Fully prefabricated light-weight large cantilever pre-bent composite cap beam structure and construction method
By using a fully prefabricated lightweight cantilever pre-bending composite cap beam structure and pre-bending construction method, the problems of large weight and complex construction of traditional cap beams have been solved, achieving lightweight and high-quality prefabrication and assembly effects.
Patent Information
- Application Number
- CN202010714602.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-07-23
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2040-07-23
AI Technical Summary
The precast and assembled cap beam structure of traditional urban elevated bridges with six or more lanes is difficult to hoist as a whole due to the large weight of the concrete material. The construction process of segmented precasting and on-site assembly is complicated and the quality is difficult to control, making it difficult to guarantee the integrity of the structure.
The structure adopts a fully prefabricated lightweight cantilever pre-bending composite cap beam, which uses a combination of variable cross-section box steel beams and reinforced concrete flanges, filled with lightweight and foamed concrete. Combined with the pre-bending construction method, it reduces on-site assembly procedures and improves overall integrity and safety.
The lightweight design of the cap beam was achieved, reducing the cross-sectional dimensions and structural self-weight, improving the overall integrity, safety, and reliability of construction quality, and simplifying the construction process.
Smart Images

Figure CN111719417B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the field of cap beam structure design of prefabricated assembled piers in bridge engineering, and relates to a fully prefabricated light large cantilever pre-bent composite cap beam structure and a construction method. Background Art
[0002] Large cantilever cap beams are common in urban viaducts with more than six lanes. Traditional designs usually use cap beams with prestressed concrete structures. Due to the low specific strength of concrete materials, the cross-sectional size and structural weight of such cap beams are usually large. Overall prefabrication is often limited by urban road transportation restrictions and the lifting capacity of lifting equipment, making overall prefabrication and lifting construction difficult to implement. Therefore, it is often necessary to adopt the method of block prefabrication and on-site assembly to meet the needs of on-site scaffolding-free construction.
[0003] The solution in the existing prefabrication and assembly process is usually to adopt the method of prefabrication in blocks and then assemble them on site. However, the prefabrication and on-site assembly of blocks involves many construction processes, the construction process takes a long time, and there are problems such as difficulty in controlling the quality of joint construction and difficulty in ensuring the integrity of the cap beam after assembly. Summary of the invention
[0004] The invention provides a fully prefabricated light-weight large cantilever pre-bent composite cap beam structure and a construction method.
[0005] The solution adopted by the present invention to solve the technical problem is a fully prefabricated lightweight large cantilever pre-bent composite cap beam structure, including a variable-section box-type steel beam, a reinforced concrete upper flange plate and a reinforced concrete lower flange plate respectively laid on the upper and lower surfaces of the variable-section box-type steel beam, the middle part of the variable-section box-type steel beam is a uniform-section pier top connecting section, and the two sides are variable-section cantilever sections, the uniform-section pier top connecting section is filled with lightweight concrete, and the variable-section cantilever section is filled with foam concrete.
[0006] Furthermore, the variable-section box-type steel beam includes an upper flange plate and a lower flange plate of the steel beam which are spaced apart from each other, two web plates are symmetrically arranged between the upper flange plate and the lower flange plate of the steel beam, an inner cavity is enclosed between the two web plates and the upper flange plate and the lower flange plate of the steel beam, an outer cavity is enclosed on the outer side of the web plates and the upper flange plate and the lower flange plate of the steel beam, a plurality of partitions are spaced apart in the inner cavity along the length direction of the variable-section box-type steel beam, the upper flange plate of the steel beam is arranged horizontally, the middle part of the lower flange plate of the steel beam is a horizontal part, and both sides are bent upward to form an inclined part.
[0007] Furthermore, the partition is welded to the upper flange plate of the web steel beam and the lower flange plate of the steel beam, and the upper flange plate of the steel beam and the lower flange plate of the steel beam are welded to the web.
[0008] Furthermore, a plurality of shear bolts are welded on the outer surfaces of the upper flange plate of the steel beam and the lower flange plate of the steel beam.
[0009] Furthermore, a reserved hole for the longitudinal reinforcement of the pier body to pass through is opened in the middle of the lower flange plate of the steel beam.
[0010] Furthermore, a plurality of reinforcing ribs are evenly distributed on the inner surface of the lower flange plate of the steel beam around the circumference of the reserved hole, and the reinforcing ribs are welded to the variable-section box-type steel beam.
[0011] Furthermore, the four corners of the partition are provided with notches.
[0012] Furthermore, a through hole is opened in the middle of the partition.
[0013] Furthermore, blocks are arranged at both ends of the reinforced concrete upper flange plate, and a plurality of support pads are arranged on the surface of the reinforced concrete upper flange plate at intervals between the two blocks.
[0014] A construction method for a fully prefabricated lightweight large cantilever pre-bent composite cap beam comprises the following steps:
[0015] Step 1: Design and manufacture special brackets and supporting equipment for applying pre-bending force;
[0016] Step 2: Install the prepared variable-section box-shaped steel beams in pairs on a special tensioning frame, with one steel beam at the upper position and the other at the lower position, and temporarily fix the cantilever end of the variable-section box-shaped steel beam by steel strands or steel plates;
[0017] Step 3: Install jacks at the positions corresponding to the piers of the two variable-section box-shaped steel beams, and apply pre-bending force synchronously according to the design requirements;
[0018] Step 4: After the load is stable, the construction of the reinforced concrete upper flange plate is carried out. First, the steel cage in the reinforced concrete upper flange plate is tied and installed on the surface of the steel beam upper flange of the variable-section box-type steel beam, and then a formwork is set up outside the steel cage. Subsequently, concrete is poured in the formwork and cured. After reaching the design strength, the formwork is removed and the pre-bending force applied by the jack is released. Finally, the temporary fixing device at the cantilever end is removed;
[0019] Step 5: sequentially hoist the upper variable-section box-shaped steel beam to the designated position of the prefabrication yard, flip the lower variable-section box-shaped steel beam and hoist it to the designated position of the prefabrication yard, then carry out the construction of the reinforced concrete upper flange plate, tie and install the steel cage in the reinforced concrete lower flange plate on the surface of the lower flange of the variable-section box-shaped steel beam, then set up the formwork outside the steel cage, then pour concrete in the formwork and cure it, and remove the formwork after reaching the design strength;
[0020] Step 6: Cast the support pad stone on the surface of the reinforced concrete upper flange plate and the blocks on both sides in the prefabrication yard;
[0021] Step 7: Transport the variable-section box-type steel beam processed in step 6 to the construction site. After hoisting it into place, pour lightweight concrete into the equal-section pier top connection section, and pour lightweight foam concrete into the variable-section cantilever sections on both sides.
[0022] Compared with the prior art, the present invention has the following beneficial effects: simple structure, reasonable design, and full use of the technical advantages of steel that has a compressive strength more than 5 times that of concrete and a shear strength more than 32 times that of concrete, which can greatly reduce the cross-sectional size and structural deadweight of the cap beam, achieve the lightweight design goal of the cap beam, and improve the integrity, safety and reliability of construction quality of the structure. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] The present invention is further described below in conjunction with the accompanying drawings.
[0024] Figure 1 It is the overall structural schematic diagram of the cap beam;
[0025] Figure 2 for Figure 1 AA cross-sectional diagram of ;
[0026] Figure 3 for Figure 1 BB cross-sectional diagram;
[0027] Figure 4 for Figure 1 Detailed diagram of the 1 / 2 cap beam;
[0028] Figure 5 for Figure 4 Schematic diagram of CC cross section.
[0029] In the figure: 1-variable cross-section box-type steel beam; 2-reinforced concrete upper flange plate; 3-reinforced concrete lower flange plate; 4-partition plate; 5-support pad stone; 6-block; 7-pier body; 8-cap; 9-foam concrete; 10-shear bolts on the upper flange plate; 11-longitudinal reinforcement of the steel cage in the concrete upper flange plate; 12-standing reinforcement of the steel cage in the concrete upper flange plate; 13-hoops of the steel cage in the concrete upper flange plate; 14-shear bolts on the lower flange plate; 15-longitudinal reinforcement of the steel cage in the concrete lower flange plate; 16-standing reinforcement of the steel cage in the concrete lower flange plate; 17-hoops of the steel cage in the concrete lower flange plate; 18-steel beam upper flange plate; 19-steel beam lower flange plate; 20-web plate; 21-lightweight concrete. DETAILED DESCRIPTION
[0030] The present invention is further described below in conjunction with the accompanying drawings and specific embodiments.
[0031] like Figure 1-5As shown, a fully prefabricated light-weight large cantilever pre-bent composite cap beam structure comprises a variable-section box-type steel beam 1, a reinforced concrete upper flange plate 2 and a reinforced concrete lower flange plate 3 respectively laid on the upper and lower surfaces of the variable-section box-type steel beam, the middle portion of the variable-section box-type steel beam is a uniform-section pier top connecting section, and both sides are variable-section cantilever sections, the uniform-section pier top connecting section is filled with lightweight concrete 21, and the variable-section cantilever section is filled with foam concrete 9, which can prevent the web and flange plates from buckling, and protect the steel beam from corrosion caused by external factors, while also further reducing the weight of the prefabricated cap beam itself, the variable-section box-type steel beam comprises a steel beam upper flange plate 18 and a steel beam lower flange plate 19 which are spaced apart from each other, and the space between the steel beam upper flange plate and the steel beam lower flange plate is 40 mm. Two webs 20 are symmetrically arranged on the left and right, and the two webs surround an inner cavity with the upper flange plate and the lower flange plate of the steel beam, and the outer side of the web surrounds an outer cavity with the upper flange plate and the lower flange plate of the steel beam, and a number of partitions 4 are arranged at intervals in the inner cavity along the length direction of the variable-section box-type steel beam, the upper flange plate of the steel beam is arranged horizontally, the middle part of the lower flange plate of the steel beam is a horizontal part, and both sides are bent upward to form an inclined part; the shear force in the cap beam is borne by the web, and the bending moment is jointly borne by the upper and lower flange plates of the steel beam and the upper and lower flange plates of reinforced concrete, which utilizes the technical advantages of steel that the compressive strength is more than 5 times that of concrete materials and the shear strength is more than 32 times that of concrete materials, gives full play to the technical and economic advantages of steel and concrete materials, and greatly reduces the cross-sectional size of the cap beam and the deadweight of the structure;
[0032] The inner cavity of the cantilever end and the outer cavities on both sides are filled with foam concrete, which has a dry bulk density of 300~1600kg / m 3 , which is equivalent to about 1 / 5 to 1 / 8 of ordinary cement concrete. It can greatly reduce the bending moment and shear force of the cap beam caused by the deadweight of the concrete at the cantilever end, reduce the load on the pier, reduce the cost of the structure and foundation, and is beneficial to earthquake resistance. The foam concrete has a certain compressive strength of 0.6~25.0MPa, which has a good supporting effect on the web plates on both sides of the steel beam and the cantilevered flange plates, and can improve the local stability of the steel beam.
[0033] In this embodiment, the partition is welded to the upper flange plate of the web steel beam and the lower flange plate of the steel beam, and the upper flange plate of the steel beam and the lower flange plate of the steel beam are welded to the web.
[0034] In this embodiment, a plurality of shear studs are welded on the outer surfaces of the upper flange plate and the lower flange plate of the steel beam. The shear studs 10 and 14 on the upper flange plate and the lower flange plate of the steel beam are used to transfer the interface shear force between the steel beam and the upper and lower flange plates of reinforced concrete.
[0035] In this embodiment, in order to facilitate the effective connection between the variable-section box-type steel beam and the prefabricated pier body below it, a reserved hole is opened in the middle of the lower flange plate of the steel beam for the longitudinal reinforcement of the pier body to pass through. In order to achieve the effective anchoring of the longitudinal reinforcement of the lower prefabricated pier body extending into the variable-section box-type steel beam, on the one hand, the steel bar ends adopt a mushroom head connection structure, and on the other hand, the inner and outer cavities of the steel beam in the top area of the pier body are filled with lightweight concrete materials.
[0036] In this embodiment, a plurality of reinforcing ribs are evenly distributed on the inner surface of the lower flange plate of the steel beam around the circumference of the reserved hole, and the reinforcing ribs are welded to the variable-section box-type steel beam to ensure the local strength and stability requirements of the lower flange steel plate of the steel beam when subjected to stress.
[0037] In this embodiment, notches are formed at the four corners of the partition.
[0038] In this embodiment, a through hole is opened in the middle of the partition.
[0039] In this embodiment, stoppers 6 are provided at both ends of the reinforced concrete upper flange plate, and a plurality of support pads 5 are provided on the surface of the reinforced concrete upper flange plate at intervals between the two stoppers.
[0040] A construction method for a fully prefabricated lightweight large cantilever pre-bent composite cap beam comprises the following steps:
[0041] Step 1: Design and manufacture special brackets and supporting equipment for applying pre-bending force;
[0042] Step 2: Install the prepared variable-section box-shaped steel beams in pairs on a special tensioning frame, with one steel beam at the upper position and the other at the lower position, and temporarily fix the cantilever end of the variable-section box-shaped steel beam by steel strands or steel plates;
[0043] Step 3: Install jacks at the positions corresponding to the piers of the two variable-section box-shaped steel beams, and apply pre-bending force synchronously according to the design requirements;
[0044] Step 4: After the load is stable, the construction of the reinforced concrete upper flange plate is carried out. First, the steel cage in the reinforced concrete upper flange plate is tied and installed on the surface of the steel beam upper flange of the variable-section box-type steel beam, and then a formwork is set up outside the steel cage. Subsequently, concrete is poured in the formwork and cured. After reaching the design strength, the formwork is removed and the pre-bending force applied by the jack is released. Finally, the temporary fixing device at the cantilever end is removed;
[0045] Step 5: sequentially hoist the upper variable-section box-shaped steel beam to the designated position of the prefabrication yard, flip the lower variable-section box-shaped steel beam and hoist it to the designated position of the prefabrication yard, then carry out the construction of the reinforced concrete upper flange plate, tie and install the steel cage in the reinforced concrete lower flange plate on the surface of the lower flange of the variable-section box-shaped steel beam, then set up the formwork outside the steel cage, then pour concrete in the formwork and cure it, and remove the formwork after reaching the design strength;
[0046] Step 6: Cast the support pad stone on the surface of the reinforced concrete upper flange plate and the blocks on both sides in the prefabrication yard;
[0047] Step 7: Transport the variable-section box-type steel beam processed in step 6 to the construction site. After hoisting it into place, pour lightweight concrete into the equal-section pier top connection section, and pour lightweight foam concrete into the variable-section cantilever sections on both sides.
[0048] During the prefabrication process, the method of pre-bending composite beams is used to apply prestress to the steel plates and concrete slabs on the upper and lower flanges of the steel beams, avoiding the trouble of traditional PC cap beam layout and tensioning prestressed steel strands, reducing on-site operation procedures, and improving the integrity, safety and reliability of construction quality of the structure.
[0049] If this patent discloses or involves components or structural parts that are fixedly connected to each other, then, unless otherwise stated, the fixed connection can be understood as: a detachable fixed connection (for example, connected by bolts or screws), or as: a non-detachable fixed connection (for example, riveting, welding). Of course, the fixed connection can also be replaced by an integrated structure (for example, manufactured by a casting process) (except when it is obviously impossible to use an integrated forming process).
[0050] In the description of this patent, it should be understood that the terms "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship, are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing this patent, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on this patent.
[0051] The preferred embodiments listed above further illustrate the objectives, technical solutions and advantages of the present invention in detail. It should be understood that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A fully prefabricated lightweight large cantilever pre-bent composite cap beam structure, characterized in that: It includes a variable-section box-shaped steel beam, a reinforced concrete upper flange plate and a reinforced concrete lower flange plate respectively laid on the upper and lower surfaces of the variable-section box-shaped steel beam, the middle part of the variable-section box-shaped steel beam is a uniform-section pier top connection section, and both sides are variable-section cantilever sections, the uniform-section pier top connection section is filled with lightweight concrete, and the variable-section cantilever section is filled with foam concrete; the variable-section box-shaped steel beam includes a steel beam upper flange plate and a steel beam lower flange plate arranged at intervals up and down, two web plates are symmetrically arranged between the steel beam upper flange plate and the steel beam lower flange plate, and the inner cavity is surrounded by the steel beam upper flange plate and the steel beam lower flange plate between the two web plates The outer side of the web plate is surrounded by the outer cavity with the upper flange plate and the lower flange plate of the steel beam, and a number of partitions are arranged at intervals in the inner cavity along the length direction of the variable-section box-type steel beam. The upper flange plate of the steel beam is arranged horizontally, and the middle part of the lower flange plate of the steel beam is a horizontal part, and both sides are bent upward to form an inclined part; a reserved hole for the longitudinal reinforcement of the pier body is opened in the middle part of the lower flange plate of the steel beam; a number of reinforcing ribs are evenly distributed on the inner surface of the lower flange plate of the steel beam around the circumference of the reserved hole, and the reinforcing ribs are welded to the variable-section box-type steel beam; blocks are arranged at both ends of the reinforced concrete upper flange plate, and a number of support pads are arranged on the surface of the reinforced concrete upper flange plate between the two blocks.
2. The fully prefabricated light-weight large cantilever pre-bent composite cap beam structure according to claim 1 is characterized in that: The partition plate is welded to the web plate, the upper flange plate of the steel beam, and the lower flange plate of the steel beam, and the upper flange plate of the steel beam, the lower flange plate of the steel beam, and the web plate are welded.
3. The fully prefabricated light-weight large cantilever pre-bent composite cap beam structure according to claim 1 is characterized in that: A plurality of shear bolts are welded on the outer surfaces of the upper flange plate of the steel beam and the lower flange plate of the steel beam.
4. The fully prefabricated light-weight large cantilever pre-bent composite cap beam structure according to claim 1 is characterized in that: The four corners of the partition are provided with notches.
5. The fully prefabricated light-weight large cantilever pre-bent composite cap beam structure according to claim 4 is characterized in that: A through hole is opened in the middle of the partition.
6. A construction method of a fully prefabricated light-weight large cantilever pre-bent composite cap beam, using the fully prefabricated light-weight large cantilever pre-bent composite cap beam structure as claimed in claim 1, characterized in that: The following steps are involved: Step 1: Design and manufacture special brackets and supporting equipment for applying pre-bending force; Step 2: Install the prepared variable-section box-shaped steel beams in pairs on a special tensioning frame, with one steel beam at the upper position and the other at the lower position, and temporarily fix the cantilever end of the variable-section box-shaped steel beam by steel strands or steel plates; Step 3: Install jacks at the positions corresponding to the piers of the two variable-section box-shaped steel beams, and apply pre-bending force synchronously according to the design requirements; Step 4: After the load is stable, the construction of the reinforced concrete upper flange plate is carried out. First, the steel cage in the reinforced concrete upper flange plate is tied and installed on the surface of the steel beam upper flange of the variable-section box-type steel beam, and then a formwork is set up outside the steel cage. Subsequently, concrete is poured in the formwork and cured. After reaching the design strength, the formwork is removed and the pre-bending force applied by the jack is released. Finally, the temporary fixing device at the cantilever end is removed; Step 5: sequentially hoist the upper variable-section box-shaped steel beam to the designated position of the prefabrication yard, flip the lower variable-section box-shaped steel beam and hoist it to the designated position of the prefabrication yard, then carry out the construction of the reinforced concrete upper flange plate, tie and install the steel cage in the reinforced concrete lower flange plate on the surface of the lower flange of the variable-section box-shaped steel beam, then set up the formwork outside the steel cage, then pour concrete in the formwork and cure it, and remove the formwork after reaching the design strength; Step 6: Cast the support pad stone on the surface of the reinforced concrete upper flange plate and the blocks on both sides in the prefabrication yard; Step 7: Transport the variable-section box-type steel beam processed in step 6 to the construction site. After hoisting it into place, pour lightweight concrete into the equal-section pier top connection section, and pour lightweight foam concrete into the variable-section cantilever sections on both sides.