Anti-slip tunnel structure and construction method thereof

By setting up a fixed connection between the upper and lower connecting beams and anti-sliding piles in the tunnel structure, an overall anti-sliding structure is formed, which solves the problem that the anti-sliding structure independently bears landslide thrust during construction in the landslide section of the tunnel project, and improves landslide stability and construction safety reduce project costs.

CN111502691BActive Publication Date: 2024-11-08CHINA RAILWAY ERYUAN ENGINEERING GROUP CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202010415261.5
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-05-15
Publication Date
2024-11-08
Estimated Expiration
2040-05-15

AI Technical Summary

Technical Problem

When the existing tunnel project is constructed in a landslide site, the tunnel direction intersects at a large angle with the main axis of the landslide. The anti-slip structure and the tunnel structure are two separate systems, which independently bear the thrust or pressure of the landslide, resulting in large investment in the project, difficult construction and limited scope of application. .

Method used

Design an anti-slip tunnel structure, by setting up an upper connecting beam and a lower connecting beam in the tunnel structure and fixedly connecting it with the anti-slip piles on the upper and lower sides, forming an integral structure to jointly resist the thrust and pressure of the landslide body, and increase the Great overall stiffness to improve anti-slip ability.

Benefits of technology

It effectively improves the stability of landslides, avoids the diseases caused by landslides, reduces project costs and construction difficulties, and improves construction safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111502691B_ABST
    Figure CN111502691B_ABST
Patent Text Reader

Abstract

The invention relates to an anti-sliding tunnel structure and a construction method thereof, wherein the anti-sliding tunnel structure comprises a tunnel structure passing through a landslide body, wherein a plurality of upper connecting beams and a lower connecting beam are respectively provided on an arch and an invert arch, a plurality of upper anti-sliding piles and a lower anti-sliding pile are respectively provided on both sides of the tunnel structure, and the upper connecting beams and the lower connecting beams are fixedly connected to the upper anti-sliding piles and the lower anti-sliding piles; the construction method comprises: step one: excavating a pile well at a predetermined anti-sliding pile position and applying an anti-sliding pile wall; step two: pouring anti-sliding pile concrete to a designed height; step three: excavating a tunnel and applying initial support; step four: implanting a first connecting steel bar on the anti-sliding pile, tying a connecting beam steel bar on the first connecting steel bar, tying a secondary lining internal steel bar, arranging a second connecting steel bar along the direction of the tunnel structure, and connecting the connecting beam steel bar to the secondary lining internal steel bar through the second connecting steel bar; and step five: erecting a formwork to cast the secondary lining, an upper connecting beam and a lower connecting beam.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of tunnel engineering, in particular to an anti-slip tunnel structure and a construction method thereof. Background Art

[0002] The direction of the tunnel intersects with the main axis of the landslide at a large angle, specifically when the angle between the direction of the tunnel and the main axis of the landslide is greater than 45°, and when the tunnel structure cuts through the landslide surface horizontally, the landslide will generate a large thrust on the side wall of the tunnel and a large pressure on the top of the tunnel. The tunnel project faces dual safety risks in construction and operation. During the construction process, on the one hand, the rock and soil properties in the landslide area are poor, and landslides, roof collapse, and excessive deformation of the initial support are prone to occur during tunnel excavation, making construction difficult; on the other hand, tunnel excavation at the landslide surface disturbs the landslide, which is easy to aggravate the sliding of the landslide. During the construction and operation of the tunnel, once the landslide slides, it will cause various diseases such as deformation, cracking, and falling of the tunnel lining, endangering operational safety and difficult to control. Therefore, it is necessary to adopt reasonable and effective methods to reinforce the landslide and tunnel.

[0003] The current reinforcement measures mainly include landslide prevention and control projects and tunnel reinforcement projects. The landslide control project mainly sets up anti-slide piles, prestressed anchor cables and other blocking projects in the landslide body to resist the thrust of the landslide, and combines drainage projects, clearing and unloading or counterpressure measures to improve the stability coefficient of the landslide. The tunnel reinforcement project mainly improves the mechanical properties of the surrounding rock through surrounding rock grouting, anchor rods or other measures, reduces the landslide thrust on the lining, or adopts measures such as increasing the initial support stiffness and the thickness of the secondary lining to ensure the safety of the tunnel project. The current structural form has the following problems:

[0004] The landslide prevention and control project and the tunnel project acted independently and failed to form a whole, and failed to give full play to the anti-slip ability of each component. As described in the Chinese utility model patent "Anti-slip reinforcement structure of landslide rock pile section tunnel" with application number 201420056067.2, two rows of anti-slip piles are set on the upper and lower sides of the tunnel to resist the thrust of the landslide on the tunnel side wall, but the two rows of anti-slip piles act independently and are not connected to the tunnel lining structure; this remediation measure is to avoid the impact of the landslide thrust on the tunnel structure. The anti-slip project on the upper side of the tunnel needs to resist all the landslide thrust on the upper side of the tunnel, so a larger cross-section anti-slip pile is required, the project investment is large, and the anti-slip piles on the lower side of the tunnel fail to give full play to their anti-slip ability. For example, as described in the Chinese invention patent "A reinforcement structure and construction method for a tunnel crossing a landslide" with application number 201510587488.7, the anti-slide piles on the upper and lower sides of the tunnel are extended out of the landslide surface and connected with connecting beams and pipe racks, which improves the integrity of the anti-slide project to a certain extent, but has the following limitations: the anti-slide structure and the tunnel structure are still two separate systems, which independently bear the thrust or pressure from the landslide; the structure sets anti-slide piles from the surface of the landslide body, the anti-slide height of the anti-slide piles is large, and the landslide thrust it bears is large, requiring a larger anti-slide pile section and pile length, and it is necessary to excavate the soil between the anti-slide piles on both sides, which is not suitable for deep sections of the landslide body; overall, the structural project has large investment, difficult construction, and limited scope of application. Summary of the invention

[0005] The purpose of the present invention is to provide an anti-slip tunnel structure and a construction method thereof in view of the problem that when a tunnel project in the prior art is constructed in a landslide area, the direction of the tunnel intersects with the main axis direction of the landslide at a large angle, and the anti-slip structure and the tunnel structure are two separate systems that independently bear the thrust or pressure from the landslide. Therefore, it is necessary to use anti-slip piles with a larger cross-section and a larger burial depth. However, such a project has a large investment and is difficult to construct.

[0006] In order to achieve the above object, the technical solution adopted by the present invention is:

[0007] A slide-resistant tunnel structure comprises a tunnel structure passing through a landslide body, wherein the arch and the invert arch of the tunnel structure are respectively provided with a plurality of upper connecting beams and a lower connecting beam, and the upper connecting beams and the lower connecting beams are both arranged at intervals along the direction of the tunnel structure; the two sides of the tunnel structure are respectively provided with a plurality of upper anti-slide piles and a lower anti-slide piles, and the upper anti-slide piles and the lower anti-slide piles are both arranged at intervals along the direction of the tunnel structure; the two ends of the upper connecting beam are respectively fixedly connected to the upper anti-slide piles and the lower anti-slide piles, and the two ends of the lower connecting beam are respectively fixedly connected to the upper anti-slide piles and the lower anti-slide piles.

[0008] The upper anti-slip pile is located on the upper side in the sliding direction, and the lower anti-slip pile is located on the lower side in the sliding direction. The spacing between two adjacent upper anti-slip piles or two adjacent lower anti-slip piles is determined according to the thrust of the landslide, and the spacing between the upper anti-slip piles and the lower anti-slip piles arranged opposite to each other is determined according to the size of the tunnel.

[0009] Since the tunnel structure passes through the landslide body, the anti-slide tunnel structure is provided with the upper anti-slide piles and the lower anti-slide piles, which can reinforce the landslide body and resist the thrust of the landslide body on the tunnel structure. Since the top and bottom of the tunnel structure are also provided with a plurality of upper connecting beams and lower connecting beams, respectively, the tunnel structure can be reinforced to avoid deformation, cracking, block falling and other defects of the tunnel structure.

[0010] The anti-slip tunnel structure described in the present invention is suitable for when a tunnel project is constructed in a landslide area, and the direction of the tunnel intersects with the main axis direction of the landslide at a large angle. The large angle means that the angle between the direction of the tunnel and the main axis direction of the landslide is greater than 45°. Since the anti-slip tunnel structure described in the present invention fixes the two ends of the upper connecting beam to the upper anti-slip piles and the lower anti-slip piles respectively, and the two ends of the lower connecting beam are fixedly connected to the upper anti-slip piles and the lower anti-slip piles respectively, the traditional anti-slip structure and the tunnel structure are combined into a whole to jointly resist the thrust and pressure generated by the landslide body on the tunnel structure, thereby increasing the overall stiffness of the anti-slip tunnel structure, forming a large-resistance anti-slip structure, and effectively improving the anti-slip ability of the anti-slip tunnel structure, thereby improving the stability of the landslide and avoiding damage caused by landslide sliding during tunnel construction and operation.

[0011] As a preferred solution of the present invention, the upper connecting beam and the lower connecting beam are evenly spaced along the direction of the tunnel structure, and the upper anti-slip piles and the lower anti-slip piles are evenly spaced along the direction of the tunnel structure.

[0012] As a preferred solution of the present invention, the two ends of the upper connecting beam are respectively fixedly connected to the upper anti-sliding pile and the lower anti-sliding pile by a first connecting steel bar, and the two ends of the lower connecting beam are respectively fixedly connected to the upper anti-sliding pile and the lower anti-sliding pile by a first connecting steel bar; an effective connection is established between the upper connecting beam and the upper anti-sliding pile and the lower anti-sliding pile, and an effective connection is established between the lower connecting beam and the upper anti-sliding pile and the lower anti-sliding pile, which is beneficial to increase the overall rigidity of the anti-sliding tunnel structure, form a high-resistance anti-sliding structure, and effectively improve the anti-sliding ability of the anti-sliding tunnel structure. Preferably, the first connecting steel bar is an L-shaped steel bar.

[0013] As a preferred embodiment of the present invention, the tunnel structure includes primary support and secondary lining, the secondary lining is arranged on the inner side of the primary support, and the pile walls of the upper anti-slip piles and the lower anti-slip piles are arranged adjacent to the primary support for reinforcing the tunnel structure.

[0014] As a preferred solution of the present invention, the initial support includes a vault anchor rod and a primary sprayed concrete layer, the vault anchor rod is inserted into the surrounding rock of the tunnel structure to reinforce the surrounding rock, the vault anchor rod is connected to the primary sprayed concrete layer, a steel frame layer is provided on the primary sprayed concrete layer, and a secondary sprayed concrete layer is provided on the steel frame layer to establish a stable tunnel structure and provide a good structural foundation for later construction. Preferably, in the section where the upper anti-slip piles and the lower anti-slip piles are provided, the vault anchor rods are not provided on both sides of the tunnel structure, and the steel frame layer is formed by welding a number of steel sections.

[0015] As a preferred solution of the present invention, the initial support and the secondary lining are arranged along the entire length of the tunnel, the upper connecting beam and the lower connecting beam are arranged on the inner side of the secondary lining and are fixedly connected to the secondary lining. The secondary lining and the upper connecting beam and the lower connecting beam jointly reinforce the tunnel structure.

[0016] As a preferred embodiment of the present invention, the initial support is arranged along the entire length of the tunnel, the secondary lining is arranged in sections along the direction of the tunnel structure, the upper connecting beam and the lower connecting beam are arranged between two adjacent sections of the secondary lining, the upper connecting beam and the lower connecting beam are arranged opposite to each other and fixedly connected to the inner side of the initial support, and the upper anti-slip piles and the lower anti-slip piles are arranged on the outer side of the initial support at the secondary lining section. Here, the upper connecting beam and the lower connecting beam can be used as tunnel lining structures, saving the engineering workload of the tunnel lining project and the engineering cost, and the upper anti-slip piles and the lower anti-slip piles are arranged on the outer side of the initial support at the secondary lining section, and the upper connecting beam and the lower connecting beam are still fixedly connected to the upper anti-slip piles and the lower anti-slip piles to form a high-resistance anti-slip structure, strengthen the tunnel structure, effectively improve the anti-slip ability of the anti-slip tunnel structure, and improve the stability of the landslide.

[0017] As a preferred solution of the present invention, the top surfaces of the upper anti-slip piles and the lower anti-slip piles are both 1-2m higher than the top surface of the tunnel structure, and the pile wells from the top surfaces of the upper anti-slip piles and the lower anti-slip piles to the ground are backfilled with soil, which not only effectively reduces the landslide thrust borne by the tunnel structure, but also reduces the anchoring length of the upper anti-slip piles and the lower anti-slip piles, shortens the pile length, saves the amount of reinforced concrete, and is beneficial to saving project costs.

[0018] The outer sides of the upper anti-slip piles and the lower anti-slip piles are both provided with anti-slip pile protective walls, which facilitates the casting of the upper anti-slip piles and the lower anti-slip piles.

[0019] A construction method for an anti-slip tunnel structure comprises the following steps:

[0020] Step 1: excavating a pile well at a predetermined anti-slide pile position and constructing an anti-slide pile wall, wherein the anti-slide pile includes an upper anti-slide pile and a lower anti-slide pile;

[0021] Step 2: pouring the anti-slide pile concrete to the designed height, where the designed height refers to the height of the anti-slide pile when the top surface of the anti-slide pile is 1-2m higher than the top surface of the tunnel structure;

[0022] Step 3: Excavate the tunnel and apply initial support;

[0023] Step 4: implanting a first connecting steel bar on the anti-sliding pile, and tying the connecting beam steel bars of the upper connecting beam and the lower connecting beam on the first connecting steel bar, so as to connect the anti-sliding pile with the upper connecting beam and the lower connecting beam. Preferably, the first connecting steel bar is welded to the connecting beam steel bar, and the internal steel bars of the secondary lining are tied. A second connecting steel bar is arranged along the direction of the tunnel structure, and the connecting beam steel bars of the upper connecting beam and the lower connecting beam are respectively connected to the internal steel bars of the secondary lining through the second connecting steel bar, so as to connect the secondary lining with the upper connecting beam and the lower connecting beam, so as to ensure the stability of the tunnel structure.

[0024] Step 5: erecting formwork and pouring concrete for the secondary lining, the upper connecting beam and the lower connecting beam.

[0025] Since in step 1 of the present invention, the pile well for the anti-slide pile is excavated before the tunnel is excavated, it is not easy to disturb the landslide, and at the same time the stability of the landslide is improved, which can provide effective protection for the construction of tunnel excavation and initial support, and improve the safety of tunnel construction.

[0026] Since the construction method of the anti-slip tunnel structure described in the present invention utilizes the first connecting steel bar to connect the anti-slip piles with the upper connecting beam and the lower connecting beam, a high-resistance anti-slip structure is formed, the overall stiffness of the anti-slip tunnel structure is increased, and the anti-slip ability of the anti-slip tunnel structure is effectively improved, thereby improving the stability of the landslide, avoiding damage caused by landslide sliding during tunnel construction and operation, and the method is easy to construct and has strong feasibility.

[0027] As a preferred embodiment of the present invention, the step 2 further comprises: backfilling soil on the top surface of the anti-sliding pile, and sealing the pile well mouth with rammed clay.

[0028] As a preferred embodiment of the present invention, the initial support in step three includes: after the arch anchor is driven into the surrounding rock, a primary shotcrete layer is applied, and then a steel frame layer is installed, and a secondary shotcrete layer is applied to establish a stable tunnel structure, providing a good structural foundation for later construction.

[0029] As a preferred embodiment of the present invention, the construction method of the anti-slip tunnel structure further includes step six: constructing tunnel drainage works and other ancillary facilities.

[0030] In summary, due to the adoption of the above technical solution, the anti-slip tunnel structure of the present invention has the following beneficial effects:

[0031] 1. Since the anti-slip tunnel structure described in the present invention fixes the two ends of the upper connecting beam to the upper anti-slip piles and the lower anti-slip piles respectively, and the two ends of the lower connecting beam are fixedly connected to the upper anti-slip piles and the lower anti-slip piles respectively, the traditional anti-slip structure and the tunnel structure are combined into a whole to jointly resist the thrust and pressure generated by the landslide body on the tunnel structure, thereby increasing the overall stiffness of the anti-slip tunnel structure, forming a high-resistance anti-slip structure, and effectively improving the anti-slip ability of the anti-slip tunnel structure, thereby improving the stability of the landslide and avoiding damage caused by landslide sliding during tunnel construction and operation.

[0032] 2. When the secondary lining is arranged in sections along the direction of the tunnel structure, the upper connecting beam and the lower connecting beam are arranged at the sections of the secondary lining and are fixedly connected to the inner side of the initial support. The upper connecting beam and the lower connecting beam can serve as tunnel lining structures, saving the engineering workload of the tunnel lining project and the engineering cost; the upper anti-slip piles and the lower anti-slip piles are arranged on the outer side of the initial support at the sections of the secondary lining, and the upper connecting beam and the lower connecting beam are still fixedly connected to the upper anti-slip piles and the lower anti-slip piles to form a high-resistance anti-slip structure, strengthen the tunnel structure, effectively improve the anti-slip ability of the anti-slip tunnel structure, and improve the stability of the landslide.

[0033] 3. The top surfaces of the upper anti-slide piles and the lower anti-slide piles are 1-2m higher than the top surface of the tunnel structure. Backfilling soil is performed in the pile wells from the top surfaces of the upper anti-slide piles and the lower anti-slide piles to the ground, which not only effectively reduces the landslide thrust borne by the tunnel structure, but also reduces the anchoring length of the upper anti-slide piles and the lower anti-slide piles, shortens the pile length, saves the amount of reinforced concrete, and is beneficial to saving engineering costs.

[0034] The beneficial effects of the construction method of the anti-slip tunnel structure of the present invention are:

[0035] 1. Since the construction method of the anti-sliding tunnel structure described in the present invention utilizes the first connecting steel bar to connect the anti-sliding piles with the upper connecting beam and the lower connecting beam, a high-resistance anti-sliding structure is formed, the overall stiffness of the anti-sliding tunnel structure is increased, and the anti-sliding ability of the anti-sliding tunnel structure is effectively improved, thereby improving the stability of the landslide, avoiding damage caused by landslide sliding during tunnel construction and operation, and the method is easy to construct and has strong feasibility.

[0036] 2. Since the pile well for the anti-slide piles is excavated before the tunnel excavation in step 1 of the present invention, it is not easy to disturb the landslide, and at the same time the stability of the landslide is improved, which can provide effective protection for the construction of tunnel excavation and initial support, and improve the safety of tunnel construction. BRIEF DESCRIPTION OF THE DRAWINGS

[0037] Figure 1 is a schematic plan view of the relationship between the anti-sliding tunnel structure and the landslide position described in Example 1 of the present invention;

[0038] Figure 2 is along Figure 1 Sectional view along line II-II;

[0039] Figure 3 yes Figure 2 Detailed diagram of node A;

[0040] Figure 4 is along Figure 1 Sectional view along line III-III;

[0041] Figure 5 yes Figure 4 Detailed diagram of node B;

[0042] Figure 6 is a schematic plan view of the relationship between the anti-sliding tunnel structure and the landslide position according to Embodiment 2 of the present invention;

[0043] Figure 7 yes Figure 6 Detailed diagram of the C node.

[0044] Icons: 1-landslide body; 12-landslide surface; 21-upper anti-slide piles; 22-lower anti-slide piles; 23-empty piles; 3-initial support; 31-arch anchor rods; 32-primary sprayed concrete layer; 33-steel frame layer; 34-re-sprayed concrete layer; 4-upper connecting beam; 5-lower connecting beam; 61-first connecting steel bar; 62-second connecting steel bar; 63-connecting beam steel bar; 64-internal steel bar of secondary lining; 7-secondary lining. DETAILED DESCRIPTION

[0045] The present invention will be described in detail below in conjunction with the accompanying drawings.

[0046] In order to make the purpose, technical solution and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not used to limit the present invention.

[0047] Example 1

[0048] like Figure 1-Figure 5 As shown, an anti-sliding tunnel structure includes a tunnel structure passing through a landslide body 1, wherein the arch and the invert of the tunnel structure are respectively provided with a plurality of upper connecting beams 4 and lower connecting beams 5, and the upper connecting beams 4 and the lower connecting beams 5 are evenly spaced along the direction of the tunnel structure, wherein Figure 1-Figure 3 Ⅰ-Ⅰ in the figure is the main axis direction of the landslide, and the arrow direction is the downhill direction of the landslide. Figure 1 The middle number 12 is the landslide surface.

[0049] A plurality of upper anti-slip piles 21 and lower anti-slip piles 22 are respectively arranged on both sides of the tunnel structure, and the upper anti-slip piles 21 and the lower anti-slip piles 22 are evenly spaced along the direction of the tunnel structure. The top surfaces of the upper anti-slip piles 21 and the lower anti-slip piles 22 are 1-2 meters higher than the top surface of the tunnel structure, and the outer sides of the upper anti-slip piles 21 and the lower anti-slip piles 22 are provided with anti-slip pile walls. The spacing between two adjacent upper anti-slip piles 21 or two adjacent lower anti-slip piles 22 is determined according to the thrust of the landslide, and the spacing between the relatively arranged upper anti-slip piles 21 and the lower anti-slip piles 22 is determined according to the tunnel size.

[0050] The two ends of the upper connecting beam 4 are fixedly connected to the upper anti-slip pile 21 and the lower anti-slip pile 22 through the first connecting steel bar 61, and the two ends of the lower connecting beam 5 are fixedly connected to the upper anti-slip pile 21 and the lower anti-slip pile 22 through the first connecting steel bar 61.

[0051] The upper connecting beam 4 and the lower connecting beam 5 are both fixedly connected to the upper anti-sliding pile 21 and the lower anti-sliding pile 22 via a first connecting steel bar 61 , and the first connecting steel bar 61 is an L-shaped steel bar.

[0052] The tunnel structure includes an initial support 3 and a secondary lining 7 . The secondary lining 7 is arranged on the inner side of the initial support 3 . The pile walls of the upper anti-sliding piles 21 and the lower anti-sliding piles 22 are arranged adjacent to the initial support 3 .

[0053] The initial support 3 includes a vault anchor rod 31 and a primary sprayed concrete layer 32. The vault anchor rod 31 is inserted into the surrounding rock of the tunnel structure. The vault anchor rod 31 is connected to the primary sprayed concrete layer 32. A steel frame layer 33 is provided on the primary sprayed concrete layer 32. A secondary sprayed concrete layer 34 is provided on the steel frame layer 33. In this embodiment, preferably, in the section where the upper anti-sliding piles 21 and the lower anti-sliding piles 22 are provided, the vault anchor rods 31 are not provided on both sides of the tunnel structure, and the steel frame layer 33 is formed by welding a plurality of steel sections.

[0054] The initial support 3 is arranged along the entire length of the tunnel, and the secondary lining 7 is arranged in sections along the direction of the tunnel structure. The upper connecting beam 4 and the lower connecting beam 5 are provided between two adjacent sections of the secondary lining 7. The upper connecting beam 4 and the lower connecting beam 5 are arranged opposite to each other and fixedly connected to the inner side of the initial support 3. The upper anti-slip piles 21 and the lower anti-slip piles 22 are arranged on the outer side of the initial support 3 at the sections of the secondary lining 7. In this way, the upper connecting beam 4 and the lower connecting beam 5 here can be used as tunnel lining structures, saving the engineering workload of the tunnel lining project and saving the engineering cost, and the upper anti-slip piles 21 and the lower anti-slip piles 22 are arranged on the outside of the initial support 3 at the secondary lining 7 section, and the upper connecting beam 4 and the lower connecting beam 5 are still fixedly connected to the upper anti-slip piles 21 and the lower anti-slip piles 22 to form a high-resistance anti-slip structure, strengthen the tunnel structure, effectively improve the anti-slip ability of the anti-slip tunnel structure, and improve the stability of the landslide.

[0055] The construction method of the anti-slip tunnel structure comprises the following steps:

[0056] Step 1: excavating a pile well at a predetermined anti-slide pile position and constructing an anti-slide pile wall, wherein the anti-slide pile includes an upper anti-slide pile 21 and a lower anti-slide pile 22;

[0057] Step 2: pour the anti-slide pile concrete to the designed height, which refers to the height of the anti-slide pile when the top surface of the anti-slide pile is 1-2m higher than the top surface of the tunnel structure, backfill the empty pile 23 on the top surface of the anti-slide pile, and seal the pile well mouth with rammed clay;

[0058] Step 3: excavating the tunnel and applying the initial support 3, including: driving the arch top anchor 31 into the surrounding rock, applying the initial shotcrete layer 32, then installing the steel frame layer 33, and applying the secondary shotcrete layer 34;

[0059] Step 4: implanting the first connecting steel bar 61 on the anti-sliding pile, and tying the connecting beam steel bars 63 of the upper connecting beam 4 and the lower connecting beam 5 on the first connecting steel bar 61, so as to connect the anti-sliding pile with the upper connecting beam 4 and the lower connecting beam 5, tying the secondary lining internal steel bars 64, arranging the second connecting steel bar 62 along the direction of the tunnel structure, and connecting the connecting beam steel bars 63 of the upper connecting beam 4 and the lower connecting beam 5 with the secondary lining internal steel bars 64 respectively through the second connecting steel bar 62, so as to connect the secondary lining 7 with the upper connecting beam 4 and the lower connecting beam 5;

[0060] Step 5: erecting formwork to cast concrete for the secondary lining 7 , the upper connecting beam 4 and the lower connecting beam 5 . Specifically, the secondary lining 7 is not cast where the upper connecting beam 4 and the lower connecting beam 5 are provided.

[0061] Step 6: Construct tunnel drainage project and other ancillary facilities.

[0062] Example 2

[0063] like Figure 6-Figure 7 As shown, the difference between this embodiment and embodiment 1 is that the initial support 3 and the secondary lining 7 are both arranged along the entire length of the tunnel, the upper connecting beam 4 and the lower connecting beam 5 are arranged on the inner side of the secondary lining 7 and are fixedly connected to the secondary lining 7. Specifically, the secondary lining 7 is pre-embedded with a second connecting steel bar 62 arranged in a vertical plane, and the internal steel bars 64 of the secondary lining are connected to the connecting beam steel bars 63, thereby connecting the secondary lining 7 to the upper connecting beam 4 and the lower connecting beam 5. In this way, the reinforcement strength of the anti-sliding tunnel structure is stronger than that of embodiment 1, but the engineering cost will be increased to a certain extent compared with embodiment 1.

[0064] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. An anti-slip tunnel structure, characterized in that: The invention comprises a tunnel structure passing through a landslide body (1) and anti-slide pile structures located on both sides of the tunnel structure, wherein the arch and the invert of the tunnel structure are respectively provided with a plurality of upper connecting beams (4) and lower connecting beams (5), and the upper connecting beams (4) and the lower connecting beams (5) are both arranged at intervals along the direction of the tunnel structure; the two sides of the tunnel structure are respectively provided with a plurality of upper anti-slide piles (21) and lower anti-slide piles (22), and the upper anti-slide piles (21) and the lower anti-slide piles (22) are both arranged at intervals along the direction of the tunnel structure; the two ends of the upper connecting beam (4) are respectively fixedly connected to the upper anti-slide piles (21) and the lower anti-slide piles (22), and the two ends of the lower connecting beam (5) are respectively fixedly connected to the upper anti-slide piles (21) and the lower anti-slide piles (22); The two ends of the upper connecting beam (4) are respectively fixedly connected to the upper anti-sliding pile (21) and the lower anti-sliding pile (22) through a first connecting steel bar (61), and the two ends of the lower connecting beam (5) are respectively fixedly connected to the upper anti-sliding pile (21) and the lower anti-sliding pile (22) through a first connecting steel bar (61); The tunnel structure comprises an initial support (3) and a secondary lining (7), wherein the secondary lining (7) is arranged on the inner side of the initial support (3), and the pile walls of the upper anti-sliding piles (21) and the lower anti-sliding piles (22) are arranged on the outer side of the initial support (3); The initial support (3) comprises a vault anchor rod (31) and a primary shotcrete layer (32), wherein the vault anchor rod (31) is inserted into the surrounding rock of the tunnel structure, the vault anchor rod (31) is connected to the primary shotcrete layer (32), a steel frame layer (33) is provided on the primary shotcrete layer (32), and a secondary shotcrete layer (34) is provided on the steel frame layer (33); The initial support (3) is arranged along the entire length of the tunnel; The secondary lining (7) is arranged in sections along the direction of the tunnel structure or along the entire length of the tunnel, wherein: When the secondary lining (7) is arranged in sections along the direction of the tunnel structure, the upper connecting beam (4) and the lower connecting beam (5) are arranged between two adjacent sections of the secondary lining (7), and the upper connecting beam (4) and the lower connecting beam (5) are arranged opposite to each other and are fixedly connected to the inner side of the initial support (3); When the secondary lining (7) is arranged along the entire length of the tunnel, the upper connecting beam (4) and the lower connecting beam (5) are arranged on the inner side of the secondary lining (7) and are fixedly connected to the secondary lining (7).

2. The anti-slip tunnel structure according to claim 1, characterized in that: The top surfaces of the upper anti-slip piles (21) and the lower anti-slip piles (22) are both 1-2 m higher than the top surface of the tunnel structure, and the outer sides of the upper anti-slip piles (21) and the lower anti-slip piles (22) are both provided with anti-slip pile protective walls.

3. A construction method for an anti-slip tunnel structure, characterized in that: The following steps are involved: Step 1: excavate a pile well at the predetermined anti-slide pile position and construct an anti-slide pile wall; Step 2: pouring the anti-slide pile concrete to the designed height; Step 3: Excavate the tunnel and provide initial support (3); Step 4: implanting a first connecting steel bar (61) on the anti-sliding pile, tying the connecting beam steel bars (63) of the upper connecting beam (4) and the lower connecting beam (5) on the first connecting steel bar (61), tying the secondary lining internal steel bars (64), arranging a second connecting steel bar (62) along the direction of the tunnel structure, and connecting the connecting beam steel bars (63) of the upper connecting beam (4) and the lower connecting beam (5) to the secondary lining internal steel bars (64) respectively through the second connecting steel bars (62); Step 5: erecting a formwork and pouring concrete for the secondary lining (7), the upper connecting beam (4) and the lower connecting beam (5).

4. The construction method of a slide-resistant tunnel structure according to claim 3, characterized in that: The step 2 also includes: backfilling soil on the top surface of the anti-sliding pile, and sealing the pile well mouth with rammed clay.

5. The construction method of an anti-slip tunnel structure according to claim 3, characterized in that: The initial support (3) in step three includes: after driving the arch top anchor rod (31) into the surrounding rock, applying a primary shotcrete layer (32), then installing a steel frame layer (33), and applying a secondary shotcrete layer (34).

Citation Information

Cited By

  • Zero-damage construction method for slide-resistant pile of tunnel portal high slope in protection area

    CN117488831A