A method for quickly closing a mine tunnel
By using processed I-shaped steel and channel steel to form a grille-like frame structure, combined with concrete and inorganic salt high-water materials, the problems of low efficiency and many processes in traditional tunnel closure methods are solved, and the rapid and permanent closure of tunnels is achieved , meets the efficient needs of modern mines.
Patent Information
- Application Number
- CN202010892092.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-08-31
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2040-08-31
AI Technical Summary
Traditional mine tunnel closure methods have many processes, low efficiency, large engineering volume and high labor intensity for workers, which cannot meet the needs of modern high-yield and high-efficiency mines.
Waste I-shaped steel and channel steel are processed into standard parts to form a grille-like frame structure, and concrete and steel mesh are sprayed on the outside, and filler is formed with inorganic salt high-water materials to achieve rapid closure of the tunnel.
The process has been simplified, the construction speed has been improved, the labor intensity of workers has been reduced, and the rapid and permanent closure of the tunnel has been achieved.
Smart Images

Figure CN112065503B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of mine tunnel blocking, and in particular to a mine tunnel rapid sealing method. Background Art
[0002] After the comprehensive mining face of a coal mine is mined, the mining tunnels on both sides of the work must be closed in time to prevent air from entering the goaf and causing spontaneous combustion of loose coal or harmful gases in the goaf from entering the adjacent mining space to cause safety hazards. According to estimates, each mine needs to close about 5-10 tunnels per month, or even up to 50. According to the traditional closed tunnel construction process, two stone walls or brick walls need to be built on both sides of the closed section of the tunnel, and loess is rammed between the two closed walls. This method has many processes, low efficiency, large engineering workload, and high labor intensity for workers, which is not in line with the requirements of modern high-yield and high-efficiency mines. Summary of the invention
[0003] The present invention provides a method for quickly closing a mine tunnel in order to solve the technical problems of the existing tunnel closing method, such as multiple procedures, low efficiency, large engineering workload and high labor intensity of workers.
[0004] In order to solve the above technical problems, the technical solution adopted by the present invention is: a method for quickly closing a mine tunnel, characterized in that it comprises the following steps:
[0005] 1. Select the same type of scrap mining I-beams and cut them into standard parts 1 with a length of L;
[0006] 2. Process a hole at each end of the center axis of the web of the standard part in step 1 at a distance of X mm from the end to form a column;
[0007] 3. Weld a piece of channel steel I with a length of A and perpendicular to the standard part at each end of the standard part in step 1. The two flanges of the channel steel I are arranged opposite to each other. A hole I is drilled at each end of the axis of the waist plate of the channel steel I at a distance of Y mm from the near end to form a crossbeam.
[0008] 4. Weld a piece of channel steel II with a length of C and perpendicular to the standard part at each end of the standard part in step 1. The two flanges of the two channel steels II are arranged opposite to each other, and the bottom ends of the two channel steels II are flush with the bottom end of the standard part; drill a hole II at one end of the axis of the waist plate of the channel steel II at a distance of Z mm from the end to form an end crossbeam;
[0009] 5. Determine the section where the closed wall is to be constructed in the tunnel with a height of H and a width of B, construct a top plate groove with a width of D and a depth of E on the top plate of the section, construct a bottom plate groove with a width of D and a depth of F on the bottom plate, construct side grooves with a width of D and a depth of G on both sides, and make the bottom of the groove flat;
[0010] Sixth, in the groove formed in step 5, use bolts to assemble the columns, end beams and cross beams to form a steel structure, wherein the steel structure is a grid-like frame structure, wherein the two side frames at the upper and lower ends are formed by splicing the end beams, the middle cross frame is formed by splicing the cross beams, and the vertical frames at the left and right ends and the middle are formed by splicing the columns with the end beams and the channel steel of the cross beams;
[0011] 7. Spray concrete into the grooves of the top plate, bottom plate and two sides to make the steel structure stable;
[0012] 8. Fix the steel mesh on the outside of the steel structure constructed in step 6, and use a concrete spraying machine to spray a layer of concrete with a thickness of not less than 100mm on the steel mesh to build an inner closed wall together with the steel structure;
[0013] 9. At a distance of not less than 2m from the inner enclosed wall, construct the outer enclosed wall according to steps 1 to 8.
[0014] 10. Install a grouting steel pipe and an exhaust steel pipe on the top of the outer closed wall constructed in step 9. The steel pipe passes through the outer closed wall, with one end located between the inner closed wall and the outer closed wall and the other end exposed outside the outer closed wall. The steel pipe and the closed wall are tightly sealed.
[0015] 11. Pour inorganic salt high-water material into the space between the inner and outer closed walls through the grouting steel pipe. When the slurry overflows from the exhaust steel pipe, close the exhaust steel pipe first, increase the grouting pressure and continue to pour. When the grouting pressure reaches MPa, close the grouting steel pipe, stop grouting, and form a filling body.
[0016] Compared with the prior art, the present invention has the following beneficial effects:
[0017] Scrap I-beams and channel steels are processed into standard parts for columns, beams and end beams, which are assembled arbitrarily in the required closed tunnel according to the cross-sectional parameters to form the main bearing steel structure of the closed wall. A steel mesh is fixed on its outside, and a certain thickness of concrete is sprayed with a shotcrete machine to form a closed wall together with the steel structure. Inorganic salt and high-water materials are poured into the middle area between the two closed walls to form a filling body, thereby achieving permanent closure of the tunnel.
[0018] The invention has fewer steps, simple technology, fast construction speed, low labor intensity for workers, and can realize rapid closure of the tunnel. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 This is a schematic diagram of the structure of standard parts.
[0020] Figure 2 This is a schematic diagram of the structure of the column.
[0021] Figure 3 Schematic diagram of the beam structure.
[0022] Figure 4 This is a schematic diagram of the end beam structure.
[0023] Figure 5 This is a partial schematic diagram of the steel structure.
[0024] Figure 6 This is a schematic diagram of the steel structure.
[0025] Figure 7 Schematic diagram of a closed wall.
[0026] Figure 8 This is the closed main view of the tunnel.
[0027] Fig. 9 This is a closed top view of the tunnel.
[0028] Fig.10 This is a closed side view of the tunnel.
[0029] The following are marked in the figure:
[0030] 1-standard parts, 2-holes, 3-columns, 4-channel steel I, 5-drilling holes I, 6-cross beams, 7-channel steel II, 8-drilling holes II, 9-cross beams, 10-top plate grooving, 11-bottom plate grooving, 12-side grooving, 13-steel structure, 14-steel mesh, 15-inner closed wall, 17-grouting steel pipes, 18-exhaust steel pipes, 19-filling bodies. DETAILED DESCRIPTION
[0031] The present invention is further described below in conjunction with specific embodiments. Example
[0032] A method for quickly closing a mine tunnel comprises the following steps:
[0033] 1. Select the same type of scrap mining I-beams and cut them into standard parts 1 with a length of L, such as Figure 1 As shown;
[0034] 2. A hole 2 is made at each end of the web centerline of the standard part 1 in step 1, close to the end X mm, to form a column 3, such as Figure 2 As shown;
[0035] 3. In step 1, a channel steel Ⅰ4 with a length of A and perpendicular to the standard part 1 is welded at each end of the standard part 1. The two flanges of the channel steel Ⅰ4 are arranged opposite to each other. A hole Ⅰ5 is processed at each end of the axis of the waist plate of the channel steel Ⅰ4 at a distance of Y mm from the near end to form a crossbeam 6. Figure 3 As shown;
[0036] 4. In step 1, weld a piece of channel steel II7 with a length of C and perpendicular to the standard part 1 at each end of the standard part 1. The two flanges of the two channel steels II7 are arranged opposite to each other, and the bottom ends of the two channel steels II7 are flush with the bottom end of the standard part 1; a hole II8 is processed at one end of the axis of the waist plate of the channel steel II7 at a distance of Z mm from the end to form an end cross beam 9, such as Figure 4 As shown;
[0037] 5. Determine the section where the closed wall is to be constructed in the tunnel with a height of H and a width of B, construct a top plate groove 10 with a width of D and a depth of E on the top plate of the section, construct a bottom plate groove 11 with a width of D and a depth of F on the bottom plate, construct side grooves 12 with a width of D and a depth of G on both sides, and make the bottom of the groove flat;
[0038] 6. In the groove formed in step 5, the columns 3, the end beams 9 and the beams 6 are assembled with bolts to form a steel structure 13, which is a grid-like frame structure, such as Figure 6 As shown, the two side frames at the upper and lower ends are formed by splicing the end cross beams 9, the middle cross frame is formed by splicing the cross beams 6, and the vertical frames at the left and right ends and the middle are formed by splicing the columns 3 with the end cross beams and the channel steels of the cross beams respectively; the columns 3 are connected to the cross beams 6 or the end cross beams 9 by bolts, the ends of the columns 3 and the ends of the channel steel Ⅰ4 are connected by screwing bolts into the openings, and the ends of the columns 3 and the ends of the channel steel Ⅱ7 are connected by screwing bolts into the openings.
[0039] 7. Spray concrete into the grooves of the top plate, the bottom plate and the two sides to stabilize the steel structure 13;
[0040] 8. Fix the steel mesh 14 on the outside of the steel structure 13 constructed in step 6, and use a concrete spraying machine to spray a layer of concrete with a thickness of not less than 100 mm on the steel mesh 14 to build an inner closed wall 15 together with the steel structure 13. Figure 7 As shown;
[0041] 9. At a distance of not less than 2 m from the inner enclosed wall 15, construct the outer enclosed wall 16 according to steps 1 to 8.
[0042] 10. Install a grouting steel pipe 17 and an exhaust steel pipe 18 on the top of the outer closed wall constructed in step 9. The steel pipe passes through the outer closed wall 16, with one end located between the inner closed wall 15 and the outer closed wall 16, and the other end exposed outside the outer closed wall 16, and the steel pipe and the closed wall are tightly sealed;
[0043] 11. Inorganic salt high water material is poured into the space between the inner closed wall 15 and the outer closed wall 16 through the grouting steel pipe 17. When the slurry overflows from the exhaust steel pipe 18, the exhaust steel pipe 18 is closed first, and the grouting pressure is increased to continue to be poured. When the grouting pressure reaches 0.2MPa, the grouting steel pipe 17 is closed, and the grouting is stopped to form a filling body 19, that is, a closed structure of the tunnel is formed. Figure 8-10 shown.
[0044] Furthermore, the length of the column 3 is L=1m, and the length of the channel steel Ⅰ4 welded at both ends of the beam is A≤L / 2.
[0045] Furthermore, the distance Y from the center of the drill hole Ⅰ5 on the channel steel Ⅰ4 welded at both ends of the beam 6 to the near end is ≥30mm; the distance Z from the center of the drill hole Ⅱ8 on the channel steel Ⅱ7 welded at both ends of the end beam 9 to the near end is ≥30mm.
[0046] Furthermore, the distance between the centers of the two drilled holes Ⅰ5 on the channel steel Ⅰ4 welded at both ends of the crossbeam 6 is equal to twice the distance X from the center of the drilled hole 2 on the column 3 to the end.
[0047] Furthermore, the width of the top plate groove 10 is 240≤D≤370 and the depth is 300≤E≤500; the width of the bottom plate groove 11 is 240≤D≤370 and the depth is 300≤F≤500; the width of the side groove 12 is 240≤D≤370 and the depth is 300≤G≤500.
[0048] Furthermore, the cross-sectional height of the location where the enclosed wall is constructed is H+E+F=P, and the width is B+2G=Q, and both P and Q are integer multiples of 1 m.
[0049] Furthermore, valves are installed at the exposed ends of the grouting steel pipe 17 and the exhaust steel pipe 18.
[0050] Furthermore, the spacing ratio between the grouting steel pipe 17 and the exhaust steel pipe 18 is less than half of the width B of the tunnel.
Claims
1. A method for rapid sealing of a mine tunnel, characterized in that: The following steps are involved:
1. Select scrap mining I-beams of the same model and cut them into standard pieces with a length of L (1); 2. Processing a hole (2) at each end of the web centerline of the standard component (1) described in step 1 at a distance of X mm from the end to form a column (3); 3. A channel steel I (4) having a length A and being perpendicular to the standard part (1) is welded to each end of the standard part (1) in step 1. The two flanges of the channel steels I (4) are arranged opposite to each other. A hole I (5) is drilled at each end of the axis of the waist plate of the channel steel I (4) at a distance of Y mm from the proximal end to form a crossbeam (6); 4. A channel steel II (7) having a length of C and perpendicular to the standard part (1) is welded to each end of the standard part (1) in step 1. The flanges of the two channel steels II (7) are arranged opposite to each other. The bottom ends of the two channel steels II (7) are flush with the bottom end of the standard part (1). A drill hole II (8) is processed at one end of the waist plate axis of the channel steel II (7) at a distance of Z mm from the end to form an end cross beam (9); 5. Determine a section where a closed wall is to be constructed in a tunnel with a height of H and a width of B, construct a top plate groove (10) with a width of D and a depth of E on the top plate of the section, construct a bottom plate groove (11) with a width of D and a depth of F on the bottom plate, construct side grooves (12) with a width of D and a depth of G on both sides, and level the bottom of the groove; the section height where the closed wall is to be constructed is H+E+F=P, and the width is B+2G=Q, where P and Q are both integer multiples of 1 m; 6. In the groove formed in step 5, the columns (3), the end cross beams (9) and the cross beams (6) are assembled with bolts to form a steel structure (13), wherein the steel structure (13) is a grid-like frame structure, wherein the two side frames at the upper and lower ends are formed by splicing the end cross beams (9), the middle cross frame is formed by splicing the cross beams (6), and the vertical frames at the left and right ends and the middle are formed by splicing the columns (3) with the end cross beams and the channel steel of the cross beams respectively; 7. Spray concrete into the grooves of the top plate, bottom plate and two sides to stabilize the steel structure (13); 8. Fix the steel mesh (14) on the outside of the steel structure (13) constructed in step 6, and spray a layer of concrete with a thickness of not less than 100 mm onto the steel mesh (14) using a concrete spraying machine to form an inner closed wall (15) together with the steel structure (13); 9. At a distance of not less than 2 m from the inner enclosed wall (15), construct the outer enclosed wall (16) according to steps 1 to 8; 10. A grouting steel pipe (17) and an exhaust steel pipe (18) are installed on the top of the outer closed wall (16) constructed in step 9. The steel pipe passes through the outer closed wall (16), with one end located between the inner closed wall (15) and the outer closed wall (16) and the other end exposed outside the outer closed wall (16). The steel pipe and the closed wall are tightly sealed. The spacing between the grouting steel pipe (17) and the exhaust steel pipe (18) is less than half of the tunnel width B.
11. Inorganic salt high-water material is poured into the space between the inner sealed wall (15) and the outer sealed wall (16) through the grouting steel pipe (17). When the slurry overflows from the exhaust steel pipe (18), the exhaust steel pipe (18) is closed first, and the grouting pressure is increased to continue to be poured. When the grouting pressure reaches 0.2MPa, the grouting steel pipe (17) is closed and the grouting is stopped to form a filling body (19).
2. A method for rapid sealing of a mine tunnel according to claim 1, characterized in that: The length of the column (3) is L=1m, and the length of the channel steel I (4) welded at both ends of the beam is A≤L / 2.
3. A method for rapid sealing of a mine tunnel according to claim 1, characterized in that: The distance Y from the center of the drilled hole I (5) on the channel steel I (4) welded at both ends of the cross beam (6) to the near end is ≥30 mm; the distance Z from the center of the drilled hole II (8) on the channel steel II (7) welded at both ends of the end cross beam (9) to the near end is ≥30 mm.
4. A method for rapid sealing of a mine tunnel according to claim 1, characterized in that: The distance between the centers of the two drilled holes I (5) on the channel steel I (4) welded at both ends of the crossbeam (6) is equal to twice the distance X from the center of the drilled hole (2) on the column (3) to the end.
5. A mine tunnel rapid sealing method according to claim 1, characterized in that: The width of the top plate groove (10) is 240≤D≤370 and the depth is 300≤E≤500; the width of the bottom plate groove (11) is 240≤D≤370 and the depth is 300≤F≤500; the width of the side groove (12) is 240≤D≤370 and the depth is 300≤G≤500.
6. A method for rapid sealing of a mine tunnel according to claim 1, characterized in that: The exposed ends of the grouting steel pipe (17) and the exhaust steel pipe (18) are both equipped with valves.