Distribution network dispatching method, device and system, processor, and electronic device
By collecting and analyzing power usage habit information at the energy management terminal, generating energy management strategies, and combining with the optimization calculation on the inverter side, the problem of insufficient precision in the simulation modeling of the distribution network is solved, and the complexity of the model is achieved In the case, improve the precision of distribution network simulation modeling and the effect of grid scheduling.
Patent Information
- Application Number
- CN202110202092.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-02-23
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2041-02-23
AI Technical Summary
The prior art is difficult to improve the precision of distribution network simulation model without increasing the complexity of distribution network simulation model, especially in distribution networks with large areas such as urban areas, especially when V2G is connected to the grid. It is difficult to carefully formulate charging and discharging strategies for each car.
By collecting power usage habit information of load terminals at the energy management terminal, using the timing model algorithm to analyze the user load prediction data, and send it to the distribution network scheduling platform to generate energy management strategies, combined with the predetermined power prediction data, The policy is sent to the energy management terminal, used to determine the target power and perform optimization calculations on the inverter side to form an updated energy management strategy.
While not increasing the complexity of the distribution network simulation model, the precision of simulation modeling is improved, and charging and discharging strategies can be formulated more precisely, grid scheduling can be optimized, and the stability and adaptability of the distribution network can be improved.
Smart Images

Figure CN112953007B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of distribution network dispatching, and in particular to a distribution network dispatching method, device and system, processor, and electronic equipment. Background Art
[0002] At present, for active distribution networks with new energy grid connection, the main energy dispatching management is still based on the physical modeling of the new energy power generation ends in the region, combined with various machine learning and other optimization algorithms to formulate dispatching management plans.
[0003] However, the existing technology has the following problems: for distribution networks with very small areas, it is possible to accurately model and simulate all the equipment in the distribution network, but for distribution networks with large areas, many power-consuming devices, and complex topological structures such as urban areas, not only is it difficult to model in detail, but the complexity of the model will also lead to a sharp increase in the amount of calculation, which does not meet the needs of the actual situation. For the user's photovoltaic power generation and charging piles, since they are basically at the end of the branch of the distribution network structure and have a small capacity, they are basically equivalent to a power supply and load during modeling and simulation. However, one of the biggest technical difficulties in V2G grid connection is the need to formulate different charging and discharging strategies for each vehicle's different SOC, which is a level that cannot be refined in the current energy dispatching management of the distribution network.
[0004] To address the above-mentioned problems, no effective solution has been proposed yet. Summary of the invention
[0005] The embodiments of the present invention provide a distribution network scheduling method, device and system, processor, and electronic device to at least solve the technical problem of how to improve the sophistication of simulation modeling without increasing the complexity of the distribution network simulation model.
[0006] According to one aspect of an embodiment of the present invention, a distribution network dispatching system is provided, including: an energy management terminal, connected to a load terminal, for collecting power usage habit information of the load terminal, and analyzing the power usage habit information using a timing model algorithm to obtain user load forecast data; a distribution network dispatching platform, connected to the energy management terminal, for generating an energy management strategy based on the user load forecast data and predetermined power forecast data, and issuing the energy management strategy to the energy management terminal.
[0007] Optionally, the energy management terminal is also connected to a distribution network, and is used to determine a target amount of electricity that the distribution network allocates to the load terminal based on the energy management strategy.
[0008] Optionally, the above-mentioned electricity usage habit information includes historical electricity usage information, and the above-mentioned energy management terminal includes: a photovoltaic inverter and / or a charging station, which is used to record the historical electricity usage information of the above-mentioned load terminal, and group the above-mentioned historical electricity usage information according to time period information to obtain multiple groups of historical electricity usage information in the same time period; the above-mentioned photovoltaic inverter and / or charging station is also used to use the above-mentioned timing model algorithm to analyze the above-mentioned historical electricity usage information in each time period to obtain the above-mentioned user load forecast data, and arrange the multiple above-mentioned user load forecast data to obtain the above-mentioned user load forecast data for multiple time periods.
[0009] Optionally, the distribution network dispatching platform is further used to use each of the time periods as the data granularity of the energy management strategy to determine the lowest target power as the optimization target of the energy management strategy.
[0010] Optionally, the distribution network dispatching platform is further used to determine the target power by the following calculation formula based on the energy management strategy: and remaining charge SOC i :
[0011]
[0012]
[0013] in, is the user load forecast data for the next hour i. The above power forecast data includes: is the photovoltaic power generation in the future hour i, is the charge and discharge amount in the future i hour; SOC i is the remaining battery power in the future i hour;
[0014] The constraints of the above calculation formula include: 1) and 2) Discharge when it is positive; 3)
[0015] Optionally, the photovoltaic inverter is also used to add the above-mentioned dispatching instruction as a constraint in the optimal algorithm when receiving the dispatching instruction of the above-mentioned distribution network, to obtain an updated energy management strategy, and if it is determined during the updating process that the above-mentioned load terminal cannot meet the constraint requirements, then the dispatching of the above-mentioned distribution network is rejected.
[0016] Optionally, the distribution network dispatching platform is further used to obtain an updated calculation formula based on the updated energy management strategy:
[0017]
[0018] in, The target power consumption of the photovoltaic inverter is limited by the distribution network.
[0019] According to another aspect of an embodiment of the present invention, a distribution network dispatching method is also provided, including: collecting power usage habit information of load terminals; using a timing model algorithm to analyze the above power usage habit information to obtain user load forecast data; sending the above user load forecast data to a distribution network dispatching platform, wherein the above distribution network dispatching platform is also used to generate an energy management strategy based on the above user load forecast data and predetermined power forecast data, and issue the above energy management strategy to the above energy management terminal.
[0020] According to another aspect of an embodiment of the present invention, a distribution network scheduling method is also provided, including: receiving user load forecast data sent by an energy management terminal, wherein the user load forecast data collects power usage habit information of the load terminal, and uses a timing model algorithm to analyze the power usage habit information to obtain user load forecast data; generating an energy management strategy based on the user load forecast data and predetermined power forecast data; and issuing the energy management strategy to the energy management terminal.
[0021] According to another aspect of an embodiment of the present invention, a distribution network dispatching device is also provided, including: a collection module for collecting power usage habit information of a load terminal; an analysis module for analyzing the above power usage habit information using a timing model algorithm to obtain user load forecast data; a sending module for sending the above user load forecast data to a distribution network dispatching platform, wherein the above distribution network dispatching platform is also used to generate an energy management strategy based on the above user load forecast data and predetermined power forecast data, and send the above energy management strategy to the above energy management terminal.
[0022] According to another aspect of an embodiment of the present invention, a distribution network dispatching device is also provided, including: a receiving module for receiving user load forecast data sent by an energy management terminal, wherein the user load forecast data collects power usage habit information of the load terminal, and uses a timing model algorithm to analyze the power usage habit information to obtain user load forecast data; a generating module for generating an energy management strategy based on the user load forecast data and predetermined power forecast data; and a sending module for sending the energy management strategy to the energy management terminal.
[0023] According to another aspect of an embodiment of the present invention, a non-volatile storage medium is further provided, wherein the non-volatile storage medium stores a plurality of instructions, and the instructions are suitable for being loaded by a processor and executing any one of the above-mentioned distribution network scheduling methods.
[0024] According to another aspect of an embodiment of the present invention, a processor is further provided, and the processor is used to run a program, wherein the program is configured to execute any one of the above-mentioned distribution network scheduling methods when running.
[0025] According to another aspect of an embodiment of the present invention, there is further provided an electronic device, comprising a memory and a processor, wherein the memory stores a computer program, and the processor is configured to run the computer program to execute any one of the above distribution network scheduling methods.
[0026] In an embodiment of the present invention, an energy management terminal is connected to a load terminal to collect power usage habit information of the load terminal, and a timing model algorithm is used to analyze the power usage habit information to obtain user load forecast data; a distribution network dispatching platform is connected to the energy management terminal to generate an energy management strategy based on the user load forecast data and predetermined power forecast data, and issue the energy management strategy to the energy management terminal, thereby achieving the purpose of improving the sophistication of simulation modeling without increasing the complexity of the distribution network simulation model, and further solving the technical problem of how to improve the sophistication of simulation modeling without increasing the complexity of the distribution network simulation model. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] The drawings described herein are used to provide a further understanding of the present invention and constitute a part of this application. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the drawings:
[0028] Figure 1 is a structural schematic diagram of a distribution network dispatching system according to an embodiment of the present invention;
[0029] Figure 2 is an optional IEEE33 classic power distribution network topology schematic diagram according to an embodiment of the present invention;
[0030] Figure 3 is a schematic diagram of an optional distribution network topology according to an embodiment of the present invention;
[0031] Figure 4 is a schematic diagram of another optional distribution network topology according to an embodiment of the present invention;
[0032] Figure 5 is a schematic diagram of another optional distribution network topology according to an embodiment of the present invention;
[0033] Figure 6 is a flow chart of a distribution network dispatching method according to an embodiment of the present invention;
[0034] Figure 7is a flow chart of another distribution network dispatching method according to an embodiment of the present invention;
[0035] Figure 8 is a structural schematic diagram of a distribution network dispatching device according to an embodiment of the present invention;
[0036] Fig. 9 It is a structural schematic diagram of another distribution network dispatching device according to an embodiment of the present invention. DETAILED DESCRIPTION
[0037] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.
[0038] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.
[0039] First, to facilitate understanding of the embodiments of the present invention, some terms or nouns involved in the present invention are explained below:
[0040] Edge computing: refers to the use of an open platform that integrates network, computing, storage, and application core capabilities to provide the nearest service on the side close to the source of objects or data. Its application is initiated on the edge side, resulting in faster network service response, meeting the basic needs of the industry in terms of real-time business, application intelligence, security and privacy protection. Edge computing is between physical entities and industrial connections, or on top of physical entities. Cloud computing can still access historical data of edge computing.
[0041] Load forecasting: Load forecasting is to determine the load data at a specific moment in the future based on many factors such as the system's operating characteristics, capacity expansion decisions, natural conditions and social impacts, while meeting certain accuracy requirements. The load refers to the electricity demand (power) or electricity consumption.
[0042] Light power forecast: Based on the solar power generation data and meteorological forecast data, it uses statistical techniques and means to analyze and forecast the active power of photovoltaic power stations a certain time in advance.
[0043] Example 1
[0044] According to an embodiment of the present invention, there is also provided an embodiment for implementing the above-mentioned distribution network dispatching system. Figure 1 is a schematic diagram of the structure of a distribution network dispatching system according to an embodiment of the present invention. Figure 1 As shown, the above-mentioned distribution network dispatching system includes: an energy management terminal 10, a load terminal 12 and a distribution network dispatching platform 14, wherein:
[0045] The energy management terminal 10 is connected to the load terminal 12 and is used to collect the power usage habit information of the load terminal and analyze the power usage habit information using a time series model algorithm to obtain user load forecast data;
[0046] The distribution network dispatching platform 14 is connected to the energy management terminal 10, and is used to generate an energy management strategy based on the user load forecast data and predetermined power forecast data, and send the energy management strategy to the energy management terminal.
[0047] In an embodiment of the present invention, an energy management terminal is connected to a load terminal to collect power usage habit information of the load terminal, and a timing model algorithm is used to analyze the power usage habit information to obtain user load forecast data; a distribution network dispatching platform is connected to the energy management terminal to generate an energy management strategy based on the user load forecast data and predetermined power forecast data, and issue the energy management strategy to the energy management terminal, thereby achieving the purpose of improving the sophistication of simulation modeling without increasing the complexity of the distribution network simulation model, and further solving the technical problem of how to improve the sophistication of simulation modeling without increasing the complexity of the distribution network simulation model.
[0048] The embodiment of the present application uses photovoltaic inverters or charging stations (or photovoltaic inverters and charging stations integrated) as energy management terminals (nodes) for users and small businesses, and delegates the optimization strategy that should have been responsible for simulation calculations by the distribution network dispatching platform (cloud side) to the inverter side (edge side). After the inverter optimizes and calculates the area it is connected to and manages, it uploads its control strategy optimization plan to the distribution network dispatching platform, and then the platform formulates the dispatching management plan in the area based on the plans uploaded by each node.
[0049] Optionally, the main content of the edge computing of the inverter is the supply and demand balance plan of photovoltaic power generation, energy storage and load, with the most economical goal (the lowest amount of electricity purchased from the grid on the inverter side). The core is to use the ARMA time series model algorithm to analyze the user's electricity usage habits, thereby realizing the ability to predict the load on the user side;
[0050] Among them, the basic formula of the ARMA time series model is t :
[0051]
[0052] Among them, α t is a white noise sequence, p is the order of the autoregressive model, and q is the order of the moving average model.
[0053] In an optional embodiment, the energy management terminal is also connected to a power distribution network, and is used to determine a target amount of electricity to be allocated by the distribution network to the load terminal based on the energy management strategy.
[0054] As an optional embodiment, assuming that the photovoltaic inverter needs to predict the load conditions for the next 24 hours, the historical electricity consumption information recorded by the inverter is imported (excluding the data of photovoltaic power generation and energy storage charging and discharging), and the data is grouped by hour, with the data at the same time as one group; then, by observing the PACF and ACF truncation, the values of p and q are judged respectively, that is, each hour has a separate pair of (p, q) values; finally, the ARMA time series model is used to predict a new load value for each hour, and the 24 predicted values are arranged by time to obtain the load forecast result for the next 24 hours.
[0055] In an optional embodiment, the above-mentioned electricity usage habit information includes historical electricity usage information, and the above-mentioned energy management terminal includes: a photovoltaic inverter and / or a charging station, which is used to record the historical electricity usage information of the above-mentioned load terminal, and group the above-mentioned historical electricity usage information according to time period information to obtain multiple groups of historical electricity usage information in the same time period; the above-mentioned photovoltaic inverter and / or charging station is also used to use the above-mentioned timing model algorithm to analyze the above-mentioned historical electricity usage information of each time period to obtain the above-mentioned user load forecast data, and arrange multiple above-mentioned user load forecast data to obtain the above-mentioned user load forecast data for multiple time periods.
[0056] In an embodiment of the present application, the distribution network dispatching platform uses an optimal algorithm (genetic algorithm) to combine the optical power forecast data provided by the optical power forecast provider in the region and the locally calculated user load forecast data to calculate the best energy management strategy for a period of time in the future.
[0057] In an optional embodiment, the distribution network dispatching platform is further used to use each of the time periods as the data granularity of the energy management strategy to determine the lowest target power as the optimization target of the energy management strategy.
[0058] The goal is: Minimum, for example, the photovoltaic inverter needs to calculate the energy management strategy for the next 24 hours, the data granularity is 1 hour, and the optimization goal is to minimize the amount of electricity purchased from the power grid.
[0059] In an optional embodiment, the distribution network dispatching platform is further used to determine the target power by the following calculation formula based on the energy management strategy: and remaining charge SOC i :
[0060]
[0061]
[0062] in, is the user load forecast data for the next hour i. The above power forecast data includes: is the photovoltaic power generation in the future hour i, is the charge and discharge amount in the future i hour; SOC i is the remaining battery power in the future i hour;
[0063] The constraints of the above calculation formula include: 1) and 2) Discharge when it is positive; 3)
[0064] In the embodiments of the present application, The sequence is provided by the load forecast results, The sequence is calculated by combining the light power prediction data with the actual photovoltaic module capacity. Finally, by adjusting the battery charging and discharging strategy (i.e. ) to achieve the goal of purchasing the minimum amount of electricity from the grid.
[0065] In addition, if the inverter receives some dispatching instructions from the power grid, the constraints of the power grid instructions can be added to the optimal algorithm to form a new energy management strategy. In this process, if it is found that the constraint requirements cannot be met, the grid dispatch can be rejected in time and other solutions can be found to avoid causing stability problems in the distribution network.
[0066] In an optional embodiment, the photovoltaic inverter is also used to add the above-mentioned scheduling instructions as constraints in the optimal algorithm when receiving the scheduling instructions of the above-mentioned distribution network, to obtain an updated energy management strategy, and if it is determined during the updating process that the above-mentioned load terminal cannot meet the constraint requirements, then the scheduling of the above-mentioned distribution network is rejected.
[0067] In an optional embodiment, the distribution network dispatching platform is further used to obtain an updated calculation formula based on the updated energy management strategy:
[0068]
[0069] in, The target power consumption of the photovoltaic inverter is limited by the distribution network.
[0070] As an optional embodiment, the cloud accepts the result of edge computing, which is the load condition of the edge node in the future (positive or negative). The difference from edge computing is that the optimization calculation of the cloud is aimed at the stability of the power grid, and the voltage stability of the distribution network is achieved by controlling the public energy storage and power generation equipment at the regional points. Its optimization algorithm can also use genetic algorithms to find the global optimal solution. If it is encountered that the control requirements cannot be met by relying on public equipment, a scheduling request can also be sent to the edge node at the end, and a new scheduling strategy can be used after obtaining the approval of the edge node.
[0071] For example, Figure 2 As shown, taking the IEEE33 classic distribution network topology as an example, the grid stability requirement is the node voltage deviation V dev Within ±5%, the target is V dev Minimum, the calculation formula is as follows:
[0072]
[0073] Constraints: 1) V bus-min ≤Vbus ≤V bus-max , where V bus-min =0.96pu,V bus-max =L05p.u.
[0074] Among them, V bus It is calculated by power flow calculation tools, such as MATPOWER. In power flow calculation, the power of each node is required. It is provided by the edge computing results on the user side. In the entire distribution network, V dev The minimum target mainly depends on the P provided by public energy storage and power generation equipment. public , the genetic algorithm is used to obtain public The best control strategy.
[0075] In the embodiments of the present application, the scheme uses a variety of topological structures. For example, the edge computing capability of the inverter is used to provide support for the fine modeling of the distribution network. Therefore, the scheme has the following topological structures, but is not limited to the following:
[0076] 1) If Figure 3 As shown in the figure, there is an energy management device on the distribution network side. This situation is suitable for urban power supply networks that are not prone to large changes. The management device can be added in the substation; 2) As Figure 4 As shown in the figure, there is no energy management equipment on the distribution network side, and the best inverter on the user side in the area replaces the energy router to be responsible for the optimization calculation of the distribution network. This situation is suitable for smaller distribution network areas, where adding energy routers is not economical; 3) As Figure 5 As shown, the distribution network side is a large photovoltaic inverter. This situation is applicable to newly built distribution networks or distribution networks with centralized photovoltaic or energy storage.
[0077] Through the embodiments of the present application, the modeling of the terminal of the distribution network is more refined, and energy scheduling can be carried out more reasonably to ensure the power supply stability of the terminal, while also ensuring the economic interests of each customer; for areas with a high penetration rate of new energy, this technology can improve the dispatching center's control over the distribution network without adding monitoring and control equipment; it has the ability to respond to failures in the distribution network dispatching center, such as downtime, communication failures, and incorrect dispatching instructions, thereby improving the stability and adaptability of the terminal side of the distribution network; for users, the confidentiality of their data such as distribution forms and electricity usage information is guaranteed.
[0078] Example 2
[0079] According to an embodiment of the present invention, an embodiment of a distribution network dispatching method is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.
[0080] Figure 6 is a flow chart of a distribution network dispatching method according to an embodiment of the present invention. Figure 6 As shown, the method comprises the following steps:
[0081] Step S102, collecting power usage habit information of the load terminal;
[0082] Step S104, using a time series model algorithm to analyze the above electricity usage habit information to obtain user load forecast data;
[0083] Step S106, sending the above-mentioned user load forecast data to the distribution network dispatching platform, wherein the above-mentioned distribution network dispatching platform is also used to generate an energy management strategy based on the above-mentioned user load forecast data and predetermined power forecast data, and send the above-mentioned energy management strategy to the above-mentioned energy management terminal.
[0084] In an embodiment of the present invention, power usage habit information of the load terminal is collected through an energy management terminal; the power usage habit information is analyzed by a timing model algorithm to obtain user load forecast data; the user load forecast data is sent to a distribution network dispatching platform, wherein the distribution network dispatching platform is further used to generate an energy management strategy based on the user load forecast data and predetermined power forecast data, and issue the energy management strategy to the energy management terminal, thereby achieving the purpose of improving the sophistication of simulation modeling without increasing the complexity of the distribution network simulation model, and further solving the technical problem of how to improve the sophistication of simulation modeling without increasing the complexity of the distribution network simulation model.
[0085] Figure 7 is a flow chart of another distribution network dispatching method according to an embodiment of the present invention. Figure 7 As shown, the method comprises the following steps:
[0086] Step S202, receiving user load forecast data sent by the energy management terminal, wherein the user load forecast data collects power usage habit information of the load terminal, and uses a time series model algorithm to analyze the power usage habit information to obtain the user load forecast data;
[0087] Step S204, generating an energy management strategy based on the user load forecast data and the predetermined power forecast data;
[0088] Step S206: Send the energy management strategy to the energy management terminal.
[0089] In an embodiment of the present invention, by receiving user load forecast data sent by an energy management terminal, wherein the user load forecast data collects power usage habit information of the load terminal, and adopting a timing model algorithm to analyze the power usage habit information, user load forecast data is obtained; an energy management strategy is generated based on the user load forecast data and predetermined power forecast data; and the energy management strategy is issued to the energy management terminal, thereby achieving the purpose of improving the sophistication of simulation modeling without increasing the complexity of the distribution network simulation model, thereby solving the technical problem of how to improve the sophistication of simulation modeling without increasing the complexity of the distribution network simulation model.
[0090] It should be noted that any optional or preferred distribution network scheduling method in the embodiments of the present application can be executed or implemented in the distribution network system provided in the above-mentioned embodiment 1.
[0091] In addition, it is still necessary to explain that the optional or preferred implementation of this embodiment can refer to the relevant description in Example 1, which will not be repeated here.
[0092] Example 3
[0093] According to an embodiment of the present invention, there is also provided an apparatus embodiment for implementing the above-mentioned distribution network dispatching method. Figure 8 is a schematic diagram of the structure of a distribution network dispatching device according to an embodiment of the present invention. Figure 8 As shown, the above-mentioned distribution network dispatching device includes: a collection module 80, an analysis module 82 and a sending module 84, wherein:
[0094] The collection module 80 is used to collect the power usage habit information of the load terminal; the analysis module 82 is used to analyze the above power usage habit information using a timing model algorithm to obtain user load forecast data; the sending module 84 is used to send the above user load forecast data to the distribution network dispatching platform, wherein the above distribution network dispatching platform is also used to generate an energy management strategy based on the above user load forecast data and predetermined power forecast data, and send the above energy management strategy to the above energy management terminal.
[0095] It should be noted that the above modules can be implemented by software or hardware. For example, for the latter, it can be implemented in the following ways: the above modules can be located in the same processor; or the above modules can be located in different processors in any combination.
[0096] It should be noted that the acquisition module 80, analysis module 82 and sending module 84 correspond to steps S102 to S106 in Example 1, and the examples and application scenarios implemented by the modules and the corresponding steps are the same, but are not limited to the contents disclosed in the above-mentioned Example 1. It should be noted that the modules as part of the device can be run in a computer terminal.
[0097] According to an embodiment of the present invention, another device embodiment for implementing the above-mentioned distribution network scheduling method is also provided. Fig. 9 is a schematic diagram of the structure of another distribution network dispatching device according to an embodiment of the present invention. Fig. 9 As shown, the above-mentioned distribution network dispatching device includes: a receiving module 90, a generating module 92 and a sending module 94, wherein:
[0098] The receiving module 90 is used to receive the user load forecast data sent by the energy management terminal, wherein the user load forecast data collects the power usage habit information of the load terminal, and uses the timing model algorithm to analyze the power usage habit information to obtain the user load forecast data; the generating module 92 is used to generate the energy management strategy based on the user load forecast data and the predetermined power forecast data; the sending module 94 is used to send the energy management strategy to the energy management terminal.
[0099] It should be noted that the above modules can be implemented by software or hardware. For example, for the latter, it can be implemented in the following ways: the above modules can be located in the same processor; or the above modules can be located in different processors in any combination.
[0100] It should be noted that the acquisition module 80, analysis module 82, sending module 84, receiving module 90, generation module 92 and sending module 94 correspond to steps S202 to S206 in Example 1, and the examples and application scenarios implemented by the modules and the corresponding steps are the same, but are not limited to the contents disclosed in the above-mentioned Example 1. It should be noted that the modules as part of the device can be run in a computer terminal.
[0101] It should be noted that the optional or preferred implementation of this embodiment can refer to the relevant description in Example 1, which will not be repeated here.
[0102] The above-mentioned distribution network dispatching device may also include a processor and a memory. The above-mentioned receiving module 90, generating module 92 and sending module 94 are all stored in the memory as program units, and the processor executes the above-mentioned program units stored in the memory to realize corresponding functions.
[0103] The processor includes a kernel, which retrieves the corresponding program unit from the memory. The kernel may be one or more. The memory may include non-permanent memory in a computer-readable medium, random access memory (RAM) and / or non-volatile memory, such as read-only memory (ROM) or flash RAM. The memory includes at least one memory chip.
[0104] According to an embodiment of the present application, an embodiment of a non-volatile storage medium is also provided. Optionally, in this embodiment, the non-volatile storage medium includes a stored program, wherein when the program is executed, the device where the non-volatile storage medium is located is controlled to execute any of the distribution network scheduling methods described above.
[0105] Optionally, in this embodiment, the non-volatile storage medium may be located in any computer terminal in a computer terminal group in a computer network, or in any mobile terminal in a mobile terminal group, and the non-volatile storage medium includes a stored program.
[0106] Optionally, when the program is running, the device where the non-volatile storage medium is located is controlled to perform the following functions: collecting power usage habit information of the load terminal; using a timing model algorithm to analyze the above power usage habit information to obtain user load forecast data; sending the above user load forecast data to the distribution network dispatching platform, wherein the above distribution network dispatching platform is also used to generate an energy management strategy based on the above user load forecast data and predetermined power forecast data, and send the above energy management strategy to the above energy management terminal.
[0107] Optionally, when the program is running, the device where the non-volatile storage medium is located is controlled to perform the following functions: receiving user load forecast data sent by the energy management terminal, wherein the user load forecast data collects power usage habit information of the load terminal, and uses a timing model algorithm to analyze the power usage habit information to obtain user load forecast data; generating an energy management strategy based on the user load forecast data and predetermined power forecast data; and issuing the energy management strategy to the energy management terminal.
[0108] According to an embodiment of the present application, an embodiment of a processor is also provided. Optionally, in this embodiment, the processor is used to run a program, wherein when the program is run, any one of the distribution network scheduling methods described above is executed.
[0109] According to an embodiment of the present application, an embodiment of an electronic device is also provided, including a memory and a processor, wherein the memory stores a computer program, and the processor is configured to run the computer program to execute any one of the distribution network scheduling methods described above.
[0110] According to an embodiment of the present application, an embodiment of a computer program product is also provided, which, when executed on a data processing device, is suitable for executing a program that initializes any one of the steps of the distribution network scheduling method described above.
[0111] The serial numbers of the above embodiments of the present invention are only for description and do not represent the advantages or disadvantages of the embodiments.
[0112] In the above embodiments of the present invention, the description of each embodiment has its own emphasis. For parts that are not described in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0113] In the several embodiments provided in this application, it should be understood that the disclosed technical content can be implemented in other ways. Among them, the device embodiments described above are only schematic. For example, the division of the above-mentioned units can be a logical function division. There may be other division methods in actual implementation. For example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of units or modules, which can be electrical or other forms.
[0114] The units described above as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple units. Some or all of the units may be selected according to actual needs to achieve the purpose of the present embodiment.
[0115] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0116] If the integrated unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable non-volatile storage medium. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, and the computer software product is stored in a non-volatile storage medium, including a number of instructions for a computer device (which can be a personal computer, a server or a network device, etc.) to perform all or part of the steps of the method described in each embodiment of the present invention. The aforementioned non-volatile storage medium includes: U disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), mobile hard disk, magnetic disk or optical disk and other media that can store program codes.
[0117] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principle of the present invention. These improvements and modifications should also be regarded as the scope of protection of the present invention.
Claims
1. A distribution network dispatching system, characterized in that: include: An energy management terminal is connected to the load terminal and is used to collect power usage habit information of the load terminal and analyze the power usage habit information using a time series model algorithm to obtain user load forecast data; A distribution network dispatching platform, connected to the energy management terminal, for generating an energy management strategy based on the user load forecast data and predetermined power forecast data, and issuing the energy management strategy to the energy management terminal; The power usage habit information includes historical power usage information, and the energy management terminal includes: The photovoltaic inverter and / or charging station is used to record the historical power consumption information of the load terminal, and group the historical power consumption information according to the time period information to obtain multiple groups of historical power consumption information in the same time period; The photovoltaic inverter and / or charging station is further used to use the time series model algorithm to analyze the historical power consumption information of each time period to obtain a user load forecast data, and arrange multiple user load forecast data to obtain the user load forecast data of multiple time periods; Among them, the photovoltaic inverter is also used to add the scheduling instruction as a constraint in the optimal algorithm when receiving the scheduling instruction of the distribution network, to obtain an updated energy management strategy, and if it is determined during the updating process that the load terminal cannot meet the constraint requirements, then the scheduling of the distribution network is rejected.
2. The distribution network dispatching system according to claim 1, characterized in that: The energy management terminal is also connected to the power distribution network, and is used to determine the target amount of electricity that the power distribution network allocates to the load terminal based on the energy management strategy.
3. The distribution network dispatching system according to claim 1, characterized in that: The distribution network dispatching platform is also used to use each of the time periods as the data granularity of the energy management strategy to determine the lowest target power as the optimization target of the energy management strategy.
4. The distribution network dispatching system according to claim 3, characterized in that: The distribution network dispatching platform is also used to determine the target power by the following calculation formula based on the energy management strategy: and remaining charge SOC i : in, is the user load forecast data for the future i-th hour, and the power forecast data includes: is the photovoltaic power generation in the future hour i, is the charge and discharge amount in the future i hour; SOC i is the remaining battery power in the future i hour; The constraints of the calculation formula include: 1) and 2) Discharge when it is positive; 3) 5. The distribution network dispatching system according to claim 1, characterized in that: The distribution network dispatching platform is also used to obtain an updated calculation formula based on the updated energy management strategy: in, is the limit imposed by the distribution network on the target power of the photovoltaic inverter.
6. A distribution network dispatching method, characterized in that: include: Collect information on power usage habits of load terminals; Using a time series model algorithm to analyze the electricity usage habit information to obtain user load forecast data; The user load forecast data is sent to a distribution network dispatching platform, wherein the distribution network dispatching platform is further used to generate an energy management strategy based on the user load forecast data and predetermined power forecast data, and send the energy management strategy to an energy management terminal; The power usage habit information includes historical power usage information, and the energy management terminal includes: The photovoltaic inverter and / or charging station is used to record the historical power consumption information of the load terminal, and group the historical power consumption information according to the time period information to obtain multiple groups of historical power consumption information in the same time period; The photovoltaic inverter and / or charging station is further used to use the time series model algorithm to analyze the historical power consumption information of each time period to obtain a user load forecast data, and arrange multiple user load forecast data to obtain the user load forecast data of multiple time periods; Among them, the photovoltaic inverter is also used to add the scheduling instruction as a constraint in the optimal algorithm when receiving the scheduling instruction of the distribution network, to obtain an updated energy management strategy, and if it is determined during the updating process that the load terminal cannot meet the constraint requirements, then the scheduling of the distribution network is rejected.
7. A distribution network dispatching method, characterized in that: include: Receiving user load forecast data sent by the energy management terminal, wherein the user load forecast data collects power usage habit information of the load terminal, and uses a time series model algorithm to analyze the power usage habit information to obtain the user load forecast data; generating an energy management strategy based on the user load forecast data and predetermined power forecast data; Sending the energy management strategy to the energy management terminal; The power usage habit information includes historical power usage information, and the energy management terminal includes: The photovoltaic inverter and / or charging station is used to record the historical power consumption information of the load terminal, and group the historical power consumption information according to the time period information to obtain multiple groups of historical power consumption information in the same time period; The photovoltaic inverter and / or charging station is further used to use the time series model algorithm to analyze the historical power consumption information of each time period to obtain a user load forecast data, and arrange multiple user load forecast data to obtain the user load forecast data of multiple time periods; Among them, the photovoltaic inverter is also used to add the scheduling instruction as a constraint in the optimal algorithm when receiving the scheduling instruction of the distribution network, to obtain an updated energy management strategy, and if it is determined during the updating process that the load terminal cannot meet the constraint requirements, then the scheduling of the distribution network is rejected.
8. A distribution network dispatching device, characterized in that: include: A collection module is used to collect the power usage habit information of the load terminal; An analysis module, used to analyze the power usage habit information using a time series model algorithm to obtain user load forecast data; A sending module, used to send the user load forecast data to the distribution network dispatching platform, wherein the distribution network dispatching platform is also used to generate an energy management strategy based on the user load forecast data and predetermined power forecast data, and send the energy management strategy to the energy management terminal; The power usage habit information includes historical power usage information, and the energy management terminal includes: The photovoltaic inverter and / or charging station is used to record the historical power consumption information of the load terminal, and group the historical power consumption information according to the time period information to obtain multiple groups of historical power consumption information in the same time period; The photovoltaic inverter and / or charging station is further used to use the time series model algorithm to analyze the historical power consumption information of each time period to obtain a user load forecast data, and arrange multiple user load forecast data to obtain the user load forecast data of multiple time periods; Among them, the photovoltaic inverter is also used to add the scheduling instruction as a constraint in the optimal algorithm when receiving the scheduling instruction of the distribution network, to obtain an updated energy management strategy, and if it is determined during the updating process that the load terminal cannot meet the constraint requirements, then the scheduling of the distribution network is rejected.
9. A distribution network dispatching device, characterized in that: include: A receiving module, used to receive user load forecast data sent by the energy management terminal, wherein the user load forecast data collects power usage habit information of the load terminal, and uses a time series model algorithm to analyze the power usage habit information to obtain the user load forecast data; A generating module, configured to generate an energy management strategy based on the user load forecast data and predetermined power forecast data; A sending module, used for sending the energy management strategy to the energy management terminal; The power usage habit information includes historical power usage information, and the energy management terminal includes: The photovoltaic inverter and / or charging station is used to record the historical power consumption information of the load terminal, and group the historical power consumption information according to the time period information to obtain multiple groups of historical power consumption information in the same time period; The photovoltaic inverter and / or charging station is further used to use the time series model algorithm to analyze the historical power consumption information of each time period to obtain a user load forecast data, and arrange multiple user load forecast data to obtain the user load forecast data of multiple time periods; Among them, the photovoltaic inverter is also used to add the scheduling instruction as a constraint in the optimal algorithm when receiving the scheduling instruction of the distribution network, to obtain an updated energy management strategy, and if it is determined during the updating process that the load terminal cannot meet the constraint requirements, then the scheduling of the distribution network is rejected.
10. A non-volatile storage medium, characterized in that: The non-volatile storage medium stores a plurality of instructions, and the instructions are suitable for being loaded by a processor and executing the distribution network scheduling method described in any one of claims 7 to 8.
11. A processor, characterized in that: The processor is used to run a program, wherein the program is configured to execute the distribution network scheduling method according to any one of claims 6 to 7 when running.
12. An electronic device comprising a memory and a processor, characterized in that: A computer program is stored in the memory, and the processor is configured to run the computer program to execute the distribution network scheduling method according to any one of claims 6 to 7.