizontally arranged at an upper position of the support pile (1) corresponding to a side of the plurality of support piles (1) away from the rock and soil body, a plurality of double-limbed steel hoops (2) being evenly penetrated in the gaps of the steel composite beams (3), the double-limbed steel hoops (2) being arranged one-to-one with the support piles (1), the double-limbed steel hoops (2) being sleeved on the corresponding support piles (1), and an anchor cable (10) being arranged between two adjacent support piles (1). ), a plurality of steel strands (4) are fixed in the anchor cable (10), and the other ends of the plurality of steel strands (4) pass through the gap of the steel composite beam (3) and are connected to an anchor (5); the double-limb steel hoop (2) comprises an annular steel hoop (2-1), one side of the annular steel hoop (2-1) is connected to two parallel limbs (2-2), the annular steel hoop (2-1) is sleeved on the corresponding support pile (1), and the two limbs (2-2) extend into the gap of the steel composite beam (3); The steel composite beam (3) comprises two steel sections (9) arranged in parallel and with a certain gap therebetween, and a plurality of steel tie plates (7) are welded to the two steel sections (9) along the length direction; A steel angle pad (6) is also provided between the anchor (5) and the steel composite beam (3); a hole (6-1) is provided on the steel angle pad (6) at a position corresponding to the gap of the steel composite beam (3); the end of the steel strand (4) away from the rock and soil body passes through the gap of the steel composite beam (3) and the hole (6-1) in sequence to be fixed to the anchor (5); A hook (6-2) is provided on one side of the steel angle pad (6) close to the steel composite beam (3), and the hook (6-2) is hooked on the steel composite beam (3); A rectangular gap is formed between the two legs (2-2) and the steel composite beam (3), and a wedge-shaped steel plate (8) is embedded in the rectangular gap. A reserved hole (11) is provided on the wedge-shaped steel plate (8). The multiple wedge-shaped steel plates (8) embedded in each double-leg steel hoop (2) are sequentially connected into a whole by passing a steel wire through the reserved hole (11); The supporting method of the assembled recyclable crown beam is specifically implemented according to the following steps: Step 1, placing the annular steel hoop (2-1) of the double-limb steel hoop (2) at a predetermined position on the top of the supporting pile (1) and then pouring the concrete supporting pile (1), or after the supporting pile (1) is constructed, breaking the pile head and then putting the double-limb steel hoop (2) at the predetermined position on the top of the pile; Step 2, after the support piles (1) and anchor cables (10) are constructed and meet the design strength requirements, the steel composite beam (3) is placed horizontally at the design position, the two legs (2-2) of the double-legged steel hoop (2) are inserted into the gap between the two steel sections (9) in the steel composite beam (3), the steel angle pad (6) is hung on the steel composite beam (3) through the hook (6-2), and the positions of the double-legged steel hoop (2) and the steel angle pad (6) are adjusted so that they are aligned with the support piles (1) and the anchor cables (10) respectively; Step 3, inserting a wedge-shaped steel plate (8) into and filling the rectangular gap between the two legs (2-2) of the double-leg steel hoop (2) and the steel composite beam (3), and connecting the wedge-shaped steel plate (8) into a whole by using a steel wire through the reserved hole (11); Step 4, after fixing the steel strand (4) with the anchor (5) through the steel angle pad (6), applying prestress to the anchor cable (10) with the jack, and locking the anchor head, thereby completing the tensioning and locking of the anchor cable (10); Step 5, unloading the jack, completing the support of an assembled recyclable crown beam.

2. The assembled recyclable crown beam according to claim 1, characterized in that: The upper and lower surfaces of the two steel sections (9) are welded via steel tie plates (7).

3. The assembled recyclable crown beam according to claim 2, characterized in that: The steel angle pad (6) is arranged in a right-angle trapezoidal shape, and the inclined surface of the steel angle pad (6) is away from the steel composite beam (3) and is arranged perpendicular to the steel strand (4).

Citation Information

Patent Citations

  • Fabricated recyclable crown beam

    CN211057812U