An electric climbing hanging basket for high-position small space operation and installation method
By designing an electric climbing gondola suitable for high-level and small spaces, the problem of low construction efficiency and high cost caused by the large size of the electric climbing gondola in the existing technology has been solved, enabling efficient bridge construction in a small space and reducing construction costs. , and improve work efficiency.
Patent Information
- Application Number
- CN202010413642.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-05-15
- Publication Date
- 2024-10-15
- Estimated Expiration
- 2040-05-15
AI Technical Summary
The existing electric climbing basket is large in size and cannot be used in a small space, resulting in low work efficiency and high cost in bridge construction.
An electric climbing basket is designed for high-level and small space operations, including two winches, two basket frames, two fixed steel plates, load-bearing pedals, angle steel, support rods and two fixed rods, using a "V" shape The hanging basket frame structure realizes flexible lifting of the hanging basket through the connection of the winch and the fixed steel plate. Combined with the use of drilling equipment and UPVC pipes, it is suitable for bridge construction in small spaces.
This device is suitable for smaller construction environments where bridges are built, avoiding traditional large-scale crane operations, improving work efficiency and reducing costs. It has a simple structure, is light and flexible, is suitable for a variety of operations, and can quickly complete construction tasks.
Smart Images

Figure CN111485499B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of civil engineering construction machinery and devices, and in particular to an electric climbing hanging basket for high-position small space operations and an installation method thereof. Background Art
[0002] With the rapid development of my country's road and bridge construction, economy, and comprehensive national strength, my country's construction materials, equipment, and construction technology have developed rapidly. With the continuous completion of high-tech bridge projects, China's bridge construction is advancing by leaps and bounds. The leapfrog development of railways with the rapid expansion of transportation capacity and the rapid improvement of technical equipment level as the main line is the long-term construction goal and task of my country's railways. Therefore, bridge construction is often accompanied by construction in a narrow space. Traditional construction technology uses large equipment such as cranes for construction, which is often accompanied by many shortcomings. Because the construction scope is narrow and machinery cannot enter, and the high altitude position is too high, small cranes cannot meet the construction. The use of larger cranes increases the construction cost and may have restrictions on the construction site, especially when constructing over or under the bridge, it cannot meet the normal construction conditions.
[0003] To sum up, the existing electric climbing basket is large in size and cannot be used in a smaller space. During the construction of bridges, construction is often carried out in a narrow space and the electric climbing basket cannot be used. Only large cranes can be used, resulting in low work efficiency and high costs. Summary of the invention
[0004] The present invention aims to solve the problem that the existing electric climbing hanging basket is large in size and cannot be used in a smaller space. In the process of bridge construction, construction is often accompanied by a small space range. The electric climbing hanging basket cannot be used and only a large crane can be used, resulting in low work efficiency and high cost. An electric climbing hanging basket for high-position small space operations and an installation method are proposed.
[0005] The electric climbing hanging basket for high-position small space operation of the present invention comprises two winches, two hanging basket frames, two fixed steel plates, a load-bearing pedal, angle steel, a support rod and two fixed rods;
[0006] The hanging basket frame is in a "V" shape, and a hanging basket frame is respectively provided at both ends of the load-bearing pedal, and the tip of the hanging basket frame is fixedly connected to the end surface of the load-bearing pedal, and a fixed steel plate is provided at the upper ends of the two hanging basket frames, and the upper surface of each fixed steel plate is fixedly connected to the base of the winch through an angle steel, one end of a fixed steel plate is fixedly connected to one end of a fixed rod, the other end of a fixed rod is fixedly connected to one end of another fixed steel plate, the other end of a fixed steel plate is fixedly connected to one end of another fixed rod, and the other end of another fixed rod is fixedly connected to the other end of another fixed steel plate, and the two fixed rods are arranged in parallel, and n support rods are arranged between the two fixed rods, n is a positive integer, and each support rod is arranged perpendicular to the fixed rod;
[0007] Furthermore, the fixed steel plate is a steel plate of 12mm×400mm×300mm;
[0008] Furthermore, the angle steel is an angle steel of 5mm×5mm×200mm;
[0009] Furthermore, the thickness of the load-bearing pedal is 15 mm to 25 mm;
[0010] Furthermore, the thickness of the load-bearing pedal is 20 mm;
[0011] Furthermore, the upper end of the hanging basket frame and the bottom end of the fixed steel plate 3 are connected by welding;
[0012] Furthermore, the number of support rods n, 3≤n≤6;
[0013] Furthermore, the installation method of the electric climbing hanging basket for high-position small space operation is specifically used as follows:
[0014] Step 1: The electric climbing hanging basket is transported to the construction site and put into place. The power is turned on and equipped with a socket (for electric winch and drilling equipment). The hanging basket is debugged to ensure normal operation. The hanging basket's winch hook and wire rope are lifted to the top of the frame pier with a rope and reliably connected and fixed with the embedded parts. The hanging basket is lifted to a stressed state. The operator wears a safety belt and enters the hanging basket into place. At the same time, the fall arrester is lowered and firmly connected to the safety belt buckle;
[0015] Step 2: The drilling equipment is in place. The drainage pipeline and the pier body are connected with clamps and expansion bolts. A clamp is arranged every 2m. The corners are strengthened. The drilling rig drills holes for expansion screw construction and temporarily fixes them with the clamps. The electric climbing hanging basket is used to drill the next hole until the drilling is completed. The length of a UPVC pipe is 6m.
[0016] Step 3: The staff on the top of the frame pier lowers the UPVC pipe to the clamp fixing position through the rope, and the electric hanging basket is lifted to the clamp position. The operator makes fine adjustments and fixes the clamps, and fixes all the clamps within the 6m length of the UPVC pipe in turn;
[0017] Step 4: The electric hanging basket descends to the next construction site, and repeats steps 2 and 3 to carry out construction;
[0018] Step 5: After one installation is completed, lower the electric hanging basket to the T-beam bridge deck, adjust the fixed position of the hanging basket on the frame pier top, and then lift it again to install the subsequent drainage pipeline;
[0019] Step 6. After completing the installation of the drainage pipeline of a frame pier, the electric hanging basket descends to the T-beam bridge deck, releases the fall arrester and the basket fixing buckle, and the staff moves the hanging basket to the next frame pier and repeats the construction to complete the installation of the drainage pipelines of all frame piers.
[0020] Compared with the prior art, the present invention has the following beneficial effects:
[0021] 1. The present invention overcomes the shortcomings of the prior art and adopts this electric climbing hanging basket device, which is suitable for building a smaller bridge construction environment, avoids the use of traditional large crane operations, improves work efficiency, and can be reused to save costs.
[0022] 2. The present invention overcomes the shortcomings of the prior art and utilizes the method for using an electric climbing hanging basket to achieve rapid construction and improve work efficiency during bridge construction.
[0023] 3. The invention has a simple structure, is light and flexible, is easy to use, and can be used for a variety of operations. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a front view of an electric climbing hanging basket for high-position small space operation according to the present invention;
[0025] Figure 2 It is a side view of an electric climbing hanging basket for high-position small space operation according to the present invention;
[0026] Figure 3 The present invention is a top view of an electric climbing hanging basket for high-position small space operations. DETAILED DESCRIPTION
[0027] Specific implementation method 1: Combination Figure 1 , Figure 2 and Figure 3The present embodiment is described. The present embodiment is an electric climbing hanging basket for high-position small space operation, which comprises two winches 1, two hanging basket frames 2, two fixed steel plates 3, a load-bearing pedal 4, an angle steel 5, a support rod 6 and two fixed rods 7;
[0028] The hanging basket frame 2 is in a "V" shape, and a hanging basket frame 2 is respectively provided at both ends of the load-bearing pedal 4, and the tip of the hanging basket frame 2 is fixedly connected to the end surface of the load-bearing pedal 4, and a fixed steel plate 3 is provided at the upper ends of the two hanging basket frames 2, and the upper surface of each fixed steel plate 3 is fixedly connected to the base of the winch 1 through an angle steel 5, one end of a fixed steel plate 3 is fixedly connected to one end of a fixed rod 7, the other end of a fixed rod 7 is fixedly connected to one end of another fixed steel plate 3, the other end of a fixed steel plate 3 is fixedly connected to one end of another fixed rod 7, and the other end of another fixed rod 7 is fixedly connected to the other end of another fixed steel plate 3, and the two fixed rods 7 are arranged in parallel, and n support rods 6 are arranged between the two fixed rods 7, n is a positive integer, and each support rod 6 is arranged perpendicular to the fixed rod 7;
[0029] This specific implementation method adopts this electric climbing hanging basket device, which is suitable for the construction environment of small bridges, avoiding the use of traditional large crane operations, improving work efficiency and saving costs. The electric climbing hanging basket has a simple structure, is easy to process, is light and flexible, has high applicability, and can be used for a variety of operations. Compared with traditional construction, it is more convenient, simple and efficient. When the workload is large, multiple hanging baskets can be processed for construction at the same time, and can be reused many times to save costs.
[0030] Specific implementation method 2: Combination Figure 2 This embodiment is described. This embodiment is a further limitation of the electric climbing hanging basket described in the specific embodiment 1. In this embodiment, an electric climbing hanging basket for high-position small space operation is described. The fixed steel plate 3 is a steel plate of 12mm×400mm×300mm;
[0031] In this specific implementation, the fixed steel plate 3 is a steel plate of 12 mm×400 mm×300 mm and has a thickness of 12 mm, so as to improve the stability of the winch 1 .
[0032] Specific implementation method three: Combination Figure 1 This embodiment is described. This embodiment is a further limitation of the electric climbing hanging basket described in the specific embodiment 1. In this embodiment, an electric climbing hanging basket for high-position small space operation is described. The angle steel 5 is an angle steel of 5mm×5mm×200mm.
[0033] In this specific implementation manner, the angle steel 5 is 5mm×5mm×200mm and 5mm thick, which improves the supporting force and thus improves the stability of the device.
[0034] Specific implementation method four: Combination Figure 1 and Figure 2 This embodiment is described. This embodiment is a further limitation of the electric climbing hanging basket described in the specific embodiment 1. In this embodiment, the electric climbing hanging basket for high-position small space operation, the thickness of the load-bearing pedal 4 is 15 mm to 25 mm;
[0035] In this specific implementation manner, the thickness of the load-bearing pedal 4 is 15 mm to 25 mm, and when in use, it can carry 2 to 3 people, thereby improving work efficiency.
[0036] Specific implementation method five: Combination Figure 1 and Figure 2 The present embodiment is described as a further limitation of the electric climbing hanging basket described in the fourth embodiment. The present embodiment describes an electric climbing hanging basket for high-position small space operations, and the thickness of the load-bearing pedal 4 is 20 mm.
[0037] Specific implementation method six: Combination Figure 1 and Figure 2 This embodiment is described. This embodiment is a further limitation of the electric climbing hanging basket described in the specific embodiment 1. In this embodiment, an electric climbing hanging basket for high-position small space operation is described. The upper end of the hanging basket frame 2 and the bottom end of the fixed steel plate 3 are connected by welding.
[0038] In this specific implementation, the upper end of the hanging basket frame 2 and the bottom end of the fixed steel plate 3 are connected by welding to improve the stability of the device.
[0039] Specific implementation method seven: Combination Figure 1 and Figure 2 The present embodiment is described as a further limitation of the electric climbing hanging basket described in the first embodiment. The present embodiment describes an electric climbing hanging basket for high-position small space operations, wherein the number n of the support rods 6 is 3≤n≤6.
[0040] Specific implementation method eight: Combination Figure 1 , Figure 2 and Figure 3 This embodiment describes an installation method of an electric climbing hanging basket for high-position small space operations, and its specific installation method is as follows:
[0041] Step 1: The electric climbing hanging basket is transported to the construction site and put into place. The power is turned on and equipped with a socket (for electric winch and drilling equipment). The hanging basket is debugged to ensure normal operation. The hanging basket's winch 1 hook and the wire rope are lifted to the top of the frame pier with a rope and reliably connected and fixed with the embedded parts. The hanging basket is lifted to a stressed state. The operator wears a safety belt and enters the hanging basket into place. At the same time, the anti-fall device is lowered and firmly connected to the safety belt buckle;
[0042] Step 2: The drilling equipment is in place. The drainage pipeline and the pier body are connected with clamps and expansion bolts. A clamp is arranged every 2m. The corners are strengthened. The drilling rig drills holes for expansion screw construction and temporarily fixes them with the clamps. The electric climbing hanging basket is used to drill the next hole until the drilling is completed. The length of a UPVC pipe is 6m.
[0043] Step 3: The staff on the top of the frame pier lowers the UPVC pipe to the clamp fixing position through the rope, and the electric hanging basket is lifted to the clamp position. The operator makes fine adjustments and fixes the clamps, and fixes all the clamps within the 6m length of the UPVC pipe in turn;
[0044] Step 4: The electric hanging basket descends to the next construction site, and repeats steps 2 and 3 to carry out construction;
[0045] Step 5: After one installation is completed, lower the electric hanging basket to the T-beam bridge deck, adjust the fixed position of the hanging basket on the frame pier top, and then lift it again to install the subsequent drainage pipeline;
[0046] Step 6: After completing the installation of drainage pipelines at one frame pier, the electric hanging basket is lowered to the T-beam bridge deck, the anti-fall device and the hanging basket fixing buckle are unlocked, and the staff moves the hanging basket to the next frame pier and repeats the construction to complete the installation of drainage pipelines at all frame piers;
[0047] This specific implementation method utilizes the method for using an electric climbing hanging basket to achieve rapid construction and improve work efficiency during bridge construction.
Claims
1. A method for installing an electric climbing hanging basket for high-position small space operations, the electric climbing hanging basket comprising two winches (1), two hanging basket frames (2), two fixed steel plates (3), a load-bearing pedal (4), angle steel (5), a support rod (6) and two fixed rods (7); The hanging basket frame (2) is in a "V" shape. A hanging basket frame (2) is provided at each end of the load-bearing pedal (4). The tip of the hanging basket frame (2) is fixedly connected to the end surface of the load-bearing pedal (4). A fixed steel plate (3) is provided at the upper end of each of the two hanging basket frames (2). The upper surface of each fixed steel plate (3) is fixedly connected to the base of the winch (1) through an angle steel (5). One end of a fixed steel plate (3) is fixedly connected to one end of a fixed rod (7). The other end of a fixed rod (7) is fixedly connected to one end of another fixed steel plate (3). The other end of a fixed steel plate (3) is fixedly connected to one end of another fixed rod (7). The other end of (7) is fixedly connected to the other end of another fixed steel plate (3), and the two fixed rods (7) are arranged in parallel, and n support rods (6) are arranged between the two fixed rods (7), n is a positive integer, and each support rod (6) is arranged perpendicular to the fixed rod (7); the fixed steel plate (3) is a steel plate of 12mm×400mm×300mm, the angle steel (5) adopts an angle steel of 5mm×5mm×200mm, the thickness of the load-bearing pedal (4) is 15mm~25mm, and the thickness of the load-bearing pedal (4) is 20mm. The upper end of the hanging basket frame (2) and the bottom end of the fixed steel plate (3) are connected by welding, and the number of support rods (6) is n, 3≤n≤6; Features: The specific installation method is as follows: Step 1, the electric climbing hanging basket is transported to the construction site, the power is turned on, and the socket is equipped, and debugging is performed to ensure the normal operation of the hanging basket. The hoist (1) of the hanging basket is hooked with a steel wire rope and lifted to the top of the frame pier with a rope, and is reliably connected and fixed with the embedded parts, and the hanging basket is lifted to a stressed state. The operator wears a safety belt and enters the hanging basket in place, and at the same time, the fall arrester is lowered and firmly connected to the safety belt buckle; Step 2: The drilling equipment is in place. The drainage pipeline and the pier body are connected with clamps and expansion bolts. A clamp is arranged every 2m. The corners are strengthened. The drilling rig drills holes for expansion screw construction and temporarily fixes them with the clamps. The electric climbing hanging basket is used to drill the next hole until the drilling is completed. The length of a UPVC pipe is 6m. Step 3: The staff on the top of the frame pier lowers the UPVC pipe to the clamp fixing position through the rope, and the electric hanging basket is lifted to the clamp position. The operator makes fine adjustments and fixes the clamps, and fixes all the clamps within the 6m length of the UPVC pipe in turn; Step 4: The electric hanging basket descends to the next construction site, and repeats steps 2 and 3 to carry out construction; Step 5: After one installation is completed, lower the electric hanging basket to the T-beam bridge deck, adjust the fixed position of the hanging basket on the frame pier top, and then lift it again to install the subsequent drainage pipeline; Step 6. After completing the installation of the drainage pipeline of a frame pier, the electric hanging basket descends to the T-beam bridge deck, releases the fall arrester and the basket fixing buckle, and the staff moves the hanging basket to the next frame pier and repeats the construction to complete the installation of the drainage pipelines of all frame piers.
Citation Information
Patent Citations
Hanging basket support system
CN110748139A
Mobile lifting hanging basket for construction under bridge floor
CN204125841U
Suspension type safety work gallows
CN208201644U
Electric climbing hanging basket for high-position small-space operation
CN212223633U
Gondola for work
JP1996004280A