Power supply unit

By using different communication methods in the power supply device to perform self-diagnosis and mechanical action diagnosis of the battery control unit, the problem of prolonging the starting time of the power supply device in the prior art is solved, and faster fault diagnosis and power supply are achieved.

CN111742460BActive Publication Date: 2024-12-03ENVISION AESC JAPAN LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201980014147.7
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Priority Date
2018-03-26
Filing Date
2019-03-20
Publication Date
2024-12-03
Estimated Expiration
2039-07-04

AI Technical Summary

Technical Problem

When the existing power supply device communicates between the master and slave, the self-diagnosis of the battery control unit and the diagnosis of mechanical components lead to a longer startup time and the power supply device cannot be started quickly, especially in electric vehicle applications, there is a problem of prolonging the startup time.

Method used

Multiple battery control units are used to correspond to multiple battery packs in a one-to-one manner, and self-diagnosis and mechanical action diagnosis are performed through different communication methods. The second communication method with a shorter communication period is used to communicate during mechanical action diagnosis. To reduce the troubleshooting time of system startup.

Benefits of technology

Through different communication methods, the self-diagnosis and mechanical action diagnosis time of the battery control unit is shortened, the starting efficiency of the power supply device is improved, the power can be supplied faster, and the preparation time for system startup is reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111742460B_ABST
    Figure CN111742460B_ABST
Patent Text Reader

Abstract

The present invention provides a power supply device capable of shortening the startup time. The power supply device (1) comprises a plurality of battery packs (5) and a plurality of battery control units (3A, 3B, 3C) having a master-slave structure corresponding to the plurality of battery packs (5) in a one-to-one manner. When the plurality of battery control units (3A, 3B, 3C) perform self-diagnosis at the startup of the power supply device (1), the master and the slave communicate using a first communication method, and when diagnosing mechanical movements, the master and the slave communicate using a second communication method having a shorter communication cycle than the first communication method.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to a power supply device including a plurality of battery packs and a plurality of battery control units corresponding to the respective battery packs. Background Art

[0002] This power supply device is configured to perform mechanical operation diagnosis (for example, relay welding and melting diagnosis) of mechanical components such as relays provided in each battery pack for controlling output from the battery pack before starting battery control.

[0003] Here, as such a power supply device, the following is known: a plurality of battery control units have a master-slave structure, and before starting battery control, under the control of the master control unit, each slave control unit detects a fault in the battery pack (such as adhesion of a relay, etc.), and the fault diagnosis result is communicated between the master and slaves (for example, refer to patent document 1).

[0004] Prior art literature

[0005] Patent Literature

[0006] Patent Document 1: Japanese Patent Application Publication No. 2003-209907 Summary of the invention

[0007] Problem that the invention aims to solve

[0008] However, there is a problem that when a plurality of battery control units communicating between a master and a slave perform both diagnosis of the battery control units themselves and diagnosis of mechanical components, the preparation time until the start of battery control becomes long depending on the setting of the communication method.

[0009] With regard to such a problem, the technology described in Patent Document 1 does not disclose a technology for more quickly starting battery control in terms of a communication method between a master and a slave when performing self-diagnosis of a control unit and mechanical operation diagnosis of a mechanical component.

[0010] Therefore, in the technology described in the document, if the self-diagnosis of the control unit itself and the mechanical operation diagnosis of the mechanical parts are performed at the time of system startup, the power supply device may not be started early. Therefore, for example, when such a power supply device is used as a driving power supply for an electric vehicle, the technology described in the document has room for improvement in terms of shortening the startup time and starting driving quickly.

[0011] Therefore, the present invention is completed with focus on such a problem, and its object is to provide a power supply device that can shorten the time required for self-diagnosis of the battery control unit itself and mechanical operation diagnosis of mechanical parts in such a power supply device and can quickly supply electric power.

[0012] Solutions for solving problems

[0013] In order to solve the above-mentioned problems, a power supply device involved in one embodiment of the present invention includes: a plurality of battery packs connected in parallel with respect to a load; a plurality of battery control units corresponding to the plurality of battery packs in a one-to-one manner; and a relay, which controls the output from the battery pack, the plurality of battery control units having a master-slave structure, and before starting battery control, each of the battery control units performs its own self-diagnosis and mechanical movement diagnosis of mechanical parts including the relay, the plurality of battery control units each including a communication unit, the communication unit uses a first communication method and a second communication method to communicate, the communication cycle of the second communication method is shorter than the communication cycle of the first communication method, and during the self-diagnosis of the plurality of battery control units, the master control unit and the slave control unit communicate through the first communication method, and during the mechanical movement diagnosis, the master control unit and the slave control unit communicate through the second communication method.

[0014] Effects of the Invention

[0015] According to a power supply device involved in one embodiment of the present invention, a plurality of battery control units correspond to a plurality of battery packs in a one-to-one manner and have a master-slave structure. When communicating between the master and the slave, different communication methods are used in the self-diagnosis of the battery control unit and the mechanical operation diagnosis. In the self-diagnosis of the power supply control unit, since a plurality of diagnostic checks are usually performed, the processing load is large, so communication is performed through the first communication method. In the mechanical operation diagnosis, which has a small processing load due to sequential processing, communication is performed through the second communication method with a shorter communication cycle than the first communication method. Therefore, according to the present invention, it is possible to shorten the time required for fault diagnosis at system startup, and also to quickly supply power. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic configuration diagram for explaining one embodiment of a power supply device according to one aspect of the present invention.

[0017] Figure 2 This is a schematic diagram of the battery control unit.

[0018] Figure 3 This is a flowchart of the fault diagnosis process executed by the main control unit.

[0019] Figure 4 This is a flowchart of the fault diagnosis process executed by the control unit.

[0020] Figure 51 is a timing chart for explaining the communication state in the comparative example, and is a chart for explaining the communication state in which communication is performed only by the first communication method during self-diagnosis and mechanical operation diagnosis of a mechanical component.

[0021] Figure 6 1 is a timing chart for explaining the communication state in the present embodiment, and is a chart for explaining the communication state in which communication is performed by the first communication method during self-diagnosis and communication is performed by the second communication method during mechanical operation diagnosis of a mechanical component.

[0022] Figure 7 1 is a timing chart for explaining a modification of the communication state in the present embodiment, and is a communication example for explaining a communication using both the second communication method and the first communication cycle when diagnosing the mechanical operation of a mechanical component. DETAILED DESCRIPTION

[0023] Hereinafter, an embodiment of the present invention will be described with appropriate reference to the accompanying drawings. In this embodiment, an example of a vehicle-mounted power supply device constituting an electric vehicle will be described. Among them, electric vehicles include hybrid electric vehicles that use an internal combustion engine, i.e., an engine, and an electric motor as the driving source of the vehicle, and pure electric vehicles that use an electric motor as the only driving source of the vehicle. In addition, the present invention is not limited to a vehicle-mounted power supply device for an electric vehicle, and can also be used for a household power supply device, for example.

[0024] In addition, each of the drawings is schematic. Therefore, it should be noted that the relationship and ratio between the thickness and the plane size are different from the actual ones, and the drawings also contain parts where the relationship and ratio of the sizes are different from each other. In addition, the embodiments shown below are examples of embodiments of devices or methods for embodying the technical ideas of the present invention, and the technical ideas of the present invention do not specify the materials, shapes, structures, configurations, etc. of the constituent parts as the following embodiments.

[0025] like Figure 1 As shown, the power supply device 1 according to the present embodiment includes a battery pack 2 and a battery monitoring system 3 (battery control unit). A plurality of battery packs 5 of the battery pack 2 are connected in parallel to an external load.

[0026] The power supply device 1 of the present embodiment supplies the DC power converted into the three-phase AC power via the inverter 7 to the motor generator 8 in response to the request from the system side of the vehicle. In addition, when charging is required based on the judgment of the vehicle control device 10 equipped on the system side of the vehicle, the power supply device 1 stores the DC power converted from the three-phase AC power generated by the motor generator 8 via the inverter 7. Here, the "system side of the vehicle" includes not only the vehicle control device 10 described later, but also a communication bus connected to the vehicle control device 10, and an air conditioning control unit, a light control device, etc. respectively connected to the communication bus.

[0027] Each battery pack 5 includes a plurality of battery cells 6 connected in series and relays 7A and 7B, which are mechanical components for controlling output from the battery pack 5. The battery cells 6 are composed of, for example, lithium-ion secondary batteries, nickel-hydrogen secondary batteries, or the like.

[0028] When the relays 4A and 4B are both turned on, each battery pack 5 is connected to the external load such as the motor generator 8 by turning on the relays 7A and 7B that control the output from the battery pack 5, and is disconnected from the external load by turning off the relays 7A and 7B. In addition, in the example of the figure, as an example including a plurality of battery packs, an example is shown in which three battery packs 5 each include three battery cells 6, but the structure of the present invention is not limited to this.

[0029] The battery monitoring system 3 executes processes related to fault diagnosis at system startup and also executes processes related to management of the state of the assembled battery 2 and charge and discharge control. The processes executed by the battery monitoring system 3 include measurement of the voltage and current of the assembled battery 2, calculation of the state of charge (SOC: State Of Charge) and deterioration state (SOH: State Of Health) of the assembled battery 2, measurement of the temperature of each battery pack 5, measurement of the voltage, and adjustment of the amount of stored electricity.

[0030] The battery monitoring system 3 includes a plurality of battery control units 3A, 3B, and 3C provided for each battery pack 5. In the present embodiment, three battery control units 3A, 3B, and 3C are provided according to the number of battery packs 5. Here, the plurality of battery control units 3A, 3B, and 3C involved in the present embodiment have a master-slave structure. The battery control units 3A, 3B, and 3C are connected via a communication bus, which is different from the communication bus that connects the battery control unit 3A to the vehicle control device 10.

[0031] That is, as shown in the figure, among the plurality of battery control units 3A, 3B, 3C, one battery control unit 3A is a "master control unit" and the other battery control units 3B, 3C are "slave control units." Hereinafter, each battery control unit 3A, 3B, 3C is also referred to as a master control unit 3A and a slave control unit 3B, 3C.

[0032] Here, in the battery monitoring system 3, only the main control unit 3A communicates with the vehicle control device 10 through the first communication method set on the system side. A signal related to the on and off of the start switch 11 is input to the main control unit 3A from the vehicle control device 10. In addition, the main control unit 3A outputs a signal related to the state of each battery pack 5, the voltage of each battery pack 5, the state of failure of each battery pack 5, etc. to the vehicle control device 10.

[0033] In addition, the plurality of battery control units 3A, 3B, and 3C communicate between the master and the slave based on a predetermined communication method including the first communication method. Regarding the communication between the master and the slave, communication is performed only between the master control unit 3A and the slave control unit 3B, or between the master control unit 3A and the slave control unit 3C, and no communication is performed between the slave control units 3B and 3C.

[0034] Next, refer to Figure 2 The functional structure of each battery control unit 3A, 3B, 3C is described below. In addition, except for the software responsible for the master-slave structure, the basic structure of each battery control unit 3A, 3B, 3C is the same, so the master control unit 3A is described in detail here, and the functional structure diagram and description of the slave control units 3B and 3C are omitted.

[0035] like Figure 2 As shown, the main control unit 3A includes an input unit 20, an output unit 21, a monitoring unit 22, and a communication unit 23A as functional components. The input unit 20 is input with signals related to the voltage of the battery pack 5 and the battery cell 6. The output unit 21 outputs a signal for switching the relays 7A and 7B between on and off. The monitoring unit 22 includes a voltage detection unit 22A, an abnormality detection unit 22B, a mode setting unit 22C, and a communication mode setting unit 30A.

[0036] The monitoring unit 22 includes a CPU (Central Processing Unit), a ROM (Read only Memory), a RAM (Random Access Memory), an internal clock circuit, etc. The CPU reads out a program stored in the memory and executes the program, thereby performing various functions of the functional structural parts of the monitoring unit 22. The internal clock circuit of the monitoring unit 22 is used to determine the communication cycle used in the communication method described later.

[0037] The voltage detection unit 22A detects each voltage based on the signal input to the input unit 20. The abnormality detection unit 22B compares the detected voltage with a preset voltage to determine whether each voltage is normal or abnormal, thereby detecting voltage abnormality. In addition to detecting voltage abnormalities of the battery pack 5 and the battery cell 6, the abnormality detection unit 22B also performs fault diagnosis when the system is started.

[0038] The mode setting unit 22C sets the voltage detection mode to either the “failure diagnosis mode” or the “normal mode.” When the start switch 11 is turned on, the failure diagnosis mode is activated before the battery pack 5 starts to be charged or discharged.

[0039] The fault diagnosis mode is a mode for performing fault diagnosis of the main control unit 3A itself and fault diagnosis of the battery pack 5 including mechanical operation diagnosis of the relays 7A and 7B. The normal mode is a mode for switching to normal battery control by turning on the main relays 4A and 4B to start charge and discharge control of the battery pack 5 (assembled battery 2). When the start switch 11 is switched from off to on, the mode setting unit 22C sets the voltage detection mode to the fault diagnosis mode.

[0040] When the main control unit 3A is set to the fault diagnosis mode at startup, the abnormality detection unit 22B performs fault diagnosis of the main control unit 3A itself, fault diagnosis of the battery pack 5, and mechanical operation diagnosis of the relays 7A and 7B (diagnosing whether the relays 7A and 7B are welded / broken).

[0041] As a mechanical action diagnosis, for example, when the relay 7B is turned on, the abnormality detection unit 22B outputs a command to turn off the relay 7A. When the voltage that should normally be zero is greater than zero, it is determined that the relay 7A is stuck, and the sticking of the relay 7A is detected. When the result of executing the fault diagnosis mode is that the main control unit 3A itself is not detected, and the battery pack 5 is not detected. Failure / melting of the relays 7A and 7B is not detected, and the fault diagnosis is completed, the mode setting unit 22C sets the voltage detection mode to the normal mode.

[0042] Communication mode setting unit 30A sets the communication mode to at least one of the first communication mode and the second communication mode according to the voltage detection mode. In the present embodiment, communication mode setting unit 30A sets the communication mode only to the first communication mode when the voltage detection mode is set to the normal mode.

[0043] The first communication method is a communication method pre-set on the system side in the entire vehicle system, and is a method in which the communication unit 23A communicates in the first communication cycle T1. In the first communication method, the main control unit 3A communicates with the vehicle control device 10, the slave control unit 3B, and the slave control unit 3C according to the first communication cycle T1.

[0044] As described above, the basic configurations of the slave control units 3B and 3C are the same as the master control unit 3A except that the master control unit 3A reads out a master-side program related to the master-slave structure and executes the program.

[0045] That is, the slave control units 3B and 3C read the slave-side program involved in the master-slave structure and execute the program, and perform necessary control under the control of the master control unit 3A. In addition, the communication units 23B and 23C of the slave control units 3B and 3C communicate only with the communication unit 23A of the master control unit 3A in the master-slave structure.

[0046] Here, when the communication method is set to the first communication method, the power supply device 1 collectively communicates the results of events such as the instruction signal and the voltage detection of the battery cell 6 at the edge of a predetermined first communication cycle T1.

[0047] In contrast, the second communication method is a communication method that is limited to the communication method performed only between the master control unit 3A and the slave control unit 3B and between the master control unit 3A and the slave control unit 3C in the master-slave structure of the battery monitoring system 3 during the mechanical operation diagnosis of mechanical parts such as relays, and the communication between the communication units 23A, 23B, and 23C is performed in a second communication cycle T2 that is shorter than the communication cycle of the first communication method. With respect to the second communication cycle T2, at the timing of the edge of the predetermined second communication cycle T2, the results of events related to the mechanical operation diagnosis such as the adhesion determination of the relays 7A and 7B are collectively communicated.

[0048] Next, refer to Figure 3 and Figure 4 , the fault diagnosis processing executed by each battery control unit 3A, 3B, 3C involved in this embodiment when the above-mentioned fault diagnosis mode is set is described.

[0049] When the fault diagnosis process is executed by each battery control unit 3A, 3B, 3C, in the main control unit 3A, as shown in FIG. Figure 3 As shown, the process moves to step S11, sets the communication mode to the first communication mode, and moves to the next step S12 to start self-diagnosis.

[0050] Similarly, when the fault diagnosis process is executed, in the slave control units 3B and 3C, under the control of the master control unit 3A, as shown in FIG. Figure 4 As shown, the process proceeds to step S21, where the communication method is set to the first communication method, and then proceeds to the next step S22, where self-diagnosis is started. During self-diagnosis, communication related to each event is performed at the edge of a fixed first communication cycle T1.

[0051] In the main control unit 3A, as Figure 3 As shown, transfer to the next step S13, determine whether the result of self-diagnosis detects a fault in the main control unit 3A itself and other battery control units, if no fault is detected in the main control unit 3A itself and other battery control units (No), transfer to step S14, if a fault is detected in the main control unit 3A itself or other battery control units (Yes), transfer to step S15, output the fault information to the vehicle control device 10 through the first communication method, and then transfer to step S14.

[0052] In step S14, the communication mode is set to the second communication mode, and in the next step S16, a mechanical fault detection process is performed. In the mechanical fault detection process, the main control unit 3A itself and other battery control units sequentially perform fault detection of the battery pack 5 and mechanical operation diagnosis of mechanical parts (such as adhesion detection of relays 7A and 7B).

[0053] Similarly, in the slave control units 3B and 3C, if Figure 4 As shown, the process moves to step S23 to determine whether the self-diagnosis result detects a fault of the self-control unit. If no fault is detected (no), the process moves to step S24. If a fault is detected in the self-control unit (yes), the process moves to step S25 to output the fault information to the main control unit 3A via the first communication method, and then moves to step S24. In step S24, the process sets the communication method to the second communication method and waits. When an instruction from the main control unit 3A is received, the process moves to step S26 to perform mechanical fault detection processing under the control of the main control unit 3A.

[0054] Next, in the main control unit 3A, as shown in FIG. Figure 3 As shown, the process moves to the next step S17 to determine whether a mechanical fault is detected as a result of the mechanical operation diagnosis. If no fault is detected in itself or other battery control units (No), the process moves to step S19. If a fault is detected in itself or other battery control units (Yes), the process moves to step S18. In step S18, fault notification information related to the content of the mechanical fault of the battery pack 5 is output from the communication unit 23A of the main control unit 3A to the vehicle control device 10 via the first communication method, and then the process moves to step S19.

[0055] The master control unit 3A determines in step S19 whether there is a slave control unit whose mechanical motion has not been diagnosed. If there is a slave control unit whose mechanical motion has not been diagnosed, the process returns to step S16 to perform mechanical motion diagnosis of the next corresponding slave control unit. At this time, the master control unit 3A and the slave control unit 3B and the master control unit 3A and the slave control unit 3C communicate with each other by the second communication method using the second communication cycle T2.

[0056] If there is no next corresponding slave control unit in step S19 (No), the main control unit 3A ends the mechanical action diagnosis and transfers to step S20, and each battery control unit 3A, 3B, and 3C ends the second communication mode and sets the communication mode only to the first communication mode, and each battery control unit 3A, 3B, and 3C connects relays 7A and 7B to return the processing and transfer to normal mode.

[0057] Furthermore, when the slave control units 3B and 3C receive the execution instruction of the machine operation diagnosis from the master control unit 3A by the second communication method using the second communication cycle T2, Figure 4 As shown, the process transfers to step S26 to perform mechanical fault detection processing. In step S27, the control units 3B and 3C determine whether the results of the mechanical action diagnosis have detected their own mechanical faults. If no mechanical faults are detected (No), the process transfers to step S29. If mechanical faults are detected (Yes), the process transfers to step S28.

[0058] like Figure 4 As shown, in step S28, the slave control units 3B and 3C output the fault notification information related to the mechanical fault content of the battery pack 5 from the communication units 23B and 23C of the slave control units 3B and 3C to the communication unit 23A of the main control unit 3A through the second communication method, and then transfer to step S29.

[0059] When transferring to step S29, the slave control units 3B and 3C end the second communication mode and set the communication mode only to the first communication mode. When receiving an execution instruction from the main control unit 3A, each battery control unit 3B and 3C connects the relays 7A and 7B to return the processing and transfer to the normal mode.

[0060] Next, the operation and effects of the fault diagnosis performed before starting the battery control will be described.

[0061] When the start switch 11 is turned on, the power supply device 1 according to the present embodiment starts the battery monitoring system 3 of the power supply device 1 via the vehicle control device 10 and starts fault diagnosis. Each battery control unit 3A, 3B, 3C performs self-diagnosis of the battery control unit itself and mechanical fault diagnosis of each battery pack 5 at system startup.

[0062] When the start switch 11 is turned on and charging of each battery pack 5 is started, the main control unit 3A of the power supply device 1 performs a fault diagnosis of the battery pack 5. In the following operation description, the flow is mainly described with the main control unit 3A as the main body.

[0063] When fault diagnosis starts, each battery control unit 3A, 3B, and 3C sets the communication mode to the first communication mode (steps S11 and S21). Under the control of the main control unit 3A, a series of self-diagnosis processes (steps S12 and S22) are simultaneously and parallelly performed in each battery control unit 3A, 3B, and 3C.

[0064] The self-diagnosis results of the slave control units 3B and 3C are communicated between the master control unit 3A and the slave control unit 3B (step S25) and between the master control unit 3A and the slave control unit 3C (step S25) in the first communication cycle T1, thereby completing the self-diagnosis.

[0065] When a fault in the control circuit is detected in the self-diagnosis fault detection process or in another battery control unit (step S13: Yes), the main control unit 3A outputs fault notification information related to the fault content from the communication unit 23A to the vehicle control device 10 through the first communication method (step S15). In this way, during self-diagnosis, the communication related to each event is performed with the fixed first communication cycle T1 set on the system side. In addition, it is assumed here that no fault is detected during self-diagnosis.

[0066] Next, the main control unit 3A performs a mechanical operation diagnosis of the mechanical components such as the relays 7A and 7B. As the operation diagnosis of the mechanical components, for example, the relays 7A and 7B are diagnosed for sticking (on sticking and off sticking) (step S16).

[0067] When a mechanical failure is detected in the main control unit 3A or the sub-control units 3B and 3C (step S17: Yes), the main control unit 3A outputs failure notification information related to the failure content to the vehicle control device 10 via the first communication method (step S18).

[0068] If no mechanical failure is detected by the main control unit 3A and the sub-control units 3B and 3C, the main control unit 3A turns on the relays 7A and 7B to complete the fault diagnosis and transfer to the normal battery control (step S20). Thus, the battery pack 5 (assembled battery 2) starts supplying power to the external load such as the motor generator 8.

[0069] As described above, the power supply device 1 involved in this embodiment includes a synchronous master-slave structure with a main control unit 3A as the master and other battery control units 3B, 3C as slaves. When multiple battery control units 3A, 3B, 3C work together, each communication unit 23A, 23B, 23C is synchronized with a common communication cycle, and necessary information such as indication signals and fault diagnosis results are communicated between the main control unit 3A and the slave control units 3B, 3C.

[0070] Here, in the communication during the fault diagnosis, in the past, Figure 5 As shown in the comparative example of FIG. 1 , the communication method between each of the battery control units 3A, 3B, and 3C and the vehicle control device 10 is performed only by the first communication method set on the system side.

[0071] If the communication is based only on the first communication method, as shown in the figure, since the first communication cycle T1 is relatively long, even if the diagnostic information is to be communicated after the fault diagnosis is completed, it is necessary to wait for the edge to be synchronized through the clock signal of the first communication cycle T1, resulting in a relatively long waiting time.

[0072] Therefore, if many relatively long waiting times are accumulated, the time required for fault diagnosis becomes longer. In the example shown in the figure, if the edge of the clock signal of the vehicle control device 10 is regarded as a reference, the diagnostic processing is completed at the time point of the edge e17 of the clock signal, and the processing result is returned to the system side.

[0073] In contrast, in the power supply device 1 involved in the present embodiment, the communication mode setting unit 30 sets the communication mode to a first communication mode based on a first communication cycle T1 set on the system side during self-diagnosis, and on the other hand, sets the communication mode to a second communication mode based on a second communication cycle T2 having a shorter communication cycle than the first communication mode during mechanical action diagnosis.

[0074] Therefore, if Figure 6 As shown in the example of the present embodiment, during self-diagnosis of each battery control unit, the main control unit 3A and the slave control units 3B and 3C communicate using the first communication cycle T1 set on the system side, and during mechanical movement diagnosis of mechanical parts, the main control unit 3A and the slave control units 3B and 3C communicate using the second communication cycle T2 which is shorter than the first communication cycle T1.

[0075] That is, in this embodiment, during self-diagnosis and mechanical operation diagnosis, the setting unit 30 changes the communication mode to perform communication. In the example shown in the figure, if the edge of the clock signal of the vehicle control device 10 is regarded as a reference, the diagnosis process is completed at the time point of the edge e14 of the clock signal, and the processing result is returned to the system side. Figure 5 Compared with the edge e17 in the comparative example shown, an excellent effect of shortening the processing time by three cycles is achieved.

[0076] In detail, in the figure, when diagnosing mechanical action, first, in the main control unit 3A, as an event, the connection adhesion judgment of the relay 7A and the relay 7B is performed. In addition, in the relay adhesion judgment, the judgment of the connection adhesion and the judgment of the disconnection adhesion are included, and both judgments are performed. Here, only the connection adhesion judgment is recorded. In the case where the connection adhesion of the relay 7A is not detected in the main control unit 3A, synchronization is achieved by the edge of the second communication cycle T2 that responds at the end of the event, and communication is performed between the main control unit 3A and the slave control unit 3B through the second communication method.

[0077] Thus, in the slave control unit 3B, the relay 7A and the relay 7B are connected and stuck as an event. When the slave control unit 3B does not detect the relay connection sticking, the slave control unit 3B and the master control unit 3A are synchronized by the edge of the second communication cycle T2, and communication is performed between the slave control unit 3B and the master control unit 3A. Then, similarly, the master control unit 3A and the slave control unit 3C are synchronized by the edge of the second communication cycle T2, and communication is performed by the second communication method.

[0078] Next, similarly, in the slave control unit 3C, the relay 7A and the relay 7B are determined to be connected as an event. If the slave control unit 3C does not detect the relay connection, synchronization is achieved by the edge of the second communication cycle T2, and communication is performed between the slave control unit 3C and the master control unit 3A by the second communication method.

[0079] In the power supply device 1 of the present embodiment, when the adhesion judgment of the relays 7A, 7B in each control unit 3A, 3B, 3C is completed like this, in the main control unit 3A, an instruction to turn on the relays 7A, 7B in each control unit 3A, 3B, 3C is output, and then the relays 7A, 7B are set to be turned on by the slave control unit 3B and the slave control unit 3C, and the fault diagnosis is completed, so that it can quickly transfer to normal battery control.

[0080] Thus, the power supply device 1 of the present embodiment includes a plurality of battery control units 3A, 3B, and 3C having a master-slave structure. Each battery control unit 3A, 3B, and 3C performs self-diagnosis before starting each battery control unit 3A, 3B, and 3C, and sets the communication method to the first communication method set on the system side for communication, and performs mechanical motion diagnosis by setting the communication method to the second communication method having a shorter communication cycle than the first communication method for communication, so that fault diagnosis can be completed in a short time. Therefore, the startup time of the power supply device 1 can be shortened, and the startup time of the vehicle can be shortened.

[0081] Here, the vehicle control device 10 is connected to a plurality of units in addition to the battery monitoring system 3. Therefore, the vehicle control device 10 uses only the first communication method based on the first communication cycle T1 having a relatively long communication cycle due to the high communication / processing load. This is because when the second communication method based on the second communication cycle T2 having a relatively short communication cycle is used, the communication cycle is short, so the communication / processing load increases.

[0082] In addition, there is another reason that there are various diagnoses for the self-diagnosis of the control circuit of the battery control unit 3A, 3B, 3C, so the processing load of the battery control unit 3A, 3B, 3C during self-diagnosis is high. Therefore, when the communication cycle between the master and the slave during self-diagnosis is too fast, the processing load of the battery control unit 3A, 3B, 3C becomes further high. Here, the various diagnoses include general self-diagnosis of the control unit such as memory check, AD converter function check, phase voltage circuit check, CPU function check, etc.

[0083] In contrast, with respect to the mechanical action diagnosis of the relays 7A and 7B that control the output from the battery pack 5, the power supply device 1 of the present embodiment is a structure that includes a plurality of battery packs 5 connected in parallel relative to an external load. Therefore, when the battery packs 5 are connected in parallel, if the relays 7A and 7B carried in each battery pack 5 are operated arbitrarily, it may not be possible to perform accurate mechanical action diagnosis.

[0084] Therefore, in the power supply device 1 of the present embodiment, it is necessary to sequentially diagnose the relays 7A and 7B that control the output of each battery pack 5. In other words, since the mechanical operation diagnosis of the relays 7A and 7B is not performed simultaneously, it can be said that the processing load of each battery control unit 3A, 3B, and 3C of the battery monitoring system 3 is low.

[0085] Therefore, when diagnosing the mechanical operation of relays 7A, 7B, and 7C, even if the communication cycle between the master and the slave is set as fast as possible within the range of communication, the communication / processing load will not increase significantly. In addition, since serial communication that sends data one by one is a one-to-one communication, the communication load is low, so even if the communication cycle is set as fast as possible in the second communication cycle T2, the communication / processing load will not be too large.

[0086] Therefore, in the present invention, based on the above-mentioned insights, during the self-diagnosis performed first, a first communication method based on the first communication cycle T1 is adopted, and during the mechanical action diagnosis of relays 7A, 7B, etc. performed after the self-diagnosis, a second communication method based on the second communication cycle T2 having a shorter communication cycle than the first communication cycle T1 is adopted. Depending on the communication / processing load during the diagnosis, the first communication method and the second communication method are appropriately combined, thereby shortening the time until the battery control is started as a whole.

[0087] In contrast, Figure 5 In the comparative example shown, for example, in the main control unit 3A, even if the on-stick determination of the relay 7A as an event has been completed, communication cannot be performed before the edge of the clock signal that is synchronized by the first communication cycle T1 is reached. Figure 6As shown in the process shown by the dotted line, more waiting time is generated, so the time until the fault diagnosis is completed, that is, the startup time of the power supply device 1 becomes longer. That is, a long cycle is used in the "self-diagnosis" during the period of high load, and a short cycle is used in the "relay diagnosis" during the period of low load, thereby shortening the time until the battery charge and discharge control is started.

[0088] Here, in this specification, "communication cycle" refers to the cycle of each battery control unit accessing the communication bus. For example, the battery control unit reads the data on the communication bus at the timing of the communication cycle. After that, the battery control unit saves the read data to the memory, performs calculations, writes the calculation results to the memory, and takes the calculation results into the transmission buffer. At the timing of the next communication cycle, the battery control unit transmits the information in the transmission buffer to the communication bus.

[0089] <Other structural examples involved in the present invention>

[0090] In the above embodiment, if Figure 6 1 shows an example in which the power supply device 1 performs communication by using the second communication method during machine operation diagnosis. However, during machine operation diagnosis, communication may be performed by using the first communication method in addition to the second communication method. Figure 7 This is a diagram for explaining a communication example in which communication can be quickly performed even when communication based on the second communication method fails during machine operation diagnosis.

[0091] In this example, the following configuration is adopted: when diagnosing mechanical movement, the setting units 30A, 30B, 30C of the battery control units 3A, 3B, 3C of the battery monitoring system 3 set the first communication mode as the communication mode in addition to the second communication mode, and when diagnosing mechanical movement, the communication units 23A, 23B, 23C of the battery control units 3A, 3B, 3C communicate with the slave control units 3B, 3C via the communication mode whose communication cycle arrives first between the communication based on the first communication mode and the communication based on the second communication mode.

[0092] According to this structure, Figure 7 As shown, for example, in the slave control unit 3C, even if the communication with the master control unit 3A through the second communication method fails (the × symbol in the figure), it is possible to quickly communicate by using the edge synchronized by the clock signal of the first communication cycle T1 based on the first communication method as the transmission timing without waiting for the next edge synchronized by the clock signal of the second communication cycle T2. Therefore, the subsequent adhesion determination process of the relay 7A by the slave control unit 3C can be performed earlier.

[0093] In this way, the power supply device 1 communicates by the first communication method in addition to the second communication method during mechanical operation diagnosis, thereby enabling faster communication related to fault diagnosis. In the example shown in the figure, if the edge of the clock signal of the vehicle control device 10 is regarded as a reference, the diagnostic processing is completed at the time point of the edge e15 of the clock signal, and the processing result is returned to the system side. Figure 5 Compared with edge e17 in the comparative example shown, the processing time can be shortened by 2 cycles.

[0094] In addition, the power supply device according to the present invention is not limited to the above-mentioned embodiment, and various modifications can be made without departing from the spirit of the present invention.

[0095] For example, in the above-mentioned embodiment, an example is described in which the first communication method for achieving synchronization through a clock signal of a first communication period T1 is set on the system side, but the first communication method of the present invention is not limited to this. The first communication method can adopt a method for achieving synchronization through a clock signal with a longer communication period than the second communication method.

[0096] In addition, for example, in the above-mentioned embodiment, an example is described in which the signal of the start switch 11 is input from the vehicle control device 10 to the main control unit 3A, and from the main control unit 3A to the slave control units 3B and 3C, but this is also an embodiment, and it can also be set to a structure in which the signal of the start switch 11 is sent directly from the vehicle control device 10 to the main control unit 3A and the slave control units 3B and 3C.

[0097] At this time, the first communication cycle T1 and the second communication cycle T2 set in the main control unit 3A and the slave control units 3B and 3C, respectively, can be configured to switch as follows.

[0098] For example, it can be configured as follows: in the main control unit 3A, when the start switch 11 is turned on, communication is performed by a first communication method synchronized with a first communication cycle T1, and by a start signal of mechanical motion diagnosis from the vehicle control device 10, the first communication method is switched to a second communication method synchronized with a second communication cycle T2, and after the self-control units 3B and 3C collect the results of the mechanical motion diagnosis and send the information to the vehicle control device 10, the first communication method based on the first communication cycle T1 is restored.

[0099] Moreover, the following structure can be set: in the slave control unit 3B, 3C, when the start switch 11 is turned on, communication is performed through the first communication method, and after the self-diagnosis is completed, the first communication method is switched to the second communication method, and after the mechanical action diagnosis is completed, it is restored to the first communication method based on the first communication cycle T1 (that is, not under the control of the main control unit 3A).

[0100] In addition, for example, the following structure may be adopted: after the fault diagnosis is completed only for the relays 7A and 7B of the battery pack 5 controlled by the main control unit 3A, the relays 7A and 7B of the main control unit 3A are immediately turned on without waiting for the communication between the main control unit 3A and the slave control units 3B and 3C, and power is supplied to the external load. According to this structure, even if the diagnosis result of the relays of the slave control units 3B and 3C is abnormal and the power of the battery pack 5 of the slave control units 3B and 3C cannot be used, the power of the battery pack 5 of the main control unit 3A can be supplied to a minimum.

[0101] In addition, the configuration in which the main control unit 3A transmits the self-diagnosis result to the vehicle control device 10 without waiting for the self-diagnosis result from the slave control units 3B and 3C can be a system configuration in which the vehicle control device 10 performs relay control. Therefore, in the above-mentioned embodiment, the following configuration example is shown: even if the vehicle control device 10 instructs the mechanical operation diagnosis, the main control unit 3A waits until the self-diagnosis or result from the slave control units 3B and 3C is obtained.

[0102] In addition, the power supply device 1 based on the above-mentioned embodiment can also be used as a vehicle power supply device for other electric vehicles, such as railway vehicles such as hybrid electric vehicles, buses such as buses, cargo vehicles such as trucks, industrial vehicles such as battery-type forklift trucks, etc. In addition, the power supply device 1 according to the above-mentioned embodiment can also be used as a power supply for power supply devices other than electric vehicles, such as uninterruptible power supply devices used in computer systems, server systems, etc., and power supply devices used in home power generation equipment.

[0103] In the above embodiment, for example, the battery cell 6 is composed of a lithium ion secondary battery, but the present invention is not limited thereto. The present invention is also applicable to the battery cell 6 composed of other secondary batteries such as nickel-hydrogen batteries other than lithium ion secondary batteries.

[0104] Description of Reference Numerals

[0105] 1: power supply device; 2: battery pack; 3: battery monitoring system; 5: battery pack; 6: battery cell; 3A: main control unit (battery control unit); 3B: slave control unit (battery control unit); 3C: slave control unit (battery control unit); 22: monitoring unit; 30A, 30B, 30C: setting unit (communication method); 23A, 23B, 23C: communication unit.

Claims

1. A power supply device comprising: a plurality of battery packs connected in parallel with respect to a load; a plurality of battery control units corresponding to the plurality of battery packs in a one-to-one manner; and a relay that controls output from the battery packs, the plurality of battery control units having a master-slave structure, and before starting battery control, each of the battery control units performs its own self-diagnosis and mechanical operation diagnosis of mechanical parts including the relay, the power supply device being characterized in that: The plurality of battery control units each include a communication unit, the communication unit communicating using a first communication method and a second communication method, the first communication method being a method of communicating between the master control unit and the slave control unit according to a first communication cycle, and the second communication method being a method of communicating between the master control unit and the slave control unit according to a second communication cycle shorter than the first communication cycle, During the self-diagnosis, the master control unit and the slave control unit communicate with each other using the first communication method. During the machine operation diagnosis, the plurality of battery control units communicate with each other using the second communication method.

2. The power supply device according to claim 1, wherein: During the machine operation diagnosis, the communication unit communicates with the slave control unit using the communication method based on the first communication method and the communication method based on the second communication method, whichever communication cycle arrives first.

3. The power supply device according to claim 1 or 2, wherein: When the master control unit determines that at least the master control unit itself has no abnormality through the self-diagnosis and the machine operation diagnosis, the master control unit starts the charge and discharge control without waiting for the diagnosis result of the slave control unit.