A skid-mounted hydrogen refueling station
Through the container structure and multiple safety designs, the skid-mounted hydrogenation station solves the problems of high cost and inconvenient transportation of existing hydrogenation stations, achieves efficient and safe hydrogen filling, and is suitable for the rapid matching needs of hydrogen energy vehicles.
Patent Information
- Application Number
- CN202010549982.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-06-16
- Publication Date
- 2024-10-01
- Estimated Expiration
- 2040-06-16
AI Technical Summary
Under the land market conditions where land is at a premium, existing hydrogenation stations are costly and inconvenient for transportation and transfer, making it difficult to meet the rapid supporting needs of hydrogen energy vehicles.
A skid-mounted hydrogenation station is designed, which adopts a container structure and is internally divided into a hydrogen storage bottle group area, a compressor area and a hydrogenation area. It is equipped with a high-pressure hydrogen storage bottle group, a hydrogen boosting system, a hydrogenation system, and a hydrogenation area. Machine and station control system, integrated design, including explosion vent and multiple safety valves to ensure safety and facilitate transportation.
A highly centralized hydrogen refueling station with a small footprint, small installation volume, quick put into use, and easy transportation and transfer is achieved, ensuring a safe and efficient hydrogen filling process and reducing land and capital costs.
Smart Images

Figure CN111609309B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of hydrogen energy, and in particular relates to a skid-mounted hydrogen refueling station. Background Art
[0002] As the global greenhouse effect becomes increasingly prominent and national policies encourage the development and utilization of hydrogen energy, more and more hydrogen-powered vehicles are put on the market, and the infrastructure that provides hydrogen-powered vehicles with hydrogen refueling functions, hydrogen refueling stations, have also emerged as a necessary supporting implementation. Given the current market conditions where land is scarce and the high land and capital costs of fixed hydrogen refueling stations, modular, highly integrated, safe and reliable hydrogen refueling equipment is more suitable for the early stage of fuel cell vehicle development.
[0003] Compared with open hydrogen refueling machines, the advantages of skid-mounted hydrogen refueling stations are high concentration, integrated design, small footprint, small installation volume, fast commissioning, and easy transportation and transfer. In response to the use needs of skid-mounted hydrogen refueling stations, a skid-mounted hydrogen refueling station with good safety and high reliability is proposed. Summary of the invention
[0004] The technical problem solved by the present invention is to provide a skid-mounted hydrogen refueling station which has good safety, high reliability, high centralization and is easy to transport and transfer.
[0005] In order to solve the above-mentioned technical problems, the present invention adopts the following technical scheme: a skid-mounted hydrogen refueling station, characterized in that it includes a container and a gas unloading column, a hydrogen boosting system, a hydrogenation system, a hydrogenator, a station control system and a high-pressure hydrogen storage bottle group which are arranged in the container and connected by connecting pipelines. The interior of the container is divided into three parts by partitions: a hydrogen storage bottle group area, a compressor area and a hydrogenation area. The high-pressure hydrogen storage bottle group, the gas unloading column and some components of the hydrogenation system are installed in the hydrogen storage bottle group area, the hydrogen boosting system, the station control system and some components of the hydrogenation system are installed in the compressor area, and the hydrogenator is installed in the hydrogenation area.
[0006] Further preferably, the thickness of the internal partition of the container is ≥2mm, and an explosion-proof top is provided on the top of the container. The explosion-proof top adopts a structure that is high in the front and low in the back. The front part of the explosion-proof top is connected to the container through explosion-proof bolts, and the rear part of the explosion-proof top is hinged to the container through hinges. The explosion-proof top as a whole can be disassembled and has rain and snow protection function. In case of hydrogen leakage and explosion inside the container, the explosion-proof top opens and quickly releases the hydrogen in the container. Hydrogen leakage detectors are provided on the tops of the containers in the hydrogen storage bottle group area, the compressor area and the hydrogenation area.
[0007] Further preferably, the unloading column is an external gas source inlet, and the external gas source includes a compressed air source, a nitrogen source and a high-pressure hydrogen source of a tube bundle truck. The unloading column includes a hose, a pressure gauge, a pressure reducer, a safety valve, a ball valve, a one-way valve and a needle valve. The compressed air source is connected to the unloading column through a hose, and enters the positive pressure cabin of the hydrogenation machine after being depressurized by the pressure reducer. The nitrogen source is connected to the unloading column through a hose, and supplies gas to the solenoid valve of the compressor and the hydrogenation system after being depressurized by the pressure reducer. A safety valve is provided in the bypass before the nitrogen source enters the pressure reducer. When the nitrogen When the pressure at the gas source inlet exceeds the pressure, the safety valve opens to discharge the gas. The high-pressure hydrogen gas source of the tube bundle car is connected to the compressor air intake and the pneumatic ball valve of the hydrogenation system respectively after passing through the ball valve. The nitrogen gas source and the high-pressure hydrogen gas source of the tube bundle car are connected through a hose through a ball valve and a one-way valve to achieve the nitrogen gas source to purge the hydrogen pipeline. A safety valve is installed in the bypass at the inlet of the high-pressure hydrogen gas source of the tube bundle car. When the inlet pressure of the high-pressure hydrogen gas source exceeds the pressure, the safety valve opens to discharge the gas. Pressure gauges are installed on the three air inlet pipelines to monitor the inlet pressure at any time.
[0008] Further preferably, the hydrogen boosting system includes a compressor, inlet and outlet air hoses and a cooling system. The hydrogen boosting system is connected to the pipeline of the gas unloading column bundle vehicle and the hydrogen storage bottle group of the hydrogenation system at the front and rear respectively, and is used to supply gas to the high-pressure hydrogen storage bottle group after pressurizing the low-pressure gas source to a high-pressure gas source. The inlet and outlet air hoses are mainly used to compensate for the displacement caused by the vibration of the compressor during operation. The cooling system cools the gas when the temperature rises when the low-pressure gas source is pressurized to a high-pressure gas source. The hydrogen boosting system is installed in the compressor area of the skid-mounted station.
[0009] Further preferably, the hydrogenation system is a pipeline system between the hydrogen storage bottle group and the tube bundle vehicle to the hydrogenator, and the hydrogenation system includes a safety valve, a one-way valve, a ball valve, a pressure gauge, a pressure sensor, a filter, a pneumatic ball valve, a solenoid valve and a needle valve. The hydrogenation system is divided into three parallel air intake pipelines, one of which is drawn from the high-pressure hydrogen gas source of the gas column tube bundle vehicle, and the other two are drawn from the outlet of the compressor of the hydrogen boosting system. A safety valve is set on the bypass before the compressor outlet pipeline enters the hydrogenation system to prevent overpressure. After the two-way air intake of the compressor enters the hydrogenation system through the one-way valve, it is connected in parallel with the two-way air supply of the high-pressure hydrogen storage bottle group. The three-way air intake is connected to the hydrogenation system through the one-way valve. The rear ends of the parallel air intake pipelines are equipped with filters, pneumatic ball valves and one-way valves. The two air supply pipelines of the high-pressure hydrogen storage bottle are equipped with pressure gauges and pressure sensors. The pneumatic ball valve is provided with driving gas by the solenoid valve. The air inlet of the solenoid valve is supplied with air from the compressed air source of the tube bundle vehicle. The air outlet of the solenoid valve is connected to the corresponding pneumatic ball valves. The solenoid valve is controlled by the station control system. After the three-way parallel pipelines are connected in series to form a total hydrogen pipeline, the air circuit switch is controlled by the pneumatic ball valve. After the three-way parallel pipelines are connected in series, a safety valve and a sampling port are arranged in front of the pneumatic ball valve. The sampling port pipeline is controlled by a ball valve and a needle valve. The outlets of the two safety valves are connected to the total exhaust pipeline.
[0010] Further preferably, the hydrogenator is a device used for hydrogenation stations to safely refill high-pressure hydrogen from a hydrogen storage source into a hydrogen storage bottle onboard a fuel cell vehicle. The hydrogenator includes a mass flow meter, a pull-off valve, a hydrogenation gun and a positive pressure cabin. The total hydrogen supply pipeline of the hydrogenation system enters the hydrogenator and is connected to the mass flow meter, the ball valve and the pull-off valve before entering the hydrogenation gun. The hydrogenation gun is connected to the filling port of the vehicle. A pressure gauge, a pressure sensor and a manual drain port are provided in the bypass before entering the pull-off valve. The manual drain port is manually controlled by a ball valve and a needle valve. The hydrogenation gun and the pull-off valve are connected to the total drain pipeline. The electronic control part of the hydrogenator is a touch screen, which is installed in the positive pressure cabin. The positive pressure cabin is provided with a compressed air source by an air unloading column. An electromagnetic valve is provided in and out of the positive pressure cabin to control the air circuit switch. A pressure sensor is provided in the bypass before entering the positive pressure cabin to monitor the intake pressure, and a pressure gauge is provided in the positive pressure cabin to monitor the pressure in the cabin.
[0011] Further preferably, the station control system is used to control the entire hydrogenation process and safety protection. The station control system consists of a PLC system, a fire alarm and a gas detection system. The PLC system is connected to the pressure sensor and solenoid valve in the hydrogenation system and the pressure sensor, solenoid valve and mass flow meter in the hydrogenator through lines; the opening pressure of the nitrogen gas source safety valve is higher than the maximum design pressure of the nitrogen inlet, and the opening pressure of the high-pressure hydrogen gas source safety valve of the tube bundle vehicle is higher than the gas supply pressure of the tube bundle vehicle; the opening pressure of the compressor outlet pipeline safety valve should be higher than the compressor outlet The pressure is lower than the maximum hydrogen supply pressure. After the three-way parallel pipelines are connected in series, the opening pressure of the bypass safety valve in front of the pneumatic ball valve is consistent with the opening pressure of the safety valve of the compressor outlet pipeline. The three-way parallel air intake pipeline draws air from the high-pressure hydrogen gas source of the gas unloading column bundle truck as a low-pressure gas supply pipeline. The one connected to the two bottle groups in the hydrogen storage bottle group is a medium-pressure gas supply pipeline, and the one connected to the single bottle group of the hydrogen storage bottle group is a high-pressure gas supply pipeline; the high-pressure hydrogen storage bottle group stores the low-pressure gas source after being pressurized by a hydrogen boosting system, and is mainly composed of high-pressure hydrogen storage cylinders, and the number of high-pressure hydrogen storage cylinders is not less than 3.
[0012] Further preferably, the connecting pipeline is divided into a high-pressure hydrogen pipeline, a low-pressure hydrogen pipeline, a venting pipeline, a nitrogen pipeline and a compressed air pipeline, wherein the high-pressure hydrogen pipeline is a hydrogen supply pipeline from the hydrogen boosting system to the hydrogenation system, a hydrogen supply pipeline from the hydrogenation system to the hydrogenation machine hydrogenation gun, and a hydrogen supply pipeline from the hydrogen storage bottle group to the hydrogenation system; the low-pressure hydrogen pipeline is a gas supply pipeline from the gas unloading column bundle vehicle to the hydrogenation system and the compressor; the venting pipeline is an emptying pipeline, and the gas unloading column, hydrogen boosting system, hydrogenation system, hydrogenation machine and high-pressure hydrogen storage bottle are all connected in parallel with the venting pipeline, and a flame arrester is provided at the outlet of the venting pipeline; the pneumatic ball valve in the nitrogen pipeline hydrogenation system drives the gas, and a pressure reducer is provided at the inlet of the nitrogen pipeline to adjust the inlet pressure; the compressed air pipeline mainly provides protective gas for the positive pressure cabin, which is a closed cavity and has touch screen electrical components installed inside.
[0013] The skid-mounted hydrogenation station of the present invention is characterized in that the specific hydrogenation process is as follows: after pressing the hydrogenation button, the SV203 and SV204 solenoid valves are opened, that is, the high-pressure pipeline solenoid valve and the main pipeline solenoid valve are controlled. After 1 second, the SV203 and SV204 solenoid valves are closed in sequence, and the pressure is read. When the pressure is greater than 1MPa, hydrogenation is started; otherwise, a low pressure indication is given and hydrogenation is stopped. The SV201 and SV204 solenoid valves are opened in sequence, that is, the low-pressure pipeline solenoid valve and the main pipeline solenoid valve are controlled. When P=10MPa, the SV203 and SV204 solenoid valves are closed. 4 solenoid valves, open SV204 solenoid valve after 30 seconds, if the flow rate ratio is less than 20%, the flow rate ratio is the ratio of the real-time gas flow rate or gas flow rate of the filling process measured by the mass flow meter to the gas flow rate or gas flow rate when the solenoid valve is opened, close SV201 solenoid valve, open SV202 solenoid valve after 30 seconds, when the flow rate ratio is less than 35%, close SV202 solenoid valve, open SV203 solenoid valve after 15 seconds, when the pressure reaches the rated hydrogenation pressure, close SV203 and SV203 solenoid valves, and the hydrogenation is completed.
[0014] Compared with the prior art, the present invention has the following beneficial effects:
[0015] 1. Compared with hydrogen refueling stations, skid-mounted hydrogen refueling stations have the advantages of high concentration, integrated design, small footprint, small installation volume, fast commissioning, and easy transportation and transfer;
[0016] 2. Different from the previous skid-mounted hydrogen refueling station, the high-pressure hydrogen bottle group in this invention is integrated in the container, which has better integrity and can complete hydrogen refueling without relying on external hydrogen supply trailers;
[0017] 3. In the present invention, the high-pressure hydrogen storage bottle group, the charged components and the station control system are arranged in zones in the container, thus ensuring safety to the greatest extent;
[0018] 4. The present invention adopts an explosion-removing top design on the top of the container, which can minimize the destructiveness when a hydrogen explosion occurs;
[0019] 5. The present invention is provided with safety valves at all critical pressure positions to prevent overpressure from causing damage to rear-end devices or hydrogen refueling vehicles. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a schematic diagram of the process of the present invention;
[0021] Figure 2 It is a structural schematic diagram of the present invention. DETAILED DESCRIPTION
[0022] The technical solution of the present invention is described in detail in conjunction with the accompanying drawings. A skid-mounted hydrogen refueling station is characterized in that it includes a container and a gas unloading column, a hydrogen boosting system, a hydrogenation system, a hydrogenation machine, a station control system and a high-pressure hydrogen storage bottle group connected by connecting pipelines arranged in the container. The interior of the container is divided into three parts: a hydrogen storage bottle group area, a compressor area and a hydrogenation area by a partition. The high-pressure hydrogen storage bottle group, the gas unloading column and some components of the hydrogenation system are installed in the hydrogen storage bottle group area, and the hydrogen boosting system, the station control system and some components of the hydrogenation system are installed in the compressor area. The hydrogenator is installed in the hydrogenation area; the thickness of the internal partition of the container is ≥2mm, and an explosion-proof top is provided on the top of the container. The explosion-proof top adopts a structure that is high in the front and low in the back. The front part of the explosion-proof top is connected to the container through explosion-proof bolts, and the rear part of the explosion-proof top is hinged to the container through hinges. The explosion-proof top as a whole can be disassembled and has rain and snow protection function. In the event of hydrogen leakage and explosion inside the container, the explosion-proof top opens and quickly releases the hydrogen in the container. Hydrogen leakage detectors are provided on the tops of the containers in the hydrogen storage bottle group area, the compressor area and the hydrogenation area.
[0023] The gas unloading column of the present invention is an external gas source inlet, and the external gas source includes a compressed air source, a nitrogen source and a high-pressure hydrogen source of a tube bundle truck. The gas unloading column includes a hose, a pressure gauge, a pressure reducer, a safety valve, a ball valve, a one-way valve and a needle valve. The compressed air source is connected to the gas unloading column through a hose, and enters the positive pressure cabin of the hydrogenation machine after the pressure is relieved by the pressure reducer. The nitrogen source is connected to the gas unloading column through a hose, and supplies gas to the solenoid valve of the compressor and the hydrogenation system after the pressure is relieved by the pressure reducer. A safety valve is provided in the bypass before the nitrogen source enters the pressure reducer. When the nitrogen gas When the pressure at the source inlet exceeds the pressure, the safety valve opens to discharge the gas. The high-pressure hydrogen source of the tube bundle car is connected to the compressor air intake and the pneumatic ball valve of the hydrogenation system through a ball valve. The nitrogen source and the high-pressure hydrogen source of the tube bundle car are connected through a hose through a ball valve and a one-way valve to achieve the nitrogen source to purge the hydrogen pipeline. A safety valve is installed in the bypass at the inlet of the high-pressure hydrogen source of the tube bundle car. When the inlet pressure of the high-pressure hydrogen source exceeds the pressure, the safety valve opens to discharge the gas. Pressure gauges are installed on the three air intake pipelines to monitor the inlet pressure at any time.
[0024] The hydrogen boosting system described in the present invention includes a compressor, inlet and outlet air hoses and a cooling system. The front and rear of the hydrogen boosting system are respectively connected to the pipeline of the gas unloading column bundle vehicle and the hydrogen storage bottle group of the hydrogenation system, and is used to supply gas to the high-pressure hydrogen storage bottle group after boosting the low-pressure gas source to a high-pressure gas source. The inlet and outlet air hoses are mainly used to compensate for the displacement caused by the vibration generated by the compressor during operation. The cooling system cools the gas when the temperature rises when the low-pressure gas source is boosted to a high-pressure gas source. The hydrogen boosting system is installed in the compressor area of the skid-mounted station.
[0025] The hydrogenation system of the present invention is a pipeline system between the hydrogen storage bottle group and the tube bundle vehicle to the hydrogenator. The hydrogenation system includes a safety valve, a one-way valve, a ball valve, a pressure gauge, a pressure sensor, a filter, a pneumatic ball valve, a solenoid valve and a needle valve. The hydrogenation system is divided into three parallel air intake pipelines, one of which is drawn from the high-pressure hydrogen gas source of the gas column tube bundle vehicle, and the other two are drawn from the outlet of the compressor of the hydrogen boosting system. A safety valve is set on the bypass before the compressor outlet pipeline enters the hydrogenation system to prevent overpressure. After the two-way air intake of the compressor enters the hydrogenation system through the one-way valve, it is connected in parallel with the two-way air supply of the high-pressure hydrogen storage bottle group. The three-way parallel air intake pipeline is connected to the hydrogenation system. A filter, a pneumatic ball valve and a one-way valve are provided at the rear end of the air intake pipeline. The two air supply pipelines of the high-pressure hydrogen storage bottle are provided with a pressure gauge and a pressure sensor. The pneumatic ball valve is provided with driving gas by the solenoid valve. The air inlet of the solenoid valve is supplied with air by the compressed air source of the tube bundle vehicle. The air outlet of the solenoid valve is connected to the corresponding pneumatic ball valve. The solenoid valve is controlled by the station control system. After the three-way parallel pipelines are connected in series to form a total hydrogen pipeline, the air circuit switch is controlled by the pneumatic ball valve. After the three-way parallel pipelines are connected in series, a safety valve and a sampling port are provided in front of the pneumatic ball valve. The sampling port pipeline is controlled by a ball valve and a needle valve. The outlets of the two-way safety valves are connected to the total exhaust pipeline.
[0026] The hydrogenator described in the present invention is a device used for hydrogenation stations to safely add high-pressure hydrogen from a hydrogen storage gas source to a hydrogen storage bottle on a fuel cell vehicle. The hydrogenator comprises a mass flow meter, a pull-off valve, a hydrogenation gun and a positive pressure cabin. After entering the hydrogenator, the total hydrogen supply pipeline of the hydrogenation system is connected to the mass flow meter, the ball valve and the pull-off valve, and then enters the hydrogenation gun. The hydrogenation gun is connected to the filling port of the vehicle. Before entering the pull-off valve, a bypass is provided with a pressure gauge, a pressure sensor and a manual emptying port. The manual emptying port is manually controlled by a ball valve and a needle valve. The hydrogenation gun and the pull-off valve are connected to the total emptying pipeline. The electronic control part of the hydrogenator is a touch screen, which is installed in the positive pressure cabin. The positive pressure cabin is provided with a compressed air source by an air discharge column. An electromagnetic valve is provided in and out of the positive pressure cabin to control the air circuit switch. Before entering the positive pressure cabin, a pressure sensor is provided in the bypass to monitor the intake pressure. The positive pressure cabin is provided with a pressure gauge to monitor the pressure in the cabin.
[0027] The station control system of the present invention is used to control the entire hydrogenation process and safety protection. The station control system consists of a PLC system, a fire alarm and a gas detection system. The PLC system is connected to the pressure sensor and solenoid valve in the hydrogenation system and the pressure sensor, solenoid valve and mass flow meter in the hydrogenator through lines; the opening pressure of the nitrogen gas source safety valve is higher than the maximum design pressure of the nitrogen intake, and the opening pressure of the high-pressure hydrogen gas source safety valve of the tube bundle vehicle is higher than the gas supply pressure of the tube bundle vehicle; the opening pressure of the compressor outlet pipeline safety valve should be higher than the compressor outlet pressure The pressure is lower than the maximum hydrogen supply pressure. After the three-way parallel pipelines are connected in series, the opening pressure of the bypass safety valve in front of the pneumatic ball valve is consistent with the opening pressure of the safety valve of the compressor outlet pipeline. The three-way parallel air intake pipeline draws air from the high-pressure hydrogen gas source of the gas unloading column bundle truck as a low-pressure gas supply pipeline. The one connected to the two bottle groups in the hydrogen storage bottle group is a medium-pressure gas supply pipeline, and the one connected to the single bottle group of the hydrogen storage bottle group is a high-pressure gas supply pipeline; the high-pressure hydrogen storage bottle group stores the low-pressure gas source after being pressurized by the hydrogen boosting system, and is mainly composed of high-pressure hydrogen storage cylinders, and the number of high-pressure hydrogen storage cylinders is not less than 3.
[0028] The connecting pipelines described in the present invention are divided into high-pressure hydrogen pipelines, low-pressure hydrogen pipelines, venting pipelines, nitrogen pipelines and compressed air pipelines, wherein the high-pressure hydrogen pipelines are hydrogen supply pipelines from the hydrogen boosting system to the hydrogenation system, from the hydrogenation system to the hydrogenation gun of the hydrogenation machine, and from the hydrogen storage bottle group to the hydrogenation system; the low-pressure hydrogen pipeline is the gas supply pipeline part from the gas unloading column bundle vehicle to the hydrogenation system and the compressor; the venting pipeline is an emptying pipeline, and the gas unloading column, hydrogen boosting system, hydrogenation system, hydrogenation machine and high-pressure hydrogen storage bottle are all connected in parallel with the venting pipeline, and a flame arrester is provided at the outlet of the venting pipeline; the pneumatic ball valve in the nitrogen pipeline hydrogenation system drives the gas, and a pressure reducer is provided at the inlet of the nitrogen pipeline to adjust the inlet pressure; the compressed air pipeline mainly provides protective gas for the positive pressure cabin, which is a closed cavity and has touch screen electrical components installed inside.
[0029] The specific hydrogenation process of the skid-mounted hydrogenation station described in the present invention is as follows: after pressing the hydrogenation button, open the SV203 and SV204 solenoid valves, that is, control the high-pressure pipeline solenoid valve and the main pipeline solenoid valve. After 1 second, close the SV203 and SV204 solenoid valves in sequence, read the pressure, and start hydrogenation when the pressure is greater than 1MPa; otherwise, give a low pressure indication and stop hydrogenation, open the SV201 and SV204 solenoid valves in sequence, that is, control the low-pressure pipeline solenoid valve and the main pipeline solenoid valve. When P=10MPa, close the SV204 solenoid valve. Valve, open SV204 solenoid valve after 30 seconds, if the flow rate ratio is less than 20%, the flow rate ratio is the ratio of the real-time gas flow rate or gas flow rate of the filling process measured by the mass flow meter to the gas flow rate or gas flow rate when the solenoid valve is opened, close SV201 solenoid valve, open SV202 solenoid valve after 30 seconds, when the flow rate ratio is less than 35%, close SV202 solenoid valve, open SV203 solenoid valve after 15 seconds, when the pressure reaches the rated hydrogenation pressure, close SV203 and SV203 solenoid valves, and the hydrogenation is completed.
[0030] The basic principles, main features and advantages of the present invention are shown and described above. Without departing from the spirit and scope of the present invention, the present invention may also be subject to various changes and improvements, which all fall within the scope of the present invention to be protected.
Claims
1. A skid-mounted hydrogen refueling station, characterized in that The container comprises a gas unloading column, a hydrogen boosting system, a hydrogenation system, a hydrogenation machine, a station control system and a high-pressure hydrogen storage bottle group which are connected to each other through connecting pipelines. The interior of the container is divided into three parts: a hydrogen storage bottle group area, a compressor area and a hydrogenation area by a partition. The high-pressure hydrogen storage bottle group, the gas unloading column and some components of the hydrogenation system are installed in the hydrogen storage bottle group area, the hydrogen boosting system, the station control system and some components of the hydrogenation system are installed in the compressor area, and the hydrogenation machine is installed in the hydrogenation area. The thickness of the partition inside the container is ≥2mm, and an explosion-proof top is provided on the top of the container. The explosion-proof top adopts a front-high and rear-low structure. The front part of the explosion-proof top is connected to the container through explosion-proof bolts, and the rear part of the explosion-proof top is hinged to the container through hinges. The explosion-proof top can be disassembled as a whole and has It has the function of preventing rain and snow. In case of hydrogen leakage and explosion inside the container, the explosion venting top opens and quickly releases the hydrogen in the container. The tops of the containers in the hydrogen storage bottle group area, the compressor area and the hydrogenation area are all equipped with hydrogen leakage detectors; the hydrogenation machine is a device used for hydrogenation stations to safely refill high-pressure hydrogen from the hydrogen storage source into the on-board hydrogen storage bottles of fuel cell vehicles. The hydrogenation machine includes a mass flow meter, a pull-off valve, a hydrogenation gun and a positive pressure cabin. The total hydrogen supply pipeline of the hydrogenation system enters the hydrogenation machine and is connected to the mass flow meter, the ball valve and the pull-off valve before entering the hydrogenation gun. The hydrogenation gun is connected to the filling port of the vehicle. A pressure gauge, a pressure sensor and a manual emptying port are provided in the bypass before entering the pull-off valve. The manual emptying port is manually controlled by a ball valve and a needle valve. The hydrogenation gun and the pull-off valve are connected to the total emptying pipeline. The electronic control part of the hydrogenator is a touch screen, which is installed in the positive pressure cabin. The positive pressure cabin is provided with a compressed air source by an air unloading column. A solenoid valve is provided to control the air circuit switch in and out of the positive pressure cabin. A pressure sensor is provided in the bypass before entering the positive pressure cabin to monitor the intake pressure, and a pressure gauge is provided in the positive pressure cabin to monitor the pressure in the cabin; the hydrogenation system is a pipeline system between the hydrogen storage bottle group and the tube bundle vehicle to the hydrogenator. The hydrogenation system includes a safety valve, a one-way valve, a ball valve, a pressure gauge, a pressure sensor, a filter, a pneumatic ball valve, a solenoid valve and a needle valve. The hydrogenation system is divided into three parallel intake pipelines, one of which is drawn from the high-pressure hydrogen source of the air unloading column tube bundle vehicle, and the other two are drawn from the outlet of the hydrogen booster system compressor. A safety bypass is provided before the compressor outlet pipeline enters the hydrogenation system Valve is used to prevent overpressure. The two-way air intake of the compressor enters the hydrogenation system through the one-way valve and is connected in parallel with the two-way air supply of the high-pressure hydrogen storage bottle group. The rear ends of the three-way parallel air intake pipelines are equipped with filters, pneumatic ball valves and one-way valves. The two-way air supply pipelines of the high-pressure hydrogen storage bottle are equipped with pressure gauges and pressure sensors. The pneumatic ball valve is provided with driving gas by the solenoid valve. The air inlet of the solenoid valve is supplied with air by the compressed air source of the tube bundle vehicle. The air outlet of the solenoid valve is connected to each corresponding pneumatic ball valve. The solenoid valve is controlled by the station control system. After the three-way parallel pipelines are connected in series to form a total hydrogen pipeline, the pneumatic ball valve controls the air circuit switch. After the three-way parallel pipelines are connected in series, a safety valve and a sampling port are provided in front of the pneumatic ball valve. The sampling port pipeline is controlled by the ball valve and the needle valve to control the switch, and the outlets of the two-way safety valves are connected to the total exhaust pipeline.
2. The skid-mounted hydrogen refueling station according to claim 1, characterized in that: The unloading column is an external gas source inlet, and the external gas source includes a compressed air source, a nitrogen source and a high-pressure hydrogen source of a tube bundle truck. The unloading column includes a hose, a pressure gauge, a pressure reducer, a safety valve, a ball valve, a one-way valve and a needle valve. The compressed air source is connected to the unloading column through a hose, and enters the positive pressure cabin of the hydrogenation machine after being depressurized by the pressure reducer. The nitrogen source is connected to the unloading column through a hose, and supplies gas to the solenoid valve of the compressor and the hydrogenation system after being depressurized by the pressure reducer. A safety valve is provided in the bypass before the nitrogen source enters the pressure reducer. When the nitrogen source enters When the inlet pressure exceeds the pressure, the safety valve opens to discharge. The high-pressure hydrogen source of the tube bundle car is connected to the compressor intake and the pneumatic ball valve of the hydrogenation system through the ball valve respectively. The nitrogen source and the high-pressure hydrogen source of the tube bundle car are connected through the ball valve and the one-way valve after passing through the hose to realize the nitrogen source to purge the hydrogen pipeline. A safety valve is set at the bypass at the inlet of the high-pressure hydrogen source of the tube bundle car. When the inlet pressure of the high-pressure hydrogen source exceeds the pressure, the safety valve opens to discharge. Pressure gauges are set on the three intake pipelines to monitor the inlet pressure at any time.
3. The skid-mounted hydrogen refueling station according to claim 1, characterized in that: The hydrogen boosting system includes a compressor, inlet and outlet air hoses and a cooling system. The hydrogen boosting system is connected to the pipeline of the gas unloading column bundle vehicle and the hydrogen storage bottle group of the hydrogenation system at the front and rear respectively, and is used to supply gas to the high-pressure hydrogen storage bottle group after boosting the low-pressure gas source to a high-pressure gas source. The inlet and outlet air hoses are mainly used to compensate for the displacement caused by the vibration of the compressor during operation. The cooling system cools the gas when the gas temperature rises when the low-pressure gas source is boosted to a high-pressure gas source. The hydrogen boosting system is installed in the compressor area of the skid-mounted station.
4. The skid-mounted hydrogen refueling station according to claim 1, characterized in that: The station control system is used to control the entire hydrogenation process and safety protection. The station control system consists of a PLC system, a fire alarm and a gas detection system. The PLC system is connected to the pressure sensor and solenoid valve in the hydrogenation system and the pressure sensor, solenoid valve and mass flow meter in the hydrogenation machine through lines; the opening pressure of the nitrogen gas source safety valve is higher than the maximum design pressure of the nitrogen intake, and the opening pressure of the high-pressure hydrogen gas source safety valve of the tube bundle vehicle is higher than the gas supply pressure of the tube bundle vehicle; the opening pressure of the compressor outlet pipeline safety valve should be higher than the compressor outlet pressure low At the maximum hydrogen supply pressure, the opening pressure of the bypass safety valve in front of the pneumatic ball valve after the three-way parallel pipeline is connected in series is consistent with the opening pressure of the safety valve of the compressor outlet pipeline. The three-way parallel air intake pipeline draws air from the high-pressure hydrogen gas source of the gas unloading column bundle truck as a low-pressure gas supply pipeline. The one connected to the two bottle groups in the hydrogen storage bottle group is a medium-pressure gas supply pipeline, and the one connected to the single bottle group of the hydrogen storage bottle group is a high-pressure gas supply pipeline; the high-pressure hydrogen storage bottle group stores the low-pressure gas source after being pressurized by a hydrogen boosting system, and the number of high-pressure hydrogen storage cylinders is not less than 3.
5. The skid-mounted hydrogen refueling station according to claim 1, characterized in that: The connecting pipelines are divided into high-pressure hydrogen pipelines, low-pressure hydrogen pipelines, venting pipelines, nitrogen pipelines and compressed air pipelines, wherein the high-pressure hydrogen pipelines are the hydrogen supply pipelines from the hydrogen boosting system to the hydrogenation system, the hydrogenation system to the hydrogenation machine hydrogenation gun, and the hydrogen storage bottle group to the hydrogenation system; the low-pressure hydrogen pipeline is the gas supply pipeline part from the gas unloading column bundle vehicle to the hydrogenation system and the compressor; the venting pipeline is the exhaust pipeline, and the gas unloading column, hydrogen boosting system, hydrogenation system, hydrogenation machine and high-pressure hydrogen storage bottle are all connected in parallel with the venting pipeline, and a flame arrester is provided at the outlet of the venting pipeline; the pneumatic ball valve in the nitrogen pipeline hydrogenation system drives the gas, and a pressure reducer is provided at the inlet of the nitrogen pipeline to adjust the inlet pressure; the compressed air pipeline mainly provides protective gas for the positive pressure cabin, which is a closed cavity and has touch screen electrical components installed inside.
