A combined cap beam, bridge and construction process suitable for continuous bridge deck structure

By adopting a steel-concrete composite cover beam structure, using inverted T-shaped steel beams and multi-layer post-pouring concrete, the problems of long construction cycle and weak bridge deck clearance are solved, and the effects of convenient construction and high bridge deck durability are achieved. .

CN113073541BActive Publication Date: 2024-12-03TRANSFIGURE DESIGN CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110357958.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-04-01
Publication Date
2024-12-03
Estimated Expiration
2041-04-01

AI Technical Summary

Technical Problem

The construction of the existing overpasses has long construction cycles, great traffic impact, heavy structure, difficult to guarantee welding quality, large steel usage, high cost and weak clearance during continuous structure of the bridge deck, which affects the durability and driving of the bridge deck. Comfort.

Method used

Adopt a steel-concrete composite cover beam structure, including prefabricated inverted T-shaped steel beams, concrete blocks, adaptable deformation pads and multi-layer post-pouring concrete. The structural joint is achieved through shear connection components and anchored steel bars, reducing bridge deck clearance and increasing Force uniformity at the continuous bridge deck.

Benefits of technology

It achieves convenient construction and transportation, reduces the impact of ground traffic, improves the durability and driving comfort of the bridge deck. The overall structure is simple and easy to construct, and the bridge deck formed has excellent durability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113073541B_ABST
    Figure CN113073541B_ABST
Patent Text Reader

Abstract

The present invention discloses a composite cap beam, a bridge and a construction process suitable for a continuous bridge deck structure. The composite cap beam comprises a steel-concrete composite cap beam and a continuous bridge deck structure arranged at the upper end of the steel-concrete composite cap beam. The steel-concrete composite cap beam comprises a steel beam and a concrete block arranged on the top of the steel beam. The continuous bridge deck structure comprises an adaptive deformation pad arranged on the top of the concrete block, a first post-cast concrete arranged on the top of the adaptive deformation pad, and a second post-cast concrete arranged on the top of the first post-cast concrete. A vertical gap extending along the width direction of the bridge deck is arranged in the middle of the first post-cast concrete. The first post-cast concrete and the second post-cast concrete are both fixedly connected to the bridge deck. The steel-concrete composite cap beam structure in the present invention is reasonably stressed and can reduce on-site operations. The continuous bridge deck structure can reduce the bridge deck gap to one. Combined with the arrangement of other components, the stress at the continuous part of the bridge deck is effectively improved, so that the durability of the bridge is good.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of bridge engineering, and in particular relates to a combined cap beam, a bridge and a construction process suitable for continuous bridge deck structure. Background Art

[0002] With the advancement of urbanization in my country, the conflict between land shortage and traffic congestion in urban transportation construction has become increasingly prominent. Therefore, urban viaducts are increasingly widely used in urban road reconstruction and construction. With the widespread application of viaducts, the conflict between the viaduct substructure and the underpass is inevitable, and it is often necessary to adopt the form of portal piers with large column spacing.

[0003] At present, the commonly used portal pier cap beams are mainly prestressed concrete cap beams and steel cap beams. For prestressed concrete cap beams, it is necessary to set up brackets and formwork before pouring concrete. The construction period is long, which has a great impact on the traffic under the bridge and increases traffic congestion points. For steel cap beams, it has the advantages of light weight, convenient lifting and on-site connection, and little impact on the traffic under the bridge. However, there are problems such as difficult to ensure the quality of on-site welding, high cost due to large steel consumption, and high cost of later maintenance and painting.

[0004] In urban viaducts, due to road clearance and other limiting factors, conventional inverted T-shaped cap beams are widely used to avoid raising the overall longitudinal section and increasing the size of the bridge. However, in the prior art, the two sides of the conventional inverted T-shaped cap beam are used to support the corresponding beam body, and two gaps are formed between the inverted T-shaped cap beam and the beam body. When the bridge deck is subsequently constructed continuously, the construction requirements are high, and the two gaps are equivalent to two weak points in the continuous structure of the bridge deck, which makes the formed bridge deck poorly durable and affects driving comfort. Summary of the invention

[0005] The technical problem to be solved by the present invention is to overcome the deficiencies and defects mentioned in the above background technology and provide a combined cap beam, a bridge and a construction process suitable for continuous bridge deck structure.

[0006] In order to solve the above technical problems, the technical solution proposed by the present invention is:

[0007] A composite cap beam suitable for continuous bridge deck construction comprises a steel-concrete composite cap beam and a continuous bridge deck structure arranged at the upper end of the steel-concrete composite cap beam, wherein the steel-concrete composite cap beam comprises a steel beam and a concrete block arranged on the top of the steel beam, wherein the continuous bridge deck structure comprises an adaptive deformation pad arranged on the top of the concrete block, a first post-cast concrete arranged on the top of the adaptive deformation pad, and a second post-cast concrete arranged on the top of the first post-cast concrete, wherein a vertical gap extending along the width direction of the bridge deck is arranged in the middle of the first post-cast concrete, and the first post-cast concrete and the second post-cast concrete are both fixedly connected to the bridge deck.

[0008] Furthermore, the vertical gap divides the first post-cast concrete into two independent pieces of concrete.

[0009] Furthermore, the steel beam is a prefabricated component, the cross section of the steel beam is an inverted T-shape, and the cross-sectional height of the steel beam is 0.4 to 0.6 times the full height of the steel-concrete composite cap beam;

[0010] The steel beam comprises a middle box and side boxes fixedly connected to both sides of the middle box, a beam support is fixed on the top of the side box, and a bottom plate of the steel beam is provided with reserved holes for inserting anchor steel bars extending from the top surface of the pier column.

[0011] Furthermore, the steel beam and the concrete block are connected via a shear connection member, and the shear connection member is fixed to the top of the steel beam.

[0012] Furthermore, the concrete blocks, the first post-cast concrete, and the second post-cast concrete are all cast-in-place concrete structures; and the first post-cast concrete and the second post-cast concrete are both fixedly connected to the bridge deck through steel bars.

[0013] As a general inventive concept, the present invention provides a composite bridge, including pier columns, precast main beams, and a bridge deck arranged on the top of the precast main beams, and also includes the above-mentioned composite cap beam suitable for continuous structure of the bridge deck fixed on the pier columns, the precast main beams are erected on both sides of the steel-concrete composite cap beam, a gap is left between the precast main beams and the steel-concrete composite cap beam, and the top surface of the concrete block is flush with the bottom surface of the bridge deck.

[0014] Furthermore, a deformation-adaptable pad is provided in the gap between the prefabricated main beam and the steel-concrete composite cap beam.

[0015] Furthermore, reserved grooves are provided on the top surfaces of the bridge deck on both sides of the first post-poured concrete, and the top surface of the first post-poured concrete is 10 to 15 cm lower than the top surface of the bridge deck and is flush with the bottom surfaces of the reserved grooves; the second post-poured concrete is filled in the two reserved grooves, and the top surface of the second post-poured concrete is flush with the top surface of the bridge deck.

[0016] Furthermore, the steel-concrete composite cap beam spans across two pier columns.

[0017] As a general inventive concept, the present invention provides a construction process for a composite bridge, comprising the following steps:

[0018] 1) Construction of bridge pier columns: hoisting and supporting the steel beam on the bridge pier columns; inserting the anchor steel bars extending from the bridge pier columns into the steel beams through the reserved holes on the steel beams, and pouring and filling concrete into the steel beams to securely connect the steel beams to the bridge pier columns;

[0019] 2) Using the steel beam as a platform, concrete blocks are cast on site. The concrete blocks are connected to the steel beam through shear connection components on the top surface of the steel beam to form a steel-concrete composite cap beam as a whole;

[0020] 3) After the steel-concrete composite cap beam meets the force requirements, prefabricated main beams and bridge decks are erected on both sides of the steel-concrete composite cap beam;

[0021] 4) An adaptive deformation pad is set between the steel-concrete composite cap beam and the precast main beams on both sides thereof, and an adaptive deformation pad is placed on the top surface of the concrete block, and then the first post-cast concrete is cast on the top of the adaptive deformation pad, and a vertical gap extending along the width direction of the bridge deck is left in the middle of the first post-cast concrete;

[0022] 5) Then cast the second post-cast concrete on the first post-cast concrete. After hardening and forming, the first post-cast concrete and the second post-cast concrete are fixedly connected to the bridge deck; then, the bridge deck layer is paved on the bridge deck and the second post-cast concrete.

[0023] Compared with the prior art, the present invention has the following beneficial effects:

[0024] 1) The steel-concrete composite cap beam structure of the present invention has reasonable force, is convenient for construction and transportation, can reduce on-site operations, does not need to set up or sets up fewer brackets during the construction process, and has little impact on ground traffic.

[0025] 2) The bridge deck continuous structure of the present invention can reduce the gap at the continuous part of the conventional inverted T-shaped cap beam bridge deck, and reduce the two bridge deck gaps of the inverted T-shaped cap beam to one gap. Combined with the arrangement of steel-concrete composite cap beams, adaptive deformation pads and other components, the stress at the continuous part of the bridge deck is effectively improved, thereby improving the durability of the bridge.

[0026] 3) The composite cap beam of the present invention has a simple overall structure, is easy to construct, and is convenient for continuous construction of the bridge deck. The composite bridge of the present invention has reasonable stress, and the formed bridge deck has good durability and high driving comfort. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0028] Figure 1 It is a schematic diagram of the elevation structure of a composite cap beam suitable for a continuous bridge deck structure;

[0029] Figure 2 It is a structural schematic diagram of a steel-concrete composite cap beam;

[0030] Figure 3 It is a schematic diagram of the elevation structure of the combined bridge;

[0031] Figure 4 yes Figure 3 AA cross-sectional structural diagram;

[0032] Figure 5 It is a structural schematic diagram of step 1) in the combined bridge construction process;

[0033] Figure 6 It is a structural schematic diagram of step 2) in the combined bridge construction process;

[0034] Figure 7 It is a structural schematic diagram of step 3) in the combined bridge construction process;

[0035] Figure 8 It is a structural schematic diagram of step 4) in the combined bridge construction process;

[0036] Fig. 9 It is a structural schematic diagram of step 5) in the combined bridge construction process.

[0037] Legend:

[0038] 1. Steel-concrete composite cap beam; 11. Steel beam; 111. Middle box; 112. Side box; 113. Beam support; 12. Concrete block; 13. Shear connection member; 2. Continuous structure of bridge deck; 21. Adaptable deformation pad; 22. First post-poured concrete; 221. Vertical gap; 23. Second post-poured concrete; 24. Adaptable deformation pad; 3. Pier column; 4. Precast main beam; 5. Bridge deck; 51. Reserved groove; 6. Bridge deck layer. DETAILED DESCRIPTION

[0039] In order to facilitate the understanding of the present invention, the present invention will be described more comprehensively and meticulously below in conjunction with the accompanying drawings and preferred embodiments of the present invention, but the protection scope of the present invention is not limited to the following specific embodiments.

[0040] Unless otherwise defined, all professional terms used below have the same meanings as those generally understood by those skilled in the art. The professional terms used herein are only for the purpose of describing specific embodiments and are not intended to limit the scope of protection of the present invention.

[0041] Unless otherwise specified, various raw materials, reagents, instruments and equipment used in the present invention can be purchased from the market or prepared by existing methods.

[0042] Embodiment 1:

[0043] like Figures 1-2As shown, the composite cap beam suitable for the continuous structure of the bridge deck in this embodiment includes a steel-concrete composite cap beam 1 and a bridge deck continuous structure 2 arranged at the upper end of the steel-concrete composite cap beam 1, the steel-concrete composite cap beam 1 includes a steel beam 11 and a concrete block 12 arranged on the top of the steel beam 11, the bridge deck continuous structure 2 includes an adaptive deformation pad 21 arranged on the top of the concrete block 12, a first post-cast concrete 22 arranged on the top of the adaptive deformation pad 21, and a second post-cast concrete 23 arranged on the top of the first post-cast concrete 22. A vertical gap 221 extending along the width direction of the bridge deck is arranged in the middle of the first post-cast concrete 22, and the first post-cast concrete 22 and the second post-cast concrete 23 are both fixedly connected to the bridge deck 5.

[0044] In the composite cap beam of this embodiment, the steel beam 11 is fixed on the pier column 3. The steel beam 11 can serve as the bottom formwork of the concrete block 12 and provide a platform for erecting the side formwork (prefabricated main beam 4, etc.), and can also bear the construction load when pouring the concrete block 12, thereby achieving the effect of no support or less support. Compared with the conventional concrete inverted T-shaped cap beam, the steel-concrete composite cap beam 1 can reduce the deadweight of the structure.

[0045] In the composite cap beam of the present embodiment, an adaptable deformation pad 21 is provided on the concrete block 12. The adaptable deformation pad 21 includes but is not limited to a rubber plate, which can be placed directly on the concrete block 12. The adaptable deformation pad 21 is used to adapt to various deformations of the bridge deck and meet the deformation requirements under different temperatures and loads. A bridge deck continuous structure 2 is provided at the upper end of the steel-concrete composite cap beam 1. The bridge deck continuous structure 2 is fixedly connected to the bridge deck 5 of the bridge (the bridge deck 5 is fixedly mounted on the main beam of the bridge), and a vertical gap 221 is left in the middle of the first post-poured concrete 22. The vertical gap 221 can adapt to the longitudinal deformation of the bridge deck 5. It reduces the two bridge deck gaps of the conventional inverted T-shaped cap beam to one gap. Combined with the provision of the adaptable deformation pad 21, it can effectively improve the stress at the continuous part of the bridge deck and has good durability. The overall structure of the composite cap beam of the present embodiment is simple, easy to construct, and convenient for continuous construction of the bridge deck.

[0046] In this embodiment, the vertical gap 221 divides the first post-cast concrete 22 into two independent pieces of concrete. The vertical gap 221 is provided so that the bridge deck continuous structure 2 is subjected to uniform stress as a whole.

[0047] In this embodiment, the steel beam 11 is a prefabricated component, the cross section of the steel beam 11 is an inverted T-shape, the cross section height of the steel beam 11 is 0.4 to 0.6 times the full height of the steel-concrete composite cap beam 1, and the neutral axis of the steel-concrete composite cap beam 1 is close to the steel beam 11 or located inside the steel beam 11. This setting allows the concrete block 12 to be compressed without tensile stress in the full cross section, making full use of the compression performance of concrete, avoiding the weakness of poor tensile performance of concrete, and making the force more reasonable and favorable.

[0048] In this embodiment, the steel beam 11 includes a middle box 111, side boxes 112 fixedly connected to both sides of the middle box 111, a beam support 113 fixed to the top of the side box 112, and a support stiffening plate for bearing the local pressure at the beam support 113 is provided on the side box 112. The bottom plate of the steel beam 11 is provided with a reserved hole for inserting the anchor steel bars extending from the top surface of the pier column 3. By pouring concrete into a specific area of ​​the steel beam 11 and hardening it into shape, the steel beam 11 can be fixedly connected to the pier column 3.

[0049] Furthermore, when the steel-concrete composite cap beam 1 is a composite cap beam suitable for spanning two bridge pier columns 3, the steel beam 11 extends from one end close to the bridge pier column 3 along the bridge width direction within a width range of 1.2 to 1.5 times the height of the steel beam 11 (a partition is set in the steel beam 11 to limit the range), anchor bolts are fixed on the inner side of the wall plate of the steel beam 11, and concrete is poured within the above range (the concrete is filled with full height in the height direction of the steel beam 11). The anchor steel bars on the bridge pier column 3 are combined with the concrete in the steel beam 11 and the anchor bolts, so that the connection between the steel beam 11 and the bridge pier column 3 can be made more reliable. When the steel beam 11 in this embodiment spans two bridge pier columns 3, it mainly bears positive bending moment, the upper edge is compressed, and the lower edge is tensile, while the side box 112 is farther from the central axis and contributes more to the bending resistance, so the thickness of the wall plate of the side box 112 is greater than the thickness of the wall plate of the middle box 111.

[0050] In this embodiment, the steel beam 11 and the concrete block 12 are connected by a shear connection member 13, which includes but is not limited to anchor nails, steel shear keys, etc. The shear connection member 13 is welded to the top of the steel beam 11. The shear connection member 13 is used to enhance the connection stability between the steel beam 11 and the concrete block 12 to prevent slippage between the structures. The arrangement of the shear connection member 13 needs to be determined by calculation to ensure that the steel beam 11 and the concrete block 12 in the composite cap beam are reliably connected and bear force together.

[0051] In this embodiment, the concrete block 12, the first post-cast concrete 22, and the second post-cast concrete 23 are all cast-in-place concrete structures. The above cast-in-place concrete structure has better integrity than the precast concrete structure, and the on-site connection construction of the precast concrete structure is more difficult to control. The first post-cast concrete 22 and the second post-cast concrete 23 are fixedly connected to the bridge deck 5 through steel bars (not shown in the figure). The steel bars extend from the side walls of the bridge deck 5. Through the connection of the steel bars, the connection between the structures can be tight and stable, so that the force at the continuous part of the bridge deck is stable and the durability is enhanced.

[0052] Embodiment 2:

[0053] like Figures 1 to 4As shown, the composite bridge in this embodiment includes a bridge pier column 3, a precast main beam 4, a bridge deck 5 arranged on the top of the precast main beam 4, and a composite cap beam suitable for the continuous structure of the bridge deck as described in Example 1 fixed on the bridge pier column 3. The precast main beam 4 is erected on both sides of the steel-concrete composite cap beam 1, specifically on the beam body support 113. There is a gap between the precast main beam 4 and the steel-concrete composite cap beam 1, and the top surface of the concrete block 12 is flush with the bottom surface of the bridge deck 5. In general, the inner side walls of the precast main beam 4 and the bridge deck 5 are flush.

[0054] The composite bridge in this embodiment adopts the composite cap beam in Embodiment 1. The bridge structure is reasonably stressed, so that the formed bridge deck has good durability and high driving comfort. No brackets or few brackets are needed when constructing the cap beam, which has little impact on the traffic under the bridge. The steel beam 11 can be used as the bottom template of the upper cast-in-place concrete block 12. When the steel-concrete composite cap beam 1 is stressed, the compressive performance of the upper concrete block 12 and the tensile performance of the lower steel beam 11 can be exerted, and the building height of the bridge can be reduced, the net height under the bridge can be increased, or the bridge deck elevation can be reduced, the bridge scale can be reduced, and the deadweight of the structure can be reduced. The overall structure of the composite bridge in this embodiment is simple, stable, and beautiful in appearance.

[0055] In this embodiment, an adaptable deformable pad 24 is arranged (fixed) in the gap between the prefabricated main beam 4 and the steel-concrete composite cap beam 1. The adaptable deformable pad 24 includes but is not limited to a polyethylene foam block, a rubber block, etc. The adaptable deformable pad 24 is mainly used to adapt to the longitudinal bridge deformation caused by temperature or load. The adaptable deformable pad 24 can play a good buffering role for the longitudinal displacement of the prefabricated main beam 4.

[0056] Furthermore, the adaptive deformation pad 24 is preferably arranged at the corner of the adaptive deformation pad 21 and the concrete block 12. The bridge deck continuous structure 2 can be made more stable, and the adaptive deformation pad 24 is combined with the adaptive deformation pad 21 to make the buffering effect better.

[0057] In this embodiment, reserved grooves 51 are provided on the top surface of the bridge deck 5 on both sides of the first post-cast concrete 22. The top surface of the first post-cast concrete 22 is 10 to 15 cm lower than the top surface of the bridge deck 5 and is flush with the bottom surface of the reserved grooves 51. The second post-cast concrete 23 is filled in the two reserved grooves 51. The top surface of the second post-cast concrete 23 is flush with the top surface of the bridge deck 5. Through the above arrangement, the bridge deck continuous structure 2 in the composite cap beam can be stably and tightly connected with the prefabricated main beam 4 and the bridge deck 5 of the bridge, which is suitable for the continuous structure of the bridge deck, making the overall structure of the bridge more stable and the force more uniform, thereby extending the service life of the bridge.

[0058] In this embodiment, the steel-concrete composite cap beam 1 spans across two bridge pier columns 3. When the steel-concrete composite cap beam 1 spans across two bridge pier columns 3, the cap beam is mainly subjected to positive bending moment, with the upper edge under compression and the lower edge under tension, which can avoid the concrete part of the steel-concrete composite cap beam from being subjected to tension, and the force is more reasonable.

[0059] In this embodiment, when the precast main beam 4 is a concrete precast main beam, the concrete precast main beam and the bridge deck 5 are prefabricated as a whole; when the precast main beam 4 is a steel main beam, the steel main beam is connected to the post-cast bridge deck 5 through shear keys.

[0060] In this embodiment, the top surfaces of the bridge deck 5 and the second post-cast concrete 23 are jointly paved with a bridge deck layer 6, wherein the bridge deck layer 6 can be an asphalt bridge deck.

[0061] like Figures 1 to 9 As shown, the construction process of the combined bridge in this embodiment includes the following steps:

[0062] 1) During the construction of the pier column 3, the steel beam 11 is hoisted and supported on the pier column 3; the anchoring steel bars extending from the pier column 3 are inserted into the steel beam 11 through the reserved holes on the steel beam 11, and concrete is poured into the steel beam 11 (a pouring hole is provided at the connection between the side box 111 and the middle box 112), and the concrete in the steel beam 11 is connected into a whole. End sealing plates are arranged on both sides of the steel beam 11 to seal after the concrete is poured. After hardening and forming, the steel beam 11 is fixedly connected to the pier column 3.

[0063] 2) Using the steel beam 11 as the bottom form and setting up the side form platform, the concrete block 12 is cast on site. The concrete block 12 is connected to the steel beam 11 through the shear connection member 13 on the top surface of the steel beam 11 to form a steel-concrete composite cap beam 1 as a whole.

[0064] 3) After the steel-concrete composite cap beam 1 meets the force requirements, precast main beams 4 and bridge decks 5 are erected on both sides of the steel-concrete composite cap beam 1; if the precast main beam 4 is a concrete precast main beam, the bridge deck 5 and the concrete precast main beam are prefabricated as a whole before being erected; if the precast main beam 4 is a steel main beam, after the steel main beam is constructed, the cast concrete bridge deck 5 (or precast bridge deck 5) and the steel main beam are connected by shear keys to form a steel-concrete composite beam.

[0065] 4) An adaptive deformation pad 24 is arranged between the steel-concrete composite cap beam 1 and the precast main beams 4 on both sides thereof, and an adaptive deformation pad 21 is placed on the top surface of the concrete block 12, and then the first post-cast concrete 22 is cast on the top of the adaptive deformation pad 21, and a vertical gap 221 extending along the width direction of the bridge deck is left in the middle of the first post-cast concrete 22.

[0066] 5) Then, the second post-cast concrete 23 is cast on the first post-cast concrete 22. After hardening and forming, the first post-cast concrete 22 and the second post-cast concrete 23 are both fixedly connected to the bridge deck 5; then, the bridge deck layer 6 is paved on the bridge deck 5 and the second post-cast concrete 23.

[0067] In the construction process of this embodiment, the steel beam 11 is a prefabricated component, which is directly hoisted and supported on the bridge pier column 3, and has little impact on ground traffic during the construction process. Subsequently, the on-site cast concrete block 12, the first post-cast concrete 22, and the second post-cast concrete 23 are used, which is easy to operate and makes the connections between the structures tight. This construction process is easy to operate and has high overall efficiency.

Claims

1. A composite cap beam suitable for continuous bridge deck construction, characterized in that: The invention comprises a steel-concrete composite cap beam (1) and a continuous bridge deck structure (2) arranged at the upper end of the steel-concrete composite cap beam (1), wherein the steel-concrete composite cap beam (1) comprises a steel beam (11) and a concrete block (12) arranged on the top of the steel beam (11), and the continuous bridge deck structure (2) comprises an adaptable deformation pad (21) arranged on the top of the concrete block (12), a first post-cast concrete (22) arranged on the top of the adaptable deformation pad (21), and a second post-cast concrete (23) arranged on the top of the first post-cast concrete (22), wherein a vertical gap (221) extending along the width direction of the bridge deck is arranged in the middle of the first post-cast concrete (22), and the first post-cast concrete (22) and the second post-cast concrete (23) are both fixedly connected to the bridge deck (5).

2. The composite cap beam suitable for continuous bridge deck construction according to claim 1, characterized in that: The vertical gap (221) divides the first post-cast concrete (22) into two independent pieces of concrete.

3. The composite cap beam suitable for continuous bridge deck construction according to claim 1, characterized in that: The steel beam (11) is a prefabricated component, the cross section of the steel beam (11) is an inverted T-shape, and the cross section height of the steel beam (11) is 0.4 to 0.6 times the full height of the steel-concrete composite cap beam (1); The steel beam (11) comprises a middle box (111) and side boxes (112) fixedly connected to both sides of the middle box (111); a beam support (113) is fixed on the top of the side box (112); and a bottom plate of the steel beam (11) is provided with a reserved hole for inserting anchor steel bars extending from the top surface of the pier column (3).

4. The composite cap beam suitable for a continuous bridge deck structure according to any one of claims 1 to 3, characterized in that: The steel beam (11) and the concrete block (12) are connected via a shear connection member (13), and the shear connection member (13) is fixed to the top of the steel beam (11).

5. The composite cap beam suitable for a continuous bridge deck structure according to any one of claims 1 to 3, characterized in that: The concrete block (12), the first post-cast concrete (22), and the second post-cast concrete (23) are all cast-in-place concrete structures; the first post-cast concrete (22) and the second post-cast concrete (23) are both fixedly connected to the bridge deck (5) via steel bars.

6. A composite bridge, comprising a pier column (3), a prefabricated main beam (4), and a bridge deck (5) arranged on top of the prefabricated main beam (4), characterized in that: It also includes a composite cap beam suitable for continuous bridge deck structure as described in any one of claims 1 to 5 fixedly mounted on a pier column (3), the precast main beam (4) being erected on both sides of a steel-concrete composite cap beam (1), a gap being left between the precast main beam (4) and the steel-concrete composite cap beam (1), and the top surface of the concrete block (12) being flush with the bottom surface of the bridge deck (5).

7. The composite bridge according to claim 6, characterized in that: A cushion block (24) capable of adapting to deformation is provided in the gap between the prefabricated main beam (4) and the steel-concrete composite cap beam (1).

8. The composite bridge according to claim 6, characterized in that: The top surfaces of the bridge deck (5) on both sides of the first post-cast concrete (22) are provided with reserved grooves (51), the top surface of the first post-cast concrete (22) is 10 to 15 cm lower than the top surface of the bridge deck (5) and is flush with the bottom surface of the reserved grooves (51); the second post-cast concrete (23) is filled in the two reserved grooves (51), and the top surface of the second post-cast concrete (23) is flush with the top surface of the bridge deck (5).

9. The combined bridge according to any one of claims 6 to 8, characterized in that: The steel-concrete composite cap beam (1) spans across two bridge pier columns (3).

10. A construction process for a composite bridge, characterized in that: The following steps are involved: 1) constructing a bridge pier column (3), hoisting a steel beam (11) and supporting it on the bridge pier column (3); inserting the anchoring steel bars extending from the bridge pier column (3) into the steel beam (11) through the reserved holes on the steel beam (11), pouring and filling concrete into the steel beam (11), so that the steel beam (11) and the bridge pier column (3) are fixedly connected; 2) Using the steel beam (11) as a platform, pouring concrete blocks (12) on site, the concrete blocks (12) are connected to the steel beam (11) via shear connection members (13) on the top surface of the steel beam (11), and forming a steel-concrete composite cap beam (1) as a whole; 3) After the steel-concrete composite cap beam (1) reaches the force requirements, a prefabricated main beam (4) and a bridge deck (5) are erected on both sides of the steel-concrete composite cap beam (1); 4) an adaptable deformation pad (24) is arranged between the steel-concrete composite cap beam (1) and the prefabricated main beams (4) on both sides thereof, and an adaptable deformation pad (21) is placed on the top surface of the concrete block (12), and then a first post-cast concrete (22) is cast on the top of the adaptable deformation pad (21), and a vertical gap (221) extending in the width direction of the bridge deck is left in the middle of the first post-cast concrete (22); 5) Then, the second post-cast concrete (23) is cast on the first post-cast concrete (22). After hardening and forming, the first post-cast concrete (22) and the second post-cast concrete (23) are fixedly connected to the bridge deck (5); and then, the bridge deck layer (6) is paved on the bridge deck (5) and the second post-cast concrete (23).