Embedded parts pre-embedded device and construction method for large bridges across rivers
By designing the embedded devices of brackets, connecting rods and support rods, combined with the fixing method of wine bottle-shaped brackets and threaded anchors, the problem of inaccurate positioning and unstable fixation of embedded parts of large bridges across rivers has been solved, achieving a more efficient , safe construction process.
Patent Information
- Application Number
- CN202011167082.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2020-10-28
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2040-10-28
AI Technical Summary
In the construction of large-scale bridges across rivers, inaccurate positioning and unstable fixation of embedded parts lead to difficulties in assembling steel girders, and may even cause falling accidents. Moreover, the existing flexible fixing methods affect construction efficiency in windy weather.
A pre-embedded device including brackets, connecting rods and support rods is designed. The body is installed through bolts, and is fixed on the steel bars on the concrete pouring ground using compression devices and threaded anchors. It is combined with a wine bottle-shaped bracket to bypass the base of the hanging basket. Achieve more stable fixation and adjustment of embedded parts.
It improves the fixation stability of embedded parts, avoids falling accidents, simplifies the construction process, reduces construction costs, and improves work efficiency.
Smart Images

Figure CN112112055B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of bridge construction, and in particular to an embedded component embedded device and a construction method for a large bridge across a river. Background Art
[0002] In the construction of large buildings, it is often necessary to install embedded parts during construction. Embedded parts are components pre-installed in concealed projects, that is, components placed during the pouring of the structure, and are used for overlap when building the upper structure to facilitate the installation of the foundation of external engineering equipment; for example, the patent publication number CN207700070U and the patent name of a tie arch bridge arch foot embedded part positioning device discloses a tie arch bridge arch foot embedded part positioning device including a large bracket, a small bracket, a slot, a vertical positioning pole, a longitudinal cross bar, a shelving beam and a connecting rod; the patent does not require surveyors to measure multiple times during the hoisting process, which can shorten the hoisting time and make the hoisting operation of embedded parts safer, but this method will have the problem of inconvenient installation of the positioning device, and at the same time, after the embedded parts are installed on the positioning device, only the positioning pole is used for positioning, which is prone to inaccurate positioning progress, resulting in difficulty in assembling the steel trusses in the later stage, or even the situation that the assembly cannot be performed;
[0003] Another problem is that the embedded parts of large bridges across rivers are large in size and weigh several tons, and the bridges need to be cast for multiple times. The embedded parts must be fixed in a specified position by hanging outside before the second or multiple castings, so that anchoring zippers such as steel bars can be passed through the embedded parts for casting. The prior art uses flexible fixation, which makes the fixation of the embedded parts unstable. In windy weather, the embedded parts will shake due to the flexible hanging suspension, which is inconvenient for construction and affects work efficiency. In severe cases, falling accidents may even occur. The equipment used for hanging the embedded parts is difficult to avoid the hanging basket equipment due to its complex structure and large footprint, which affects the work of the hanging basket. For this reason, an embedded part embedding device and a construction method for large bridges across rivers are proposed. Summary of the invention
[0004] The purpose of the present invention is to solve the above problems and to provide a pre-embedded device and construction method for a large bridge across a river.
[0005] In order to achieve the above-mentioned purpose, the present invention provides the following technical scheme: an embedded device for embedded parts of a large bridge across a river, comprising a pad arranged on a concrete casting ground, an embedded device body being installed on the pad, the embedded device body comprising a bracket, a connecting rod and a support rod installed on the bracket, characterized in that: a plurality of connecting plates 1 and 2 are welded on the bracket, through holes are provided on the connecting plates 1 and 2, the connecting rod is installed on the connecting plate 1 by bolts, and the support rod is installed on the connecting plate 2 by bolts.
[0006] Further preferably: a clamping device is also installed on the bracket, the clamping device includes a pressure plate installed on the bracket, a gasket is installed on the pressure plate, steel bars are arranged on the concrete casting ground, the steel bars pass through the pressure plate and the gasket, and threaded anchors are also installed on the steel bars.
[0007] Further preferably, the bracket, connecting rod, supporting rod and pad are all made of H-shaped steel.
[0008] Further preferably, the bracket is a wine bottle type bracket.
[0009] An embedded component embedded device and construction method for a large bridge across a river, characterized in that it comprises the following steps:
[0010] Step 1: Install the bracket; select and install the embedded device according to the position of the embedded parts. First, install the pad on the concrete pouring ground, then place the embedded device body on the pad, and finally install the pressure plate through the steel bar on the bracket, and press the bracket with a threaded anchor;
[0011] Step 2: Lifting of embedded parts: Place the control line on the embedded device, then install the embedded parts on the support rod with a crane, and clamp the embedded parts on the support rod through the lifting ears on the embedded parts;
[0012] Step 3: Retest and fine-tune to check whether the embedded parts are placed in the specified position. Use a hand chain hoist or hydraulic device to adjust the position of the embedded parts. After the embedded parts are adjusted to the specified position, weld the lifting lugs to the support rods to fix the embedded parts.
[0013] Step 4: interlaced pouring; interlaced pouring; after inserting steel bars into the lower part of the embedded parts and fixing them, pour concrete to form them;
[0014] Step 5: Disassemble the bracket; remove the lifting ear from the support rod, unscrew the threaded anchor, loosen the pressure plate, and lift the bracket out for next use.
[0015] Beneficial effects of the present invention:
[0016] 1. The present invention has a simple structure. The embedded device body is composed of a bracket, a connecting rod and a supporting rod, which is convenient for hanging the embedded device. The pressing plate is fixed to the threaded steel bar on the concrete pouring ground of the first phase and the bracket is pressed by a threaded anchor to fix the embedded device. The installation is more convenient and the embedded device is also fixed more firmly.
[0017] 2. After the embedded parts are hung on the support rod, the position of the embedded parts can be adjusted by a hand winch or a hydraulic device. After the embedded parts are installed at the specified position, the lifting ears on the embedded parts are welded to the support rod to fix the position of the embedded parts, thereby replacing the flexible fixation to prevent the embedded parts from being unstable, thereby facilitating the insertion of steel bars in the later stage, thereby improving work efficiency and avoiding falling accidents.
[0018] 3. The present invention adopts a wine bottle-shaped bracket, which can bypass the hanging basket base, making the installation of the embedded device more convenient and the embedded device more practical. The device can be reused, thereby reducing construction costs. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Attached Figure 1 It is a schematic diagram of the structure of the present invention;
[0020] Attached Figure 2 Yes Figure 1 Enlarged view of point A in the middle;
[0021] Attached Figure 3 It is a schematic diagram of the structure of the embedded device body;
[0022] Attached Figure 4 It is a schematic diagram of the bracket structure.
[0023] Legend: 1. Concrete pouring ground; 2. Pad; 3. Embedded device body; 301. Bracket; 3011. Connecting piece 1; 3012. Connecting piece 2; 302. Connecting rod; 303. Support rod; 304. Clamping device; 3041. Pressing plate; 3042. Gasket; 3043. Threaded anchor; 5. Rebar; 6. Hanging basket base. DETAILED DESCRIPTION
[0024] Next, we combine the attached Figure 1-4 The embedded parts embedded device and the construction method of the large bridge across the river described in the present invention are further explained.
[0025] See attached Figure 1-4As shown in, a pre-embedded device for a large bridge across a river in this embodiment includes a pad 2 arranged on a concrete pouring ground 1, an embedded device body 3 is installed on the pad 2, and the embedded device body 3 includes a bracket 301, a connecting rod 302 and a support rod 303 installed on the bracket 301, characterized in that: a plurality of connecting pieces 1 3011 and connecting pieces 2 3012 are welded on the bracket 301, and through holes are provided on the connecting pieces 1 3011 and the connecting pieces 2 3012, and the connecting rod 302 is installed on the connecting piece 1 3011 by bolts, The support rod 303 is installed on the second connecting piece 3012 by bolts; the embedded device body 3 can be raised by the pad 2, and the position of the embedded device body 3 can be adjusted, thereby adjusting the position of the embedded part; the connecting piece 1 3011 and the connecting rod 302 are connected by bolts; the connection between the second connecting piece 3012 and the support rod 303 can facilitate the installation and disassembly of the connecting rod 302 and the support rod 303; and multiple connecting pieces 3012 are provided, and the connecting pieces 3012 at different positions can be selected according to the size of the embedded part to install the support rod 303, so that the embedded device is more practical.
[0026] See attached Figure 1-2 As shown, a clamping device 304 is also installed on the bracket 301, and the clamping device 304 includes a pressing plate 3041 installed on the bracket 301, and a gasket 3042 is installed on the pressing plate 3041. A steel bar 5 is arranged on the concrete casting ground 1, and the steel bar 5 passes through the pressing plate 3041 and the gasket 3042. A threaded anchor 3043 is also installed on the steel bar 5; the pressing plate 3041 and the bracket 301 are clamped and fixed by the threaded anchor 3043 to prevent the embedded device from falling off during the installation of the embedded parts.
[0027] See attached Figure 1-4 As shown, the bracket 301, the connecting rod 302, the supporting rod 303 and the pad 2 are all made of H-shaped steel; the H-shaped steel can make the bracket 301, the connecting rod 302, the supporting rod 303 and the pad 2 stronger and more stable.
[0028] See attached Figure 1 As shown, the bracket 301 is a wine bottle-shaped bracket; through the wine bottle-shaped structural design, during the installation of the embedded device, the bracket 301 can bypass the hanging basket base 6, making the embedded device more suitable for working conditions and more practical.
[0029] The working process and construction method of the present invention are as follows:
[0030] Step 1: Install the bracket; select and install the embedded device according to the position of the embedded part. First, install the pad 2 on the concrete casting ground 1 by screws, then place the embedded device body 3 on the pad 2, and finally install the pressing plate 3041 on the bracket 301 through the steel bar 5, and press the bracket 301 with the threaded anchor 3043;
[0031] Step 2: hoisting the embedded parts; placing a control line on the embedded device to facilitate controlling the position of the embedded parts, and then installing the embedded parts on the support rod 303 with a crane, and clamping the embedded parts on the support rod 303 through the lifting ears on the embedded parts;
[0032] Step 3: Retest and fine-tune to check whether the embedded parts are placed in the specified position. Use a hand chain hoist or a hydraulic device to adjust the position of the embedded parts. After the embedded parts are adjusted to the specified position, weld the lifting lugs to the support rods 303 to fix the position of the embedded parts.
[0033] Step 4: interlaced pouring: after the embedded parts are fixed, the steel bars are inserted into the lower part of the embedded parts and fixed, and then the concrete is poured to form the parts;
[0034] Step 5: Disassemble the bracket; after the lower part of the embedded part is poured, cut and remove the lifting lug from the support rod, unscrew the threaded anchor 3043, loosen the pressure plate 3041, and lift the bracket 304 out with a crane for next use.
[0035] The above embodiments are intended to illustrate the present invention, not to limit the present invention. Any solution that is a simple transformation of the present invention belongs to the protection scope of the present invention.
Claims
1. A pre-embedded device for a large bridge across a river, comprising a base plate (2) arranged on a concrete pouring ground (1), a pre-embedded device body (3) mounted on the base plate (2), the pre-embedded device body (3) comprising a bracket (301), a connecting rod (302) and a supporting rod (303) mounted on the bracket (301), characterized in that: A plurality of connecting plates (3011) and connecting plates (3012) are welded to the bracket (301), and through holes are provided on the connecting plates (3011) and the connecting plates (3012). The connecting rod (302) is mounted on the connecting plate (3011) by bolts, and the supporting rod (303) is mounted on the connecting plate (3012) by bolts. A clamping device (304) is also mounted on the bracket (301), and the clamping device (304) comprises a pressing plate (3041) mounted on the bracket (301), and a gasket (3042) is mounted on the pressing plate (3041). A steel bar (5) is arranged on the concrete casting ground (1), and the steel bar (5) passes through the pressing plate (3041) and the gasket (3042), and a threaded anchor (3043) is also mounted on the steel bar (5). The bracket (301) is a wine bottle-shaped bracket.
2. The embedded component embedded device for a large bridge across a river according to claim 1, characterized in that: The bracket (301), the connecting rod (302), the supporting rod (303) and the pad (2) are all made of H-shaped steel.
3. A construction method for embedded parts and embedded devices for a large bridge across a river according to any one of claims 1-2, characterized in that: The steps include: Step 1: Install the bracket; select and install the embedded device according to the position of the embedded part, first install the pad (2) on the concrete pouring ground (1), then place the embedded device body (3) on the pad (2), and finally install the pressure plate (3041) through the steel bar (5) on the bracket (301), and press the bracket (301) with the threaded anchor (3043); Step 2: hoisting the embedded parts; placing the control line on the embedded device, and then installing the embedded parts on the support rod (303) by a crane, and clamping the embedded parts on the support rod (303) through the lifting ears on the embedded parts; Step 3: retest and fine-tune; check whether the embedded part is placed in the specified position, adjust the position of the embedded part by hand chain hoist or hydraulic device, and after the embedded part is adjusted to the specified position, weld the lifting lug to the support rod (303) to fix the position of the embedded part; Step 4: interlaced pouring: insert steel bars into the lower part of the embedded parts and fix them before pouring concrete to form them; Step 5: Disassemble the bracket; remove the lifting ear from the support rod (303), unscrew the threaded anchor (3043), loosen the pressure plate (3041), and lift the bracket (304) out for next use.
Citation Information
Patent Citations
Tied arch bridge encircles foot built -in fitting positioner
CN207700070U
Embedded part embedding device of river-crossing large bridge
CN213508007U
Cited By
Embedded connecting structure for I-beam hoisting and construction method
CN122013678A
A pre-embedded connecting structure for I-beam hoisting and a construction method
CN122013678B