Station truss type station hall structure and construction method

Through the horizontal parallel setting of the prefabricated upper and lower chord plates and the adjustable compression mechanism, combined with the design of the upper and lower grooves of the side walls and drainage pipes, the problem of long construction period and water leakage of the middle plate of the subway station was solved, and the middle plate and the The solid connection of the side walls and efficient drainage improve the construction efficiency and the safety of the station hall level.

CN111962553BActive Publication Date: 2024-10-22CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202010749694.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-07-30
Publication Date
2024-10-22
Estimated Expiration
2040-07-30

AI Technical Summary

Technical Problem

The construction period of the mid-board at the hall level of the subway station is long, and the existing prefabricated truss-type mid-board and the side wall are not firmly connected, which cannot effectively solve the problems of water leakage and cleaning, affecting the appearance and pedestrian safety.

Method used

Prefabricated upper chord plates and prefabricated lower chord plates are used, and the side walls are equipped with upper grooves and lower grooves. They are connected through vertical connecting rods and inclined plate supports, combined with an adjustable compression mechanism and embedded drainage pipes, to realize the middle plate and side wall. Strong connection and drainage design.

Benefits of technology

It speeds up the construction period, reduces project risks and costs, avoids the construction of water retaining sills, ensures drainage effects, and improves the dryness and safety of the station hall floor.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN111962553B_ABST
    Figure CN111962553B_ABST
Patent Text Reader

Abstract

The present invention belongs to the technical field of rail transit structural engineering, and specifically provides a station truss-type station hall structure and construction method, including a side wall and a middle plate structure, the middle plate includes a prefabricated upper chord plate and a prefabricated lower chord plate, the side wall is provided with an upper groove and a lower groove, the prefabricated upper chord plate and the prefabricated lower chord plate are arranged horizontally and parallel, and the ends of the prefabricated upper chord plate and the prefabricated lower chord plate are respectively inserted into the upper groove and the lower groove; the prefabricated upper chord plate and the prefabricated lower chord plate are connected as a whole through a vertical connecting rod and an inclined plate support; an adjustable clamping mechanism is provided in the upper groove, and the adjustable clamping mechanism includes a pressure bar rod that can be moved downward to clamp the prefabricated upper chord plate. It effectively avoids the problems of the middle plate and the side wall requiring cast-in-place construction, the long time for steel bar binding, and the need to wait for the strength of concrete, which can speed up the construction cycle, reduce engineering risks, and save engineering costs. In addition, a drainage pipe is provided near the side wall of the middle plate, which eliminates the trouble of constructing a water retaining sill, and can speed up the cleaning, fire fighting and discharge of leaking water.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of rail transit structural engineering, and in particular relates to a station truss-type hall structure and a construction method. Background Art

[0002] The conventional method for the middle slab of the subway station hall is to use cast-in-place concrete structure. However, the station space is large and the formwork support construction is complex, resulting in a long construction period and slow speed. At present, the market is vigorously developing prefabricated and assembled buildings and promoting prefabricated and assembled structures. There are prefabricated and assembled truss-type station middle slabs, but there is currently no effective way to ensure the firm connection between the prefabricated and assembled truss-type middle slabs and the side walls.

[0003] On the other hand, the middle plate of the subway station hall needs to be equipped with drainage ditches near the side walls due to water leakage and cleaning needs in the side walls. The conventional practice is to set a water retaining sill near the side wall of the middle plate to provide a drainage channel. However, the water retaining sill cannot be constructed at the same time as the middle plate structure, and needs to be constructed twice. There is a construction joint between the water retaining sill and the middle plate, which will cause water to flow out of the water retaining sill, affecting the appearance of the station hall and the safety of pedestrians. In addition, the construction steps are many, the cycle is long, and the quality is difficult to guarantee. Summary of the invention

[0004] The purpose of the present invention is to overcome the problems in the prior art that the construction period of the middle plate structure of the subway station hall layer is long and a water retaining sill is required, and the drainage effect is difficult to ensure.

[0005] To this end, the present invention provides a station truss-type station hall structure, including a side wall and a middle plate structure, the middle plate includes a prefabricated upper chord plate and a prefabricated lower chord plate, the side wall is provided with an upper groove and a lower groove, the prefabricated upper chord plate and the prefabricated lower chord plate are arranged horizontally and parallel, and the ends of the prefabricated upper chord plate and the prefabricated lower chord plate are respectively inserted into the upper groove and the lower groove;

[0006] The prefabricated upper chord plate and the prefabricated lower chord plate are connected into a whole through vertical connecting rods and inclined plate supports;

[0007] An adjustable pressing mechanism is arranged in the upper groove, and the adjustable pressing mechanism comprises a pressing bar rod which can be moved downward to press the prefabricated upper chord plate.

[0008] Preferably, the upper inner wall of the upper groove is a slope, and the adjustable clamping mechanism includes embedded bolts and a pressure bar rod, the end of the embedded bolt is connected to the pressure bar rod, and the pressure bar rod is provided with an extrusion surface and an inclined sliding surface, the inclined sliding surface can be slidably abutted against the outer side surface of the slope, and the extrusion surface abuts against the top of the prefabricated upper chord plate.

[0009] Preferably, a local slope is provided on the upper surface of the prefabricated upper chord plate, and a lower end of the local slope is close to the side wall.

[0010] Preferably, an upper pre-buried drainage pipe is provided at the lower end of the local slope, and the bottom end of the upper pre-buried drainage pipe is connected to the drainage pipe.

[0011] Preferably, the upper pre-buried drainage pipes include a plurality of them, and the distance between two adjacent upper pre-buried drainage pipes ranges from 2 to 6 m.

[0012] Preferably, a lower pre-buried drainage pipe is provided at one end of the prefabricated lower chord plate close to the side wall, and the pre-buried downpipe is connected to the upper pre-buried drainage pipe.

[0013] Preferably, the side wall includes a left wall and a right wall, two ends of the prefabricated upper chord plate are respectively abutted against the upper groove of the left wall and the upper groove of the right wall, and two ends of the prefabricated lower chord plate are respectively abutted against the lower groove of the left wall and the lower groove of the right wall.

[0014] Preferably, the top end of the connecting rod and the top end of the inclined plate intersect with the prefabricated upper chord plate, and the bottom end of the connecting rod is away from the bottom end of the inclined plate and intersects with the prefabricated lower chord plate respectively.

[0015] Preferably, waterproof caulking material is embedded in both the upper groove and the lower groove.

[0016] The present invention also provides a construction method for a station truss type station hall structure, comprising:

[0017] S1: Cast-in-place side walls, and reserve upper and lower grooves on the side walls;

[0018] S2: inserting the prefabricated upper chord plate and the prefabricated lower chord plate into the upper groove and the lower groove respectively, wherein the prefabricated upper chord plate and the prefabricated lower chord plate are connected into a whole through vertical connecting rods and inclined plate supports;

[0019] S3: adjusting the adjustable pressing mechanism in the upper groove to press the prefabricated upper chord plate into the upper groove.

[0020] Beneficial effects of the present invention: The station truss-type hall structure provided by the present invention includes a side wall and a middle plate structure, the middle plate includes a prefabricated upper chord plate and a prefabricated lower chord plate, the side wall is provided with an upper groove and a lower groove, the prefabricated upper chord plate and the prefabricated lower chord plate are arranged horizontally and parallelly, and the ends of the prefabricated upper chord plate and the prefabricated lower chord plate are respectively inserted into the upper groove and the lower groove; the prefabricated upper chord plate and the prefabricated lower chord plate are connected as a whole through a vertical connecting rod and an inclined plate support; an adjustable clamping mechanism is provided in the upper groove, and the adjustable clamping mechanism includes a pressure bar rod that can be moved downward to clamp the prefabricated upper chord plate. This prefabricated assembled truss middle plate and side wall connection structure can effectively avoid the problems of the middle plate and the side wall requiring cast-in-place construction, long steel bar binding time, and concrete strength waiting time, which can speed up the construction period, reduce engineering risks, and save engineering costs. In addition, a drainage pipe is provided on the middle plate near the side wall, eliminating the trouble of constructing a water retaining sill, and can speed up the cleaning, fire fighting and drainage of leaking water.

[0021] The present invention will be further described in detail below with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 It is a structural schematic diagram of a station truss-type station hall structure and a construction method of the present invention.

[0023] Explanation of the reference numerals in the accompanying drawings: prefabricated upper chord plate 1, prefabricated lower chord plate 2, vertical connecting rod 3, inclined plate 4, upper embedded drainage pipe 5, lower embedded drainage pipe 6, embedded bolts 7, pressure bar rod 8, waterproof caulking material 9, side wall 10. DETAILED DESCRIPTION

[0024] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0025] In the description of the present invention, it should be understood that the terms "center", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc., indicating the orientation or position relationship are based on the orientation or position relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0026] The terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features; in the description of the present invention, unless otherwise specified, "plurality" means two or more.

[0027] The embodiment of the present invention provides a station truss type station hall structure, such as Figure 1 As shown, it includes a side wall 10 and a middle plate structure, the middle plate includes a prefabricated upper chord plate 1 and a prefabricated lower chord plate 2, the side wall 10 is provided with an upper groove and a lower groove, the prefabricated upper chord plate 1 and the prefabricated lower chord plate 2 are arranged horizontally and parallel, and the ends of the prefabricated upper chord plate 1 and the prefabricated lower chord plate 2 are respectively inserted into the upper groove and the lower groove;

[0028] The prefabricated upper chord plate 1 and the prefabricated lower chord plate 2 are supported and connected into a whole by vertical connecting rods 3 and inclined plates 4;

[0029] An adjustable pressing mechanism is arranged in the upper groove, and the adjustable pressing mechanism comprises a pressing bar rod 8 which can be moved downward to press the prefabricated upper chord plate 1 .

[0030] This prefabricated assembled truss center plate and side wall connection structure can effectively avoid the problems of the center plate and side walls requiring cast-in-place construction, long steel bar binding time, and the need to wait for concrete strength. It can speed up the construction cycle, reduce project risks, and save project costs.

[0031] In a preferred solution, the upper inner wall of the upper groove is a slope, and the adjustable clamping mechanism includes an embedded bolt 7 and a pressure bar rod 8. The end of the embedded bolt 7 is connected to the pressure bar rod 8. The pressure bar rod 8 is provided with an extrusion surface and an inclined sliding surface. The inclined sliding surface can slide against the outer side surface of the slope, and the extrusion surface abuts against the top of the prefabricated upper chord plate 1. By making full use of the space of the side wall of the subway station, the method of reserving grooves and embedded bolts 7 on the side wall and the pressure bar rod 8 is adopted, so that the prefabricated assembled truss middle plate can be firmly fixed to the side wall to ensure integrity. With such a connection structure, the truss middle plate and the side wall can be firmly connected, and the installation operation during on-site construction is simple, fast, and the construction efficiency is high.

[0032] In a preferred solution, an upper embedded drainage pipe 5 is provided at the lower end of the local slope, and the bottom end of the upper embedded drainage pipe 5 is connected to a drainage pipe. A lower embedded drainage pipe 6 is provided at one end of the prefabricated lower chord plate 2 close to the side wall, and the embedded downpipe is connected to the upper embedded drainage pipe 5. The method of partially setting a slope on the upper chord plate of the truss-type middle plate, setting multiple embedded drainage pipes, and using the lower chord plate as a drainage channel can effectively discharge the leakage water of the station hall layer to the platform layer, ensuring the dryness of the station hall layer. Such a drainage design can not only effectively discharge the leakage water of the station hall layer, but also avoid various matters related to the on-site construction of water retaining sills. The installation operation during on-site construction is simple, fast, and has high construction efficiency.

[0033] The main contents of the design include: the upper chord of the truss-type middle plate is partially sloped, multiple pre-buried drainage pipes are installed (spacing 2-6m), and the lower chord is used as a drainage channel, which can effectively discharge the leakage water from the station hall layer to the platform layer to ensure the dryness of the station hall layer; at the same time, it eliminates the need to complete the construction of the water retaining sill of the conventional middle plate.

[0034] The leakage water of the middle plate (station hall layer) passes through the local slope of the upper chord plate and gathers beside the side wall. The upper pre-buried drainage pipes 5 of the upper chord plate are set with small spacing and large number, so that the water can flow to the top of the lower chord plate as soon as possible, and then be discharged into the platform layer track area through the pre-buried drainage pipes of the lower chord plate (20m spacing) in the space enclosed by the lower chord plate, inclined plate 4 and side wall.

[0035] This drainage design of the truss-type middle plate structure adopts the method of partially setting slopes on the truss-type middle plate chord plate, setting multiple pre-buried drainage pipes, and using the lower chord plate as a drainage channel, which can effectively drain the leakage water from the station hall layer to the platform layer, ensuring the dryness of the station hall layer. This drainage design can not only effectively drain the leakage water from the station hall layer, but also avoid various matters related to the on-site construction of water retaining sills. The installation operation during on-site construction is simple, fast, and efficient.

[0036] This truss-type middle plate structural drainage design can effectively accelerate the discharge of leakage water from the middle plate to the platform track area as soon as possible, ensuring the dryness of the station hall layer. At the same time, it can avoid the problems of cast-in-place construction of the middle plate water retaining sill, long steel bar binding time, and the need to wait for concrete strength. It can speed up the construction period, reduce project risks, and save project costs.

[0037] In a preferred solution, waterproof caulking materials are embedded in the upper groove and the lower groove. After the middle plate structure is plugged into the groove of the side wall, the waterproof caulking materials are installed and embedded to achieve better waterproof effect.

[0038] In a preferred embodiment, a protrusion is provided at the end of the prefabricated upper chord plate 1, and the protrusion is inserted into the groove. The protrusion is higher than the overall height of the prefabricated upper chord plate 1, so that water flows down to the drainage pipe through the local slope and will not go over the protrusion and enter the side wall.

[0039] The above examples are merely illustrative of the present invention and do not constitute a limitation on the protection scope of the present invention. All designs that are the same or similar to the present invention fall within the protection scope of the present invention.

Claims

1. The station truss type station hall structure, including the side wall and the middle plate structure, Features: The middle plate includes a prefabricated upper chord plate and a prefabricated lower chord plate, the side wall is provided with an upper groove and a lower groove, the prefabricated upper chord plate and the prefabricated lower chord plate are arranged horizontally and parallelly, and the ends of the prefabricated upper chord plate and the prefabricated lower chord plate are respectively inserted into the upper groove and the lower groove; The prefabricated upper chord plate and the prefabricated lower chord plate are connected into a whole through vertical connecting rods and inclined plate supports; An adjustable pressing mechanism is provided in the upper groove, and the adjustable pressing mechanism includes a pressing bar rod that can be moved downward to press the prefabricated upper chord plate; The upper surface of the prefabricated upper chord plate is provided with a local slope, and the lower end of the local slope is close to the side wall; the lower end of the local slope is provided with an upper pre-buried drainage pipe, and the bottom end of the upper pre-buried drainage pipe is connected to the drainage pipe; the end of the prefabricated lower chord plate close to the side wall is provided with a lower pre-buried drainage pipe, and the lower pre-buried drainage pipe is connected to the upper pre-buried drainage pipe; the leakage water of the middle plate is collected to the side of the side wall through the local slope, flows into the space enclosed by the prefabricated lower chord plate, the inclined plate and the side wall through the upper pre-buried drainage pipe, and then flows into the platform layer track area through the lower pre-buried drainage pipe; The upper inner wall of the upper groove is a slope, and the adjustable clamping mechanism includes an embedded bolt and a pressure bar rod. The end of the embedded bolt is connected to the pressure bar rod. The pressure bar rod is provided with an extrusion surface and an inclined sliding surface. The inclined sliding surface can be slidably abutted against the outer side surface of the slope, and the extrusion surface abuts against the top of the prefabricated upper chord plate.

2. The station truss type hall structure according to claim 1, Features: The upper pre-buried drainage pipes include a plurality of them, and the spacing between two adjacent upper pre-buried drainage pipes ranges from 2 to 6 m.

3. The station truss type hall structure according to claim 1, Features: The side wall includes a left wall and a right wall, two ends of the prefabricated upper chord plate are respectively abutted against the upper groove of the left wall and the upper groove of the right wall, and two ends of the prefabricated lower chord plate are respectively abutted against the lower groove of the left wall and the lower groove of the right wall.

4. The station truss type hall structure according to claim 1, Features: The top end of the connecting rod and the top end of the inclined plate intersect with the prefabricated upper chord plate, and the bottom end of the connecting rod is away from the bottom end of the inclined plate and intersects with the prefabricated lower chord plate respectively.

5. The station truss type hall structure according to claim 1, Features: Waterproof caulking materials are embedded in the upper groove and the lower groove.

6. The construction method of the station truss type hall structure according to any one of claims 1 to 5, It is characterized in that include: S1: Cast-in-place side walls, and reserve upper and lower grooves on the side walls; S2: inserting the prefabricated upper chord plate and the prefabricated lower chord plate into the upper groove and the lower groove respectively, wherein the prefabricated upper chord plate and the prefabricated lower chord plate are connected into a whole through vertical connecting rods and inclined plate supports; S3: adjusting the adjustable pressing mechanism in the upper groove to press the prefabricated upper chord plate into the upper groove.