A hydraulic anchor drilling vehicle and its three-station propulsion beam
Through the rotational switching and limit structure of the three-station propulsion beam, the problems of low drilling and anchor switching rate and inaccurate angle in existing anchor support are solved, efficient and accurate anchor and anchoring operations are achieved, and support is improved Protect quality and safety.
Patent Information
- Application Number
- CN202010544098.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-06-15
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2040-06-15
AI Technical Summary
In the existing anchor support technology, the drilling anchor switching rate is low, the operation is complicated and it is difficult to ensure accurate angle, resulting in inaccurate positioning of anchor and anchor operations, affecting the quality and safety of support.
Three-station propulsion beam is adopted, and the drilling station, anchor station and anchor station are rotated and switched, and the combined structure of rotating beam and fixed beam is used to combine the limit block and limit base to ensure the speed of drilling and anchor switching. and precision, and the anchor assembly is connected by hose to reduce weight and save space.
It significantly improves the drilling anchor switching rate and accuracy, ensures the continuity and accuracy of anchoring operations, improves production efficiency and economic benefits, and reduces the quality and installation space of the propulsion beams.
Smart Images

Figure CN111706370B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of mining and tunnel engineering machinery, and in particular to a hydraulic anchor drilling vehicle and a three-station propulsion beam thereof. Background Art
[0002] Underground support (tunnel support) is mainly used to mitigate and reduce the movement of surrounding rock, so that the tunnel cross-section does not shrink excessively, and at the same time prevent the scattered and damaged surrounding rock from falling off; usually, in order for the tunnel support to play an active role in adjusting and controlling the deformation of the surrounding rock, the support should be installed before the surrounding rock becomes loose and damaged, so that the support can play a load-bearing role together with the surrounding rock while the surrounding rock still maintains self-bearing capacity.
[0003] Take anchor support as an example; in the process of anchor support, it is necessary to drill the anchor hole first, and then hammer in the anchor; in the early stage of anchor support, air-leg rock drills are often used to drill holes manually, and then the anchors are installed manually; this solution has high work intensity, low operating efficiency, low support quality, and low safety factor; therefore, it was soon replaced by a double-boom anchor drilling vehicle, which drills holes with one drill arm and installs anchors with the other drill arm; the initial technical problems such as low safety factor were solved; but since this solution requires two sets of drill arm operating devices, the operation is complicated, and the two drill arms are independent of each other, it is relatively difficult to align the holes when the other drill arm installs the anchor after the drilling is completed; that is, the initial technical problems such as high work intensity, low operating efficiency, and low support quality still exist.
[0004] Therefore, the existing anchor support often adopts a single-drill arm anchor drilling vehicle, that is, a propulsion beam pushes the slide plate to install a drilling and anchor rock drill respectively, and the slide plate is translated to switch the "drill / anchor" rock drill to drill holes and install anchors; or only one rock drill is installed, and the purpose of drilling and installing anchors is achieved by switching the drill rod and the anchor rod; for example, the hydraulic anchor trolley disclosed in the Chinese patent document with publication number CN209539352U achieves the purpose of drilling and installing anchors by switching the drill rod and the anchor rod;
[0005] But they still have the following shortcomings:
[0006] 1) Although the drilling and anchor switching rate has been improved to a certain extent compared with the original anchor support solution, there is still room for improvement;
[0007] 2) For an anchor drilling vehicle using a double rock drill, two sets of propulsion devices are often used, which makes the propulsion beam very heavy and complicated to operate.
[0008] Therefore, a Chinese patent document with publication number CN110761816A discloses an automatic anchor drilling mechanism, which belongs to the technical field of drilling mechanisms; it includes a fixed seat, a rotating frame hinged to the fixed seat and equipped with a drilling and anchoring kit, and a propulsion component for driving the drilling and anchoring kit to move forward and backward; the rotating frame is driven to rotate by the driving component. The drilling and anchoring kit on the rotating frame includes a drill rod, an anchoring agent and an anchor rod. The drilling mechanism of the present invention is provided with a rotating frame, and the drill rod, the anchoring agent and the anchor rod are arranged at different positions of the rotating frame. The positioning of the three before construction is achieved by the rotation of the rotating frame, and the three processes of drilling holes with the drill rod, applying the anchoring agent and applying the anchor rod are transformed into one process, and the entire process of drilling the drill rod, applying the anchoring agent and applying the anchor rod is realized through automatic control. The drilling mechanism only needs one propulsion device, and positioning is sufficient once, so as to realize the precise positioning action of the drill rod, the anchoring agent and the anchor rod.
[0009] Although the patent document solves the above-mentioned technical problems, technicians in this field have found that there are still some shortcomings during use; theoretically, after the drilling mechanism completes a positioning, as long as the rotating frame rotates a specific angle, the subsequent anchoring operation and anchoring operation do not need to be positioned again, but this is not the case in actual operation. For example, during the drilling operation, the entire drilling rig mechanism is in a vibrating state, which will obviously cause the drilling rig to have a certain displacement, so the subsequent rotation of the rotating frame after a specific angle will also have a certain deviation. In addition, how to ensure that the rotating frame rotates a specific angle and the angular error is small enough is not mentioned in the above-mentioned patent document. Summary of the invention
[0010] In order to solve the above-mentioned technical problems, the purpose of the present invention is to overcome the shortcomings of the prior art and provide a hydraulic anchor drilling vehicle and a three-station propulsion beam thereof, which includes a drilling station, an anchor station and an anchoring station that are switched by rotation, greatly improving the switching rate and ensuring angle accuracy and positioning accuracy during the switching process.
[0011] In order to achieve the above-mentioned purpose, the present invention adopts the following technical solutions:
[0012] A three-station propulsion beam, comprising a bracket mounted on a working arm and a rotating beam mounted on the bracket, a drilling device for completing a drilling operation, an anchoring device for completing an anchoring operation and an anchoring device for completing an anchoring operation are mounted on the rotating beam, characterized in that;
[0013] The three-station push beam also includes a fixed beam fixedly mounted on the bracket, the rotating beam includes a push rod, a sleeve and a plurality of connecting pieces, the sleeve and the push rod are distributed in parallel and fixedly connected by a plurality of connecting pieces, the sleeve is sleeved and mounted on the fixed beam and can rotate relative to the fixed beam, the anchoring device, the drilling device and the anchoring device are all mounted on the sleeve, the drilling device and the anchoring device are respectively located on both sides of the anchoring device, the push rod is driven by the switching cylinder to rotate with the fixed beam as the central axis; thereby, the drilling device is in a drilling position during drilling operation, the anchoring device is in an anchoring position during anchoring operation, and the anchoring device is in an anchoring position during anchoring;
[0014] And during the drilling operation, anchoring operation, anchor rod operation and the rotation of the rotating beam, the top end of the fixed beam always rests on the top plate of the tunnel to be anchored and remains fixed.
[0015] Preferably, a top plate is provided at the top of the fixed beam, and a plurality of protrusions are distributed on the upper surface of the top plate so that the fixed beam can be stably pressed against the top plate of the tunnel to be anchored.
[0016] Preferably, when the push rod is rotated from the initial position to the maximum rotatable position, the angle of rotation relative to the axis of the fixed beam does not exceed 135 degrees.
[0017] Preferably, a limit cylinder, an anchor limit block and an anchor limit base are also provided. The anchor limit base is installed on a fixed beam or a bracket, and the anchor limit block is fixedly installed on the sleeve. In the process of switching the oil cylinder to drive the rotating beam to rotate counterclockwise, the drilling device, the anchor device and the anchor rod device are in the drilling position, the anchor position and the anchor rod position respectively. The limit cylinder drives the anchor limit base to move to abut against the anchor limit block so that the anchor device is in the anchor position, and in the process of switching the oil cylinder to drive the rotating beam to rotate clockwise, the drilling device and the anchor rod device are in the drilling position and the anchor rod position respectively, and the anchor limit base does not abut against the anchor limit block.
[0018] Preferably, the anchoring limiting base is rotatably mounted on a fixed beam or a bracket, and the limiting oil cylinder is hinged to the anchoring limiting base.
[0019] Preferably, the drilling device comprises a drilling guide rail, a drilling rock drill and a drilling propulsion device, wherein the drilling guide rail is arranged along the axial direction of the sleeve and is fixedly mounted on the sleeve, and the drilling propulsion device can be selected from a cylinder or a motor, and the drilling propulsion device pushes the drilling rock drill to move along the drilling guide rail to complete the drilling operation;
[0020] The anchoring device includes an anchoring assembly for inputting anchoring agent and pushing the anchoring agent to move, a guide tube for conveying anchoring agent, an anchoring guide rail, and an anchoring propulsion device for pushing the guide tube to move back and forth along the anchoring guide rail. The anchoring guide rail is arranged along the axial direction of the sleeve and fixedly installed on the sleeve. The anchoring propulsion device includes a slider and a pusher. The slider is slidably installed on the anchoring guide rail. The guide tube is fixedly connected to the slider and detachably connected to the anchoring assembly. The pusher pushes the slider to move back and forth on the anchoring guide rail to complete the anchoring operation.
[0021] The anchor device includes an anchor guide rail, an anchor rock drill and an anchor propulsion device. The anchor guide rail is arranged along the axial direction of the sleeve and is fixedly installed on the sleeve. The anchor propulsion device can select an oil cylinder or a motor. The anchor propulsion device pushes the anchor rock drill to move along the anchor guide rail to complete the anchor operation.
[0022] Wherein, the drilling guide rail and the anchor guide rail are respectively located on both sides of the anchoring guide rail.
[0023] Preferably, the anchor rock drill and the drilling rock drill use a common thrust cylinder to complete their thrust and retraction; a limit interlocking device and an interlocking cylinder for pushing the limit interlocking device to move laterally are also provided, wherein, when the drilling rock drill is in the drilling position, the interlocking cylinder drives the limit interlocking device to move to one side of the anchor rock drill to fix the anchor rock drill, and the thrust cylinder drives the drilling rock drill to complete the drilling operation; when the anchor rock drill is in the anchor position, the interlocking cylinder drives the limit interlocking device to move to one side of the drilling rock drill to fix the drilling rock drill, and the thrust cylinder drives the anchor rock drill to complete the anchor operation.
[0024] Preferably, the sleeve is further provided with an upper pulley block, a lower pulley block, a movable pulley block, a pull-back wire rope and a propulsion wire rope, the upper pulley block is fixed at the upper end of the sleeve and the lower pulley block is fixed at the lower end of the sleeve, the movable pulley block is installed in the middle section of the sleeve and is pushed by the propulsion cylinder so that the movable pulley block moves up and down along the axial direction of the sleeve, one end of the pull-back wire rope is fixed to the drilling and rock drilling machine, and passes through a pulley in the lower pulley block, a pulley in the movable pulley block, and another pulley in the lower pulley block in sequence, and the other end of the pull-back wire rope is fixed to the bolt rock drilling machine; one end of the propulsion wire rope is fixed to the drilling and rock drilling machine, and passes through a pulley in the upper pulley block, another pulley in the movable pulley block, and another pulley in the upper pulley block in sequence, and the other end of the propulsion wire rope is fixed to the bolt rock drilling machine;
[0025] One end of the pull-back wire rope is fixed at position A on the drilling rig and the other end is fixed at position B on the bolting rig, wherein both position A and position B are located above the lower pulley block;
[0026] Furthermore, one end of the propulsion wire rope is fixed at position C on the drilling rig and the other end is fixed at position D on the bolting rig, wherein both position C and position D are located below the upper pulley block.
[0027] Preferably, the anchoring assembly comprises a tee, a first outlet end of the tee being provided with a first valve, a second outlet end being provided with a second valve, and a third outlet end being connected to a first conduit detachably connected to a guide tube, wherein the first outlet end is connected to a second conduit for inputting an anchoring agent, and the second outlet end is connected to a third conduit for inputting water.
[0028] A hydraulic anchor drilling vehicle comprises the three-station propulsion beam as described above.
[0029] The beneficial effects of the present invention are:
[0030] 1) The purpose of drilling and anchoring switching is achieved by rotating the rotating beam. Compared with the original drilling and anchoring switching by translation and sliding, the switching speed of anchoring is further improved. In the process of rotation, the top of the fixed beam is always fixed against the top plate of the tunnel to be anchored, ensuring the accuracy of drilling and anchoring switching, avoiding the inability to quickly and accurately align the center hole after the anchoring switching due to the movement of the whole vehicle, the movement of the working arm or the movement of the propulsion beam during the rotation switching process, thereby making the rock drilling and anchoring process more continuous, with high production efficiency and better economic benefits.
[0031] 2) By setting up multiple limit blocks and multiple limit bases, it is ensured that during the rotation and switching of the propulsion beam, the drilling device is accurately positioned at the drilling position, the anchor rod device is accurately positioned at the anchor rod position, and the anchoring device is accurately positioned at the anchoring position.
[0032] 3) The anchoring assembly in the anchoring device is relatively large in size and its installation position overlaps with the installation of the pushing member to a certain extent, that is, it is difficult to provide installation space for the anchoring assembly on the propulsion beam. Therefore, in the present invention, the anchoring assembly is connected to the guide tube by the first conduit of the hose, which easily solves this problem. In addition, the anchoring assembly is a separate device, which not only facilitates the addition of water and resin anchoring agent to the anchoring assembly, but also reduces the weight of the propulsion beam and saves installation space on the propulsion beam. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] Figure 1 The structure of the propulsion beam in the first embodiment of the present invention is shown in FIG. Figure 1 ;
[0034] Figure 2 The structure of the propulsion beam in the first embodiment of the present invention is shown in FIG. Figure 2 ;
[0035] Figure 3 The structure of the propulsion beam in the first embodiment of the present invention is shown in FIG. Figure 3 ;
[0036] Figure 4 Schematic diagram of the position limiting interlocking device in the first embodiment of the present invention;
[0037] Figure 5 This is an exploded schematic diagram of the position limiting interlocking device in the first embodiment of the present invention;
[0038] Figure 6 This is a schematic diagram of the oil circuit of the propulsion beam in the first embodiment of the present invention;
[0039] Figure 7 is a schematic diagram of rotation switching in the first embodiment of the present invention;
[0040] Figure 8 Schematic diagram of the anchoring device in the first embodiment of the present invention Figure 1 ;
[0041] Fig. 9 Schematic diagram of the anchoring device in the first embodiment of the present invention Figure 2 ;
[0042] Fig.10 It is a schematic diagram of the anchoring assembly in the first embodiment of the present invention.
[0043] Description of the accompanying drawings: 1, bracket; 2, fixed beam; 4, drilling device; 6, anchor rod device; 31, push rod; 32, sleeve; 33, connecting piece; 7, limit cylinder; 51, anchor limit block; 52, anchor limit base; 41, first limit block; 42, drilling limit base; 62, anchor limit base; 43, drilling guide rail; 44, drilling rock drill; 53, anchor assembly; 54. Guide pipe; 55. Anchor guide rail; 56. Sliding block; 57. Pusher; 63. Anchor guide rail; 64. Anchor rock drill; 34. Switching cylinder; 8. Limit interlocking device; 81. Propulsion cylinder; 82. Interlocking cylinder; 20. Top plate; 35. Anchor magazine; 350. Motor; 351. Upper storage plate; 352. Lower storage plate; 353. Center shaft; 83. Upper pulley block; 84. Lower pulley block; 85. movable pulley block; 801. position A; 802. position B; 803. position C; 804. position D; 86. limit seat; 87. limit block; 88. limit groove; 89. limit member; 805. reversing valve A; 806. reversing valve B; 531. first outlet port; 532. first valve; 533. second outlet port; 534. second valve; 58. first conduit; 59. guide ring. DETAILED DESCRIPTION
[0044] Embodiments of the present invention are described in detail below, examples of which are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are intended to be used to explain the present invention, and should not be construed as limiting the present invention.
[0045] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "clockwise", "counterclockwise" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.
[0046] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "plurality" means two or more, unless otherwise clearly specified.
[0047] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0048] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.
[0049] In the present invention, "up", "down", "front", "back", "left" and "right" are used as the Figure 1 The position of each component in the structure is taken as the reference; among them, the top plate on the fixed beam is located at the upper end.
[0050] Embodiment 1:
[0051] A hydraulic anchor drilling vehicle comprises an engineering chassis, a working arm, Figure 1-3 The three-station propulsion beam, electrical device, hydraulic device and cab shown in the figure; wherein, the engineering chassis is used to provide support for the whole vehicle to ensure the rigidity and strength of the whole vehicle, the front lateral telescopic form of the outriggers of the engineering chassis can ensure the working stability of the whole vehicle, the electrical device and the hydraulic device are used to ensure the normal operation of the three-station propulsion beam and the working arm, the cab is used to accommodate the driver and the driver operates the working arm and the three-station propulsion beam to complete the underground support work; the three-station propulsion beam is installed on the working arm and adjusted to a vertical state through the working arm;
[0052] In this embodiment, the three-station propulsion beam includes a bracket 1 mounted on the working arm and a rotating beam mounted on the bracket 1, and a drilling device 4 for completing the drilling operation, an anchor device 6 for completing the anchor operation, and an anchor device for completing the anchor operation are installed on the rotating beam;
[0053] The three-station push beam also includes a fixed beam 2 fixedly mounted on the bracket 1, and the rotating beam includes a push rod 31, a sleeve 32 and a plurality of connecting pieces 33. The sleeve 32 and the push rod 31 are distributed in parallel and fixedly connected by a plurality of connecting pieces 33. The sleeve 32 is sleeved and mounted on the fixed beam 2 and can rotate relative to the fixed beam 2. The anchoring device, the drilling device 4 and the anchoring device 6 are all mounted on the sleeve 32. The drilling device 4 and the anchoring device 6 are respectively located on both sides of the anchoring device. The push rod 31 is driven by the switching cylinder 34 to rotate with the fixed beam 2 as the central axis; thereby, the drilling device 4 is in a drilling position during drilling operation, the anchoring device is in an anchoring position during anchoring operation, and the anchoring device 6 is in an anchoring position during anchoring;
[0054] Furthermore, during the drilling operation, anchoring operation, bolting operation and the rotation of the rotating beam, the top end of the fixed beam 2 always rests against the top plate of the tunnel to be anchored and remains stationary.
[0055] With such arrangement, the purpose of drilling and anchoring switching is achieved by rotating the rotating beam, which further improves the speed of anchoring switching compared to the original drilling and anchoring switching by translation and sliding, and in the process of rotation, the top of the fixed beam 2 is always against the tunnel roof that needs to be anchored and remains stationary, ensuring the accuracy of drilling and anchoring switching, and avoiding the inability to quickly and accurately align the center hole after anchoring switching due to the movement of the entire vehicle, the movement of the working arm, or the movement of the three-station propulsion beam during the rotation switching process, thereby making the rock drilling and anchoring process more continuous, with high production efficiency and better economic benefits.
[0056] In this embodiment, a top plate 20 is provided at the top of the fixed beam 2, and a plurality of protrusions are distributed on the upper surface of the top plate 20 so that the fixed beam 2 can be stably pressed against the top plate of the tunnel to be anchored; further preferably, the fixed beam 2 is driven by a working arm to press against the top plate of the tunnel, or the fixed beam 2 is a retractable beam and is driven by an oil cylinder to press against the top plate of the tunnel; the top plate 20 can further prevent tilting or shaking during the drilling and anchoring processes, as well as possible displacement during the switching process of the drill rod rock drill and the anchor rock drill 64.
[0057] When the push rod 31 rotates from the initial position to the maximum rotatable position, the angle of rotation relative to the axis of the fixed beam 2 does not exceed 135 degrees; in the present embodiment, the angle of rotation of the rotating beam from the initial position to the maximum rotatable position is between 80-100 degrees; this arrangement is because the rotating beam is pushed by the switching cylinder 34 and then rotates, so its rotation angle is difficult to reach 180°, and the optimal rotation angle is around 90°; in addition, the greater centralization of the drilling device 4 and the anchor device 6 is also conducive to the installation of the anchor magazine 35.
[0058] In this embodiment, if Figure 7 As shown, a limiting oil cylinder 7, an anchoring limiting block 51 and an anchoring limiting base 52 are also provided. The anchoring limiting base 52 is installed on the fixed beam 2 or the bracket 1, and the anchoring limiting block 51 is fixedly installed on the sleeve 32. In the process that the piston of the switching oil cylinder 34 retracts from the extended state to drive the rotating beam to rotate counterclockwise, the drilling device 4, the anchoring device and the anchor rod device 6 are in the drilling position, the anchoring position and the anchor rod position respectively, and the piston of the limiting oil cylinder 7 extends to drive the anchoring limiting base 52 to move to abut against the anchoring limiting block 51 so that the anchoring device is in the anchoring position, and the piston of the switching oil cylinder 34 extends from the retracted state to drive the rotating beam to rotate clockwise. During the movement, the drilling device 4 and the anchor device 6 are in the drilling position and the anchor position respectively. During this process, the piston of the limit cylinder 7 is always in a retracted state. This is set because, generally speaking, the longest extension position and the fully retracted position of the switching cylinder 34 piston are determined, which can ensure that the drilling device 4 is in the drilling position and the anchor device 6 is in the anchor position. When the anchoring device is in the anchoring position, the piston of the switching cylinder 34 is in the middle position, which cannot be accurately determined. Therefore, by fixing the limit block 87 and the anchor limit base 52 during the rotation, the anchoring position can be accurately determined.
[0059] It is worth noting that in other embodiments, when the piston of the switching cylinder 34 is extended from the retracted state to drive the rotating beam to rotate, the drilling device 4, the anchoring device and the anchor rod device 6 are successively in the drilling position, the anchoring position and the anchor rod position, and when the piston of the switching cylinder 34 is retracted from the extended state to drive the rotating beam to rotate, the drilling device 4 and the anchor rod device 6 are successively in the drilling position and the anchor rod position, and this scheme is also feasible; and the piston of the limit cylinder 7 retracts to drive the anchor limit base 52 to move to abut against the anchor limit block 51 so that the anchor device is in the anchor position. This scheme is also feasible.
[0060] It is worth noting that the above two positions of the switching cylinder 34 are only two optimal modes, that is, when the switching cylinder 34 is in other positions, the drilling rock drill 44 and / or the bolting rock drill 64 can also be in the drilling position.
[0061] In this embodiment, the anchor limit base 52 is rotatably mounted on the fixed beam 2 or the bracket 1, and the limit cylinder 7 is hinged to the anchor limit base 52; in other embodiments, the anchor limit base 52 is slidably mounted on the fixed beam 2 or the bracket 1, and the limit cylinder 7 is fixedly connected to the anchor limit base 52; wherein, considering that during the rotation of the rotating beam, the rotating beam is stopped by the anchor limit block 51 and the anchor limit base 52 being offset, and the rotating beam is installed with drilling holes, anchoring and anchor rod devices 6, its rotational inertia is relatively large. At the same time, in this process, the connection between the limit cylinder 7 and the anchor limit base 52 is a stress concentration point. Therefore, in this embodiment, the anchor limit base 52 is preferably rotatably mounted on the fixed beam 2 or the bracket 1 to ensure the stability of the connection between the limit cylinder 7 and the anchor limit base 52.
[0062] In this embodiment, at least one first adjusting bolt is further provided, and the first adjusting bolt is installed on the anchoring limit block 51 or the anchoring limit base 52. When the anchoring limit block 51 and the anchoring limit base 52 are against each other, the first adjusting bolt can be adjusted to make the rotating beam rotate again. This is arranged because even through the cooperation of the anchoring limit block 51 or the anchoring limit base 52, there may still be a certain small deviation between the anchoring device and the anchoring position due to processing and other reasons, and this deviation can be avoided by adjusting the first adjusting bolt.
[0063] In this embodiment, a first limit block 41, a drilling limit base 42 and an anchor limit base 62 are also provided. The drilling limit base 42 and the anchor limit base 62 are fixedly mounted on the fixed beam 2 or the bracket 1. The first limit block 41 is fixedly mounted on the sleeve 32. When the first limit block 41 is against the drilling limit base 42, the drilling device 4 is in the drilling position; when the first limit block 41 is against the anchor limit base 62, the anchor device 6 is in the anchor position; further preferably, at least two second adjusting bolts are provided. The second adjusting bolts are mounted on the first limit block 41 or the drilling limit base 42 or the anchor limit base 62. When the first limit block 41 and the drilling limit base 42 are against each other or when the first limit block 41 is against the anchor limit base 62, adjusting the second adjusting bolt can make the rotating beam rotate again.
[0064] In this embodiment, the structure of the working arm can refer to the working arms involved in the publication numbers CN209539352U, CN210141141U, CN108868841A, and CN108756965A; generally speaking, the working arm includes a first boom and a second boom, the rear end of the first boom is rotatably mounted on the engineering chassis, and is provided with a rear lifting swing cylinder to manipulate the rotation of the first boom; the rear end of the second boom is fixedly connected to the first boom and the front end of the second boom is hinged to the bracket 1, and is provided with a front lifting swing cylinder to manipulate the three-station push The feed beam is rotated, and further preferably, a first arm seat and a second arm seat are provided, the first arm seat is fixedly mounted on the engineering chassis and the first boom is rotatably mounted on the first arm seat, the second arm seat is fixedly mounted on the front end of the first boom and the second boom is fixedly mounted on the second arm seat, one end of the rear lift swing cylinder is rotatably mounted on the first arm seat and the other end is hinged to the first boom, one end of the front lift swing cylinder is rotatably mounted on the second arm seat and the other end is hinged to the bracket 1; in this way, the three-station push beam can be sent to the specified position at a specified angle.
[0065] In this embodiment, if Figure 1-2As shown, an anchor bar warehouse 35 for storing anchor bars is also provided on one side of the rotating beam, and the structure of the anchor bar warehouse can refer to the anchor bar warehouse 35 involved in publication numbers CN209539352U, CN110173286A, CN108979688A, CN108222987A, and CN204238883U; generally speaking, the anchor bar warehouse 35 includes a protective cover, a motor 350, an upper storage bar tray 351, and a lower storage bar tray 352, wherein a central shaft 353 is connected between the upper storage bar tray 351 and the lower storage bar tray 352, and grooves for accommodating drill rods or anchor rods are provided on the circumference of the upper storage bar tray 351 and the lower storage bar tray 352, and a plurality of guide wheels are provided on the circumference of the upper storage bar tray 351 and the lower storage bar tray 352, and the guide wheels are located on one side of the grooves. It is used to press the anchor rods and drill rods. It is also conducive to the smooth removal of the drill rod and avoids the wear of the drill rod; the motor 350 drives the upper rod storage plate 351 and the lower rod storage plate 352 to swing; and the anchor rod is installed on the anchor rock drill 64 during the swinging process. Further preferably, the lower rod storage plate 352 can move up and down on the central axis 353 to adapt to the sizes of anchor rods of different lengths. In this way, the use of the screw-in anchor rod bin 35 greatly improves the rod capacity of the anchor rod bin 35, avoids frequent installation of anchor rods, reduces auxiliary work time, improves efficiency, has a compact structure, greatly reduces the labor intensity of personnel, and ensures personnel safety.
[0066] In this embodiment, the drilling device 4 includes a drilling guide rail 43, a drilling rock drill 44 and a drilling propulsion device. The drilling guide rail 43 is arranged along the axial direction of the sleeve 32 and is fixedly installed on the sleeve 32. The drilling propulsion device can select a cylinder or a motor. The drilling propulsion device pushes the drilling rock drill 44 to move along the drilling guide rail 43 to complete the drilling operation.
[0067] like Figure 8-9As shown, the anchoring device includes an anchoring assembly 53 for inputting anchoring agent and pushing the anchoring agent to move, a guide tube 54 for conveying anchoring agent, an anchoring guide rail 55 and an anchoring propulsion device for pushing the guide tube 54 to move back and forth along the anchoring guide rail 55. The anchoring guide rail 55 is arranged along the axial direction of the sleeve 32 and is fixedly installed on the sleeve 32. The anchoring propulsion device includes a slider 56 and a pusher 57. The slider 56 is slidably installed on the anchoring guide rail 55. The guide tube 54 is fixedly connected to the slider 56 and is detachably connected to the anchoring assembly 53. The pusher 57 pushes the slider 56 to move back and forth on the anchoring guide rail 55 to complete the anchoring operation. This arrangement is because the anchoring assembly 53 in the anchoring device is relatively large in size and its installation position is close to the pusher 57. There is also a certain overlap in the installation, that is, it is difficult to provide installation space for the anchor assembly 53 on the propulsion beam. Therefore, in the present invention, the anchor assembly 53 is connected to the guide pipe 54 by the first conduit 58 of the hose, which can easily solve this problem. The anchor assembly 53 is used as a separate device, which not only facilitates the addition of water and resin anchoring agent to the anchor assembly 53, but also reduces the weight of the propulsion beam and saves installation space on the propulsion beam.
[0068] The anchor device 6 includes an anchor guide rail 63, an anchor rock drill 64 and an anchor propulsion device. The anchor guide rail 63 is arranged along the axial direction of the sleeve 32 and fixedly installed on the sleeve 32. The anchor propulsion device can select a cylinder or a motor. The anchor propulsion device pushes the anchor rock drill 64 to move along the anchor guide rail 63 to complete the anchor operation; the drilling guide rail 43 and the anchor guide rail 63 are respectively located on both sides of the anchoring guide rail 55.
[0069] Among them, the bolt rock drill 64 and the drilling rock drill 44 can share the same cylinder or motor to complete the propulsion, or use two separate cylinders or motors to complete the propulsion. In this embodiment, it is preferred to use the propulsion cylinder 81 to complete the propulsion of the bolt rock drill 64 and the drilling rock drill 44.
[0070] In this embodiment, a limit interlocking device 8 and an interlocking cylinder 82 for pushing the limit interlocking device 8 to move horizontally are also provided, wherein when the drilling rock drill 44 is in the drilling position, the interlocking cylinder 82 drives the limit interlocking device 8 to move to the side of the anchor rock drill 64 to fix the anchor rock drill 64, and the thrust cylinder 81 drives the drilling rock drill 44 to complete the drilling operation; when the anchor rock drill 64 is in the anchor position, the interlocking cylinder 82 drives the limit interlocking device 8 to move to the side of the drilling rock drill 44 to fix the drilling rock drill 44, and the thrust cylinder 81 drives the anchor rock drill 64 to complete the anchor operation.
[0071] With such arrangement, the drilling rock drill 44 and the bolting rock drill 64 can be driven by a single propulsion cylinder 81, which is easy to operate and can effectively reduce the cost of the whole vehicle, which is conducive to the further promotion of underground support mechanization.
[0072] Among them, the propulsion cylinder 81 can propel and pull back the drilling rock drill 44 and the anchor rock drill 64 through a wire rope or a chain. In this embodiment, as shown in the figure, the propulsion cylinder 81 propels and pulls back the drilling rock drill 44 and the anchor rock drill 64 through a wire rope; specifically, the sleeve 32 is also provided with an upper pulley group 83, a lower pulley group 84, a movable pulley group 85, a pullback wire rope and a propulsion wire rope, the upper pulley group 83 is fixed to the upper end of the sleeve 32 and the lower pulley group 84 is fixed to the lower end of the sleeve 32, the movable pulley group 85 is installed in the middle section of the sleeve 32 and is pushed by the propulsion cylinder 81 so that the movable pulley group 85 moves up and down along the axial direction of the sleeve 32, one end of the pullback wire rope is fixed on the drilling rock drill 44, and passes through a pulley in the lower pulley group 84, a pulley in the movable pulley group 85, the lower pulley group 84 in sequence. The other end of the pull-back wire rope is fixed to the anchor rock drill 64; one end of the propulsion wire rope is fixed to the drilling rock drill 44, and is passed around a pulley in the upper pulley group 83, another pulley in the movable pulley group 85, and another pulley in the upper pulley group 83 in sequence, and the other end of the propulsion wire rope is fixed to the anchor rock drill 64.
[0073] Further preferably, one end of the pull-back wire rope is fixed to a position A801 on the drilling rig 44 and the other end is fixed to a position B802 on the bolting rig 64, wherein both the position A801 and the position B802 are located above the lower pulley block 84;
[0074] Furthermore, one end of the propulsion wire rope is fixed to a position C803 on the drilling rig 44 and the other end is fixed to a position D804 on the bolting rig 64 , wherein both the position C803 and the position D804 are located below the upper pulley block 83 .
[0075] With such arrangement, when the anchor drill 64 is fixed and the thrust cylinder 81 pushes the movable pulley block 85 upward, the pull-back wire rope and the thrust wire rope can only push the drilling machine 44 upward under the joint action of the pull-back wire rope and the thrust wire rope, and because the anchor drill 64 is fixed, and when the thrust cylinder 81 pulls the movable pulley block 85 downward, the drilling machine 44 will descend under the joint action of the pull-back wire rope and the thrust wire rope; similarly, when the drilling machine 44 is fixed, the pull-back wire rope and the thrust wire rope can only drive the anchor drill 64 to move under the joint action of the pull-back wire rope and the thrust wire rope, and because the drilling machine 44 is fixed.
[0076] It is worth noting that, in other embodiments, the propulsion cylinder 81 can also complete the propulsion and retraction of the drilling rock drill 44 and the bolting rock drill 64 through a chain.
[0077] In this embodiment, if Figure 4 and Figure 5 As shown, the limit interlocking device 8 includes a limit seat 86 and a limit block 87. The limit seat 86 is fixedly connected to the rotating beam, and a limit groove 88 is provided on the limit seat 86. The limit block 87 is slidably installed in the limit groove 88 and is connected to the interlocking cylinder 82. The limit block 87 is provided with limit members 89 at both ends, and the limit member 89 is fixedly connected or integrally formed with the limit block 87; wherein, when the interlocking cylinder 82 pushes the limit block 87 to slide toward the side of the drilling and rock drilling machine 44 and makes the limit member 89 on the side of the drilling and rock drilling machine 44 contact with the drilling and rock drilling machine 44, the drilling and rock drilling machine 44 can be limited. The movement in the axial direction and the limit piece 89 on one side of the anchor rock drill 64 is no longer in contact with the anchor rock drill 64; when the interlocking cylinder 82 pushes the limit block 87 to slide toward the side of the anchor rock drill 64 and makes the limit piece 89 on one side of the anchor rock drill 64 contact with the anchor rock drill 64, the movement of the anchor rock drill 64 in the axial direction can be limited and the limit piece 89 on one side of the drilling rock drill 44 is no longer in contact with the drilling rod rock drill; further preferably, the limit piece 89 is a bolt and is fixed at both ends of the limit block 87.
[0078] In this embodiment, when the switching cylinder 34 starts to drive the rotating beam to rotate, the interlocking cylinder 82 starts to drive the limit interlocking device 8 to move at the same time; when the drilling rock drill 44 moves to the drilling position, the limit interlocking device 8 also moves to the side of the anchor rock drill 64 to limit the axial movement of the anchor rock drill 64; or, when the anchor rock drill 64 moves to the drilling position, the limit interlocking device 8 also moves to the side of the drilling rock drill 44 to limit the axial movement of the drilling rock drill 44. Further preferably, the oil circuit diagram of the switching cylinder 34, the interlocking cylinder 82 and the propulsion cylinder 81 is as follows: Figure 6 As shown, a connected reversing valve A805 and a reversing valve B806 are also provided, wherein the large chamber of the switching cylinder 34 is communicated with the small chamber of the interlocking cylinder 82, and the small chamber of the switching cylinder 34 is communicated with the large chamber of the interlocking cylinder 82, and the two oil ports of the reversing valve A805 are respectively communicated with the large chamber and the small chamber of the switching cylinder 34 or the interlocking cylinder 82; the two oil ports of the reversing valve B806 are respectively communicated with the large chamber and the small chamber of the propulsion cylinder 81; such an arrangement enables the switching cylinder 34 and the interlocking cylinder 82 to be always in a synchronous motion state, and the propulsion cylinder 81 starts to drive the drill rod rock drill or the anchor rock drill 64 to move after the switching cylinder 34 and the interlocking cylinder 82 have completed their movements, making the operation process very simple, quick and error-free.
[0079] It is worth noting that in other embodiments, the interlocking cylinder 82 and the switching cylinder 34 may not move at the same time, and the switching and interlocking of the drilling rig 44 and the bolting rig 64 can still be completed; but relatively speaking, the working time will be slightly extended and another reversing valve will be added.
[0080] In this embodiment, if Fig.10 As shown, the anchoring assembly 53 includes a tee, a first outlet end 531 of the tee is provided with a first valve 532, a second outlet end 533 is provided with a second valve 534, and a third outlet end is connected to a first conduit 58 detachably connected to the guide tube 54, wherein the first outlet end 531 is connected to a second conduit for inputting an anchoring agent, and the second outlet end 533 is connected to a third conduit for inputting water; with such an arrangement, when the anchoring agent needs to be loaded, the second valve 534 is closed, the first valve 532 is opened, and the resin anchoring agent is input from the first outlet end 531, generally directly loaded manually, and then the first valve 532 is closed, the second valve 534 is opened, and the resin anchoring agent is sent to the bottom of the hole and maintained at the bottom of the hole under the action of the water flow.
[0081] It is further preferred that the first conduit 58 is a hose; this is so configured because when there is no need to load the anchoring agent, the anchoring assembly 53 and the guide tube 54 are disconnected, that is, the first conduit 58 and the guide tube 54 are separated and the anchoring assembly 53 is an independent device not installed on the three-station propulsion beam. In this way, when the guide tube 54 extends into the bottom of the hole under the action of the pushing member 57, the first conduit 58, which is a hose, is then connected to the guide tube 54. In this way, there is no need to consider the installation of the anchoring assembly 53 on the three-station propulsion beam, and space is saved for the installation of the anchor rod device 6 and the drilling device 4; of course, it is also feasible that the first conduit 58 and the guide tube 54 are always in a connected state.
[0082] More preferably, both the first valve 532 and the second valve 534 are ball valves; of course, in other embodiments, the first valve 532 and the second valve 534 may also be butterfly valves, stop valves or other valves.
[0083] In this embodiment, the pusher 57 of the anchoring device is a driving motor 350 or an electric motor, and the pusher 57 drives the slider 56 to move back and forth along the anchor rod guide rail 63 through a chain or a synchronous belt. More preferably, fixed gears that cooperate with the chain or synchronous belt drive are installed at both ends of the anchor guide rail 55, and the pusher 57 is connected to one of the fixed gears. This arrangement can ensure that the slider 56 has a sufficiently long stroke and the movement process of the guide tube 54 is sufficiently stable.
[0084] Further preferably, a guide ring 59 is fixed to one end of the anchoring guide rail 55, and the guide tube 54 passes through the guide ring 59. Such an arrangement can further ensure that the guide tube 54 will not deviate during the process of extending into the bottom of the hole.
[0085] In this embodiment, the specific working process of the hydraulic anchor drilling vehicle for underground support is as follows:
[0086] 1) The driver manipulates the working arm so that the three-station propulsion beam is located at a specified position at a specified angle, and the top plate 20 on the fixed beam 2 is against the top plate of the tunnel to be anchored. At this time, the drilling machine 44 is in the drilling position and the bolting machine 64 is in a fixed state;
[0087] 2) Drilling process: the propulsion cylinder 81 drives the movable pulley block 85 to rise, and drives the drilling rock drill 44 to rise by pulling back the wire rope and pushing the wire rope to complete the drilling work; after the drilling is completed, the propulsion cylinder 81 drives the movable pulley block 85 to descend, and drives the drilling rock drill 44 to descend to the initial position by pulling back the wire rope and pushing the wire rope;
[0088] 3) Anchoring process: the switching cylinder 34 and the limit cylinder 7 work simultaneously, so that the anchor limit block 51 abuts against the anchor limit base 52, and then the pusher 57 drives the guide tube 54 to extend into the bottom of the hole drilled by the drill rod, and then the resin anchor is first injected into the guide tube 54, and then the resin anchor is sent to the bottom of the hole by water flow and kept at the bottom of the hole, and then the pusher 57 drives the guide tube 54 to extend out of the hole drilled by the drill rod;
[0089] 4) Anchoring process: the switching cylinder 34, the limiting cylinder 7 and the interlocking cylinder 82 work simultaneously, wherein the piston rod of the switching cylinder 34 extends to the maximum value to drive the rotating beam to rotate around the fixed beam 2, and makes the anchor limiting block 61 abut against the anchor limiting base 62, and at the same time, the piston rod of the interlocking cylinder 82 extends to the maximum value to drive the limiting block 87 to move horizontally in the limiting groove 88, and fix the drilling rock drill 44; then the propulsion cylinder 81 drives the movable pulley block 85 to rise, and drives the anchor rock drill 64 to rise by pulling back the wire rope and pushing the wire rope to complete the anchoring work;
[0090] 5) After the bolting is completed, the propulsion cylinder 81 drives the movable pulley block 85 to descend, and drives the bolting rock drill 64 to descend to the initial position by pulling back the wire rope and the propulsion wire rope; then the piston rod of the switching cylinder 34 and the piston rod of the interlocking cylinder 82 are both retracted to the initial position, so that the drilling rock drill 44 is in the drilling position and the bolting rock drill 64 is in a fixed state;
[0091] 6) The anchor bar warehouse replaces the rock drill with new anchor bars;
[0092] 7) Repeat the above steps to complete the underground support at other locations.
[0093] It is worth noting that during the drilling and anchoring process of a single anchor rod, the top plate 20 on the fixed beam 2 always rests on the same position on the top plate of the tunnel to be anchored.
[0094] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "examples", "specific examples", or "some examples" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner.
[0095] Although the embodiments of the present invention have been shown and described above, it is understood that the above embodiments are exemplary and cannot be understood as limiting the present invention. A person skilled in the art may change, modify, replace and modify the above embodiments within the scope of the present invention without departing from the principles and purpose of the present invention. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A three-station propulsion beam, comprising a support (1) mounted on a working arm and a rotating beam mounted on the support (1), wherein a drilling device (4) for completing a drilling operation, an anchor device (6) for completing an anchor operation, and an anchor device for completing an anchor operation are mounted on the rotating beam, characterized in that ; The three-station propulsion beam also includes a fixed beam (2) fixedly mounted on the bracket (1), the rotating beam including a push rod (31), a sleeve (32) and a plurality of connecting pieces (33), the sleeve (32) and the push rod (31) are arranged in parallel and fixedly connected by the plurality of connecting pieces (33), the sleeve (32) is sleeved and mounted on the fixed beam (2) and can rotate relative to the fixed beam (2), the anchoring device, the drilling device (4) and the anchoring device (6) are all mounted on the sleeve (32), the drilling device (4) and the anchoring device (6) are respectively located on both sides of the anchoring device, and the push rod (31) is driven by the switching cylinder (34) to rotate with the fixed beam (2) as the central axis; thereby, the drilling device (4) is in a drilling position during drilling operation, the anchoring device is in an anchoring position during anchoring operation, and the anchoring device (6) is in an anchoring position during anchoring; In addition, during the drilling operation, anchoring operation, bolting operation and the rotation of the rotating beam, the top end of the fixed beam (2) always rests against the top plate of the tunnel to be anchored and remains stationary; A limit oil cylinder (7), an anchor limit block (51) and an anchor limit base (52) are also provided. The anchor limit base (52) is mounted on the fixed beam (2) or the bracket (1). The anchor limit block (51) is fixedly mounted on the sleeve (32). When the switching oil cylinder (34) drives the rotating beam to rotate counterclockwise, the drilling device (4), the anchoring device and the anchor rod device (6) are in the drilling position, the anchoring position and the anchor rod position respectively. The limit oil cylinder (7) drives the anchor limit base (52) to move to abut against the anchor limit block (51) so that the anchor device is in the anchoring position. When the switching oil cylinder (34) drives the rotating beam to rotate clockwise, the anchor limit base (52) does not abut against the anchor limit block (51). The drilling device (4) comprises a drilling guide rail (43), a drilling rock drill (44) and a drilling propulsion device. The drilling guide rail (43) is arranged along the axial direction of the sleeve (32) and is fixedly mounted on the sleeve (32). The drilling propulsion device can be a cylinder or a motor. The drilling propulsion device pushes the drilling rock drill (44) to move along the drilling guide rail (43) to complete the drilling operation. The anchoring device comprises an anchoring assembly (53) for inputting an anchoring agent and pushing the anchoring agent to move, a guide tube (54) for conveying the anchoring agent, an anchoring guide rail (55), and an anchoring propulsion device for pushing the guide tube (54) to move back and forth along the anchoring guide rail (55), wherein the anchoring guide rail (55) is arranged along the axial direction of the sleeve (32) and is fixedly mounted on the sleeve (32), and the anchoring propulsion device comprises a slider (56) and a pusher (57), wherein the slider (56) is slidably mounted on the anchoring guide rail (55), the guide tube (54) is fixedly connected to the slider (56) and is detachably connected to the anchoring assembly (53), and the pusher (57) pushes the slider (56) to move back and forth on the anchoring guide rail (55) to complete the anchoring operation; The anchor device (6) comprises an anchor guide rail (63), an anchor rock drill (64) and an anchor propulsion device. The anchor guide rail (63) is arranged along the axial direction of the sleeve (32) and is fixedly mounted on the sleeve (32). The anchor propulsion device can be a cylinder or a motor. The anchor propulsion device pushes the anchor rock drill (64) to move along the anchor guide rail (63) to complete the anchor operation. The drilling guide rail (43) and the anchor rod guide rail (63) are respectively located on two sides of the anchoring guide rail (55).
2. A three-station propulsion beam according to claim 1, characterized in that: A top plate (20) is provided at the top of the fixed beam (2), and a plurality of protrusions are distributed on the upper surface of the top plate (20) so that the fixed beam (2) can be stably pressed against the top plate of the tunnel to be anchored.
3. A three-station propulsion beam according to claim 1, characterized in that: When the push rod (31) rotates from the initial position to the maximum rotatable position, the angle of rotation relative to the axis of the fixed beam (2) does not exceed 135 degrees.
4. A three-station propulsion beam according to claim 1, characterized in that: The anchoring limiting base (52) is rotatably mounted on the fixed beam (2) or the bracket (1), and the limiting oil cylinder (7) is hinged to the anchoring limiting base (52).
5. The three-station propulsion beam according to claim 1, characterized in that: The bolt rock drill (64) and the drilling rock drill (44) use a common propulsion cylinder (81) to complete their propulsion and retraction; A limit interlocking device (8) and an interlocking cylinder (82) for pushing the limit interlocking device (8) to move laterally are also provided, wherein when the drilling rock drill (44) is in the drilling position, the interlocking cylinder (82) drives the limit interlocking device (8) to move to one side of the anchor rock drill (64) so that the anchor rock drill (64) is fixed, and the propulsion cylinder (81) drives the drilling rock drill (44) to complete the drilling operation; when the anchor rock drill (64) is in the anchor position, the interlocking cylinder (82) drives the limit interlocking device (8) to move to one side of the drilling rock drill (44) so that the drilling rock drill (44) is fixed, and the propulsion cylinder (81) drives the anchor rock drill (64) to complete the anchor operation.
6. The three-station propulsion beam according to claim 1, characterized in that: The sleeve (32) is also provided with an upper pulley block (83), a lower pulley block (84), a movable pulley block (85), a pull-back wire rope and a propulsion wire rope. The upper pulley block (83) is fixed to the upper end of the sleeve (32) and the lower pulley block (84) is fixed to the lower end of the sleeve (32). The movable pulley block (85) is installed in the middle section of the sleeve (32) and is pushed by the propulsion cylinder (81) so that the movable pulley block (85) moves up and down along the axial direction of the sleeve (32). One end of the pull-back wire rope is fixed to the drilling machine ( 44), and sequentially passes through a pulley in the lower pulley block (84), a pulley in the movable pulley block (85), and another pulley in the lower pulley block (84), and the other end of the pull-back wire rope is fixed to the bolt rock drill (64); one end of the propulsion wire rope is fixed to the drilling rock drill (44), and sequentially passes through a pulley in the upper pulley block (83), another pulley in the movable pulley block (85), and another pulley in the upper pulley block (83), and the other end of the propulsion wire rope is fixed to the bolt rock drill (64); One end of the pull-back wire rope is fixed to a position A (801) on the drilling rock drill (44) and the other end is fixed to a position B (802) on the bolting rock drill (64), wherein both the position A (801) and the position B (802) are located above the lower pulley block (84); Furthermore, one end of the propulsion wire rope is fixed to position C (803) on the drilling rig (44) and the other end is fixed to position D (804) on the bolting rig (64), wherein both position C (803) and position D (804) are located below the upper pulley block (83).
7. The three-station propulsion beam according to claim 1, characterized in that: The anchoring assembly (53) comprises a tee, a first outlet end (531) of the tee is provided with a first valve (532), a second outlet end (533) is provided with a second valve (534), and a third outlet end is connected to a first conduit (58) detachably connected to the guide tube (54), wherein the first outlet end (531) is used to input an anchoring agent, and the second outlet end (533) is connected to a third conduit for inputting water.
8. A hydraulic anchor drilling vehicle, characterized in that: It comprises a three-station propulsion beam according to any one of claims 1-7.
Citation Information
Patent Citations
Anchor rod mounting device
CN108222987A
Anchor rod drill truck
CN108756965A
Rock bolt trolley
CN108868841A
Full-automatic rock bolting jumbo
CN108979688A
Anchor rod storage assembly for anchor rod trolley
CN110173286A