A cast-in-place concrete pile head separation device

By using a flexible plate laying mechanism to form a physical isolation layer in the construction of highway bridges and culverts, the problems of time-consuming, labor-intensive and dust-generating pile head removal in the existing technology are solved, efficient and safe pile head separation and removal are achieved, and construction efficiency is improved. quality.

CN112942315BActive Publication Date: 2024-10-22MCC CAPITAL ENGINEERING & RESEARCH INC LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110395738.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-04-13
Publication Date
2024-10-22
Estimated Expiration
2041-04-13

AI Technical Summary

Technical Problem

In the existing technology, during the construction of highway bridges and culverts, the process of cutting out the overfilled part of the cast-in-place concrete pile heads is time-consuming and labor-intensive, and it is easy to damage the main reinforcements, generate dust, and pose a hidden danger to the health and quality safety of the workers.

Method used

Design a cast-in-place concrete pile head separation device, including a flexible plate, a flexible plate laying mechanism and a positioning component. By forming a physical isolation layer at the pile top elevation, the invalid pile head is separated from the pile body, and the flexible plate laying mechanism is used. Spread the isolation layer into the concrete to avoid manual cutting and drilling operations.

Benefits of technology

It greatly reduces the labor intensity of pile heads, improves work efficiency, avoids damage to the main reinforcement and the generation of dust, and improves construction quality and safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112942315B_ABST
    Figure CN112942315B_ABST
Patent Text Reader

Abstract

The present invention proposes a cast-in-place concrete pile head separation device, which relates to the field of concrete pouring technology. The cast-in-place concrete pile head separation device includes a flexible plate, a flexible plate laying mechanism and a positioning component. The flexible plate is accommodated in the flexible plate laying mechanism. The flexible plate laying mechanism is fixedly connected to the positioning component and preset at the pile top elevation position through the positioning component. The flexible plate laying mechanism can unfold the flexible plate in the cast-in-place concrete and form an isolation layer. The cast-in-place concrete pile head separation device proposed by the present invention can form a circle of physical isolation layer in the concrete at the pile top elevation position to separate the invalid pile head from the pile body.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of concrete pouring, and in particular to a cast-in-place concrete pile head separation device. Background Art

[0002] During the construction of highway bridges and culverts, the pouring of concrete needs to strictly comply with industry standards. The current industry standard JTG / T3650-2020 "Technical Specifications for Highway Bridge and Culvert Construction" stipulates that when the concrete is poured to the top of the pile, measures should be taken to maintain the concrete pressure in the conduit to avoid the excessive density of the mud on the top of the pile, resulting in mud balls or loose concrete on the top of the pile; when the pouring is about to end, the amount of concrete poured should be checked to determine whether the measured concrete pouring height is correct. The top elevation of the bored pile should be no less than 0.5m higher than the design elevation. When there are poor geological conditions, excessive mud density in the hole, and a large pile diameter, the height of the over-pouring should be appropriately increased; the excess over-pouring should be chiseled off before the construction of the foundation or before the pile connection. The pile head after chiseling should be dense and free of loose layers, and the concrete should reach the strength grade specified in the design. In the above construction process, the over-pouring part of the concrete that needs to be chiseled off is the chiseled pile head.

[0003] At present, the over-filled pile heads are mostly removed manually with pneumatic picks or other mechanical cutting equipment, and then the main reinforcement in the reinforcement cage is cleaned and corrected. These methods are not only time-consuming and labor-intensive, but may also damage the main reinforcement, causing quality and safety hazards. In addition, a large amount of dust will be generated during the crushing process, which will cause certain harm to the surrounding environment and the health of the operators.

[0004] The existing patent "A bridge pile foundation pile head breaking device and pile head breaking method" (authorization announcement number CN105297729B) proposes that before pouring concrete, a circle of rubber hose is arranged at the pile top elevation. After the concrete reaches a certain strength, the rubber hose is manually pulled to form a circle of grooves around the pile body. When chiseling out the over-filled pile head, a pneumatic pick is used to drill horizontal holes along the groove toward the center of the pile body. After the drilling is completed, several steel chisels are driven into the drilled hole and the concrete pile head is pried to form a horizontal fracture surface at the concrete groove, thereby cutting off and separating the effective pile body and the invalid pile body. However, when using a pneumatic pick to drill holes, the operating requirements for the operators are high, and the cross-section cannot be ensured to be horizontal and flat. Vibration and a large amount of dust will also be generated during the drilling process, which will cause certain harm to the health of the operators. In addition, the steel chisel needs to be manually driven in and the concrete pile head needs to be pried. The entire operation process is not only labor-intensive, but also labor-intensive and time-consuming.

[0005] Another existing patent, "A Pile Head Separation Device and Pile Breaking Construction Method" (application publication number CN111877312A), proposes to use steel plates to prefabricate conical barrier plates and sleeves, and weld the barrier plates and sleeves into a whole. The device is installed on the completed pile main reinforcement through the holes in the pile main reinforcement on the barrier plate, and the pile main reinforcement and the barrier steel plate are welded and fixed using the "one-over-one" welding method. After pouring the concrete, wait for the concrete to solidify, locate the over-filled part of the separation line outside the pile protective layer, use a cutting machine to chisel the pile outer protective layer along the dividing line, and lift the pile head. Use a cutting machine to cut the weld between the barrier plate and part of the main reinforcement, take out the welded body of the barrier plate and the sleeve, break the protruding small part of the conical concrete column and the circular concrete column in the middle, and complete the breaking of the invalid pile head. However, the use of steel plates to prefabricate conical baffles and sleeves, and welding the baffles and sleeves into a whole requires high processing accuracy, and the baffles need to be welded to the main reinforcement. Later, the welding points between the baffles and part of the main reinforcement need to be cut, and the process is cumbersome. It also requires high welding skills of the operators, and the installation and cutting of the baffle kits. The main reinforcement may be damaged, and there are certain quality and safety risks. After the concrete solidifies, a cutting machine is used to chisel the outer protective layer of the pile along the dividing line. Temporary electricity needs to be connected on site, which has high requirements on temporary electricity and the use and management of cutting equipment. A large amount of dust will be generated when using the cutting machine, which will cause certain harm to the health of the operators. If the cutting depth is not properly controlled, the main reinforcement will be damaged.

[0006] In view of this, the inventor has designed a cast-in-place concrete pile head separation device based on many years of production design experience in this field and related fields and through repeated experiments, in order to solve the problems existing in the prior art. Summary of the invention

[0007] The present invention provides a cast-in-place concrete pile head separation device, which can form a circle of physical isolation layer in the concrete at the pile top elevation position to separate the invalid pile head from the pile body.

[0008] In order to achieve the above-mentioned purpose, the present invention proposes a cast-in-place concrete pile head separation device, wherein the cast-in-place concrete pile head separation device includes a flexible plate, a flexible plate laying mechanism and a positioning component, the flexible plate is accommodated in the flexible plate laying mechanism, the flexible plate laying mechanism is fixedly connected to the positioning component and is preset at the pile top elevation position by the positioning component, and the flexible plate laying mechanism can unfold the flexible plate in the cast-in-place concrete to form an isolation layer.

[0009] The cast-in-place concrete pile head separation device as described above, wherein the flexible plate is an aluminum plate, a steel plate or a plastic plate.

[0010] The cast-in-place concrete pile head separation device as described above, wherein the flexible plate is coated with a concrete release agent layer.

[0011] The cast-in-place concrete pile head separation device as described above, wherein the flexible board laying mechanism includes a fixed rod, a reel rod and a connecting rod, the fixed rod and the reel rod are arranged in parallel and have a gap, the flexible board is pre-rolled on the reel rod, and the end of the flexible board is fixed on the fixed rod, a ring is provided at one end of the fixed rod, the connecting rod is fixedly connected to one end of the reel rod and is arranged perpendicular to the reel rod, the connecting rod passes through the ring and cooperates with the ring for rotation, the connecting rod drives the reel rod to rotate around the ring, and causes the flexible board to unfold with the fixed rod as the starting point to form the isolation layer.

[0012] The cast-in-place concrete pile head separation device as described above, wherein the positioning component includes a center tube and at least one positioning bracket, the center tube is vertically arranged and has a receiving cavity that passes through from top to bottom, the connecting rod is passed through the receiving cavity and is rotatably installed on the inner wall of the center tube, the bottom end of the connecting rod passes through the receiving cavity and is connected to the reel rod, the ring is located between the reel rod and the center tube, and the positioning bracket is fixedly connected to the outer wall of the center tube.

[0013] As described above, in the cast-in-place concrete pile head separation device, the connecting rod is rotatably mounted on the inner wall of the center tube through a rotating bearing, a limiting ring which is aligned with the rotating bearing is fixed on the inner wall of the center tube, the bottom end of the outer ring of the rotating bearing is clamped on the upper end of the limiting ring, and the inner ring of the rotating bearing is fixedly connected to the connecting rod.

[0014] In the cast-in-place concrete pile head separation device as described above, a sealing gasket for sealing the accommodating cavity is provided at the bottom end of the central tube, and the connecting rod passes through the sealing gasket.

[0015] The cast-in-place concrete pile head separation device as described above, wherein the positioning bracket includes a plurality of support rods, one end of each of the support rods is fixedly connected to the outer wall of the central tube, the other end of each of the support rods extends radially outwardly of the central tube, and the plurality of support rods are evenly distributed along the circumference of the central tube.

[0016] In the cast-in-place concrete pile head separation device as described above, the top end of the connecting rod passes through the accommodating cavity upward and is provided with a handle.

[0017] In the cast-in-place concrete pile head separation device as described above, a motor is also provided on the central tube, and the motor is connected to the top end of the connecting rod and drives the connecting rod to rotate around its axis.

[0018] Compared with the prior art, the cast-in-place concrete pile head separation device proposed by the present invention has the following characteristics and advantages:

[0019] The cast-in-place concrete pile head separation device proposed in the present invention presets the flexible plate laying mechanism at the pile top elevation position through the positioning component. After the concrete pouring is completed, the flexible plate laying mechanism then unfolds the flexible plate in the cast-in-place concrete at the pile top elevation position and forms an isolation layer, thereby physically isolating the invalid pile head (over-pouring part) from the pile body. When the concrete reaches a certain strength, there is no need for manual cutting or pneumatic picks to remove the concrete, no need to overlap temporary electricity, basically no dust is generated, and the main reinforcement will not be damaged. The pile head can be directly lifted by a crane or loader to remove the invalid pile head. It not only greatly reduces the labor intensity of chiseling the pile head and improves work efficiency, but also avoids damage to the steel bars in the concrete, and improves the construction quality of the concrete pile body. BRIEF DESCRIPTION OF THE DRAWINGS

[0020] The accompanying drawings described herein are only for explanation purposes and are not intended to limit the scope of the present invention in any way. In addition, the shapes and proportional dimensions of the various components in the figures are only schematic, used to help understand the present invention, and are not specifically limited to the shapes and proportional dimensions of the various components of the present invention. Those skilled in the art can select various possible shapes and proportional dimensions to implement the present invention according to the teachings of the present invention.

[0021] Figure 1 It is a structural schematic diagram of the cast-in-place concrete pile head separation device in the present invention;

[0022] Figure 2 It is a structural schematic diagram of the flexible board laying mechanism in the present invention;

[0023] Figure 3 It is a schematic diagram of the installation of the connecting rod in the present invention;

[0024] Figure 4 It is a bottom view of the cast-in-place concrete pile head partition device of the present invention;

[0025] Figure 5 It is a stereoscopic diagram of the cast-in-place concrete pile head separation device in the present invention.

[0026] Description of reference numerals:

[0027] 100. Cast-in-place concrete pile head separation device; 10. Flexible board;

[0028] 20. Flexible board laying mechanism; 21. Fixing rod;

[0029] 22. reel rod; 23. connecting rod;

[0030] 24. Ring; 25. Handle;

[0031] 30. Positioning component; 31. Center tube;

[0032] 32. Positioning bracket; 321. Support rod;

[0033] 33. Rotating bearing; 34. Limiting ring;

[0034] 35. Sealing gasket. DETAILED DESCRIPTION

[0035] The details of the present invention can be more clearly understood with reference to the accompanying drawings and the description of the specific embodiments of the present invention. However, the specific embodiments of the present invention described herein are only used for the purpose of explaining the present invention and cannot be understood as limiting the present invention in any way. Under the guidance of the present invention, technicians can conceive of any possible variations based on the present invention, which should all be considered to belong to the scope of the present invention.

[0036] It should be noted that when an element is referred to as being "fixed to" or "disposed on" another element, it may be directly on the other element or there may be an intermediate element. When an element is referred to as being "connected to" another element, it may be directly connected to the other element or there may be an intermediate element.

[0037] Please refer to Figures 1 to 5 The present invention proposes a cast-in-place concrete pile head separation device 100, which includes a flexible board 10, a flexible board laying mechanism 20 and a positioning component 30. The flexible board 10 is accommodated in the flexible board laying mechanism 20, and the flexible board laying mechanism 20 is connected to the positioning component 30 and is preset at the pile top elevation position through the positioning component 30. The flexible board laying mechanism 20 can unfold the flexible board 10 in the cast-in-place concrete and form an isolation layer.

[0038] The cast-in-place concrete pile head separation device 100 proposed by the present invention presets the flexible plate laying mechanism 20 at the pile top elevation position through the positioning component 30. After the concrete pouring is completed, the flexible plate laying mechanism 20 then unfolds the flexible plate 10 in the cast-in-place concrete at the pile top elevation position and forms an isolation layer, thereby physically isolating the invalid pile head (over-filled part) from the pile body. When the concrete reaches a certain strength, there is no need for manual cutting or pneumatic picks to remove the concrete, no need to overlap temporary electricity, basically no dust is generated, and the main reinforcement will not be damaged. The pile head can be directly lifted by a crane or a loader to remove the invalid pile head. Not only does it greatly reduce the labor intensity of chiseling the pile head and improve work efficiency, it also avoids damage to the steel bars in the concrete and improves the construction quality of the concrete pile body.

[0039] The cast-in-place concrete pile head separation device 100 proposed by the present invention has a simple structure and is convenient to construct, which effectively improves the construction efficiency, reduces the project cost, and ensures that the construction work is safe and efficient.

[0040] In an optional embodiment of the present invention, the flexible board laying mechanism 20 includes a fixed rod 21, a reel rod 22 and a connecting rod 23, one end of the fixed rod 21 is provided with a collar 24, the connecting rod 23 is fixedly connected to one end of the reel rod 22 and is arranged perpendicular to the reel rod 22, the connecting rod 23 passes through the collar 24 and rotates with the collar 24, the fixed rod 21 and the reel rod 22 are arranged in parallel and have a gap, the flexible board 10 is pre-rolled on the reel rod 22, and the end of the flexible board 10 is fixed on the fixed rod 21, the connecting rod 23 drives the reel rod 22 to rotate around the collar 24, and the flexible board 10 on the reel rod 22 is unfolded to form an isolation layer starting from the fixed rod 21. The unfolded flexible board 10 is annular, and the concrete (invalid pile head) located above it and the concrete located below it are separated into two parts that do not contact each other, which is convenient for separation in subsequent construction.

[0041] In an optional example of this embodiment, a protective tube (not shown) is provided on the outer cover of the reel rod 22, an annular space is formed between the protective tube and the inner wall and the reel rod 22, the flexible board 10 is rolled in the annular space, a strip groove is provided on the wall of the protective tube, the strip groove penetrates the wall of the protective tube along the radial direction of the protective tube, and the end of the flexible board 10 penetrates the strip groove and is connected to the fixed rod 21. With the above structure, when the connecting rod 23 drives the reel rod 22 to rotate, the flexible board 10 is easier to unfold.

[0042] In an optional example of this embodiment, the positioning component 30 includes a central tube 31 and at least one positioning bracket 32. The central tube 31 is vertically arranged and has a receiving cavity that passes through from top to bottom. The connecting rod 23 is arranged in the receiving cavity and is rotatably mounted on the inner wall of the central tube 31. The bottom end of the connecting rod 23 passes through the receiving cavity downward and is fixedly connected to the reel rod 22. The collar 24 is located between the reel rod 22 and the central tube 31. The positioning bracket 32 ​​is fixedly connected to the outer wall of the central tube 31. With the above structure, the central tube 31 is fixedly connected to the steel bars of the pile foundation through the positioning bracket 32, so that the connecting rod 23 installed on the central tube 31 is fixed at a predetermined position, and the reel rod 22 and the fixed rod 21 arranged at the bottom end of the connecting rod 23 are also arranged at a predetermined position (the pile top elevation position); and the fixed rod 21 and the reel rod 22 are both arranged horizontally, and the isolation layer formed after the flexible board 10 is unfolded is also arranged horizontally, so that the end surface of the pile head after separation is also flatter, which is conducive to subsequent construction.

[0043] In an optional example, the connecting rod 23 is rotatably mounted on the inner wall of the center tube 31 through a rotating bearing 33. A limiting ring 34 is fixedly provided on the inner wall of the center tube 31 to cooperate with the rotating bearing 33. The bottom end of the outer ring of the rotating bearing 33 is clamped on the top of the limiting ring 34, and the inner ring of the rotating bearing 33 is fixedly connected to the connecting rod 23.

[0044] Preferably, two rotating bearings 33 are provided on the outer sleeve of the connecting rod 23, and the two rotating bearings 33 are arranged at intervals up and down, and two stop rings 34 are fixedly provided on the inner wall of the central tube 31. The outer wall of each stop ring 34 is fixedly connected to the inner wall of the central tube 31, and the two stop rings 34 are arranged at intervals up and down.

[0045] In the present invention, the width of the flexible plate 10 is slightly smaller than the inner diameter of the pile foundation steel cage, and accordingly, the lengths of the fixed rod 21 and the reel rod 22 are also slightly smaller than the inner diameter of the pile foundation steel cage. The corresponding width of the flexible plate 10 and the lengths of the fixed rod 21 and the reel rod 22 can be adopted according to different pile diameters, thereby being suitable for most concrete pile foundations of different pile diameters, and being reusable and low-cost.

[0046] In an optional example of this embodiment, a sealing pad 35 is provided at the bottom end of the accommodating cavity, and the connecting rod 23 passes through the sealing pad 35. The sealing pad 35 seals the bottom of the accommodating cavity to prevent concrete grout from invading the accommodating cavity.

[0047] In an optional example, the inner edge of the sealing gasket 35 is sealed and fixedly connected to the connecting rod 23 , and the outer edge of the sealing gasket 35 is sealed and rotatably matched with the inner wall of the central tube 31 .

[0048] In another optional example, the inner edge of the sealing gasket 35 is sealingly rotatably matched with the connecting rod 23 , and the outer edge of the sealing gasket 35 is sealingly fixedly connected to the inner wall of the central tube 31 .

[0049] In an optional example of this embodiment, the positioning bracket 32 ​​includes a plurality of support rods 321, one end of each support rod 321 is fixedly connected to the outer wall of the central tube 31, the other end of each support rod 321 extends radially outwardly of the central tube 31, and the plurality of support rods 321 are evenly distributed along the circumference of the central tube 31. With the above structure, the other end of each support rod 321 can be connected to the main reinforcement of the steel cage by binding, so that the central tube 31 can be fixed at a predetermined position.

[0050] Preferably, the positioning bracket 32 ​​includes four support rods 321 , and the four support rods 321 are evenly distributed along the circumference of the central tube 31 .

[0051] In an optional example, two positioning brackets 32 are disposed outside the central tube 31 , and the two positioning brackets 32 are spaced apart up and down to further ensure that the central tube 31 can be fixed at a predetermined position.

[0052] In an optional example of the present invention, the top end of the connecting rod 23 passes through the accommodating cavity upward and is provided with a handle 25. Rotating the handle 25 can drive the connecting rod 23 to rotate, thereby unfolding the flexible board 10.

[0053] In another optional example of the present invention, a motor is further provided on the central tube 31, and the motor is connected to the top end of the connecting rod 23 and drives the connecting rod 23 to rotate around its axis, thereby reducing the workload of the operator.

[0054] In an optional embodiment of the present invention, the flexible board 10 is an aluminum board, a PVC film (plastic board) or a steel board. Preferably, the flexible board 10 is a thin aluminum board or a thin steel board, which can not only ensure that the flexible board 10 can be easily rolled and unfolded, but also ensure that the flexible board 10 has a certain strength, and the damage of the flexible board will affect the isolation effect.

[0055] In an optional embodiment of the present invention, the flexible board 10 is coated with a concrete release agent to form a concrete release agent layer, which further ensures that the ineffective pile head and the pile body can be separated.

[0056] Please refer to Figures 1 to 5 Now, in conjunction with an embodiment, the specific use process of the cast-in-place concrete pile head separation device 100 proposed by the present invention is described in detail:

[0057] In this embodiment, the flexible plate 10 is selected to be a thin aluminum plate, and the width of the thin aluminum plate is slightly smaller than the inner diameter of the pile foundation steel cage. The flexible plate 10 is pre-rolled on the reel rod 22, and the end of the flexible plate 10 is fixed on the fixing rod 21. Two positioning brackets 32 are arranged outside the central tube 31. According to the pile foundation length in the design drawing, the pile top elevation is measured, and the steel cage is marked. The two positioning brackets 32 are adjusted so that the reel rod 22 is consistent with the pile top elevation and kept in a horizontal position. After the positioning is correct, the support rods 321 of the two positioning brackets 32 are connected to the main reinforcement of the steel cage by binding (the main reinforcement of the steel cage can be wrapped with a sleeve, and the support rod 321 is connected to the sleeve); the collar 24 at one end of the fixed rod 21 is sleeved with the connecting rod 23, and the other end of the fixed rod 21 is also tied to the main reinforcement of the steel cage. Concrete release agent is applied on the flexible plate 10. After the pile foundation concrete is poured normally, the handle 25 for shaking the hand is rotated around the connecting rod 23. The connecting rod 23 drives the reel rod 22 to rotate, and the flexible plate 10 rolled on the reel rod 22 is gradually unfolded with the fixed rod 21 as the starting point, forming a circle of physical isolation layer in the concrete at the pile top elevation position, which can separate the invalid pile head from the pile body.

[0058] The detailed explanation of the above-mentioned embodiments is only intended to explain the present invention so as to facilitate a better understanding of the present invention. However, these descriptions cannot be interpreted as limitations on the present invention for any reason. In particular, the various features described in different embodiments may also be arbitrarily combined with each other to form other embodiments. Unless there is a clear description to the contrary, these features should be understood to be applicable to any embodiment and are not limited to the described embodiments.

Claims

1. A cast-in-place concrete pile head separation device, characterized in that: The cast-in-place concrete pile head separation device comprises a flexible plate, a flexible plate laying mechanism and a positioning component, wherein the flexible plate is accommodated in the flexible plate laying mechanism, the flexible plate laying mechanism is preset at the pile top elevation position by the positioning component, and the flexible plate laying mechanism can unfold the flexible plate in the cast-in-place concrete to form an isolation layer; The flexible board laying mechanism comprises a fixed rod, a reel rod and a connecting rod, wherein the fixed rod and the reel rod are arranged in parallel and have a gap, the flexible board is pre-rolled on the reel rod, and the end of the flexible board is fixed on the fixed rod, a collar is arranged at one end of the fixed rod, the connecting rod is fixedly connected to one end of the reel rod and is arranged perpendicular to the reel rod, the connecting rod passes through the collar and cooperates with the collar for rotation, the connecting rod drives the reel rod to rotate around the collar, and the flexible board is unfolded with the fixed rod as the starting point to form the isolation layer; The positioning component includes a center tube and at least one positioning bracket. The center tube is vertically arranged and has a receiving cavity that passes through from top to bottom. The connecting rod is passed through the receiving cavity and is rotatably installed on the inner wall of the center tube. The bottom end of the connecting rod passes through the receiving cavity and is connected to the reel rod. The ring is located between the reel rod and the center tube. The positioning bracket is fixedly connected to the outer wall of the center tube.

2. The cast-in-place concrete pile head separation device according to claim 1, characterized in that: The flexible plate is an aluminum plate, a steel plate or a plastic plate.

3. The cast-in-place concrete pile head separation device according to claim 1 or 2, characterized in that: The flexible plate is coated with a concrete release agent layer.

4. The cast-in-place concrete pile head separation device according to claim 1, characterized in that: The connecting rod is rotatably mounted on the inner wall of the center tube through a rotating bearing. A limiting ring is fixedly provided on the inner wall of the center tube and matches the rotating bearing. The bottom end of the outer ring of the rotating bearing is clamped on the upper end of the limiting ring, and the inner ring of the rotating bearing is fixedly connected to the connecting rod.

5. The cast-in-place concrete pile head separation device according to claim 1, characterized in that: A sealing gasket for closing the accommodating cavity is arranged at the bottom end of the central tube, and the connecting rod passes through the sealing gasket.

6. The cast-in-place concrete pile head separation device according to claim 1, characterized in that: The positioning bracket includes a plurality of support rods, one end of each support rod is fixedly connected to the outer wall of the central tube, the other end of each support rod extends radially outwardly of the central tube, and the plurality of support rods are evenly distributed along the circumference of the central tube.

7. The cast-in-place concrete pile head separation device according to claim 1, characterized in that: The top end of the connecting rod passes through the accommodating cavity upward and is provided with a handle.

8. The cast-in-place concrete pile head separation device according to claim 1, characterized in that: A motor is also provided on the central tube, and the motor is connected to the top end of the connecting rod and drives the connecting rod to rotate around its axis.