A system for synchronous loading and unloading of fixed lifting containers
By setting up synchronous loading and unloading units and carrying trolleys on both sides of the railway loading and unloading line, and using the lifting mechanism and synchronous joint control cables to realize synchronous loading and unloading of containers, the problem of low loading and unloading efficiency in the existing technology is solved, and the efficiency of railway logistics and the convenience of loading and unloading are improved. sex.
Patent Information
- Application Number
- CN202010420818.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-05-18
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2040-05-18
AI Technical Summary
Existing container loading and unloading and transshipment equipment have low loading and unloading efficiency in railway transportation, resulting in long parking times of transport trains, poor timeliness, and complex equipment control, making it difficult to meet the needs of efficient loading and unloading, which limits the development of railway logistics.
A fixed-lift container synchronous loading and unloading system is designed. By setting up synchronous loading and unloading units on both sides of the loading and unloading line, the lifting mechanism and the carrying trolley are used to realize the pre-storage and synchronous loading and unloading of containers. Combined with the synchronous joint control cable, multiple synchronous loading and unloading units are realized. Working together, equipment control is simplified and loading and unloading efficiency is improved.
It greatly shortens the loading and unloading time of containers, reduces train parking time, improves the efficiency of railway logistics, reduces costs, and simplifies the loading and unloading process, and is suitable for multimodal transport sites.
Smart Images

Figure CN111532812B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of railway logistics, and in particular relates to a fixed lifting container whole-train synchronous loading and unloading system. Background Art
[0002] With the continuous development of the logistics industry and the increasing needs of people's lives and industrial production, the timeliness of cargo transportation is increasingly required. Among the many modes of logistics transportation, railway logistics, as an important mode of transportation for logistics transportation, has assumed an increasingly important role.
[0003] At the same time, containers, as a common carrier of goods, are widely used in railway transportation. At present, there are various loading and unloading and transshipment equipment for loading and unloading containers on railway trains, such as container-specific gantry cranes, reach stackers, shore cranes, container forklifts, straddle carriers and other container loading and unloading equipment commonly used in railways. The loading and unloading and transshipment processes of the above equipment are quite mature and can meet the existing container loading and unloading needs to a certain extent.
[0004] However, existing container loading and unloading and transshipment equipment can only handle single or two containers at the same time. A container transport train usually needs to be loaded and unloaded multiple times, which not only takes a long time to load and unload, resulting in long parking time of the transport train and poor timeliness of container loading and unloading, but also requires continuous control of the loading and unloading equipment along the longitudinal direction of the train, which is cumbersome to control and has poor loading and unloading accuracy. With the rapid development of the logistics industry today, the above-mentioned loading and unloading equipment and loading and unloading methods have been difficult to meet the requirements of efficient loading and unloading of containers, which has greatly restricted the application and development of railway logistics. Summary of the invention
[0005] In response to one or more of the above defects or improvement needs in the prior art, the present invention provides a fixed-lift container train synchronous loading and unloading system, which can effectively realize the synchronous loading and unloading of containers on an entire train, greatly shortening the loading and unloading time of containers, avoiding long-term stops of trains at platforms, shortening the loading and unloading time of railway logistics, improving the efficiency of railway logistics, and reducing the cost of railway logistics.
[0006] To achieve the above-mentioned object, the present invention provides a fixed lifting container row synchronous loading and unloading system, characterized in that it comprises a transport track and a plurality of synchronous loading and unloading units sequentially arranged along the loading and unloading line;
[0007] One end of the transport track is connected to the loading and unloading line, and the other end thereof extends to a warehouse where containers can be stored, and a transport trolley is provided on the transport track to realize the transfer of containers between the warehouse and the corresponding synchronous loading and unloading unit;
[0008] The synchronous loading and unloading unit is arranged corresponding to the loading flatbed on the train, and after the train stops at the loading and unloading line, each loading flatbed on the train can correspond to a synchronous loading and unloading unit respectively; at the same time, a plurality of the synchronous loading and unloading units are connected in parallel with a synchronous joint control cable, and each synchronous loading and unloading unit can be controlled individually or synchronously;
[0009] The synchronous loading and unloading unit includes a plurality of lifting mechanisms which are arranged on both sides of the loading and unloading line; the bottom of the lifting mechanism is fixedly arranged, and a lifting rod is arranged on the top thereof, and a driving assembly and a lifting assembly are arranged corresponding to the lifting rod; one end of the lifting rod points to one side of the loading and unloading line, and the driving assembly can drive it to move horizontally to achieve the matching or separation of the end of the lifting rod from the loading and unloading slot on the container; the lifting assembly is used to drive the lifting rod to perform vertical lifting and lowering to achieve the lifting or lowering of the container; and the lifting mechanisms in the same synchronous loading and unloading unit are connected in series with a synchronous linkage cable, so that the lifting rods of each lifting mechanism can be synchronously extended or lifted.
[0010] As a further improvement of the present invention, a pit is opened beside the loading and unloading line corresponding to the lifting mechanism, and the bottom of the lifting mechanism is fixed in the pit.
[0011] As a further improvement of the present invention, there are four lifting mechanisms in each of the synchronous loading and unloading units, which are used to lift the four corners of the container.
[0012] As a further improvement of the present invention, at least one lifting mechanism is respectively provided on both sides of the synchronous loading and unloading unit for lifting both sides of the container.
[0013] As a further improvement of the present invention, the driving assembly includes a transverse cylinder, and one end of the lifting rod is movably matched with the transverse cylinder and can move horizontally relative to the transverse cylinder.
[0014] As a further improvement of the present invention, the transverse cylinder and the lifting rod are matched and connected by chain transmission, gear transmission or screw transmission.
[0015] As a further improvement of the present invention, the lifting assembly is a hydraulic lifting assembly, which includes a lifting rod and a lifting cylinder arranged vertically and coaxially, and a hydraulic pump arranged corresponding to the lifting cylinder;
[0016] The bottom of the lifting cylinder is fixed, and the bottom of the lifting rod is movably matched with the top of the lifting cylinder; the hydraulic pump is matched and connected with the lifting cylinder to change the hydraulic pressure in the lifting cylinder to lift or lower the lifting rod.
[0017] As a further improvement of the present invention, the lifting assembly is a gear lifting assembly or a screw lifting assembly.
[0018] As a further improvement of the present invention, the transport trolley is a single vehicle that can operate alone or a plurality of vehicles that can operate simultaneously.
[0019] As a further improvement of the present invention, a positioning assembly is provided corresponding to the transport trolley and the synchronous loading and unloading unit for rapid positioning of the transport trolley and the corresponding synchronous loading and unloading unit.
[0020] The above-mentioned improved technical features can be combined with each other as long as they do not conflict with each other.
[0021] In general, the above technical solution conceived by the present invention has the following beneficial effects compared with the prior art:
[0022] (1) The fixed lifting container whole train synchronous loading and unloading system of the present invention is characterized by arranging synchronous loading and unloading units on the loading flatbeds of the corresponding trains on both sides of the loading and unloading line, and utilizing the corresponding arrangement of multiple lifting mechanisms in the synchronous loading and unloading units, which can effectively realize the pre-storage of containers on the synchronous loading and unloading units, that is, forming a pre-storage station for containers above the loading and unloading line; at the same time, by arranging synchronous joint control cables to connect the synchronous loading and unloading units accordingly, the synchronous loading and unloading units can work synchronously or independently, providing conditions for loading and unloading multiple containers on the same train at the same time, effectively improving the efficiency of container loading and unloading, shortening the parking time of trains, promoting the development of railway logistics, and reducing the cost of railway logistics;
[0023] (2) The fixed lifting type container whole-row synchronous loading and unloading system of the present invention, by correspondingly arranging components such as a lifting rod, a driving assembly and a lifting assembly in the lifting mechanism, and using the driving assembly and the lifting assembly to correspondingly realize the horizontal movement and the lifting movement of the lifting rod, can quickly realize the matching or separation of the lifting rod with the loading and unloading slot on the container, and can realize the rapid lifting after matching with the loading and unloading slot, so as to realize the rapid pre-storage or rapid loading of the container. At the same time, the synchronous control of each lifting mechanism in the same synchronous loading and unloading unit can effectively ensure the convenience of container pre-storage and loading and unloading, and ensure the accuracy of container pre-storage and loading and unloading;
[0024] (3) The fixed lifting container whole-row synchronous loading and unloading system of the present invention can quickly locate the carrying trolley and the corresponding synchronous loading and unloading unit by correspondingly setting a positioning component between the carrying trolley and the synchronous loading and unloading unit, further improving the efficiency of container pre-storage and loading and unloading. At the same time, by setting up multiple carrying trolleys at the same time, multiple containers can be pre-stored and loaded and unloaded at the same time, further improving the efficiency of container transfer and pre-storage;
[0025] (4) The fixed lifting container whole train synchronous loading and unloading system of the present invention has a simple structure and is easy to set up. It can be fully applied to multimodal transport sites such as water-rail, road-rail, etc. It can meet the capacity matching between different transport modes under large transport volume conditions, ensure the smooth intermodal transport between different transport modes, greatly reduce the number of railway loading and unloading lines, improve the utilization rate of trains, reduce the number of freight cars, optimize the entire multimodal transport ecology, greatly shorten the loading and unloading time of containers, avoid long-term stops of trains at platforms, shorten the time of railway logistics loading and unloading, improve the efficiency of railway logistics, and reduce the cost of railway logistics. It has good application prospects and promotion value. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 This is a structural front view of a synchronous loading and unloading unit lifting a container in an embodiment of the present invention;
[0027] Figure 2 This is a schematic structural diagram of a synchronous loading and unloading unit loading a container onto a train in an embodiment of the present invention;
[0028] Figure 3 It is a structural side view of a synchronous loading and unloading unit lifting a container in an embodiment of the present invention;
[0029] Figure 4 is a top view of the structure when multiple synchronous loading and unloading units simultaneously lift containers in an embodiment of the present invention;
[0030] Figure 5 1 is a schematic diagram of the structure of the container train synchronous loading and unloading system in an embodiment of the present invention when no containers are pre-stored;
[0031] Figure 6 It is a structural schematic diagram of the container train synchronous loading and unloading system in the embodiment of the present invention when the container pre-storage begins;
[0032] Figure 7 1 is a schematic diagram of the structure of the container train synchronous loading and unloading system in the embodiment of the present invention when the container pre-storage is completed;
[0033] Figure 8 It is a structural schematic diagram of the train in the embodiment of the present invention when it starts to match the whole-train synchronous loading and unloading system of containers;
[0034] Fig. 9 It is a structural schematic diagram of a train carrying containers after completing synchronous loading of the entire train in an embodiment of the present invention;
[0035] In all the drawings, the same figure marks represent the same technical features, specifically: 1. Container, 2. First lifting rod, 3. First transverse cylinder, 4. First lifting rod, 5. First lifting cylinder, 6. First pit, 7. First hydraulic pump, 8. Loading and unloading line, 9. Second hydraulic pump, 10. Second pit, 11. Second lifting cylinder, 12. Second lifting rod, 13. Second transverse cylinder, 14. Second lifting rod, 15. Train, 16. Synchronous control cable, 17. Transport trolley. DETAILED DESCRIPTION
[0036] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention. In addition, the technical features involved in the various embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
[0037] In the description of the present invention, it is to be understood that the terms “center”, “longitudinal”, “lateral”, “length”, “width”, “thickness”, “up”, “down”, “front”, “back”, “left”, “right”, “vertical”, “horizontal”, “top”, “bottom”, “inside”, “outside”, “clockwise”, “counterclockwise”, “axial”, “radial”, “circumferential”, etc., indicating orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0038] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.
[0039] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0040] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.
[0041] Example:
[0042] See also Figures 1 to 9 The fixed lifting container train synchronous loading and unloading system in the preferred embodiment of the present invention aims to realize the synchronous loading of multiple containers 1 on each loading flatbed of the train 15 or the synchronous unloading of multiple containers 1 on the train 15, thereby improving the efficiency of loading and unloading of containers 1. In order to achieve the above-mentioned purpose, in the preferred embodiment of the present invention, each loading flatbed corresponding to the train 15 is sequentially provided with synchronous loading and unloading units on both sides along the loading and unloading line 8 of the train 15, that is, multiple synchronous loading and unloading units are provided along the longitudinal direction of the loading and unloading line 8.
[0043] For the container synchronous loading and unloading system in the preferred embodiment of the present invention, its working principle can be roughly understood as follows:
[0044] When it is necessary to load containers onto the train 15, before the train 15 docks at the station, the transport trolley 17 is used to transport the containers 1 to be loaded in sequence to the corresponding synchronous loading and unloading units, and the synchronous loading and unloading units there will lift the corresponding containers 1 to a certain height. The pre-storage work of each container 1 can be completed before the train 15 docks at the station, and then when the train 15 docks at the station, each loading platform of the train 15 is vertically aligned with the corresponding container 1. Finally, each synchronous loading and unloading unit is controlled to load the container onto the corresponding loading platform at the same time, so as to realize the synchronous loading of containers on the entire train. The above process can be referred to. Figures 5 to 9 The graphic content in .
[0045] Of course, when it is necessary to unload the entire vehicle from the train 15, the working principle is exactly the opposite of the above process. After the train 15 stops steadily on the loading and unloading line 8, each synchronous loading and unloading unit starts to operate at the same time, matches the container 1 at the corresponding position, and lifts each container 1 by a certain distance, so that each container 1 is synchronously and quickly away from the train. Then the train 15 can leave from the loading and unloading line 8 without stopping for a long time. After the train 15 leaves, the transport trolley 17 can transfer the container 1 to the corresponding position according to the storage or transfer needs of each container 1.
[0046] Specifically, the synchronous loading and unloading unit in the preferred embodiment is as follows: Figures 1 to 4As shown in , it corresponds to the loading flatbed arrangement of the train 15, that is, one synchronous loading and unloading unit is arranged corresponding to one loading flatbed. Usually, a plurality of loading flatbeds are arranged continuously on the train 15, that is, a plurality of synchronous loading and unloading units are arranged in sequence along the loading and unloading line 8. At the same time, a transport trolley 17 is arranged corresponding to the pre-storage of the container 1, and a transport track connected to the loading and unloading line 8 is arranged corresponding to the transport trolley 17, so that the transport trolley 17 can run on the transport track. Accordingly, one end of the transport track is connected to the loading and unloading line 8, and the other end extends to the warehouse where the container 1 is stored, so that the transport trolley can travel back and forth between the loading and unloading line 8 and the warehouse.
[0047] Furthermore, in the preferred embodiment, at least one lifting mechanism is respectively provided on both sides of the synchronous loading and unloading unit, for example Figure 4 In the preferred embodiment shown, the lifting mechanisms on both sides of the loading and unloading line 8 are symmetrically arranged, and the number of lifting mechanisms on both sides of the loading and unloading line 8 is two respectively. Figure 1 The lifting mechanism shown on the left side of the middle is used as an example for description, which includes a first lifting rod 2, a first lateral cylinder 3, a first lifting rod 4, and a first lifting cylinder 5 which are arranged in sequence. The first lifting rod 4 and the first lifting cylinder 5 are arranged coaxially in the vertical direction, the first lifting rod 4 is arranged above the first lifting cylinder 5, and its bottom is movably embedded in the top of the cylindrical first lifting cylinder 5, and can be lifted and lowered vertically under the drive of external force.
[0048] Furthermore, the bottom of the first lifting cylinder 5 is fixedly arranged, and in the preferred embodiment, in order to ensure the relative position of the first lifting rod 4 and the container 1, a pit of a certain depth is opened beside the loading and unloading line 8, namely the first pit 6, and then the bottom of the first lifting cylinder 5 is fixed to the bottom surface of the first pit 6. In order to realize the vertical lifting of the first lifting rod 4 relative to the first lifting cylinder 5, in the preferred embodiment, a lifting assembly is correspondingly arranged between the two, such as a first hydraulic pump 7 arranged in the first pit 6, and the first hydraulic pump 7 is matched with the first lifting cylinder 5. By changing the hydraulic pressure in the first lifting cylinder 5, the vertical lifting of the first lifting rod 4 can be realized accordingly. However, it is obvious that the above-mentioned lifting assembly is not the only form in which the first lifting rod 4 can be driven for vertical lifting. In actual setting, other forms of lifting assemblies can be arranged for the first lifting rod 4 and the first lifting cylinder 5 according to actual needs, such as a gear-driven lifting assembly, a screw-driven lifting assembly, a pneumatic-driven lifting assembly, etc.
[0049] Furthermore, a first transverse cylinder 3 is provided at the top of the first lifting rod 4, and its end is always aligned with one side of the loading and unloading line 8, and a first lifting rod 2 that can move horizontally is provided on the first transverse cylinder 3. Specifically, the first transverse cylinder 3 is a cylindrical structure in a horizontal state, and one end of the first lifting rod 2 is coaxially embedded in the end of the first transverse cylinder 3, and can reciprocate along the axis in the horizontal direction. The first lifting rod 2 and the first transverse cylinder 3 are preferably matched and connected in the form of chain transmission, gear transmission or screw transmission, so that the horizontal movement distance can be freely controlled to approach or move away from the container 1 on the transport trolley 17 or the loading platform. Accordingly, in actual application, a loading and unloading groove is provided on the container 1 corresponding to its loading and unloading, which is used for matching the lifting and unloading mechanism. In view of this, the first lifting rod 2 in the preferred embodiment can match the loading and unloading groove of the container 1 with its end through horizontal movement, thereby realizing the lifting of the container 1.
[0050] Furthermore, in order to achieve the stability of the pre-storage and loading and unloading of the container 1, a plurality of lifting mechanisms are provided corresponding to the lifting of the same container 1, for example Figure 4 At the same time, the lifting mechanism located on the right side of the loading and unloading line 8 is as shown in Figure 1 , 2 As shown in the figure, it includes a correspondingly opened second pit 10, and a second hydraulic pump 9, a second lifting cylinder 11, a second lifting rod 12, a second traverse cylinder 13 and a second lifting rod 14 correspondingly arranged in the second pit 10. From the cross-sectional schematic diagram, the lifting mechanisms on both sides of the loading and unloading line 8 are symmetrically arranged. Furthermore, the number of lifting mechanisms corresponding to the loading and unloading of the same container 1 on both sides of the loading and unloading line 8 is at least two, that is, after the train 15 completes parking, there are at least four lifting mechanisms corresponding to the same loading flatbed, corresponding to the four corners of the container 1 respectively.
[0051] Furthermore, each lifting mechanism in the synchronous loading and unloading unit is electrically connected to the control cable in a series connection, so that the first lifting rod 4 and the first lifting rod 2 in each lifting mechanism can move synchronously, so that each first lifting rod 2 can simultaneously match or simultaneously detach from the loading and unloading slot of the container 1. At the same time, the synchronous loading and unloading units along the loading and unloading line 8 are electrically connected by the synchronous joint control cable 16, and each synchronous loading and unloading unit is preferably connected to the synchronous joint control cable 16 in a parallel connection, so that each synchronous loading and unloading unit can be controlled to move synchronously, and each synchronous loading and unloading unit can also be independently controlled. Under normal circumstances, each synchronous loading and unloading unit works synchronously, thereby realizing the synchronous loading and unloading of multiple containers 1 on the entire train 15.
[0052] The fixed lifting container train synchronous loading and unloading system obtained by the above arrangement preferably has a working process including a container loading process and a container unloading process.
[0053] When the containers 1 stacked in the warehouse need to be loaded in batches onto the train 15, i.e., the container loading process, the control process preferably includes:
[0054] (1) Before the train 15 stops at the station, the transport trolley 17 is controlled to move on the transport track, and the containers 1 in the warehouse are transported to the corresponding positions on the loading and unloading line 8 in sequence, and then the synchronous loading and unloading unit at the position is controlled to work. By utilizing the lifting movement of the lifting rod and the horizontal movement of the lifting rod, each lifting rod in the synchronous loading and unloading unit is matched with the loading and unloading slot on the container at the same time, and then each lifting rod is controlled to rise to a certain height synchronously, so as to lift the container 1 on the transport trolley 17 to a predetermined height.
[0055] By sequentially carrying out the above process, the containers 1 to be loaded can be pre-stored one after another above the loading and unloading line 8. Obviously, the loading of the containers 1 in the warehouse on the transport trolley 17 can be completed using existing loading and unloading equipment, and the transport trolley 17 that can travel on the transport track can be one or more.
[0056] (2) After the containers 1 to be loaded have been pre-stored in the synchronous loading and unloading units, the train 15 is controlled to enter the station and accurately stop at the predetermined position of the loading and unloading line 8, so that each loading platform is aligned with the corresponding synchronous loading and unloading unit;
[0057] (3) The synchronous loading and unloading units are controlled to work simultaneously through the synchronous control cable 16, so that the lifting rods in each synchronous loading and unloading unit are simultaneously lowered to a certain height, so that each container 1 can be simultaneously lowered to the corresponding loading flatbed, and then each lifting rod is controlled to move to the side away from the container 1, so that each synchronous loading and unloading unit is released from matching with the container 1. At this time, the synchronous loading of the containers on the entire train is completed. The loaded train 15 does not need to stay on the platform for too long and can leave the platform to transfer the container to the next destination.
[0058] When the containers 1 on the train 15 need to be unloaded in batches to the warehouse, i.e., the container unloading process, the control process preferably includes:
[0059] (1) Controlling the train 15 to stop accurately at a predetermined position of the loading and unloading line 8 to achieve alignment of each loading platform with the corresponding synchronous loading and unloading unit, that is, achieving alignment of each container 1 on the train with the corresponding synchronous loading and unloading unit;
[0060] (2) The synchronous loading and unloading units at various positions are controlled to work simultaneously through the synchronous control cable 16. The lifting and lowering movement of the lifting rods and the horizontal movement of the lifting rods in each synchronous loading and unloading unit are utilized to make each lifting rod in the synchronous loading and unloading unit match the loading and unloading slots on the container at the same time, thereby controlling each lifting rod to rise to a certain height synchronously, thereby lifting each container 1 on the train 15 to a predetermined height at the same time, completing the simultaneous unloading of all containers 1, that is, realizing the pre-storage of all containers 1 on the synchronous loading and unloading unit.
[0061] (3) Control the train 15 to leave the station without making a long stop. After the train 15 leaves the loading and unloading line 8, control the transport trolley 17 to move on the transport track until the transport trolley 17 moves to the corresponding position on the loading and unloading line 8 and locks, control the lifting rods in the synchronous loading and unloading unit at this position to drop to a certain height, and then control the lifting rods to move away from the container, so that the synchronous loading and unloading unit is no longer matched with the container, and then control the transport trolley 17 to move, and transport the container to the warehouse for storage. The above process is performed in sequence to complete the storage of the containers pre-stored on each synchronous loading and unloading unit.
[0062] Of course, the transport trolley 17 can be used for multiple transports, or multiple transport trolleys 17 can be used for simultaneous transport, which can be specifically selected according to actual needs. At the same time, in order to achieve rapid positioning of the transport trolley 17 and the synchronous loading and unloading unit, a positioning component, such as a laser positioning component, an electronic tag scanning and recognition component, etc., can be set between the two to facilitate the transport trolley 17 to quickly run to the corresponding position on the loading and unloading line 8 and align with the synchronous loading and unloading unit.
[0063] The fixed-lift container whole-train synchronous loading and unloading system of the present invention has a simple structure and is easy to control. Fixed-lift lifting mechanisms are respectively arranged on both sides of the loading and unloading line of the train to form corresponding synchronous loading and unloading units. Corresponding control of multiple synchronous loading and unloading units can realize the pre-storage of multiple containers before loading and the simultaneous loading of multiple containers onto the train, as well as the simultaneous unloading of multiple containers on the train, thereby realizing the synchronous loading and unloading of containers on the entire train, greatly shortening the loading and unloading time of the containers, avoiding long-term stops of the train at the platform, shortening the loading and unloading time of railway logistics, improving the efficiency of railway logistics, reducing the cost of railway logistics, and having good application prospects and promotion value.
[0064] It will be easily understood by those skilled in the art that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A fixed lifting container train synchronous loading and unloading system, used to achieve the synchronous loading of multiple containers on each loading platform of the train or the synchronous unloading of multiple containers on the train; characterized in that: It includes a carrying track and a plurality of synchronous loading and unloading units sequentially arranged along the loading and unloading line; One end of the transport track is connected to the loading and unloading line, and the other end thereof extends to a warehouse where containers can be stored. A transport trolley is provided on the transport track to realize the transfer of containers between the warehouse and the corresponding synchronous loading and unloading unit; a positioning assembly is provided corresponding to the transport trolley and the synchronous loading and unloading unit to quickly position the transport trolley and the corresponding synchronous loading and unloading unit; The synchronous loading and unloading units are arranged corresponding to the loading flatbeds on the train, and after the train stops at the loading and unloading line, each loading flatbed on the train can correspond to a synchronous loading and unloading unit, thereby forming a pre-storage position for containers above the loading and unloading line; at the same time, multiple synchronous loading and unloading units are connected in parallel with synchronous joint control cables, and each synchronous loading and unloading unit can be controlled individually or synchronously; The synchronous loading and unloading unit includes a plurality of lifting mechanisms which are arranged on both sides of the loading and unloading line; the bottom of the lifting mechanism is fixedly arranged, and a lifting rod is arranged on the top thereof, and a driving assembly and a lifting assembly are arranged corresponding to the lifting rod, and the driving assembly includes a transverse moving cylinder, one end of the lifting rod is movably matched with the transverse moving cylinder, and can move horizontally relative to the transverse moving cylinder; one end of the lifting rod points to one side of the loading and unloading line, and the driving assembly can drive it to move horizontally to achieve the matching or separation of the end of the lifting rod with the loading and unloading slot on the container; the lifting assembly is used to drive the lifting rod to perform vertical lifting and lowering to achieve the lifting or lowering of the container; and the lifting mechanisms in the same synchronous loading and unloading unit are connected in series with a synchronous joint control cable, so that the lifting rods of the lifting mechanisms can be synchronously extended or lifted, so as to achieve the pre-storage of multiple containers before loading and the simultaneous loading of multiple containers onto the train, as well as the simultaneous unloading of multiple containers on the train, thereby achieving the synchronous loading and unloading of containers on the entire train, thereby shortening the loading and unloading time of the containers and the parking time of the train.
2. The fixed lifting container row synchronous loading and unloading system according to claim 1, wherein: Corresponding to the lifting mechanism, a pit is opened beside the loading and unloading line, and the bottom of the lifting mechanism is fixed in the pit.
3. The fixed lifting container row synchronous loading and unloading system according to claim 1, wherein: At least one lifting mechanism is respectively arranged on both sides of the synchronous loading and unloading unit for lifting both sides of the container.
4. The system for synchronous loading and unloading of a fixed-lift container train according to any one of claims 1 to 3, wherein: The transverse movement cylinder and the lifting rod are matched and connected by chain transmission, gear transmission or screw transmission.
5. The fixed lifting container row synchronous loading and unloading system according to any one of claims 1 to 3, wherein: The lifting assembly is a hydraulic lifting assembly, which includes a lifting rod and a lifting cylinder arranged coaxially in a vertical direction, and a hydraulic pump arranged corresponding to the lifting cylinder; The bottom of the lifting cylinder is fixed, and the bottom of the lifting rod is movably matched with the top of the lifting cylinder; the hydraulic pump is matched and connected with the lifting cylinder to change the hydraulic pressure in the lifting cylinder to lift or lower the lifting rod.
6. The system for synchronous loading and unloading of a fixed-lift container train according to any one of claims 1 to 3, wherein: The lifting assembly is a gear lifting assembly or a screw lifting assembly.
7. The fixed lifting container row synchronous loading and unloading system according to any one of claims 1 to 3, wherein: The transport trolley can be a single vehicle that can run alone or a plurality of vehicles that can run simultaneously.