Processing equipment
By designing two cassette placement tables and corresponding positioning units in the processing device, and using the control unit to move the cassette placement tables between the handover position and the retreat position, the problem of long downtime during cartridge replacement in the prior art is solved, and the efficiency is improved Processing productivity.
Patent Information
- Application Number
- CN202010960646.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Priority Date
- 2019-09-19
- Filing Date
- 2020-09-14
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2040-09-14
AI Technical Summary
The existing processing device cannot process the next box at the same time when the box is replaced, resulting in low processing throughput and long downtime, becoming a production bottleneck.
A processing device is designed, which includes two box placing tables and corresponding positioning units. The control unit moves the box placing tables between the handover position and the retreat position, so that the final processed product of the first box can be moved from the second box to the second box immediately after the processing is completed. The box is taken out and temporarily stored to reduce processing interruption time, and after the processing of the first box is completed, the items in the second box are moved into the original box to continue processing.
It effectively reduces downtime when switching boxes, increases overall processing throughput, and achieves more efficient productivity.
Smart Images

Figure CN112519012B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a processing device including: a holding unit that holds a workpiece; and a processing unit that processes the workpiece held by the holding unit. Background Art
[0002] In the past, for example, as disclosed in Patent Document 1, in a processing device for cutting a semiconductor wafer as a workpiece, the following structure is known: a box containing multiple wafers is placed on a box mounting table, and the box mounting table is moved in the height direction (Z-axis direction) to perform continuous processing.
[0003] During the continuous processing, for example, while the first wafer is being cut, the second wafer is taken out of the cassette in advance and placed in a temporary storage area, and the cutting of the second wafer is immediately performed when the cutting of the first wafer is completed. In this way, the time required for processing all the wafers in one cassette can be shortened.
[0004] Patent Document 1: Japanese Patent Application Publication No. 2013-222834
[0005] When the processing of the last wafer of the first cassette is completed, the processing moves to the second cassette. However, since the last wafer must be returned to the original cassette (the first cassette), the next second cassette cannot be set.
[0006] Therefore, the first wafer of the next second cassette cannot be unloaded and the wafer is left waiting in the temporary storage area, and processing by the processing apparatus has to be stopped at the timing of cassette replacement.
[0007] The processing stoppage at the time of cartridge replacement becomes down time of the processing device and becomes a bottleneck in improving processing throughput (processing amount per unit time), and therefore improvement is desired. Summary of the invention
[0008] In view of the above, an object of the present invention is to provide a processing apparatus capable of reducing downtime even at the time of cartridge replacement and improving processing throughput (productivity).
[0009] According to one embodiment of the present invention, a processing device is provided, which comprises: a holding unit, which holds a workpiece; and a processing unit, which processes the workpiece held by the holding unit, wherein the processing device comprises: a first box stage, which carries a first box capable of accommodating a plurality of the workpieces; a second box stage, which carries a second box capable of accommodating a plurality of the workpieces; a first positioning unit, which positions the first box stage at a handover position and a first box retreat position; a second positioning unit, which positions the second box stage at the handover position and the second box retreat position; and a conveying unit, which conveys the workpiece between the handover position and the holding unit, the handover position and the first box retreat position being arranged adjacent to each other in a Z direction, and the handover position and the second box retreat position being arranged adjacent to each other in an X direction perpendicular to the Z direction.
[0010] In addition, according to one embodiment of the present invention, the processing device has a control unit that controls at least the first positioning unit and the second positioning unit, and the control unit controls the first positioning unit and the second positioning unit in such a manner that the first box loading platform and the second box loading platform are respectively positioned at the handover position, so as to move the workpiece processed by the processing unit into the box in the first box and the second box that originally accommodates the workpiece.
[0011] According to the structure of the present invention, even when the final workpiece stored in the first box is being processed, the workpiece can be moved out of the second box and made to wait in the temporary storage area, and after the processing of the final workpiece stored in the first box is completed, the first workpiece of the second box can be immediately transported from the temporary storage area to the holding unit. The processing interruption time can be compressed, so that the downtime of the box switching time can be greatly reduced, and the overall processing output (productivity) of the device can be improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 It is a figure which shows one Example of the processing apparatus of this invention.
[0013] Figure 2 (A) is a diagram showing a structural example of a first box mounting table, Figure 2 (B) is a diagram showing a structural example of the second box mounting table.
[0014] Figure 3 It is a figure which shows the states of the delivery position and the retreat position of the cassette mounting table.
[0015] Figure 4 It is a diagram showing other states of the delivery position and the retracted position of the cassette mounting table.
[0016] Figure 5 : is a figure which shows the internal structure of a box.
[0017] Figure 6 It is a timing chart showing the status of the cartridge, etc.
[0018] Description of symbols
[0019] 20: Loading and unloading unit; 23: First conveying unit; 32: Second conveying unit; 51: First box loading platform; 51a: Loading surface; 51d: Abutment portion; 52: Second box loading platform; 52a: Loading surface; 52d: Abutment portion; 52s: Detection unit; 5: Holding unit; 70: Cleaning unit; 510: First positioning unit; 512: Vertical frame; 514: Vertical guide rail; 516: Ball screw; 518: Motor; 520: Second positioning unit; 522: vertical frame; 524: vertical guide rail; 526: ball screw; 528: motor; 531: horizontal frame; 532: base; 534: horizontal guide rail; 536: ball screw; 538: motor; 600: control unit; F: frame; K1: first box; K2: second box; Kt: storage shelf; P0: handover position; P1: first box retreat position; P2: second box retreat position; T: belt; W: chip. DETAILED DESCRIPTION
[0020] Figure 1 A processing device 1 related to one embodiment of the present invention has a rotating cutting tool as a processing unit, for example, a cutting device configured to singulate a plate-shaped semiconductor wafer. In addition, the present invention can also be provided to a laser processing device or an expansion device for singulating a semiconductor wafer in addition to the cutting device.
[0021] The workpiece is, for example, a roughly disk-shaped wafer made of materials such as Si (silicon), SiC (silicon carbide), GaN (gallium nitride), GaAs (gallium arsenide) or other semiconductors. Alternatively, the workpiece is a substrate made of materials such as sapphire, glass, quartz, etc. Alternatively, the workpiece may be a package substrate containing a plurality of device chips sealed by a molded resin or the like.
[0022] like Figure 1 As shown in FIG. 1 , a holding unit 5 for holding a workpiece is disposed at the center of the upper surface of the base 2 of the processing device 1. The holding unit 5 is configured as a chuck table for sucking and holding a wafer W as a workpiece, and moves in the X-axis direction so that a cutting unit (not shown) can perform cutting processing. The wafer W as a workpiece is stored in the cassettes K1 and K2 in a state where it is fixed to the frame F by means of a tape T.
[0023] In the region where the holding unit 5 moves, a pair of guide rails 7 are arranged in parallel with each other at a position above the holding unit 5 to form a temporary storage region M. Each guide rail 7 is formed in an L-shaped cross section and can carry both ends of a frame F that supports a workpiece. The pair of guide rails 7 is configured to be movable in directions approaching / separating from each other and to guide and temporarily store the frame F.
[0024] The frame F carried out from the first cassettes K1 and K2 is temporarily placed on the guide rail 7 by the carry-in / carry-out unit 20. The carry-in / carry-out unit 20 includes a plate portion 21 and a clamping portion 22 disposed at the end of the plate portion 21 and configured to be able to grip the outer periphery of the frame F by the clamping portion 22, and the frame F and the wafer W as the workpiece are integrated.
[0025] The plate portion 21 of the loading / unloading unit 20 is connected to the L-shaped arm portion 26 of the first transport unit 23 , and the loading / unloading unit 20 moves in the Y-axis direction together with the first transport unit 23 .
[0026] The first transport unit 23 transports the workpiece from the guide rail 7 to the holding unit 5 , and includes an arm 26 , a holding unit 24 mounted on the lower portion of the arm 26 , and at least four suction units 25 mounted on the ends of the holding unit 24 to suction the frame F.
[0027] The first conveying unit 23 is connected to the first Y-axis direction feeding unit 28 and moves in the Y-axis direction. The first Y-axis direction feeding unit 28 is provided at the side portion 3a of the housing 3, and includes: a ball screw 28a extending in the Y-axis direction; a motor 28b connected to the front end of the ball screw 28a; a pair of guide rails 28c arranged parallel to the ball screw 28a; and a first moving portion 28d, wherein a nut provided inside the first moving portion 28d is screwed with the ball screw 28a, and the side portion of the first moving portion 28d is in sliding contact with the pair of guide rails 28c.
[0028] The first moving portion 28 d and the arm 26 of the first transport unit 23 are connected via the lifting portion 27 , and the lifting portion 27 can move the loading / unloading unit 20 and the first transport unit 23 up and down in the Z-axis direction.
[0029] The second conveying unit 32 conveys the workpiece from the holding unit 5 to the cleaning unit 70, and the second conveying unit 32 has: a disc-shaped cover portion 33; a holding portion 34, which is arranged at the lower portion of the cover portion 33; at least four adsorption portions 35, which are installed at the end portions of the holding portion 34 to adsorb the frame F; and an L-shaped arm portion 36, which is installed at the upper portion of the cover portion 33.
[0030] The second conveying unit 32 is connected to the second Y-axis direction feeding unit 38 and moves in the Y-axis direction. The second Y-axis direction feeding unit 38 is provided at the side portion 3a of the housing 3, and includes: a ball screw 38a extending in the Y-axis direction; a motor 38b connected to the front end of the ball screw 38a; a pair of guide rails 38c arranged parallel to the ball screw 38a; and a second moving portion 38d, wherein a nut provided inside the second moving portion 38d is screwed with the ball screw 38a, and the side portion of the second moving portion 38d is in sliding contact with the pair of guide rails 38c.
[0031] The arm 36 of the second transport unit 32 is connected to the second moving unit 38 d via the lifting unit 37 , and the lifting unit 37 moves in the up-down direction, so that the second transport unit 32 can be moved up and down in the Z-axis direction.
[0032] Next, the structure related to the cassette mounting table will be described.
[0033] like Figure 1 As shown, in the processing device 1, a first box mounting table 51 and a second box mounting table 52 are provided in a manner opposed to each other in the X-axis direction (the processing feed direction of the processing device). The boxes K1 and K2 are carried in / out at any time with respect to each mounting table 51 and 52. The box mounted on the first box mounting table 51 at any time is defined as a first box, and the box mounted on the second box mounting table 52 at any time is defined as a second box, and are appropriately expressed as boxes K1, K2... in the specification and the drawings.
[0034] like Figure 2 As shown in (A), the upper surface of the first box mounting table 51 is configured as a mounting surface 51a for mounting the first box K1. The first box mounting table 51 is arranged to be movable along the Z-axis direction on a vertical frame 512 erected along the Z-axis direction (height direction). The vertical frame 512 is provided with: a pair of vertical guide rails 514, 514 extending along the Z-axis direction; a ball screw 516 disposed between the vertical guide rails 514, 514; and a motor 518 connected to the upper end of the ball screw 516.
[0035] A nut provided inside the first cassette mounting table 51 is screwed with the ball screw 516 . When the ball screw 516 is rotationally driven by the motor 518 , the first cassette mounting table 51 moves up and down along the vertical guide rails 514 , 514 .
[0036] According to the above structure, the first box mounting table 51 is positioned at the transfer position P0 ( Figure 3 ) and the first box retreat position P1 ( Figure 3 ) of the first positioning unit 510. Figure 2As shown in FIG. 5A , the control unit 600 controls the motor 518 , thereby controlling the operation of the first positioning unit 510 .
[0037] like Figure 2 As shown in (B), the upper surface of the second box mounting table 52 is configured as a mounting surface 52a for mounting the second box K2. The second box mounting table 52 is arranged to be movable along the Z-axis direction on a vertical frame 522 erected along the Z-axis direction. The vertical frame 522 is provided with: a pair of vertical guide rails 524, 524 extending along the Z-axis direction; a ball screw 526 disposed between the vertical guide rails 524, 524; and a motor 528 connected to the upper end of the ball screw 526.
[0038] A nut provided inside the second cassette mounting table 52 is screwed into the ball screw 526 . When the ball screw 526 is rotationally driven by the motor 528 , the second cassette mounting table 52 moves up and down along the longitudinal guide rails 524 , 524 .
[0039] The vertical frame 522 for the second box mounting table 52 is vertically arranged on the base 532, and the base 532 moves in the X-axis direction. The base 532 is arranged to be movable in the X-axis direction on the horizontal frame 531 arranged substantially horizontally in the X-axis direction. The horizontal frame 531 is provided with: a pair of horizontal guide rails 534, 534 extending in the X-axis direction; a ball screw 536 disposed between the horizontal guide rails 534, 534; and a motor 538 connected to one end of the ball screw 536.
[0040] The nut arranged inside the base 532 is threadedly engaged with the ball screw 536. When the ball screw 536 is driven to rotate by the motor, the base 532 moves horizontally in the X-axis direction along the transverse guide rails 534, 534, and accordingly, the second box mounting table 52 (vertical frame 522) moves horizontally in the X-axis direction.
[0041] According to the above structure, the second box mounting table 52 is positioned at the transfer position P0 ( Figure 3 ) and the second box retreat position P2 ( Figure 3 ) of the second positioning unit 520. Figure 2 As shown in FIG. 5B , the control unit 600 controls the motors 528 and 538 , thereby controlling the operation of the second positioning unit 520 .
[0042] Next, the operation of the cassette mounting table will be described.
[0043] like Figure 3 and Figure 4 As shown, the first cassette mounting table 51 moves between the first cassette retracting position P1 and the delivering position P0.
[0044] At the first box retreat position P1, the first box K1 is carried in and out.
[0045] At the delivery position P0, the workpieces stored in the first box K1 are carried in and out.
[0046] like Figure 5 As shown, the frame F for holding the workpiece is placed on a multi-layered storage shelf Kt formed in the first box K1. At the handover position P0, the first box mounting table 51 is controlled to move up and down in such a way that the height of each layer of the storage shelf Kt of the first box K1 is consistent with the height of the clamping part 22 of the loading and unloading unit 20 at any time.
[0047] Likewise, if Figure 3 and Figure 4 As shown, the second cassette mounting table 52 moves between the second cassette retracting position P2 and the delivery position P0.
[0048] At the second box retreat position P2, the second box K2 is carried in and out.
[0049] At the delivery position P0, the workpieces stored in the second box K2 are carried in and out.
[0050] like Figure 5 As shown, in the second box K2, the second box mounting table 52 is similarly controlled to move up and down so that the height of each layer of the storage shelf Kt of the second box K2 is consistent with the height of the clamping part 22 of the loading and unloading unit 20 at any time.
[0051] like Figure 2 (A) Figure 2 As shown in (B), the first box stage 51 and the second box stage 52 are controlled by the control unit 600 which controls the first positioning unit 510 and the second positioning unit 520 respectively to control the lifting at the handover position P0 and the movement between the handover position P0 and the retreat positions P1 and P2, and are controlled in such a manner that the first box stage 51 and the second box stage 52 cooperate with each other to move.
[0052] The control unit 600 controls the workpieces carried out from the first box K1 to be carried into the first box K1 and the workpieces carried out from the second box K2 to be carried into the second box K2. In this way, the workpieces carried out from each box are carried into (returned to) the original box.
[0053] An example of a series of actions based on the above structure is described below. The timing of each action is also referred to in Figure 6 The timing diagram is shown.
[0054] like Figure 3As shown, the first box K1 is carried into the first box mounting table 51 by the automatic transport device J1. During the carrying, the first box mounting table 51 is positioned at the first box retreat position P1. A sensor for detecting the presence or absence of a box is provided on the first box mounting table 51, and the automatic transport device J1 carries the box into the first box mounting table 51 based on the information detected by the sensor.
[0055] In addition, similarly Figure 3 As shown, the second box K2 is carried into the second box mounting table 52 by the automatic transport device J2. During the carrying, the second box mounting table 52 is positioned at the second box retreat position P2. A sensor for detecting the presence or absence of a box is provided on the second box mounting table 52, and the automatic transport device carries the box into the second box mounting table 52 based on the information detected by the sensor.
[0056] In addition, the loading of the second box K2 onto the second box mounting table 52 does not need to be simultaneous with the loading of the first box K1 onto the first box mounting table 51, and is not particularly limited as long as it is before the processing of the last workpiece of the first box K1 begins. Figure 6 In the timing chart shown, it only needs to be before the time T0 has passed (before the time T1 ).
[0057] In addition, the loading of each box K1, K2 into each box loading table 51, 52 can be performed by manual operation by an operator in addition to the automatic conveying device J1, J2. In addition, the unloading of the box K1, K2 from the box loading table 51, 52 described later can also be performed by manual operation by an operator in addition to the automatic conveying device J1, J2. In addition, the automatic conveying device J1, J2 can be composed of, for example, a hanging conveying device that suspends and conveys the box along a track hung from the ceiling.
[0058] Then, if Figure 3 and Figure 5 As shown, the first box loading platform 51 is lowered and positioned at the handover position P0, and the position of the storage shelf Kt storing the unprocessed workpiece (frame F) is detected, and the first box loading platform 51 is raised and lowered in such a way that the height of the storage shelf Kt is consistent with the height of the carry-in / out unit 20 ( Figure 5 ). Then, the first unprocessed workpiece (frame F) is carried out by the carrying-in / carrying-out unit 20 and temporarily placed on the guide rail 7 ( Figure 1 )After( Figure 6 ; S1), through the first conveying unit 23 ( Figure 1 ) is transported to the holding unit for cutting ( Figure 6 ; S2).
[0059] During the cutting process of the first workpiece ( Figure 6 : S2), the first box mounting table 51 is raised and lowered, and the second unprocessed workpiece (frame F) is carried out by the carry-in / carry-out unit 20 and temporarily placed on the guide rail 7 ( Figure 1 )After( Figure 6 ; S3), maintained in the first conveying unit 23 ( Figure 1 ) and wait until the cutting of the previous workpiece (the first one) is completed ( Figure 6 ; S4).
[0060] When the cutting process of the first workpiece is completed, the first workpiece passes through the second conveying unit 32 ( Figure 1 ) is transported to the cleaning unit 70 ( Figure 6 ; S5), cleaning is performed by the cleaning unit 70 ( Figure 6 ; S6).
[0061] At this time, the second unprocessed workpiece passes through the first conveying unit 23 ( Figure 1 ) is transported to the holding unit ( Figure 6 ; S7), cutting process ( Figure 6 ; S2).
[0062] In parallel, the first box mounting table 51 is raised and lowered, and the third unprocessed workpiece (frame F) is carried out by the carrying-in / carrying-out unit 20 and temporarily placed on the guide rail 7 ( Figure 1 )superior( Figure 6 ; S3), maintained in the first conveying unit 23 ( Figure 1 ) and wait in the temporary storage area M until the cutting process of the previous workpiece (the second sheet) is completed ( Figure 6 ; S4).
[0063] The first workpiece cleaned by the cleaning unit 70 passes through the first conveying unit 23 ( Figure 1 ) is moved to the empty storage shelf Kt of the first box K1 ( Figure 5 )( Figure 6 ; S8). In this way, a series of processes for the first workpiece of the first box K1 are completed.
[0064] The second and third workpieces are cut in the same way. When the last workpiece is cut, Figure 3 As shown, the first box mounting table 51 rises and moves to the first box retreat position P1 ( Figure 6 : time T1).
[0065] At the same time, Figure 4 As shown, the second box mounting table 52 moves to the delivery position P0, and the storage shelf Kt ( Figure 5 ) position is detected, and the storage shelf Kt ( Figure 5 ) is moved in the vertical direction so that the height of the second box mounting table 52 is consistent with the height of the loading and unloading unit 20. After the first unprocessed workpiece (frame F) of the second box K2 is unloaded by the loading and unloading unit 20, it is held on the first conveying unit 23 ( Figure 1 ) and wait until the cutting process of the previous workpiece (the end of the first box K1) is completed ( Figure 6 ; S9).
[0066] When the first workpiece is removed from the second box K2, Figure 3 As shown, the second box stage 52 moves to the second box retreat position P2 again, and the first box stage 51 descends and returns to the delivery position P0, and the height of the empty storage shelf Kt of the first box K1 is adjusted to be consistent with the height of the carry-in / carry-out unit 20 ( Figure 5 ), the final workpiece after processing and cleaning is moved into the first box K1 ( Figure 6 : time T2).
[0067] At this stage, the cutting and loading of all the workpieces of the first box K1 are completed, and the Figure 4 As shown, the first box mounting platform 51 moves to the first box retreat position P1, and the first box K1 is carried out by the automatic transport device J1. Figure 6 As shown at time T3, a new box K3 is appropriately carried in.
[0068] In addition, at the same time Figure 4 As shown, the second box loading platform 52 moves to the handover position P0 ( Figure 6 : Time T3), the second workpiece of the second box K2 is taken out, and then the same process as above is repeated.
[0069] After the final workpiece is processed, the above-mentioned Figure 6 The same contents are obtained for the actions at time T1 and T2 (switching timing). Figure 3 As shown, the second cassette stage 52 moves to the second cassette retreat position P2, and the first cassette stage 51 descends to carry out the first workpiece of the newly carried cassette.
[0070] Then, if Figure 4 As shown, the first box mounting table 51 rises again and returns to the first box retreat position P1, and the second box mounting table 52 returns to the delivery position P0, and the last workpiece after cleaning is carried into the second box K2.
[0071] At this stage, the cutting and loading of all the workpieces in the second box K2 are completed. Figure 3 As shown, the second box mounting table 52 moves to the second box retreat position P2, the second box K2 is carried out by the automatic transport device J2, and another box K4 is carried in as appropriate.
[0072] In addition, at the same time Figure 3 As shown in FIG. 1 , the first box mounting table 51 moves to the delivery position P0, and the second workpiece of the first box K1 is unloaded, and then the same steps as above are repeated.
[0073] As described above, when switching from box K1 to the next box K2, the processing of the initial workpiece of the next box K2 can be started in advance, which can shorten the time of interruption of cutting processing and thus significantly reduce the downtime of box switching, thereby improving the overall processing throughput (productivity) of the device.
[0074] Next, the structure for preventing the collision of the cassette mounting table will be described.
[0075] like Figure 3 As shown, when the second box mounting table 52 moves from the second box retreat position P2 to the delivery position P0 while the first box mounting table 51 is at the delivery position P0, the box mounting tables 51 and 52 collide with each other, and the expensive workpieces in the boxes K1 and K2 are damaged, resulting in losses.
[0076] In order to avoid this situation, abutment portions 51d and 52d that are opposite to each other and can abut against each other are provided on the first box loading platform 51 and the second box loading platform 52. When the first box loading platform 51 is in the handover position P0, when the second box loading platform 52 enters the handover position P0 from the second box retreat position P2, the abutment portions 51d and 52d abut against each other, thereby forming a structure that prevents direct collision between the boxes K1 and K2.
[0077] In this embodiment, the abutment portions 51d and 52d are composed of rod-shaped plate members erected on each box loading platform 51 and 52, and by setting an effective width in the up and down direction (Z-axis direction), the abutment portions 51d and 52d can reliably abut against each other at any position within the range of movement of the first box loading platform 51 at the handover position P0.
[0078] As described above, by providing the contact portions 51d and 52d, the cassette mounting tables 51 and 52 are physically collided with each other, thereby avoiding direct collision between the cassettes K1 and K2 and preventing damage to the workpiece.
[0079] In addition, at least one of the first box mounting table 51 and the second box mounting table 52 is provided with: a detection unit 52s for detecting that the two have come closer than a predetermined distance in the horizontal direction; and a control unit 600 ( Figure 2 (B)), which is used to stop the horizontal movement of the second box carrier 52 according to the detection of the detection unit 52s.
[0080] The detection unit 52s is, for example, a proximity sensor provided on the contact portion 52d, and can detect the proximity of the contact portion 51d and output the result to the control unit ( Figure 2 The control unit controls the drive Figure 2 The motor of the ball screw 536 shown in (B) is controlled to stop the motor, thereby stopping the movement of the second box mounting table 52 (base 532).
[0081] In this way, by detecting the proximity of the two cassette stages 51 and 52 through the detection unit 52s, the movement of the second cassette stage 52 can be stopped before the contact portions 51d and 52d collide with each other, thereby preventing damage and failure of the mechanisms related to the cassette stages 51 and 52. In addition, it is also possible to prevent the impact between the cassette stages 51 and 52 from being transmitted to the cassettes K1 and K2, thereby preventing the expensive workpieces in the cassettes K1 and K2 from being damaged or destroyed.
[0082] The invention of this application can be implemented as described above.
[0083] That is, Figures 1 to 4 As shown, a processing device is provided, which has: a holding unit 5, which holds a semiconductor wafer as a workpiece; and a processing unit such as a cutting tool, which performs cutting processing on the workpiece held by the holding unit 5, wherein:
[0084] The processing device has:
[0085] A first box mounting table 51 on which a first box K1 capable of storing a plurality of workpieces is mounted;
[0086] A second box mounting table 52 for mounting a second box K2 capable of storing a plurality of workpieces;
[0087] A first positioning unit 510, which positions the first box mounting table 51 at the handover position P0 and the first box retreat position P1;
[0088] A second positioning unit 520 that positions the second box mounting table 52 at the handover position P0 and the second box retreat position P2; and
[0089] The loading and unloading unit 20 transports the workpiece between the transfer position P0 and the holding unit 5.
[0090] The handover position P0 and the first box retreat position P1 are arranged adjacent to each other in the Z direction.
[0091] The delivery position P0 and the second cassette retreat position P2 are arranged adjacent to each other in the X direction perpendicular to the Z direction.
[0092] According to the above structure, even when the final workpiece stored in the first box K1 is being processed, the workpiece can be moved out of the second box K2 and made to wait in the temporary storage area M, and the first workpiece of the second box can be immediately transported from the temporary storage area M to the holding unit after the processing of the final workpiece stored in the first box is completed. The processing interruption time can be compressed, thereby significantly reducing the downtime of the box switching time, and the overall processing output (productivity) of the device can be improved.
[0093] like Figure 2 (A) Figure 2 (B) and Figure 3 As shown,
[0094] The processing device has a control unit 600 for controlling at least the first positioning unit 510 and the second positioning unit 520.
[0095] The control unit 600 controls the first positioning unit 510 and the second positioning unit 520 so as to position the first box mounting table 51 and the second box mounting table 52 at the handover position P0 respectively, so as to move the workpiece processed by the processing unit into the box in the first box K1 and the second box K2 that originally accommodates the workpiece.
[0096] Thereby, the workpiece carried out from each cassette can be carried in (returned) to the original cassette.
Claims
1. A processing device, comprising: A holding unit that holds the workpiece; a processing unit that processes the workpiece held by the holding unit; and Cleaning unit, in, The processing device has: A first box mounting table, which mounts a first box capable of accommodating a plurality of the workpieces; A second box mounting table, which is used to mount a second box capable of accommodating a plurality of the workpieces; a first positioning unit, which positions the first box mounting table at a handover position and a first box retreat position; a second positioning unit, which positions the second box mounting platform at the handover position and the second box retreat position; a first conveying unit for conveying the workpiece between the handover position and the holding unit; as well as a second conveying unit for conveying the workpiece from the holding unit to the cleaning unit; The handover position and the first box retreat position are arranged adjacent to each other in the Z direction. The handover position and the second box retreat position are arranged adjacent to each other in the X direction perpendicular to the Z direction. The processing device is composed of: While the workpiece carried out from the first box is held by the holding unit and processed by the processing unit, the workpiece carried out from the second box is held and waited by the first transport unit, After the workpiece carried out from the first box is processed by the processing unit and is transported from the holding unit to the cleaning unit by the second transport unit, The workpiece carried out from the second box and held and waiting by the first conveying unit is conveyed to the holding unit for processing.
2. The processing device according to claim 1, wherein: The processing device has a control unit for controlling at least the first positioning unit and the second positioning unit. The control unit controls the first positioning unit and the second positioning unit in such a manner that the first box carrier and the second box carrier are respectively positioned at the handover position, so as to move the workpiece processed by the processing unit into the box in the first box and the second box that originally accommodates the workpiece.
Citation Information
Patent Citations
Cutting device
JP2013222834A
Method and device for conveying cassette
JP2007305862A
Cutting device
JP2015138856A
Processing device
JP2018181951A