A height-adjustable bridge pier hoisting machine, construction method and overpass method
By designing a height-adjustable bridge pier hoisting machine, the detachable connection and climbing mechanism of the split part and legs is used to solve the transportation problem of the hoisting machine when passing through the overpass, and the height adjustment of the hoisting machine and the efficient assembly of the prefabricated bridge pier are realized. Improve transportation convenience and construction efficiency.
Patent Information
- Application Number
- CN202010571913.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-06-22
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2040-06-22
AI Technical Summary
The existing pier hoisting machine needs to be disassembled and transported when passing through the overpass, resulting in increased transportation costs and difficulty.
A height-adjustable bridge pier hoisting machine is designed. Through the detachable connection and climbing mechanism of the split part and the legs, the height of the hoisting machine can be adjusted, and can pass through the overpass tunnel by reducing the height, and is equipped with a walking mechanism for easy assembly. Prefabricated piers.
It improves the convenience of the hoisting machine through overpass tunnels, is suitable for assembling piers of different heights, reduces construction time and transportation costs, and enhances the scope of application.
Smart Images

Figure CN111675112B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of prefabricated bridge pier installation equipment, and in particular to a height-adjustable bridge pier hoisting machine, a construction method and an overpass method. Background Art
[0002] At present, the height of the crane used for lifting bridge piers is generally high and fixed. When the crane encounters an overpass during transportation, the crane must be dismantled and transported through with special tools, which greatly increases the transportation cost and difficulty of the crane. Summary of the invention
[0003] The problem solved by the present invention is: how to improve the convenience of transportation of a bridge pier hoisting machine when passing through height-restricted terrains such as a bridge hole of an overpass.
[0004] In order to solve the above problems, the present invention provides a height-adjustable bridge pier hoisting machine, comprising:
[0005] a frame beam assembly, which includes a cross beam;
[0006] A lifting mechanism, which is arranged on the frame beam assembly and is used to lift the prefabricated bridge piers to be assembled;
[0007] a leg assembly for supporting the frame beam assembly;
[0008] The leg assembly includes a split portion and a leg portion, the upper end of the split portion is connected to the cross beam and passes through the end of the cross beam, the lower end of the split portion is detachably connected to the leg portion, and the cross beam is suitable for moving on the split portion and the leg portion.
[0009] Optionally, the split portion includes a plurality of segments, and the plurality of segments are arranged in sequence from top to bottom and are detachably connected to each other.
[0010] Optionally, the height-adjustable pier hoisting machine also includes a climbing mechanism, one end of which is arranged on the end of the beam, the other end of which is sleeved on the leg assembly, and the end of the beam is slidably connected to the leg assembly through the climbing mechanism.
[0011] Optionally, the climbing mechanism includes a positioning seat and a telescopic rod, the positioning seat is sleeved on the leg assembly and slidably connected to the leg assembly, one end of the telescopic rod is fixed to the positioning seat, and the other end is fixed to the crossbeam.
[0012] Optionally, both the split portion and the leg portion are provided with positioning holes, and the positioning seat and the split portion or the leg portion are suitable for being detachably connected at the positioning hole through a locking structure.
[0013] Optionally, two cross beams are provided, and the support leg assemblies are provided at both ends of each cross beam; the frame beam assembly also includes a main beam, which is arranged between the two cross beams and the two ends of the main beam are respectively connected to the two cross beams.
[0014] Optionally, the height-adjustable pier hoisting machine further comprises a running mechanism, which comprises a frame and a wheel set, wherein the frame is used to connect the wheel set and the leg portion; and the running mechanism is suitable for rotating relative to the leg portion.
[0015] Optionally, the traveling mechanism further comprises a telescopic member arranged at one end of the frame away from the leg portion, and one end of the telescopic member is fixed to the frame, and the other end is suitable for being supported on the ground or separated from the ground.
[0016] Optionally, the wheel set includes a plurality of running wheels, and the telescopic member is located between the plurality of running wheels.
[0017] Optionally, the lifting mechanism includes a winch, a lifting trolley, a sling and a transverse cylinder, the winch is arranged on the cross beam, the lifting trolley is arranged on the main beam, the sling is located below the lifting trolley and is suitable for connecting with the prefabricated piers to be assembled; one end of the transverse cylinder is fixed to the main beam, and the other end of the transverse cylinder is fixed to the lifting trolley, and the lifting trolley on the main beam is suitable for moving along the length direction of the main beam through the transverse cylinder.
[0018] In order to solve the above problems, the present invention further provides a construction method for erecting prefabricated bridge piers, using the above-mentioned height-adjustable bridge pier hoisting machine, comprising:
[0019] Step 1: A transport vehicle transports a bridge pier column to enter below the height-adjustable bridge pier hoisting machine, and the height-adjustable bridge pier hoisting machine hoists the bridge pier column and vertically installs the bridge pier column on the pier platform to be hoisted;
[0020] Step 2: The transport vehicle transports the pier cap beam to the bottom of the height-adjustable pier hoisting machine, and the height-adjustable pier hoisting machine lifts the pier cap beam and moves it to the top of the pier column to assemble the pier cap beam with the pier column;
[0021] Step 3, the transport vehicle transports the pier end beam to the bottom of the height-adjustable pier hoisting machine, and the height-adjustable pier hoisting machine lifts the pier end beam and moves it to the end of the pier cap beam to assemble the pier end beam with the pier cap beam;
[0022] Step 4. Repeat step 3 to complete the assembly of the other pier end beam.
[0023] In order to solve the above problems, the present invention also provides a method for passing an overpass using a height-adjustable bridge pier hoisting machine, which uses the above-mentioned height-adjustable bridge pier hoisting machine and comprises:
[0024] Step a, the frame beam assembly of the height-adjustable bridge pier hoist falls, the split part of the leg assembly of the height-adjustable bridge pier hoist is removed, and the split part is installed on a transport vehicle as a bracket, and the transport vehicle travels to the bottom of the height-adjustable bridge pier hoist;
[0025] Step b, the frame beam assembly falls onto the bracket;
[0026] Step c: the transport vehicle lifts the frame beam assembly until the leg portion of the leg assembly leaves the ground, and the transport vehicle transports the height-adjustable pier hoist through the bridge tunnel of the overpass.
[0027] Compared with the prior art, the present invention has the following beneficial effects: by providing a splitting portion and a leg portion, the height of the leg assembly can be adjusted, thereby making the height of the hoisting machine adjustable, so that the hoisting machine can pass through height-restricted terrains such as the bridge tunnel of an overpass by lowering the height, greatly improving the convenience of transportation of the hoisting machine when passing through height-restricted terrains such as the bridge tunnel of an overpass, and making the hoisting machine suitable for lifting prefabricated piers to be assembled with different height specifications, thereby increasing the scope of application of the hoisting machine; in addition, the hoisting machine of the present invention can be used as a special equipment for assembling prefabricated piers. Compared with the prior art of using crawler cranes or truck cranes to assemble prefabricated piers, the use of the hoisting machine in this embodiment does not require the position of the hoisting machine to be arranged in advance, nor does it require preparatory work such as adding counterweights. In this way, the efficiency of the assembly construction of prefabricated piers is improved and construction time is saved. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] Figure 1 It is a structural schematic diagram of a height-adjustable bridge pier hoisting machine in an embodiment of the present invention;
[0029] Figure 2 It is a structural schematic diagram of the height-adjustable bridge pier hoisting machine from another perspective in an embodiment of the present invention;
[0030] Figure 3 It is a structural schematic diagram of the height-adjustable bridge pier hoisting machine from another perspective in an embodiment of the present invention;
[0031] Figure 4 It is a structural schematic diagram of the height-adjustable bridge pier hoisting machine from another perspective in an embodiment of the present invention;
[0032] Figure 5 (a) and Figure 5 (b) is a schematic diagram of a state corresponding to step 1.1 in the construction method for erecting prefabricated bridge piers in an embodiment of the present invention;
[0033] Figure 6 (a) and Figure 6 (b) is another state schematic diagram corresponding to step 1.1 in the construction method for erecting prefabricated bridge piers in an embodiment of the present invention;
[0034] Figure 7 (a) and Figure 7 (b) is another state schematic diagram corresponding to step 1.1 in the construction method for erecting prefabricated bridge piers in an embodiment of the present invention;
[0035] Figure 8 (a) and Figure 8 (b) is a schematic diagram of a state corresponding to step 1.2 in the construction method for erecting prefabricated bridge piers in an embodiment of the present invention;
[0036] Fig. 9 (a) and Fig. 9 (b) is another state schematic diagram corresponding to step 1.2 in the construction method for erecting prefabricated bridge piers in an embodiment of the present invention;
[0037] Fig.10 (a) and Fig.10 (b) is a schematic diagram of a state corresponding to step 2.1 in the construction method for erecting prefabricated bridge piers in an embodiment of the present invention;
[0038] Fig.11 (a) and Fig.11 (b) is another state schematic diagram corresponding to step 2.1 in the construction method for erecting prefabricated bridge piers in an embodiment of the present invention;
[0039] Fig.12 (a) and Fig.12 (b) is another state schematic diagram corresponding to step 2.1 in the construction method for erecting prefabricated bridge piers in an embodiment of the present invention;
[0040] Fig.13 (a) and Fig.13 (b) is another state schematic diagram corresponding to step 2.1 in the construction method for erecting prefabricated bridge piers in an embodiment of the present invention;
[0041] Fig.14 (a) and Fig.14 (b) is a schematic diagram of a state corresponding to step 2.2 in the construction method for erecting prefabricated bridge piers in an embodiment of the present invention;
[0042] Fig.15 (a) and Fig.15 (b) is a schematic diagram of a state corresponding to step 3.1 in the construction method for erecting prefabricated bridge piers in an embodiment of the present invention;
[0043] Fig.16 (a) and Fig.16 (b) is another state schematic diagram corresponding to step 3.1 in the construction method for erecting prefabricated bridge piers in an embodiment of the present invention;
[0044] Fig.17 (a) and Fig.17 (b) is another state schematic diagram corresponding to step 3.1 in the construction method for erecting prefabricated bridge piers in an embodiment of the present invention;
[0045] Fig.18 (a) and Fig.18 (b) is another state schematic diagram corresponding to step 3.1 in the construction method for erecting prefabricated bridge piers in an embodiment of the present invention;
[0046] Fig.19 (a) and Fig.19 (b) is a schematic diagram of a state corresponding to step 3.2 in the construction method for erecting prefabricated bridge piers in an embodiment of the present invention;
[0047] Fig. 20 (a) and Fig. 20 (b) is a schematic diagram of a state corresponding to step 4.1 in the construction method for erecting prefabricated bridge piers in an embodiment of the present invention;
[0048] Fig.21 (a) and Fig.21 (b) is another state schematic diagram corresponding to step 4.1 in the construction method for erecting prefabricated bridge piers in an embodiment of the present invention;
[0049] Fig. 22 (a) and Fig. 22 (b) is another state schematic diagram corresponding to step 4.1 in the construction method for erecting prefabricated bridge piers in an embodiment of the present invention;
[0050] Fig.23 (a) and Fig.23 (b) is another state schematic diagram corresponding to step 4.1 in the construction method for erecting prefabricated bridge piers in an embodiment of the present invention;
[0051] Fig.24 (a) and Fig.24 (b) is a schematic diagram of a state corresponding to step 4.2 in the construction method for erecting prefabricated bridge piers in an embodiment of the present invention;
[0052] Fig.25 (a) and Fig.25 (b) is a schematic diagram of the state corresponding to when the height-adjustable pier hoisting machine completes the assembly of one pier in the construction method for erecting prefabricated piers in the embodiment of the present invention;
[0053] Fig.26 (a) and Fig.26(b) is a schematic diagram of a state corresponding to when a height-adjustable pier hoist is preparing to move to the next pier to be hoisted in the construction method for erecting prefabricated piers in an embodiment of the present invention;
[0054] Fig. 27 (a) and Fig. 27 (b) is a schematic diagram of the state corresponding to step a in the method for crossing an overpass of a height-adjustable pier hoisting machine in an embodiment of the present invention;
[0055] Fig.28 (a) and Fig.28 (b) is a schematic diagram of a state corresponding to step b in the method for crossing an overpass of a height-adjustable pier hoisting machine in an embodiment of the present invention;
[0056] Fig.29 (a) and Fig.29 (b) is another state schematic diagram corresponding to step b in the method for crossing an overpass of a height-adjustable pier hoisting machine in an embodiment of the present invention;
[0057] Fig.30 (a) and Fig.30 (b) is a schematic diagram of a state corresponding to step c in the method for crossing an overpass of a height-adjustable pier hoisting machine in an embodiment of the present invention;
[0058] Fig.31 (a) and Fig.31 (b) is another state schematic diagram corresponding to step c in the method for crossing an overpass of a height-adjustable pier hoisting machine in an embodiment of the present invention;
[0059] Fig.32 (a) and Fig.32 (b) is a schematic diagram of a state corresponding to step d in the method for crossing an overpass of a height-adjustable bridge pier hoisting machine in an embodiment of the present invention;
[0060] Fig.33 (a) and Fig.33 (b) is another state schematic diagram corresponding to step d in the method for the height-adjustable bridge pier hoisting machine to pass through an overpass in an embodiment of the present invention.
[0061] Description of reference numerals:
[0062] 1-frame beam assembly, 11-cross beam, 12-main beam; 2-hoisting mechanism, 21-winch, 22-lifting trolley, 23-sling; 3-leg assembly, 31-upper section, 32-middle section, 33-leg part, 34-positioning hole; 4-travelling mechanism, 41-frame, 42-wheel set, 43-telescopic part; 5-climbing mechanism, 51-positioning seat, 511-matching hole, 52-telescopic rod; 71-pier column, 72-pier cap beam, 73-pier end beam; 8-transport vehicle. DETAILED DESCRIPTION
[0063] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, specific embodiments of the present invention are described in detail below with reference to the accompanying drawings.
[0064] It should be noted that, in the coordinate system XYZ provided herein, the positive direction of the X axis represents the front, the reverse direction of the X axis represents the rear, the positive direction of the Y axis represents the right, the reverse direction of the Y axis represents the left, the positive direction of the Z axis represents the top, and the reverse direction of the Z axis represents the bottom. At the same time, it should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein.
[0065] Combination Figure 1-Figure 4 As shown, an embodiment of the present invention provides a height-adjustable pier hoisting machine, comprising: a frame beam assembly 1, which includes a cross beam 11; a lifting mechanism 2, which is arranged on the frame beam assembly 1 and is used to lift prefabricated piers to be assembled; a leg assembly 3, which is used to support the frame beam assembly 1; the leg assembly 3 includes a splitting part and a leg part 33, the upper end of the splitting part is connected to the cross beam 11 and passes through the end of the cross beam 11, the lower end of the splitting part is detachably connected to the leg part 33, and the cross beam 11 is suitable for moving on the splitting part and the leg part 33.
[0066] In this embodiment, the movement of the height-adjustable pier hoist (hereinafter referred to as the hoist) during the assembly of the prefabricated piers can be controlled manually or by machine, for example, by setting a control mechanism on the hoist and electrically connecting the hoisting mechanism 2 and other components to the control mechanism, and using the control mechanism to control the movement of the hoist during the assembly of the prefabricated piers, so as to improve the automation degree of the hoist and the construction efficiency of the hoist. The leg assembly 3 of the hoist is used to support the frame beam assembly 1 and strengthen the overall structural strength of the hoist to ensure the stability of the hoisting mechanism 2 set on the frame beam assembly 1 when lifting the prefabricated piers to be assembled, and to ensure the stability of the hoist during movement and transportation.
[0067] The upper end of the split portion (i.e. the split portion is located at Figure 1 The end of the split part in the positive direction of the middle Z axis) is connected to the crossbeam 11 and passes through the end of the crossbeam 11. The lower end of the split part (i.e., the split part is located at Figure 1 The end in the opposite direction of the middle Z axis) is detachably connected to the leg portion 33, that is, the split portion is located above the leg portion 33 (that is, Figure 1 In this way, the height of the leg assembly 3 can be adjusted by disassembling or installing the split part (i.e., the leg assembly 3 is located at Figure 1The dimension in the Z-axis direction of the center is adjusted, thereby achieving adjustable height of the crane; moreover, by disassembling the splitting part to lower the overall height of the crane, it is convenient for the crane to pass through height-restricted terrains such as the bridge hole of an overpass without disassembling the crane, which greatly improves the convenience of transportation when the crane passes through height-restricted terrains such as the bridge hole of an overpass, and saves the transportation cost of the crane. In addition, the splitting part of the leg assembly 3 is coaxially arranged with the leg part 33 to facilitate the movement of the crossbeam 11 on the splitting part and the leg part 33, that is, the end of the crossbeam 11 is suitable for moving along the length direction of the leg assembly 3 (i.e. Figure 1 The lifting mechanism 10 is used to move the lifting mechanism 10 on the splitting part and the leg part 33, so that the position of the end of the cross beam 11 on the leg assembly 3 is adjustable, thereby achieving the height of the frame beam assembly 1 and the lifting mechanism 2 to the ground (i.e., the distance between the frame beam assembly 1 and the lifting mechanism 2 and the ground) is adjustable, so that the lifting machine is suitable for lifting and assembling prefabricated bridge piers to be assembled at different heights (i.e., at Figure 1 Various prefabricated piers to be assembled with different sizes in the Z-axis direction) increase the application scope of the lifting machine.
[0068] The hoisting machine of this embodiment is provided with a splitting part and a leg part 33, so that the height of the leg assembly 3 can be adjusted, thereby making the height of the hoisting machine adjustable, so that the hoisting machine can pass through height-restricted terrains such as the bridge tunnel of an overpass by lowering the height, which greatly improves the convenience of transportation of the hoisting machine when passing through height-restricted terrains such as the bridge tunnel of an overpass, and makes the hoisting machine suitable for lifting prefabricated bridge piers of different height specifications to be assembled, thereby increasing the scope of application of the hoisting machine.
[0069] Optionally, the split portion includes a plurality of segments, and the plurality of segments are arranged in sequence from top to bottom and are detachably connected to each other.
[0070] The split portion has a plurality of segments which are sequentially arranged from top to bottom and are detachably connected to each other. For ease of description, the split portion is described below as including an upper segment 31 and a middle segment 32, wherein the middle segment 32 is provided with at least one; the middle segment 32 is located between the upper segment 31 and the leg portion 33, that is, the upper segment 31 is located at the upper end of the middle segment 32 (that is, the upper segment 31 is arranged at the middle segment 32). Figure 1 The leg portion 33 is located at the lower end of the middle segment 32 (that is, the leg portion 33 is arranged at the middle segment 32 at the positive direction of the middle Z axis). Figure 1The end of the leg part 33 away from the middle segment 32 is used for supporting on the ground or connecting with the running mechanism 4 (described later), and the leg part 33 supports the upper segment 31 and the middle segment 32. The middle segment 32 is provided with at least one, so that the height of the leg assembly 3 can be increased (lowered) by increasing (reducing) the number of the middle segments 32, so that the height of the hoisting machine can be increased (lowered) by increasing (reducing) the number of the middle segments 32, so that the hoisting machine can lift and assemble prefabricated piers to be assembled with different height specifications, further improving the scope of application of the hoisting machine, and making up for the limitation that the existing hoisting machine is only applicable to lifting piers within a specific height range due to its fixed height.
[0071] Optionally, combined Figure 1 , Figure 2 As shown, two cross beams 11 are provided, and a leg assembly 3 is provided at both ends of each cross beam 11; the frame beam assembly 1 also includes a main beam 12, which is arranged between the two cross beams 11 and the two ends of the main beam 12 are respectively connected to the two cross beams 11.
[0072] The frame beam assembly 1 includes a cross beam 11 and a main beam 12. Two cross beams 11 are provided and are parallel to each other. The main beam 12 is arranged between the two cross beams 11 and the two ends of the main beam 12 are respectively connected to the two cross beams 11, so as to improve the structural strength of the frame beam assembly 1. One or more main beams 12 are provided. In this embodiment, it is preferred that two main beams 12 are provided, and the two main beams 12 are parallel to each other and perpendicular to the cross beam 11 to ensure the structural strength of the frame beam assembly 1. In addition, a lifting mechanism 2 is provided on both main beams 12 to facilitate the hoisting machine to perform various operations on the prefabricated bridge piers to be assembled (such as rotating and erecting the prefabricated bridge piers to be assembled after lifting). A leg assembly 3 is provided at each end of each cross beam 11, that is, there are four leg assemblies 3 in total, so as to improve the supporting capacity of the leg assembly 3 to the frame beam assembly 1 and ensure the overall stability of the hoisting machine when the hoisting machine lifts the prefabricated bridge piers to be assembled through the lifting mechanism 2. Moreover, a running mechanism 4 (described later) can be provided at the lower end of each leg assembly 3 to facilitate the movement of the crane. Moreover, the crossbeam 11 is perpendicular to the leg assembly 3, so that the crane is a door frame structure, and there is a certain space under the crane, which is convenient for the transport vehicle 8 to enter under the crane and for the crane to lift and assemble the prefabricated bridge piers to be assembled under the crane.
[0073] Furthermore, the main beam 12 may be disposed between the two cross beams 11 , or may be disposed above or below the two cross beams 11 , and this embodiment does not specifically limit this.
[0074] Optionally, combined Figure 1As shown, the height-adjustable pier hoisting machine also includes a climbing mechanism 5, one end of which is arranged at the end of the cross beam 11, and the other end of the climbing mechanism 5 is sleeved on the leg assembly 3, and the end of the cross beam 11 is slidably connected to the leg assembly 3 through the climbing mechanism 5.
[0075] The climbing mechanism 5 is used to connect the crossbeam 11 and the leg assembly 3, and is used to achieve a sliding connection between the end of the crossbeam 11 and the leg assembly 3. Specifically, one end of the climbing mechanism 5 connected to the leg assembly 3 is sleeved on the leg assembly 3, so that the height of the crossbeam 11 (i.e., the distance from the crossbeam 11 to the ground) can be changed by changing the position of the climbing mechanism 5 on the leg assembly 3, thereby changing the height of the frame beam assembly 1, so that the hoisting machine is suitable for lifting prefabricated piers to be assembled at different heights, further improving the scope of application of the hoisting machine; moreover, one end of the climbing mechanism 5 connected to the leg assembly 3 is suitable for locking the leg assembly 3 to achieve the positioning of the climbing mechanism 5 on the leg assembly 3, preventing the frame beam assembly 1 from moving down due to excessive load when the hoisting machine lifts the prefabricated piers to be assembled through the lifting mechanism 2, thereby ensuring the stability of the hoisting machine during operation.
[0076] Optionally, combined Figure 1 , Figure 4 As shown, the climbing mechanism 5 includes a positioning seat 51 and a telescopic rod 52. The positioning seat 51 is sleeved on the leg assembly 3 and slidably connected to the leg assembly 3. One end of the telescopic rod 52 is fixed on the positioning seat 51, and the other end is fixed on the crossbeam 11.
[0077] The positioning seat 51 of the climbing mechanism 5 is sleeved on the leg assembly 3 and is slidably connected to the leg assembly 3, and the positioning seat 51 is suitable for locking the leg assembly 3 to achieve the positioning of the climbing mechanism 5 on the leg assembly 3; the telescopic rod 52 is suitable for Figure 1 Telescopic in the middle Z-axis direction, used to adjust the height of the frame beam assembly 1 (i.e., the distance from the frame beam assembly 1 to the ground); based on the sliding connection between the positioning seat 51 and the leg assembly 3, by setting the telescopic rod 52, within a certain range (the telescopic range of the telescopic rod 52), the height of the frame beam assembly 1 can be adjusted only by telescoping the telescopic rod 52, without the need to adjust the position of the positioning seat 51 on the leg assembly 3, which greatly improves the convenience of the hoisting machine construction.
[0078] Optionally, combined Figure 1 , Figure 4 As shown, both the split portion and the leg portion 33 are provided with positioning holes 34 , and the positioning seat 51 and the split portion or the leg portion 33 are suitable for being detachably connected at the positioning holes 34 through a locking structure.
[0079] The positioning seat 51 of the climbing mechanism 5 locks the leg assembly 3 through a locking structure to achieve the positioning of the climbing mechanism 5 on the leg assembly 3, thereby achieving the positioning of the frame beam assembly 1; the locking structure includes a pin locking device or a fastener (such as a pin shaft), and the pin locking device or the fastener is extended into the positioning hole 34 to achieve a detachable connection between the positioning seat 51 and the split part or the leg part 33. Specifically, when the locking structure is a pin locking device, the pin locking device is arranged on the positioning seat 51, and the pin locking device has a plug-in portion suitable for extension and retraction, and the plug-in portion is arranged on the side of the positioning seat 51 facing the leg assembly 3. When the positioning seat 51 of the climbing mechanism 5 moves to the corresponding position on the leg assembly 3, the plug-in portion is opposite to the positioning hole 34 at the position, and the plug-in portion of the pin locking device is extended to be inserted into the positioning hole 34, so as to complete the positioning of the climbing mechanism 5 on the leg assembly 3; when the locking structure is a fastener, the positioning seat 51 is provided with a matching hole 511 adapted to the positioning hole 34. When the positioning seat 51 of the climbing mechanism 5 moves to the corresponding position on the leg assembly 3, the matching hole 511 is opposite to the positioning hole 34 at the position, and the fastener is inserted into the positioning hole 34 and the matching hole 511 to complete the positioning of the climbing mechanism 5 on the leg assembly 3. In this way, by locking the position of the positioning seat 51 on the leg assembly 3, the stability of the hoisting machine during operation is guaranteed.
[0080] Optionally, combined Figure 1 , Figure 3 As shown, the height-adjustable bridge pier hoisting machine also includes a running mechanism 4 , which includes a frame 41 and a wheel set 42 , wherein the frame 41 is used to connect the wheel set 42 and the leg portion 33 ; the running mechanism 4 is suitable for rotating relative to the leg portion 33 .
[0081] The running mechanism 4 is arranged at the lower end of the leg assembly 3 and is connected to the leg part 33 of the leg assembly 3, so as to drive the leg assembly 3 to move; the wheel set 42 is arranged at the end of the frame 41 away from the leg part 33 and is in contact with the ground, so as to realize the running of the running mechanism 4; the running mechanism 4 is suitable for rotating relative to the leg part 33, and the frame 41 and the wheel set 42 can rotate relative to the leg part 33 as a whole, or only the wheel set 42 can rotate relative to the leg part 33, so that the hoisting machine can turn by rotating the running mechanism 4 when moving. In addition, the cross beam 11 and the main beam 12 of the frame beam assembly 1 are perpendicular to each other, so that the traveling mechanism 4 can drive the hoisting machine to move horizontally or vertically at the prefabricated bridge pier assembly site, so as to accurately assemble the prefabricated bridge pier to be assembled lifted by the lifting mechanism 2 to the pier to be assembled (that is, the base for installing the prefabricated bridge pier to be assembled, not shown in the figure); wherein the horizontal movement refers to the movement along the length direction of the main beam 12 (that is, Figure 1 The longitudinal movement refers to the movement along the length direction of the beam 11 (i.e. Figure 1In addition, by setting the traveling mechanism 4, the hoisting machine can be used as a special device for assembling prefabricated bridge piers. The hoisting machine lifts the prefabricated bridge piers to be assembled through the lifting mechanism 2, so as to move the prefabricated bridge piers to be assembled to the pier platform to be hoisted for assembly. Compared with the prior art of assembling prefabricated bridge piers by using crawler cranes or automobile cranes, the hoisting machine in this embodiment does not need to be positioned in advance, nor does it need to add counterweights and other preparatory work. In this way, the efficiency of the assembly construction of prefabricated bridge piers is improved and the construction time is saved.
[0082] Furthermore, in the present embodiment, the wheel set 42 is preferably adapted to rotate relative to the support leg portion 33 to reduce the difficulty of rotating the running mechanism 4, and the rotation angle of the wheel set 42 is within the range of 90°±10°. In this way, it is prevented that the rotation angle of the wheel set 42 is too small (i.e., the rotation angle of the wheel set 42 is less than 80°), thereby preventing the crane from being unable to smoothly switch from longitudinal movement to lateral movement (or from lateral movement to longitudinal movement), and that the rotation angle of the wheel set 42 is too large (i.e., the rotation angle of the wheel set 42 is greater than 100°), thereby increasing the difficulty of designing and manufacturing the running mechanism 4.
[0083] Optionally, combined Figure 1 , Figure 3 As shown, the traveling mechanism 4 further includes a telescopic member 43 disposed at one end of the frame 41 away from the leg portion 33, and one end of the telescopic member 43 is fixed to the frame 41, and the other end is suitable for being supported on the ground or separated from the ground.
[0084] In this embodiment, the telescopic member 43 is suitable for telescoping. When the hoist moves, the telescopic member 43 is separated from the ground. When the hoist lifts the prefabricated pier to be assembled, the telescopic member 43 is supported on the ground, supporting the leg assembly 3, preventing the hoist from crushing the wheel set 42 or causing the wheel set 42 to slip and move due to excessive load when the hoist lifts the prefabricated pier to be assembled through the lifting mechanism 2, thereby ensuring the stability of the hoist when working; and the provision of the telescopic member 43 facilitates the rotation of the wheel set 42, that is, when the telescopic member 43 is supported on the ground, the pressure on the wheel set 42 from the leg assembly 3 and the frame beam assembly 1 is reduced or disappears (the wheel set 42 is suspended in the air), thereby facilitating the rotation of the wheel set 42 to realize the steering of the running mechanism 4.
[0085] Optionally, the wheel set 42 includes a plurality of running wheels, and the telescopic member 43 is located between the plurality of running wheels.
[0086] The wheel set 42 includes a plurality of running wheels to increase the contact area between the running mechanism 4 and the ground, thereby ensuring the stability of the crane at each running mechanism 4; the telescopic member 43 is located between the plurality of running wheels, so that the telescopic member 43 is coaxially arranged with the outrigger assembly 3, so as to ensure the supporting effect of the telescopic member 43 on the outrigger assembly 3 when it is supported on the ground. By setting the telescopic member 43 and the plurality of running wheels, the plurality of running wheels and the telescopic member 43 can be used as fulcrums when the crane lifts the prefabricated piers to be assembled through the lifting mechanism 2, thereby ensuring the stability of the crane body when the crane is working, and increasing the safety and reliability of the crane during construction.
[0087] Optionally, combined Figure 1-Figure 4 As shown, the lifting mechanism 2 includes a winch 21, a lifting trolley 22, a sling 23 and a transverse cylinder. The winch 21 is arranged on the cross beam 11, the lifting trolley 22 is arranged on the main beam 12, the sling 23 is located below the lifting trolley 22 and is suitable for connecting with the prefabricated piers to be assembled; one end of the transverse cylinder is fixed on the main beam 12, and the other end of the transverse cylinder is fixed on the lifting trolley 22, and the lifting trolley 22 on the main beam 12 is suitable for moving along the length direction of the main beam 12 through the transverse cylinder.
[0088] In this embodiment, the main beam 12 is preferably provided with two, and preferably each main beam 12 is provided with two lifting mechanisms 2, and the lifting trolley 22 of each lifting mechanism 2 is connected to a transverse oil cylinder, and the lifting trolley 22 is driven on the main beam 12 along the length direction of the main beam 12 (i.e. Figure 1 The hoist 23 is arranged to be translated in the direction of the longitudinal X-axis of the main beam 12 to adjust the position of the hoisting trolley 22 on the main beam 12 or the distance between the two hoisting trolleys 22 to meet the lifting operation requirements; the hoist 23 is located below the hoisting trolley 22, and is used to connect with the prefabricated piers to be assembled when lifting the prefabricated piers to be assembled. The winch 21, the hoisting trolley 22, and the hoist 23 are connected in sequence by ropes or chains, and the hoist 23 moves with the hoisting trolley 22 in the longitudinal direction of the main beam 12, thereby realizing the movement of the hoist 23 in the longitudinal direction of the main beam 12, and the movement of the hoist 23 in the longitudinal direction of the leg assembly 3 is realized by unwinding or reeling in the rope (or chain) of the winch 21.
[0089] Furthermore, the winch 21 may also be disposed on the main beam 12 and located at the end of the main beam 12 .
[0090] Furthermore, one end of the transverse movement cylinder away from the lifting trolley 22 may also be fixed on the crossbeam 11 .
[0091] The embodiment of the present invention further provides a construction method for erecting a prefabricated bridge pier, using the above-mentioned height-adjustable bridge pier hoisting machine, comprising:
[0092] Step 1: The transport vehicle 8 transports the bridge pier column 71 to the bottom of the height-adjustable bridge pier hoisting machine, and the height-adjustable bridge pier hoisting machine lifts the bridge pier column 71 and vertically installs the bridge pier column 71 on the pier platform to be hoisted;
[0093] Before assembling the pier, it is necessary to move the crane to the pier to be hoisted in advance to reduce the distance the crane has to travel after lifting the prefabricated pier to be assembled and moving to the pier to be hoisted. The prefabricated pier to be assembled includes a pier column 71, a pier cap beam 72 and a pier end beam 73. Figure 5-Figure 9 As shown, Figure 5 (a) to Fig. 9 (a) are Figure 5 (b) to Fig. 9 (b) In the left view, step 1 specifically includes the following steps:
[0094] Step 1.1, the traveling mechanism 4 of the crane drives the crane to move to the side of the pier to be lifted, the transport vehicle 8 transports the pier column 71 to the bottom of the crane, the lifting mechanism 2 of the crane lifts the pier column 71, the transport vehicle 8 exits from the bottom of the crane and returns to the beam yard to take the beam (it is worth noting that multiple transport vehicles 8 can also transport the pier column 71, the pier cap beam 72 and the pier end beam 73 respectively);
[0095] Step 1.2: Through the retracting and extending action of the hoisting machine, the bridge pier column 71 is erected; the hoisting machine moves to the top of the pier to be hoisted, and the bridge pier column 71 is installed on the pier to be hoisted. In this step, the bridge pier column 71 is lifted by the lifting mechanisms 2 on the two main beams 12 at the same time, and the lifted bridge pier column 71 is in a horizontal state. After that, through the retracting and extending action of the lifting mechanism 2, that is, the lifting mechanism 2 on one main beam 12 is lifted upward (i.e. Fig.15 The lifting device 23 is retracted in the positive direction of the middle Z axis, and the lifting mechanism 2 on the other main beam 12 is downward (i.e. Fig.15 The lifting device 23 is placed in the reverse direction of the middle Z axis to change the pier column 71 from a horizontal state to a vertical state, so as to facilitate the assembly with the pier to be lifted; and, because the lifting machine is mostly moved from the last pier to be lifted where the pier assembly work was completed before lifting the pier column 71, the traveling mechanism 4 needs to be rotated 90° before the lifting machine moves to the top of the pier to be lifted, so as to facilitate the lifting machine to move horizontally to the top of the pier to be lifted.
[0096] Step 2: The transport vehicle 8 transports the bridge pier column 71 to the bottom of the height-adjustable bridge pier hoisting machine, and the height-adjustable bridge pier hoisting machine lifts the bridge pier column 71 and vertically installs the bridge pier column 71 on the pier platform to be hoisted;
[0097] Specifically, combined Figure 10-Figure 14 As shown, Fig.10 (a) to Fig.14 (a) are Fig.10 (b) to Fig.14 (b) The left view, step 2 includes the following steps:
[0098] Step 2.1, the traveling mechanism 4 drives the hoist to move to the side of the pier to be hoisted, the transport vehicle 8 transports the pier cap beam 72 to enter under the hoist, and the turntable of the transport vehicle 8 rotates to adjust the position until the two ends of the pier cap beam 72 placed on the turntable are under the same main beam 12 (at this time, the axis of the pier cap beam 72 is parallel to the axis of the main beam 12, so that the two lifting mechanisms 2 on one main beam 12 can lift the pier cap beam 72 at the same time), the lifting mechanism 2 of the hoist lifts the pier cap beam 72, and the transport vehicle 8 exits from under the hoist and returns to the beam yard to take the beam;
[0099] Step 2.2: The hoisting machine moves to the top of the pier to be hoisted, and assembles the pier cap beam 72 onto the pier column 71.
[0100] Step 3: The transport vehicle 8 transports the pier end beam 73 to the bottom of the height-adjustable pier hoisting machine, and the height-adjustable pier hoisting machine lifts the pier end beam 73 and moves it to the end of the pier cap beam 72 to assemble the pier end beam 73 with the pier cap beam 72;
[0101] Specifically, combined Figure 15-19 As shown, Fig.15 (a) to Fig.19 (a) are Fig.15 (b) to Fig.19 (b) The left view, step 3 includes the following steps:
[0102] Step 3.1, the traveling mechanism 4 drives the hoist to move to the side of the pier to be hoisted, the transport vehicle 8 transports the pier end beam 73 to the bottom of the hoist, the turntable of the transport vehicle 8 rotates to adjust the position until the two ends of the pier end beam 73 placed on the turntable are under the same main beam 12, the hoisting mechanism 2 of the hoist lifts the pier end beam 73, the transport vehicle 8 exits from the bottom of the hoist and returns to the beam yard to take the beam;
[0103] Step 3.2: The hoisting machine moves to the top of the pier to be hoisted, and assembles the pier end beam 73 onto the pier cap beam 72.
[0104] Step 4: Repeat step 3 to complete the assembly of another pier end beam 73.
[0105] Specifically, combined Figure 20-24 As shown, Fig. 20 (a) to Fig.24 (a) are Fig. 20 (b) to Fig.24 (b) The left view, step 4 includes the following steps:
[0106] Step 4.1, the traveling mechanism 4 drives the hoist to move to the side of the pier to be hoisted, the transport vehicle 8 transports the pier end beam 73 to the bottom of the hoist, the turntable of the transport vehicle 8 rotates to adjust the position until the two ends of the pier end beam 73 placed on the turntable are under the same main beam 12, the hoisting mechanism 2 of the hoist lifts the pier end beam 73, the transport vehicle 8 exits from the bottom of the hoist and returns to the beam yard to take the beam;
[0107] Step 4.2: The hoisting machine moves to the top of the pier to be hoisted, and assembles the pier end beam 73 onto the pier cap beam 72.
[0108] In this embodiment, steps 1 to 4 are performed to complete the assembly of the various parts of the prefabricated bridge pier. Figure 25-26 As shown, Fig.25 (a) Fig.26 (a) are Fig.25 (b) Fig.26 In the left view (b), after the crane completes the assembly of a pier, the traveling mechanism 4 drives the crane to move away from the pier. Thereafter, the traveling mechanism 4 rotates 90° and drives the crane to move to the next pier to be hoisted, and the assembly of the various parts of the prefabricated pier is completed again through steps 1 to 4.
[0109] The embodiment of the present invention further provides a method for passing an overpass using a height-adjustable bridge pier hoist, which uses the above-mentioned height-adjustable bridge pier hoist, and comprises:
[0110] Step a, the frame beam assembly 1 of the height-adjustable bridge pier hoist falls, the split part of the leg assembly 3 of the height-adjustable bridge pier hoist is removed, and the split part is installed on the transport vehicle 8 as a bracket, and the transport vehicle 8 travels to the bottom of the height-adjustable bridge pier hoist;
[0111] Combination Fig. 27 As shown, in this step, the end of the cross beam 11 slides down along the leg assembly 3 to the leg portion 33. At this time, the split portion is removed and installed on the transport vehicle 8 as a bracket to support the frame beam assembly 1 on the transport vehicle 8, so as to avoid the frame beam assembly 1 being easily bumped and damaged when it is directly placed on the transport vehicle 8; in this way, the height of the hoisting machine is reduced.
[0112] Step b, the frame beam assembly 1 falls onto the bracket;
[0113] Combination Fig.28 , Fig.29 As shown, in this step, the end of the cross beam 11 continues to slide down along the leg assembly 3 to the main beam 12 of the frame beam assembly 1 and / or the cross beam 11 falls onto the bracket on the transport vehicle 8, so that the transport vehicle 8 supports the frame beam assembly 1.
[0114] Step c: the transport vehicle 8 lifts the frame beam assembly 1 until the leg portion 33 of the leg assembly 3 leaves the ground, and the transport vehicle 8 transports the height-adjustable pier hoist through the bridge hole of the overpass.
[0115] Combination Figure 31-Figure 33 As shown, in this step, since the crane is not provided with a traveling mechanism 4, the leg portion 33 of the leg assembly 3 is supported on the ground. Therefore, the transport vehicle 8 can lift the frame beam assembly 1 and simultaneously lift the leg assembly 3 and make the leg portion 33 leave the ground, so that the transport vehicle 8 can smoothly transport the crane through height-restricted terrains such as the bridge tunnel of an overpass.
[0116] Further, based on the above-mentioned method for the height-adjustable bridge pier hoisting machine to pass the overpass, when the hoisting machine is provided with a traveling mechanism 4, the corresponding method for the height-adjustable bridge pier hoisting machine to pass the overpass includes:
[0117] Step a1, the frame beam assembly 1 of the height-adjustable bridge pier hoist falls, the split part of the leg assembly 3 of the height-adjustable bridge pier hoist is removed, and the split part is installed on the transport vehicle 8 as a bracket, and the transport vehicle 8 drives to the bottom of the height-adjustable bridge pier hoist;
[0118] Combination Fig. 27 As shown, in this step, the end of the cross beam 11 slides down along the leg assembly 3 to the leg portion 33. At this time, the split portion is removed and installed on the transport vehicle 8 as a bracket to support the frame beam assembly 1 on the transport vehicle 8, so as to avoid the frame beam assembly 1 being easily bumped and damaged when it is directly placed on the transport vehicle 8; in this way, the height of the hoisting machine is reduced.
[0119] Step b1, the frame beam assembly 1 continues to fall until the main beam 12 of the frame beam assembly 1 falls on the bracket, the connection between the leg assembly 3 and the running mechanism 4 is disconnected, and the transport vehicle 8 lifts the frame beam assembly 1 until the leg assembly 3 is separated from the running mechanism 4;
[0120] Combination Fig.28 , Fig.29As shown, in this step, the end of the crossbeam 11 continues to slide down along the leg assembly 3 to the main beam 12 and / or the crossbeam 11 falls onto the bracket on the transport vehicle 8. At this time, the connecting parts (such as bolts, pins, etc.) between the frame 41 of the running mechanism 4 and the leg part 33 of the leg assembly 3 are removed, so that the connection between the leg assembly 3 and the running mechanism 4 is disconnected. Then, the transport vehicle 8 lifts the frame beam assembly 1 by a small height (for example, 100 mm) through the suspension cylinder. At this time, the leg part 33 is lifted together due to the connection with the crossbeam 11 of the frame beam assembly 1, so that the leg assembly 3 and the running mechanism 4 are connected. The structure 4 is separated; wherein the suspension cylinder is used to lift the load-bearing part of the transport vehicle 8 (i.e., the part of the transport vehicle 8 used to carry the frame beam assembly 1 through the bracket), and the transport vehicle 8 lifts the bracket and the frame beam assembly 1 located on the bracket by lifting the load-bearing part of the transport vehicle 8. In this way, since the load-bearing part of the transport vehicle 8 has multiple support points for the frame beam assembly 1 (i.e., multiple contact points between the bracket and the frame beam assembly 1), compared with using a car crane to lift the frame beam assembly 1, using the suspension cylinder to lift the frame beam assembly 1 can effectively ensure the stability of the frame beam assembly 1 during movement.
[0121] Step c1, the transport vehicle 8 moves to one side of the running mechanism 4, the frame beam assembly 1 falls to the ground supported by the leg portion 33 of the leg assembly 3, the frame beam assembly 1 is separated from the bracket, the transport vehicle 8 leaves the bottom of the height-adjustable bridge pier hoisting machine, and the split part installed on the transport vehicle 8 is unloaded;
[0122] Combination Fig.30 , Fig.31 As shown, in this step, the transport vehicle 8 transports the frame beam assembly 1 and the leg assembly 3 away from the running mechanism 4, so that after the frame beam assembly 1 falls, the leg portion 33 of the leg assembly 3 can be directly supported on the ground. Specifically, after the transport vehicle 8 transports the frame beam assembly 1 and the leg assembly 3 and leaves the running mechanism 4, the leg portion 33 falls relative to the frame beam assembly 1 until it is supported on the ground, supporting the frame beam assembly 1, and lifting the frame beam assembly 1 until the frame beam assembly 1 is separated from the bracket. Then, the transport vehicle 8 moves to the bottom of the frame beam assembly 1, and the splitting part installed on the transport vehicle 8 is unloaded at this time, so that the overall height of the transport vehicle 8 is further reduced when the transport vehicle 8 transports the crane in the subsequent steps, so that the transport vehicle 8 can transport the crane through the height-restricted terrain such as the bridge hole of the overpass.
[0123] Step d1, the transport vehicle 8 moves to the bottom of the height-adjustable bridge pier hoist, and lifts the frame beam assembly 1 until the leg portion 33 of the leg assembly 3 leaves the ground, and the transport vehicle 8 transports the height-adjustable bridge pier hoist through the bridge hole of the overpass.
[0124] Combination Figure 31-Figure 33As shown, in this step, the transport vehicle 8 transports the crane whose height is lowered by disassembling the splitting part to smoothly pass through the bridge hole of the overpass. Further, for step c1 and step d1, after the crane disassembles the splitting part, if the height of the crane when transported by the transport vehicle 8 is sufficient to pass through the height-restricted terrain such as the bridge hole of the overpass, it is not necessary to unload the splitting part used as a bracket on the transport vehicle 8 in step c1. At this time, the transport vehicle 8 can directly carry the crane through the height-restricted terrain such as the bridge hole of the overpass through the bracket to ensure the stability of the crane on the transport vehicle 8.
[0125] Further, based on the above-mentioned method for crossing an overpass of a height-adjustable bridge pier hoist, when the hoist is provided with a traveling mechanism 4, and the split portion includes a plurality of segments (for ease of description, the split portion is described below as including an upper segment 31 and a middle segment 32, wherein the middle segment 32 is provided with at least one); the corresponding method for crossing an overpass of a height-adjustable bridge pier hoist includes:
[0126] Step a2, the frame beam assembly 1 of the height-adjustable bridge pier hoisting machine falls, the upper segment 31 of the leg assembly 3 of the height-adjustable bridge pier hoisting machine is removed, and the upper segment 31 is installed on the transport vehicle 8 as a bracket, and the transport vehicle 8 drives to the bottom of the height-adjustable bridge pier hoisting machine;
[0127] Combination Fig. 27 As shown, in this step, the end of the cross beam 11 slides down along the support leg assembly 3 to leave the upper segment 31. At this time, the upper segment 31 is removed and the removed upper segment 31 is installed on the transport vehicle 8 as a bracket to support the frame beam assembly 1 on the transport vehicle 8, so as to prevent the frame beam assembly 1 from being easily bumped and damaged when it is directly placed on the transport vehicle 8; in this way, the height of the hoisting machine is initially lowered.
[0128] Step b2, the frame beam assembly 1 continues to fall until the main beam 12 of the frame beam assembly 1 falls on the bracket, the connection between the leg assembly 3 and the running mechanism 4 is disconnected, and the transport vehicle 8 lifts the frame beam assembly 1 until the leg assembly 3 is separated from the running mechanism 4;
[0129] Combination Fig.28 , Fig.29 As shown, in this step, the end of the crossbeam 11 continues to slide down along the leg assembly 3 to the main beam 12 and / or the crossbeam 11 falls onto the bracket on the transport vehicle 8. At this time, the connecting parts (such as bolts, pins, etc.) between the frame 41 of the running mechanism 4 and the leg portion 33 of the leg assembly 3 are removed to disconnect the connection between the leg assembly 3 and the running mechanism 4. Then, the transport vehicle 8 lifts the frame beam assembly 1 by a short height (for example, 100 mm) through the suspension cylinder. At this time, the leg assembly 3 after the upper segment 31 is removed is lifted up together due to the connection with the crossbeam 11 of the frame beam assembly 1, so that the leg assembly 3 is separated from the running mechanism 4.
[0130] Step c2, the transport vehicle 8 moves to one side of the running mechanism 4, the frame beam assembly 1 falls down to the support leg portion 33 of the support leg assembly 3 to support the ground, the frame beam assembly 1 is separated from the bracket, the transport vehicle 8 leaves the bottom of the height-adjustable bridge pier hoisting machine, and the upper segment 31 installed on the transport vehicle 8 is unloaded;
[0131] Combination Fig.30 , Fig.31 As shown, in this step, the transport vehicle 8 transports the frame beam assembly 1 and the leg assembly 3 away from the running mechanism 4, so that after the frame beam assembly 1 falls, the leg portion 33 of the leg assembly 3 can be directly supported on the ground. Specifically, after the transport vehicle 8 transports the frame beam assembly 1 and the leg assembly 3 away from the running mechanism 4, the leg portion 33 falls relative to the frame beam assembly 1 until it is supported on the ground, supporting the frame beam assembly 1 and lifting the frame beam assembly 1 until the frame beam assembly 1 is separated from the bracket. Then, the transport vehicle 8 moves to the bottom of the frame beam assembly 1, and the upper segment 31 installed on the transport vehicle 8 is unloaded.
[0132] Step d2, remove the middle section 32 of the leg assembly 3, and install the middle section 32 on the transport vehicle 8, the transport vehicle 8 moves to the bottom of the height-adjustable pier hoist, and lifts the frame beam assembly 1 until the leg part 33 of the leg assembly 3 leaves the ground, and the transport vehicle 8 transports the height-adjustable pier hoist through the bridge hole of the overpass.
[0133] Combination Figure 31-Figure 33 As shown, there are multiple middle sections 32, and the heights of the multiple middle sections 32 may be equal or unequal. Therefore, in this step, if there is only one middle section 32, when the end of the cross beam 11 moves along the leg assembly 3 to the leg portion 33, the middle section 32 of the leg assembly 3 is removed, and the middle section 32 is installed on the transport vehicle 8; if there are multiple middle sections 32, when the end of the cross beam 11 moves along the leg assembly 3 to the point where there are one or more middle sections 32 above the end of the cross beam 11, the one or more middle sections 32 of the leg assembly 3 located above the end of the cross beam 11 are removed, and the middle section 32 is installed on the transport vehicle 8. The middle section 32 is installed on the transport vehicle 8. When multiple middle sections 32 are removed, if the heights of the removed middle sections 32 are the same, one of them is selected and installed on the transport vehicle 8. If the heights of the removed middle sections 32 are inconsistent, a shorter one is selected and installed on the transport vehicle 8. In this way, when the middle section 32 installed on the transport vehicle 8 is used as a new bracket to support the frame beam assembly 1, the overall height of the crane on the transport vehicle 8 is relatively low to ensure that the crane can pass through the bridge hole of the overpass smoothly. After the middle section 32 is installed on the transport vehicle 8, the transport vehicle 8 moves to the bottom of the frame beam assembly 1 and lifts the frame beam assembly 1 until the leg portion 33 of the leg assembly 3 leaves the ground, thereby transporting the crane through the bridge hole of the overpass.
[0134] It is worth noting that the hoisting machine has a plurality of leg assemblies 3 , and the operations on the splitting parts and the leg parts 33 on the plurality of leg assemblies 3 should be kept consistent.
[0135] Although the disclosure is disclosed as above, the protection scope of the disclosure is not limited thereto. Those skilled in the art may make various changes and modifications without departing from the spirit and scope of the disclosure, and these changes and modifications will fall within the protection scope of the present invention.
Claims
1. A height-adjustable bridge pier hoisting machine, characterized in that: include: A frame beam assembly (1), comprising a cross beam (11); A lifting mechanism (2), which is arranged on the frame beam assembly (1) and is used to lift the prefabricated bridge piers to be assembled; A leg assembly (3) used to support the frame beam assembly (1); The leg assembly (3) comprises a split portion and a leg portion (33), the upper end of the split portion is connected to the cross beam (11) and passes through the end of the cross beam (11), the lower end of the split portion is detachably connected to the leg portion (33), and the cross beam (11) is suitable for moving on the split portion and the leg portion (33); There are two cross beams (11), and the two ends of each cross beam (11) are provided with the support leg assembly (3); the frame beam assembly (1) further comprises a main beam (12), the main beam (12) is arranged between the two cross beams (11), and the two ends of the main beam (12) are respectively connected to the two cross beams (11); The height-adjustable bridge pier hoisting machine further comprises a running mechanism (4), the running mechanism (4) comprising a frame (41) and a wheel set (42), the frame (41) being used to connect the wheel set (42) and the leg portion (33); the running mechanism (4) is suitable for rotating relative to the leg portion (33).
2. The height-adjustable bridge pier hoisting machine according to claim 1, characterized in that: The split portion includes a plurality of segments, and the plurality of segments are arranged in sequence from top to bottom and are detachably connected to each other.
3. The height-adjustable bridge pier hoisting machine according to claim 1, characterized in that: It also comprises a climbing mechanism (5), one end of the climbing mechanism (5) being arranged at the end of the crossbeam (11), the other end of the climbing mechanism (5) being sleeved on the leg assembly (3), and the end of the crossbeam (11) and the leg assembly (3) being slidably connected via the climbing mechanism (5).
4. The height-adjustable bridge pier hoisting machine according to claim 3, characterized in that: The climbing mechanism (5) comprises a positioning seat (51) and a telescopic rod (52); the positioning seat (51) is sleeved on the leg assembly (3) and is slidably connected to the leg assembly (3); one end of the telescopic rod (52) is fixed to the positioning seat (51), and the other end is fixed to the crossbeam (11).
5. The height-adjustable bridge pier hoisting machine according to claim 4, characterized in that: The split portion and the leg portion (33) are both provided with a positioning hole (34), and the positioning seat (51) and the split portion or the leg portion (33) are adapted to be detachably connected at the positioning hole (34) via a locking structure.
6. The height-adjustable bridge pier hoisting machine according to any one of claims 1 to 5, characterized in that: The traveling mechanism (4) further comprises a telescopic member (43) arranged at one end of the frame (41) away from the leg portion (33); one end of the telescopic member (43) is fixed to the frame (41), and the other end is suitable for being supported on the ground or separated from the ground.
7. The height-adjustable bridge pier hoisting machine according to claim 6, characterized in that: The wheel set (42) comprises a plurality of running wheels, and the telescopic member (43) is located between the plurality of running wheels.
8. The height-adjustable bridge pier hoisting machine according to any one of claims 1 to 5, characterized in that: The lifting mechanism (2) comprises a winch (21), a lifting trolley (22), a sling (23) and a transverse cylinder, wherein the winch (21) is arranged on the cross beam (11), the lifting trolley (22) is arranged on the main beam (12), and the sling (23) is located below the lifting trolley (22) and is suitable for being connected to the prefabricated pier to be assembled; one end of the transverse cylinder is fixed to the main beam (12), and the other end of the transverse cylinder is fixed to the lifting trolley (22), and the lifting trolley (22) is suitable for being moved on the main beam (12) along the length direction of the main beam (12) through the transverse cylinder.
9. A construction method for erecting prefabricated bridge piers, using the height-adjustable bridge pier hoisting machine as described in any one of claims 1 to 8, characterized in that: include: Step 1: The transport vehicle (8) transports the pier column (71) to the bottom of the height-adjustable pier hoisting machine, and the height-adjustable pier hoisting machine lifts the pier column (71) and vertically installs the pier column (71) on the pier platform to be hoisted; Step 2: The transport vehicle (8) transports the pier cap beam (72) to the bottom of the height-adjustable pier hoisting machine, and the height-adjustable pier hoisting machine lifts the pier cap beam (72) and moves it to the top of the pier column (71) to assemble the pier cap beam (72) and the pier column (71); Step 3, the transport vehicle (8) transports the pier end beam (73) to the bottom of the height-adjustable pier hoisting machine, and the height-adjustable pier hoisting machine lifts the pier end beam (73) and moves it to the end of the pier cap beam (72) to assemble the pier end beam (73) with the pier cap beam (72); Step 4: Repeat step 3 to complete the assembly of another pier end beam (73).
10. A method for passing an overpass using a height-adjustable bridge pier hoist, using the height-adjustable bridge pier hoist as claimed in any one of claims 1 to 8, characterized in that: include: Step a, the frame beam assembly (1) of the height-adjustable bridge pier hoist is lowered, the split portion of the leg assembly (3) of the height-adjustable bridge pier hoist is removed, and the split portion is installed on a transport vehicle (8) as a bracket, and the transport vehicle (8) travels to the bottom of the height-adjustable bridge pier hoist; Step b, the frame beam assembly (1) falls onto the bracket; Step c: the transport vehicle (8) lifts the frame beam assembly (1) until the leg portion (33) of the leg assembly (3) leaves the ground, and the transport vehicle (8) transports the height-adjustable pier hoist through the bridge tunnel of the overpass.