Distribution network ground fault arc simulation device and arc handling equipment verification method
The arc discharge is simulated by the arc simulation device of the distribution network grounding fault arc simulation device, which solves the problem of the lack of joint test and testing of the complete set of arc treatment equipment in the first and second fusion of the distribution network, and realizes accurate verification of arc fault handling capabilities and ensures the response capabilities of the equipment. and security.
Patent Information
- Application Number
- CN202110220422.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-02-26
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2041-02-26
AI Technical Summary
The complete set of arc treatment equipment for the first and second convergence of the existing distribution network lacks joint true tests, and the existing arc fault simulation system cannot fully simulate the arc fault status of the actual distribution network, resulting in the accuracy of arc fault handling capabilities verification.
Provides a verification method for arc simulation device for ground faults in distribution network and arc treatment equipment, and uses the gap adjustment device between the first electrode and the second electrode to simulate arc discharge, generate arc discharge through insulating gas, simulate a single-phase ground fault arc, and passes The linear stepper motor and stepper driver control the electrode spacing and arc discharge duration to verify the responsiveness of the arc treatment equipment.
Accurate joint testing of the complete set of arc treatment equipment of the first and second converged distribution network is achieved, ensuring the accuracy of verification of arc fault handling capabilities, reliable use, easy adjustment and high safety.
Smart Images

Figure CN112964964B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of electrical equipment, and relates to a distribution network ground fault arc simulation device and an arc handling equipment verification method. Background Art
[0002] The integrated primary and secondary arc handling equipment of the distribution network used in conjunction with overhead lines includes primary equipment such as pole-mounted switches and transformers, and secondary equipment such as feeder terminals (Feeder Terminal Unit, FTU).
[0003] The integrated primary and secondary arc handling equipment of the distribution network used in conjunction with the buried cable line is a ring network box, which includes primary equipment such as ring network cabinets and mutual inductors, and secondary distribution terminal equipment such as distribution terminal units (DTUs) at the station.
[0004] At present, the primary equipment such as pole-mounted switches and ring network boxes in the above-mentioned integrated primary and secondary arc handling equipment of the distribution network and the secondary equipment of distribution terminals such as station terminals and feeder terminals have independently carried out arc fault handling capability tests and verifications, but the joint real-type test of the primary and secondary equipment has not yet been carried out.
[0005] In addition, the current use of distribution terminals and distribution network typical fault characteristic signal simulation systems to carry out arc handling equipment function testing and verification has certain limitations and cannot fully simulate the actual distribution network arc fault state. In particular, for the distribution network insulators, insulating pillars, cables and other arc faults that need to be reproduced urgently, the inability to fully simulate their arc fault characteristics has laid a hidden danger for the accuracy of the arc fault handling capability verification of the primary and secondary integrated arc handling equipment of the distribution network, such as pole switches and ring network boxes. Summary of the invention
[0006] In view of the deficiencies in the prior art, the present invention provides a distribution network ground fault arc simulation device and an arc handling equipment verification method, aiming to solve the problem of lack of verification of the fault handling capability of the current primary and secondary fusion arc handling equipment.
[0007] In a first aspect, the present invention provides a distribution network ground fault arc simulation device, comprising:
[0008] a first electrode, a second electrode and a gap adjustment device;
[0009] The first electrode is arranged opposite to the second electrode;
[0010] The second electrode is connected to the gap adjustment device;
[0011] When the gap adjusting device controls the second electrode to move away from or approach the first electrode, the gap formed by the first electrode and the second electrode becomes larger or smaller;
[0012] The gap formed by the first electrode and the second electrode is filled with an insulating gas;
[0013] When the potential difference between the first electrode and the second electrode is not less than a predetermined value, and the gap adjustment device controls the second electrode to be close to the first electrode and the distance between the first electrode and the second electrode is not greater than a predetermined value, the insulating gas in the gap generates arc discharge.
[0014] Specifically, the device,
[0015] The gap adjustment device includes a linear stepping motor, a stepping driver and a pull rod.
[0016] The transmission screw of the linear stepping motor is connected to the pull rod, and the pull rod is connected to the second electrode;
[0017] The stepping driver controls the movement of the transmission screw of the linear stepping motor to make the pull rod move linearly and make the second electrode move linearly.
[0018] Specifically, the device,
[0019] The gap adjustment device controls the distance between the first electrode and the second electrode to increase or decrease in the vertical direction.
[0020] Specifically, the device further includes:
[0021] An airtight housing, wherein the airtight housing is provided with a first through hole and a second through hole;
[0022] a first conductive rod, the first conductive rod being connected to the first electrode, and the first conductive rod passing through the first through hole and extending out of the airtight housing;
[0023] A second conductive rod, wherein the second conductive rod is connected to the second electrode, and the second conductive rod passes through the second through hole and extends out of the airtight housing.
[0024] Specifically, the device,
[0025] The first conductive rod and the second conductive rod are respectively connected to a power source and a grounding electrode outside the airtight housing to generate an electric field in a gap formed by the first electrode and the second electrode.
[0026] Specifically, the device further includes:
[0027] Insulating gas charging and discharging channel;
[0028] The airtight housing is also provided with a third through hole;
[0029] The insulating gas charging and discharging channel is connected with the inner cavity of the airtight shell after passing through the third through hole.
[0030] Specifically, the device,
[0031] The airtight housing is made of insulating material;
[0032] The pull rod is made of insulating material.
[0033] Specifically, the device,
[0034] The first electrode and the second electrode are a needle-plate electrode combination, a plate-plate electrode combination, a ball-plate electrode combination or a ball-ball electrode combination.
[0035] In a second aspect, the present invention provides a distribution network ground fault arc simulation method, using the distribution network ground fault arc simulation device as described in the first aspect, comprising:
[0036] According to the arc discharge type and phase voltage of the tested line in the distribution network, the insulating gas, the first electrode, the second electrode and the distance between the electrodes are selected;
[0037] Filling the insulating gas into a gap formed by the first electrode and the second electrode;
[0038] Connecting the first electrode or the second electrode of the distribution network ground fault arc simulator to a target in the test line;
[0039] Accordingly, the second electrode or the first electrode of the distribution network ground fault arc simulation device is connected to the grounding electrode corresponding to the tested line;
[0040] The gap adjustment device of the distribution network ground fault arc simulation device controls the second electrode to move linearly according to the distance between the electrodes, so that the insulating gas in the gap formed by the first electrode and the second electrode generates arc discharge, thereby simulating the arc discharge type.
[0041] In a third aspect, the present invention provides a method for verifying arc handling equipment in a distribution network, using the distribution network ground fault arc simulation device as described in the first aspect, comprising:
[0042] According to the arc discharge type and phase voltage of the tested line in the distribution network, the insulating gas, the first electrode, the second electrode and the distance between the electrodes are selected;
[0043] Connecting the first electrode or the second electrode of the distribution network ground fault arc simulation device to the target in the test line through a single-phase switch;
[0044] Accordingly, the second electrode or the first electrode of the distribution network ground fault arc simulation device is connected to the grounding electrode corresponding to the tested line;
[0045] The tested line is provided with arc handling equipment of the tested distribution network; or
[0046] A reference distribution network arc handling device is provided in the reference line of the tested line;
[0047] The gap adjustment device of the distribution network ground fault arc simulation device controls the second electrode to move linearly according to the distance between the electrodes, so that the insulating gas in the gap formed by the first electrode and the second electrode generates arc discharge;
[0048] Check whether the arc handling equipment of the tested distribution network responds to the arc discharge and performs corresponding arc handling actions; or
[0049] checking whether the reference distribution network arc handling device responds to the arc discharge and does not perform a corresponding arc handling action;
[0050] The start time and the end time of the distribution network ground fault arc simulation device being connected to the test line are controlled by controlling the opening or closing of the single-phase switch.
[0051] The distribution network ground fault arc simulation device provided by the present invention is used to test and verify the arc handling capability of the distribution network primary and secondary integrated arc handling equipment, including the pole switch and the ring network box, for single-phase ground fault arcs. The device can accurately adjust the spacing between electrodes and the arc discharge duration, and is reliable, easy to adjust, and highly safe.
[0052] The distribution network grounding fault arc simulation method provided by the present invention is used to carry out a complete set of arc handling equipment for the distribution network, including a pole-mounted switch and a ring network box, for the joint test of primary and secondary equipment for the arc handling capability of a single-phase grounding fault. The method can accurately adjust the spacing between electrodes and the arc discharge duration, and is reliable to use, easy to adjust, and highly safe.
[0053] The distribution network arc handling equipment verification method provided by the present invention utilizes a distribution network ground fault arc simulation device to simulate a single-phase ground fault arc in the distribution network, thereby carrying out a complete set of distribution network primary and secondary integrated arc handling equipment, including a pole-mounted switch and a ring network box, and conducting a joint test of primary and secondary equipment for the single-phase ground fault arc handling capability. The method can accurately adjust the spacing between electrodes and the arc discharge duration, and is reliable to use, easy to adjust, and highly safe. BRIEF DESCRIPTION OF THE DRAWINGS
[0054] A more complete understanding of exemplary embodiments of the present invention may be obtained by referring to the following drawings:
[0055] Figure 1 It is a schematic diagram of the composition of a distribution network ground fault arc simulation device according to a preferred embodiment of the present invention;
[0056] Figure 2 A schematic diagram of applying the distribution network ground fault arc simulation device according to the preferred embodiment of the present invention to a 1-input 4-output grid to verify the distribution network arc handling equipment;
[0057] Figure 3 for Figure 2 In the scenario, the air gap of the distribution network ground fault arc simulation device is 2.5 mm and the inter-electrode voltage waveform and inter-electrode current waveform of the ball-ball electrode combination during single-phase ground fault arc discharge;
[0058] Figure 4 for Figure 2 In the scenario, the air gap of the distribution network grounding fault arc simulation device is 1.5 mm, and the inter-electrode voltage waveform and inter-electrode current waveform of the ball-ball electrode combination during single-phase grounding fault arc discharge. DETAILED DESCRIPTION
[0059] Now, exemplary embodiments of the present invention are described with reference to the accompanying drawings. However, the present invention can be implemented in many different forms and is not limited to the embodiments described herein. These embodiments are provided to disclose the present invention in detail and completely and to fully convey the scope of the present invention to those skilled in the art. The terms used in the exemplary embodiments shown in the accompanying drawings are not intended to limit the present invention. In the accompanying drawings, the same units / elements are marked with the same reference numerals.
[0060] Unless otherwise specified, the terms (including technical terms) used herein have the commonly understood meanings to those skilled in the art. In addition, it is understood that the terms defined in commonly used dictionaries should be understood to have the same meanings as those in the context of the relevant fields, and should not be understood as idealized or overly formal meanings.
[0061] At present, the fault handling capability of secondary equipment such as distribution terminals is mainly tested and verified by simulating typical fault characteristics of distribution networks, and the main difference between different test and verification methods for distribution terminals lies in the simulation method of typical fault characteristics.
[0062] At present, there are three main methods for simulating fault characteristic signals of distribution networks: the first is a database-based fault characteristic signal simulation test system; the second is a physical low-voltage distribution simulation test system; and the third is a real-time digital simulation system (RTDS) simulation test system. All three methods simulate the fault characteristic signals of distribution networks through non-actual physical models, and carry out fault handling capability testing and verification of secondary equipment such as distribution terminals.
[0063] The existing arc fault handling capability test verification technology has the following four problems:
[0064] (1) At present, the test and verification of the distribution terminal's arc fault handling capability is mainly achieved through the use of analog quantity generating devices. On-site verification and evaluation of the distribution terminal's fault function have not been carried out, and there is a lack of joint test and verification of primary and secondary equipment.
[0065] (2) Database-based fault characteristic signal simulation test system, such as the current distribution terminal and fault simulation device joint test system, whose database-based arc fault characteristic signal is derived from the actual fault on site. However, due to the small number of recording devices or signal acquisition systems installed in the distribution network, its fault case samples are limited, and the richness of arc fault characteristics is limited by the richness of fault cases.
[0066] (3) Using the physical low-voltage distribution network simulation test system, the arc fault characteristics generated in the low-voltage 0.4kV system lost some meaningful characteristic signals and could not fully and truly simulate the arc fault characteristics of the medium-voltage 10kV distribution network;
[0067] (4) The distribution network simulation test system based on the real-time digital simulation system (RTDS) cannot fully and accurately simulate the situation of the real distribution network equipment due to the use of digital modeling and simulation methods. In addition, the intermittent arc model of the distribution network at home and abroad usually ignores the influencing factors such as transient characteristics; at the same time, due to the limitation of the simulation step size, the transient signal frequency range it provides is limited.
[0068] Due to the above defects, the above three test systems cannot fully simulate the arc fault characteristics of the distribution network, which poses a hidden danger to the accuracy of the verification of the arc fault handling capability of the integrated primary and secondary pole-mounted switches and ring network boxes.
[0069] According to one embodiment of the present invention, a distribution network ground fault arc simulation device includes: a first electrode, a second electrode and a gap adjustment device; the first electrode and the second electrode are arranged opposite to each other; the second electrode is connected to the gap adjustment device; when the gap adjustment device controls the second electrode to move away from or close to the first electrode, the gap formed by the first electrode and the second electrode becomes larger or smaller; the gap formed by the first electrode and the second electrode is filled with insulating gas; when the potential difference between the first electrode and the second electrode is not less than a predetermined value, and the gap adjustment device controls the second electrode to move close to the first electrode and the distance between the first electrode and the second electrode is not greater than a predetermined value, the insulating gas in the gap generates arc discharge.
[0070] Specifically, when the gap adjustment device controls the second electrode to move linearly in a direction away from the first electrode, the gap formed by the first electrode and the second electrode becomes larger;
[0071] When the gap adjusting device controls the second electrode to move linearly in a direction close to the first electrode, the gap formed by the first electrode and the second electrode becomes smaller.
[0072] Specifically, the gap adjustment device includes a linear stepper motor, a stepper driver and a pull rod, the transmission screw of the linear stepper motor is connected to the pull rod, and the pull rod is connected to the second electrode; the stepper driver controls the movement of the transmission screw of the linear stepper motor so that the pull rod moves linearly and the second electrode moves linearly.
[0073] Specifically, the distance between the first electrode and the second electrode increases or decreases along the vertical direction.
[0074] Specifically, the second electrode is arranged below the first electrode, and the linear stepping motor is installed vertically.
[0075] Specifically, it also includes: an airtight shell, the airtight shell is provided with a first through hole and a second through hole; a first conductive rod, the first conductive rod is connected to the first electrode, and the first conductive rod extends out of the airtight shell after passing through the first through hole; a second conductive rod, the second conductive rod is connected to the second electrode, and the second conductive rod extends out of the airtight shell after passing through the second through hole.
[0076] Specifically, the first conductive rod and the second conductive rod are connected to a power source and a ground electrode respectively, so as to generate an electric field in a gap formed by the first electrode and the second electrode.
[0077] Specifically, when the first conductive rod is connected to a power source outside the airtight enclosure, the second conductive rod is connected to a grounding electrode outside the airtight enclosure. When the first conductive rod is connected to a grounding electrode outside the airtight enclosure, the second conductive rod is connected to a power source outside the airtight enclosure.
[0078] It should be understood that the specific meanings of the power supply and the grounding electrode are different according to different usage scenarios of the distribution network ground fault arc simulation device. Specifically, the power supply can be a distribution network power supply or a test power supply, and the grounding electrode is the grounding electrode of the power supply. For example, when conducting a field test of the distribution network, the power supply is a phase in the three-phase line, and the grounding electrode is the grounding network access point.
[0079] Specifically, it also includes: an insulating gas charging and discharging channel; the airtight shell is also provided with a third through hole; after the insulating gas charging and discharging channel passes through the third through hole, it is connected with the inner cavity of the airtight shell to charge and discharge insulating gas into the inner cavity of the airtight shell.
[0080] Specifically, the insulating gas charging and discharging channel is further provided with a valve, and the valve is used to close or open the insulating gas charging and discharging channel.
[0081] Specifically, a sealing ring is provided on the hole wall of the first through hole, the hole wall of the second through hole or the hole wall of the third through hole respectively.
[0082] Specifically, the airtight housing is made of insulating material; the pull rod is made of insulating material.
[0083] It should be understood that the first electrode and the second electrode are provided with conductor layers on their opposite surfaces, respectively, so that a strong current (e.g., several amperes to several hundred amperes) can continuously pass through the insulating gas between the two electrodes and emit a strong glow (i.e., arc discharge). That is, arc discharge is a continuous process, and there is visible arc light during arc discharge.
[0084] Specifically, the first electrode and the second electrode are electrode combinations such as a needle-plate electrode combination, a plate-plate electrode combination, a ball-plate electrode combination, or a ball-ball electrode combination.
[0085] Specifically, the first electrode is a needle-type electrode and the second electrode is a plate-type electrode; or the first electrode is a plate-type electrode and the second electrode is a plate-type electrode; or the first electrode is a spherical electrode and the second electrode is a plate-type electrode; or the first electrode is a spherical electrode and the second electrode is a spherical electrode.
[0086] Different electrode combinations result in different spatial electric field intensity distribution patterns between the two electrodes, thereby simulating arc discharge characteristics during various typical single-phase grounding faults.
[0087] The distribution network ground fault arc simulation device is used to simulate the continuous arc discharge fault on the line, and can accurately adjust the distance between electrodes, arc discharge intensity and arc discharge duration (such as Figure 3 and Figure 4 As shown in the figure, the single-phase ground fault arc handling capability of the integrated primary and secondary arc handling equipment of the distribution network (including pole-mounted switches and ring network boxes) can be tested and verified. It is reliable to use, easy to adjust and highly safe.
[0088] The arc simulation device is a real physical model. The electrical quantity waveforms of the arc discharge fault in the distribution network simulated by it are as follows: Figure 3 and Figure 4 As shown, it can be seen that the transient characteristic signals included in these voltage waveforms and current waveforms are richer and more realistic than the real-time digital simulation system (RTDS) digital real-time simulation software (such as RTDS, RTLAB), and the verification of the arc fault handling capability of the primary and secondary integrated arc handling equipment (including pole-mounted switches and ring network boxes) is more reasonable and reliable.
[0089] The distribution network ground fault arc simulation method according to the embodiment of the present invention uses the distribution network ground fault arc simulation device as described above, and includes:
[0090] According to the arc discharge type and phase voltage of the tested line in the distribution network, the insulating gas, the first electrode, the second electrode and the distance between the electrodes are selected;
[0091] Filling the insulating gas into a gap formed by the first electrode and the second electrode;
[0092] Connecting the first electrode or the second electrode of the distribution network ground fault arc simulator to a target in the test line;
[0093] Accordingly, the second electrode or the first electrode of the distribution network ground fault arc simulation device is connected to the grounding electrode corresponding to the tested line;
[0094] The gap adjustment device of the distribution network ground fault arc simulation device controls the second electrode to move linearly according to the distance between the electrodes, so that the insulating gas in the gap formed by the first electrode and the second electrode generates arc discharge, thereby simulating the arc discharge type.
[0095] It should be understood that the tested line is usually a three-phase line; for single-phase ground fault arc simulation, the distribution network ground fault arc simulation device needs to be connected to each phase of the three-phase line separately. At this time, the currently connected phase is the target phase in the tested line.
[0096] It should be understood that the arc discharge type of the test line in the distribution network is related to the electrode combination mode and the arc discharge medium (ie, the type of insulating gas).
[0097] The distribution network ground fault arc simulation method is used to carry out joint testing and verification of the primary and secondary equipment of the distribution network's integrated primary and secondary arc handling equipment (including pole-mounted switches and ring network boxes) for the single-phase ground fault arc handling capability. It can accurately adjust the spacing between electrodes and the arc discharge duration, and is reliable, easy to adjust and highly safe.
[0098] The distribution network arc handling equipment verification method of the embodiment of the present invention uses the above-mentioned distribution network ground fault arc simulation device, including:
[0099] According to the arc discharge type and phase voltage of the tested line in the distribution network, the insulating gas, the first electrode, the second electrode and the distance between the electrodes are selected;
[0100] Connecting the first electrode or the second electrode of the distribution network ground fault arc simulation device to the target in the test line through a single-phase switch;
[0101] Accordingly, the second electrode or the first electrode of the distribution network ground fault arc simulation device is connected to the grounding electrode corresponding to the tested line;
[0102] The tested line is provided with arc handling equipment of the tested distribution network; or
[0103] A reference distribution network arc handling device is provided in the reference line of the tested line;
[0104] The gap adjustment device of the distribution network ground fault arc simulation device controls the second electrode to move linearly according to the distance between the electrodes, so that the insulating gas in the gap formed by the first electrode and the second electrode generates arc discharge;
[0105] Check whether the arc handling equipment of the tested distribution network responds to the arc discharge and performs corresponding arc handling actions; or
[0106] checking whether the reference distribution network arc handling device responds to the arc discharge and does not perform a corresponding arc handling action;
[0107] The start time and the end time of the distribution network ground fault arc simulation device being connected to the test line are controlled by controlling the opening or closing of the single-phase switch.
[0108] It should be understood that, considering the preparation time consumed by the gap adjustment device to adjust the gap, the continuous duration between the start time and the end time of the distribution network ground fault arc simulation device being connected to the test line is not greater than the aforementioned arc discharge duration.
[0109] Specifically, the distribution network arc handling equipment verification method utilizes a distribution network ground fault arc simulation device to simulate a single-phase ground fault arc in the distribution network, and conducts joint testing and verification of the distribution network's primary and secondary integrated arc handling equipment (including pole-mounted switches and ring network boxes) for the single-phase ground fault arc handling capability. The method can accurately adjust the spacing between electrodes and the arc discharge duration, and is reliable to use, easy to adjust, and highly safe.
[0110] like Figure 1 As shown, a distribution network ground fault arc simulation device according to another embodiment of the present invention is composed of an upper conductive rod 1 (which can be the aforementioned first conductive rod), an upper sealing ring 2, an upper electrode 3 (which can be the aforementioned first electrode), a lower electrode 4 (which can be the aforementioned second electrode), a sealed and transparent acrylic box 5 (which can be the aforementioned airtight housing), a lower sealing ring 6, a valve 7, a lower conductive rod 8 (which can be the aforementioned second conductive rod), an insulating pull rod 9 (which can be the aforementioned pull rod), an insulating bracket 10, a linear stepping motor 11 and a stepping driver 12.
[0111] Specifically, the upper conductive rod 1 connects a phase of the power supply or line to the upper electrode 3, and the upper sealing ring 2 ensures that the transparent acrylic box 5 is well sealed when the upper conductive rod 1 passes through the transparent acrylic box 5, that is, there is no air leakage from the through hole there.
[0112] Specifically, the acrylic box 5 is made of transparent acrylic material. Acrylic, also known as organic glass, is derived from the English word acrylic. Its chemical name is polymethyl methacrylate. It is a plastic polymer material with good transparency, chemical stability and weather resistance. Polymethyl methacrylate has good dielectric and electrical insulation properties. Polymethyl methacrylate also has excellent arc resistance. Under the action of an arc, no carbonized conductive path or arc track phenomenon will be generated on the surface.
[0113] Specifically, the lower electrode 4 is connected to the grounding electrode corresponding to the tested circuit to achieve grounding ( Figure 1 The ground electrode is not shown).
[0114] Specifically, after the upper electrode 3 is connected to a power supply or a phase of a line and the lower electrode 4 is connected to the ground of the power supply or the ground of the line, there is a potential difference between the upper electrode 3 and the lower electrode 4, and a spatial electric field strength corresponding to the potential difference is generated in the gap.
[0115] The upper sealing ring 2 ensures that the upper conductive rod 1 passes through the transparent acrylic box 5 and the lower sealing ring 6 ensures that the lower conductive rod 8 passes through the transparent acrylic box 5 and the box is well sealed.
[0116] Specifically, after opening the valve 7, insulating gas can be filled into the acrylic box through the insulating gas filling and discharging channel as an arc discharge medium, or the insulating gas filled into the acrylic box can be discharged and replaced with other types of insulating gas.
[0117] Specifically, the arc discharge medium is determined according to the type of arc discharge to be simulated; for example, when simulating an external insulation arc fault, compressed air or non-compressed air with different temperatures and humidities may be used; when simulating an internal insulation arc fault, sulfur hexafluoride SF6 or vacuum, dry air, dry nitrogen, etc. may be used.
[0118] In specific implementation, the arc discharge medium can be: air, vacuum, sulfur hexafluoride SF6 and nitrogen, etc.
[0119] It should be noted that the arc caused by single-phase ground fault in distribution network is mainly caused by insulation fault and ground fault. At this time, the insulating gas is mainly air. The air can be divided into dry air and air with different humidity.
[0120] In the specific implementation, on the upper and lower surfaces of the acrylic box 5, a long bolt group provided with insulating gaskets (and part of the screw rod of the long bolt extends into the interior of the box) is used as the upper conductive rod and the lower conductive rod respectively, and the upper electrode 3 and the lower electrode 4 are suspended in the upper and lower parts of the inner cavity of the acrylic box.
[0121] Specifically, an insulating bracket 10 having a plurality of legs or an annular supporting surface supports the acrylic box 5. The insulating bracket 10 is arranged on the ground for easy operation by personnel. Preferably, the bracket 10 is made of insulating material or has an insulating structure to ensure the safety of personnel operation.
[0122] Specifically, the linear stepping motor 11 is provided with a transmission screw, which provides a linear stroke in a controllable manner through screw transmission steps.
[0123] Specifically, the linear stepping motor 11 is connected to the insulating pull rod 9 , the lower conductive rod 8 and the lower electrode 4 in sequence from bottom to top in the direction of the common central axis.
[0124] Specifically, the stepper driver 12 controls the transmission screw of the linear stepper motor 11 to move up and down in the vertical direction through the control line; the transmission screw is connected to the insulating pull rod 9 and drives the lower conductive rod 8 and the lower electrode 4 to move up and down, thereby adjusting the height of the gap between the upper electrode 3 and the lower electrode 4 in the vertical direction, that is, the linear spacing between the upper electrode 3 and the lower electrode 4 in the vertical direction.
[0125] Preferably, a high voltage is introduced to the upper electrode 3 through the upper conductive rod 1 (part of which extends out of the box 5), and the lower electrode 4 is grounded through the lower conductive rod 8 (part of which extends out of the box 5), so that a potential difference is generated between the upper and lower electrodes. When the spatial electric field intensity in the gap reaches a certain level, the arc discharge medium in the box cavity is ionized, generating an arc discharge and causing a gap discharge.
[0126] In specific implementation, when the gap between the upper electrode and the lower electrode is 1mm to 2.5mm, the insulating gas between the electrodes is dry air, and the effective value of the potential difference between the power supply and the grounding electrode is 5.8kV, the insulating gas generates arc discharge in the gap between the upper electrode and the lower electrode.
[0127] contrast Figure 3 and Figure 4 It can be seen that when the electrode combination is the same and the potential difference between the electrodes is the same, when the distance between the electrodes decreases, the insulation strength between the electrodes decreases, the arc discharge is more intense, the arc discharge lasts longer, and the voltage instantaneous value fluctuates more significantly (such as Figure 3 and Figure 4 The maximum voltage peak is 8.5kV); the instantaneous current value fluctuates more obviously, has stronger periodicity, and has a larger effective current value (such as Figure 3 and Figure 4 The maximum current peaks are 525A and 415A respectively).
[0128] It should be understood that, at the same spacing, different electric field strengths are required to ionize different types of insulating gases.
[0129] It should be understood that, under conditions of smaller spacing (usually millimeter level), when there is the same potential difference between the electrodes, the smaller spacing produces a stronger electric field, making it easier to ionize the insulating gas and more likely to cause gap discharge and arc generation.
[0130] In a specific implementation, the precision of the stepper motor is 0.1 mm and the stroke is 0 to 10 mm.
[0131] The spacing is determined based on the potential difference required to generate an arc and the spacing between electrodes, and is input into the stepper driver, which responds to the set spacing to control the linear stepper motor 11 to drive the insulating pull rod 9, the lower conductive rod 8 and the lower electrode 4 to move.
[0132] Specifically, when the lower electrode 4 moves downward, the gap becomes larger; when the lower electrode 4 moves upward, the gap becomes smaller.
[0133] During the arc discharge process, the stepping driver 12 may also be used to control the linear stepping motor 11 to adjust the distance between the electrodes so as to reignite or extinguish the arc.
[0134] It should be noted that when the upper and lower electrodes discharge, the lower electrode is grounded through the lower conductive rod, and has a certain grounding resistance. The discharge current flowing through the grounding resistance will cause the ground potential to rise. If the transmission screw of the linear stepper motor is a metal conductive material, the ground potential will be led to the inside of the motor, causing the motor to burn out. The fault simulation device is connected to the transmission screw of the motor through the insulating pull rod 9, which can insulate the motor from the lower electrode, avoid leading the ground potential to the inside of the motor, and ensure that when the gap discharge generates an arc, it will not affect the linear stepper motor, thereby ensuring the normal operation of the linear stepper motor.
[0135] Preferably, the device further comprises a bracket, the airtight housing is supported by the bracket; the bracket is arranged on the ground for easy operation by personnel. Preferably, it is made of insulating material or has an insulating structure to ensure safe operation.
[0136] The following combination Figure 2 , specifically describes the use of the distribution network ground fault arc simulation device, adopting the above-mentioned distribution network ground fault arc simulation method, and implementing the above-mentioned distribution network arc handling equipment verification method.
[0137] Specifically, a ground fault arc simulation device is used to simulate the ground fault of the distribution network. Figure 2 An arc fault is simulated on the 1-input and 4-output overhead line shown, that is, a single-phase grounding fault arc is reproduced.
[0138] Specifically, the test product (ie, the distribution network arc handling equipment) is a primary and secondary fused complete set of pole-mounted switches or a primary and secondary fused complete set of ring network boxes.
[0139] The tested line is an overhead line (the corresponding tested product is a primary and secondary integrated set of pole-mounted switches) or a cable line (the corresponding tested product is a primary and secondary integrated set of ring network boxes).
[0140] It should be understood that the 10kV voltage level is taken as an example here; but the distribution network ground fault arc simulation device, distribution network ground fault arc simulation method and distribution network arc handling equipment verification method are suitable for 10kV, 20kV, 35kV and 66kV distribution networks with primary and secondary integrated pole-mounted switches or primary and secondary integrated ring network boxes as test products for fault handling capability verification tests.
[0141] During the test, two sets of test products were installed, of which the 1# test product was used to be installed in the 10kV-1# overhead line / cable line (also known as the reference line), and the 2# test product was used to be installed in the 10kV-2# overhead line / cable line (also known as the test line).
[0142] After installing the arc simulation device between phase B and ground of 2# overhead line / cable line through 6# single-phase switch, the verification test of the test product's handling of single-phase grounding fault arc was carried out.
[0143] like Figure 2 As shown, the tested grid structure is 1 incoming line and 4 outgoing lines; the 1# tested product and the 2# tested product are installed on the 1# line and the 2# line on the right side respectively;
[0144] (1) Connect the 10kV AC power supply to the 1# busbar on the left, close the 1# incoming switch (three-phase, set on the 1# busbar) on the busbar, and then the 1# busbar will be energized;
[0145] (2) Close the 2# feeder switch (three-phase, set at Figure 2 1# line on the right), 3# feeder switch (three-phase, set at Figure 2 2# line on the right), 4# feeder switch (three-phase, set at Figure 2 3# line on the right) and 5# feeder switch (three-phase, set at Figure 2 4# line on the right), then these four 10kV feeders are energized;
[0146] (3) Close the 6# single-phase switch connected to the arc simulator. Figure 2 The 10kV-2# line on the right generates a ground fault in the B phase through the arc ground fault device.
[0147] Specifically, the arc simulator generates a preset arc discharge type. It should be understood that the closing duration after the 6# switch is closed can be set. When the closing duration is assumed to be 10 seconds, the 6# single-phase switch is opened after 10 seconds. After opening, the connection between the arc simulator and the B phase of the 10kV-2# line is disconnected, and the arc grounding fault disappears. That is, the arc simulator is connected and exited in the test system by closing or opening the 6# single-phase switch, that is, the start time and end time of access to the tested line are controlled.
[0148] The upper plate of the arc simulator is connected to the B phase of the 10kV-2# line through the 6# single-phase switch. When the 6# single-phase switch is closed, a grounding fault of the B phase through the arc simulator is generated on the 10kV-2# line, and the arc simulator generates a preset arc discharge type.
[0149] (4) During the 10 seconds that the arc fault lasts, check whether the line selection of the two sets of test products on line 1# and line 2# is correct.
[0150] That is, check the fault line (i.e. Figure 2 Whether the test product installed on the 10kV-2# overhead line / cable line on the right sends a trip signal (that is, whether the secondary equipment of the test product installed on the test line can effectively handle the arc), and whether the pole-mounted switch test product is tripped (that is, whether the primary equipment of the test product installed on the test line can effectively handle the arc).
[0151] That is, check the non-faulty lines (i.e. Figure 2 Check whether the distribution terminal under test installed on the 10kV-1# overhead line / cable line on the right (that is, the reference line) does not send an action signal (that is, whether the secondary equipment of the test product installed on the reference line is effective in handling arcs), and whether the pole-mounted switch under test does not operate (that is, whether the primary equipment of the test product installed on the reference line is effective in handling arcs).
[0152] The above distribution network arc handling equipment verification method effectively verifies the ability of the primary and secondary integrated pole-mounted switch or the primary and secondary integrated ring network box to handle arc faults such as correct line selection and correct tripping for single-phase grounding fault arc handling, that is, no refusal to operate or false operation.
[0153] The distribution network grounding fault arc simulation device can reproduce arc faults with different insulating gases and different electrode combinations, and provides a test platform for the joint testing and verification of the primary and secondary equipment of the distribution network's primary and secondary integrated pole-mounted switches and the distribution network's primary and secondary integrated ring network boxes for their arc fault handling capabilities.
[0154] The distribution network arc handling equipment verification method is a new test method for verifying the arc fault handling capability of the distribution network's primary and secondary integrated complete pole-mounted switches and primary and secondary integrated complete ring network boxes. It is beneficial to verify the functions of the distribution network's primary and secondary integrated equipment and improve the equipment quality.
[0155] The invention has been described above with reference to a few embodiments. However, it is known to a person skilled in the art that other embodiments than the ones disclosed above are equally within the scope of the invention, as defined by the appended patent claims.
[0156] Generally, all terms used in the claims are to be interpreted according to their ordinary meaning in the technical field, unless explicitly defined otherwise herein. All references to "a / / the [means, component, etc.]" are to be openly interpreted as at least one instance of a means, component, etc., unless explicitly stated otherwise. The steps of any method disclosed herein do not necessarily have to be performed in the exact order disclosed, unless explicitly stated otherwise.
Claims
1. A distribution network ground fault arc simulation device, characterized in that: Applicable to distribution networks above 10kV, including: a first electrode, a second electrode and a gap adjustment device; The first electrode is arranged opposite to the second electrode; The second electrode is connected to the gap adjustment device; When the gap adjusting device controls the second electrode to move away from or approach the first electrode, the gap formed by the first electrode and the second electrode becomes larger or smaller; The gap formed by the first electrode and the second electrode is filled with an insulating gas; the insulating gas includes any one of the following: air, vacuum, sulfur hexafluoride SF6 and nitrogen; wherein, when simulating an external insulation arc fault, compressed air or non-compressed air with different temperatures and humidities is used; when simulating an internal insulation arc fault, sulfur hexafluoride SF6 or vacuum, dry air, or dry nitrogen is used; When the potential difference between the first electrode and the second electrode is not less than a predetermined value, and the gap adjustment device controls the second electrode to be close to the first electrode and the distance between the first electrode and the second electrode is not greater than a predetermined value, the insulating gas in the gap generates a continuous arc discharge; during the arc discharge process, the arc is reignited or extinguished by adjusting the distance between the electrodes; The gap adjustment device controls the distance between the first electrode and the second electrode to increase or decrease in the vertical direction; The gap adjustment device includes a linear stepping motor, a stepping driver and a pull rod. The transmission screw of the linear stepping motor is connected to the pull rod, and the pull rod is connected to the second electrode; the pull rod is made of insulating material; The stepping driver controls the movement of the transmission screw of the linear stepping motor so as to make the pull rod move linearly and make the second electrode move linearly; An airtight housing, wherein the airtight housing is provided with a first through hole and a second through hole; a first conductive rod, the first conductive rod being connected to the first electrode, and the first conductive rod passing through the first through hole and extending out of the airtight housing; a second conductive rod, the second conductive rod being connected to the second electrode, and the second conductive rod passing through the second through hole and extending out of the airtight housing; The first conductive rod and the second conductive rod are respectively connected to a power source and a grounding electrode outside the airtight housing to generate an electric field in a gap formed by the first electrode and the second electrode; The power supply is a distribution network power supply or a test power supply, wherein the gap formed between the upper electrode and the lower electrode is 1 mm to 2.5 mm, the insulating gas between the electrodes is dry air, and when the effective value of the potential difference between the power supply and the grounding electrode is 5.8 kV, the insulating gas generates arc discharge in the gap formed by the upper electrode and the lower electrode.
2. The device according to claim 1, characterized in that Also includes: Insulating gas charging and discharging channel; The airtight housing is also provided with a third through hole; The insulating gas charging and discharging channel is connected with the inner cavity of the airtight shell after passing through the third through hole.
3. The device according to claim 1, characterized in that The airtight housing is made of insulating material.
4. The device according to claim 1, characterized in that The first electrode and the second electrode are a needle-plate electrode combination, a plate-plate electrode combination, a ball-plate electrode combination or a ball-ball electrode combination.
5. A method for simulating arc faults in a distribution network, using the device for simulating arc faults in a distribution network as claimed in any one of claims 1 to 4, characterized in that: Applicable to distribution networks above 10kV, including: According to the arc discharge type and phase voltage of the tested line in the distribution network, the insulating gas, the first electrode, the second electrode and the distance between the electrodes are selected; Filling the insulating gas into a gap formed by the first electrode and the second electrode; Connecting the first electrode or the second electrode of the distribution network ground fault arc simulator to a target in the test line; Accordingly, the second electrode or the first electrode of the distribution network ground fault arc simulation device is connected to the grounding electrode corresponding to the tested line; The gap adjustment device of the distribution network ground fault arc simulation device controls the second electrode to move linearly according to the distance between the electrodes, so that the insulating gas in the gap formed by the first electrode and the second electrode produces arc discharge, thereby simulating the arc discharge type. During the arc discharge process, the arc is reignited or extinguished by adjusting the distance between the electrodes.
6. A method for verifying arc handling equipment in a distribution network, using the distribution network ground fault arc simulation device as claimed in any one of claims 1 to 4, characterized in that: Applicable to distribution networks above 10kV, including: According to the arc discharge type and phase voltage of the tested line in the distribution network, the insulating gas, the first electrode, the second electrode and the distance between the electrodes are selected; Connecting the first electrode or the second electrode of the distribution network ground fault arc simulation device to the target in the test line through a single-phase switch; Accordingly, the second electrode or the first electrode of the distribution network ground fault arc simulation device is connected to the grounding electrode corresponding to the tested line; The tested line is provided with arc handling equipment of the tested distribution network; or A reference distribution network arc handling device is provided in the reference line of the tested line; The gap adjustment device of the distribution network ground fault arc simulation device controls the second electrode to move linearly according to the distance between the electrodes, so that the insulating gas in the gap formed by the first electrode and the second electrode generates arc discharge, and during the arc discharge process, the arc is reignited or extinguished by adjusting the distance between the electrodes; Check whether the arc handling equipment of the tested distribution network responds to the arc discharge and performs corresponding arc handling actions; or checking whether the reference distribution network arc handling device responds to the arc discharge and does not perform a corresponding arc handling action; The start time and the end time of the distribution network ground fault arc simulation device being connected to the test line are controlled by controlling the opening or closing of the single-phase switch.
