Temporary pier connecting device and quick-release inserting-pulling type bridge temporary pier
By designing a temporary pier connection device, the fast connection and disassembly of segments and foundations is achieved using fixed pins and drive devices, the problem of difficulty in recycling and time-consuming and labor-consuming existing temporary piers is solved, and rapid installation and reuse are achieved, and resource waste is reduced.
Patent Information
- Application Number
- CN202411844572.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-16
- Publication Date
- 2025-03-11
AI Technical Summary
The existing temporary piers are difficult to recycle, time-consuming and labor-intensive, resulting in waste of resources.
A temporary pier connection device is designed, including the first and second connecting steel plates, a fixed pin shaft and a driving device. The fixed pin shaft is driven to be plugged into the pin hole through the driving device to realize the quick connection and disassembly of the segment and the foundation.
The rapid installation and disassembly of temporary piers is realized, which reduces construction time and manpower and material consumption, and the device can be reused and reduces resource waste.
Smart Images

Figure CN119593311A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of supporting devices, and particularly to a temporary pier connecting device and a quick-detachable plug-in type temporary bridge pier comprising the temporary pier connecting device. Background Art
[0002] At present, the common temporary pier methods are to fix the temporary pier directly by pouring, or to directly drive the pier steel pipe column into the soil. Both of these solutions have certain abandoned projects, and it is difficult to disassemble and recycle them in the later stage, resulting in a certain waste of resources. With the rapid development of building industrialization, bridge structures are bound to enter the industrialization period of rapid assembly. The installation of existing assembled temporary piers requires a lot of manpower and material resources such as welding and bolts. Summary of the invention
[0003] In view of this, in order to solve the technical problems of inconvenient recovery, time-consuming and labor-consuming of existing temporary piers, on the one hand, the present invention provides a temporary pier connection device, which has the advantages of being safe and reliable, quick-disconnectable, easy to operate and reusable.
[0004] To achieve the above object, the present invention provides the following technical solutions:
[0005] A temporary pier connection device, comprising:
[0006] A first connecting steel plate;
[0007] A second connecting steel plate, which is plugged into the first connecting steel plate and has a pin hole;
[0008] A fixed pin shaft is driven by a driving device, passes through the first connecting steel plate and is inserted into the pin hole.
[0009] Preferably, the driving device comprises:
[0010] Control the shaft;
[0011] A transmission shaft, one end of which is meshed and connected with the control shaft, and the other end of which is meshed and connected with the fixed pin shaft;
[0012] The control shaft is rotated to drive the transmission shaft to rotate and drive the fixed pin shaft to be inserted into the pin hole.
[0013] Preferably, the control shaft comprises:
[0014] A connecting rod is provided with a control knob at one end and a control gear at the other end.
[0015] Preferably, the transmission shaft comprises:
[0016] The transmission rod has transmission gears at both ends.
[0017] Preferably, the fixing pin shaft is provided with a gear slot for meshing with the transmission gear.
[0018] Preferably, the first connecting steel plate and the second connecting steel plate are connected via a slot.
[0019] In another aspect, the present invention provides a quick-detachable plug-in type temporary bridge pier, comprising a segment and a foundation;
[0020] The segments and foundation are connected via the temporary pier connection device mentioned above;
[0021] The first connecting steel plate is pre-buried in the segment, and the second connecting steel plate is pre-buried in the foundation.
[0022] Preferably, adjacent segments are connected via the temporary pier connection device;
[0023] The adjacent segments are pre-buried with a first connecting steel plate, a fixing pin shaft and a driving device, and the driving device drives the fixing pin shaft to be inserted into the pin hole of the first connecting steel plate.
[0024] Preferably, a foundation opening is opened on the foundation, and the second connecting steel plate is pre-buried in the foundation opening.
[0025] Preferably, a segment connecting opening is opened on the segment, and the first connecting steel plate is pre-embedded in the segment connecting opening.
[0026] Compared with the prior art, the present invention has the following beneficial effects:
[0027] The temporary pier connection device provided by the present invention has the advantages of being safe and reliable, quick-detachable and pluggable, convenient to operate, and reusable. It can be applied to bridges of any structure, has fast construction speed, and is simple in structure.
[0028] The present invention provides a quick-detachable plug-in bridge temporary pier using the temporary pier connection device, which is easy to install and remove, has good structural stress performance, is easy to install and remove, and can be reused. It only requires a small reserved space and manual operation, has a simple structure, reasonable stress, and a wide range of applications. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 It is a structural schematic diagram of the temporary pier connection device of the present invention;
[0030] Figure 2 It is a schematic diagram of the segment structure;
[0031] Figure 3 It is a schematic diagram of the structure in which the first connecting steel plate is embedded in the segment;
[0032] Figure 4 This is a schematic diagram of the structure where the second connecting steel plate is embedded in the foundation;
[0033] Figure 5 is a schematic diagram of the structure of the first connecting steel plate;
[0034] Figure 6 This is a schematic diagram of the overall structure of a quick-detachable plug-in type temporary bridge pier;
[0035] Figure 7 A schematic diagram of the structure of a temporary pier connection device that enables quick disconnection and plugging between segments;
[0036] Figure 8 is a schematic diagram of the structure of the transmission shaft;
[0037] Fig. 9 A schematic diagram of the structure of the control shaft;
[0038] Fig.10 Schematic diagram of the fixing pin;
[0039] In the figure, 1, segment; 2, foundation; 3, concrete cylinder; 4, control shaft; 5, temporary pier connection device; 6, foundation opening; 7, second connecting steel plate; 8, segment connection port; 9, transmission shaft; 10, first connecting steel plate; 11, slot; 12, fixing pin shaft; 13, pin hole; 14, transmission gear; 15, transmission rod; 16, control gear; 17, control knob; 18, connecting rod; 19, gear slot. DETAILED DESCRIPTION
[0040] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention; it is obvious that the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments, and all other embodiments obtained by ordinary technicians in this field based on the embodiments of the present invention without making creative work are within the scope of protection of the present invention.
[0041] In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "top / bottom" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only and cannot be understood as indicating or implying relative importance.
[0042] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "provided with", "mounted / connected", "connected", etc. should be understood in a broad sense. For example, "connected" can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0043] like Figure 1-10 As shown, the present invention provides a temporary pier connection device 5, comprising:
[0044] A first connecting steel plate 10;
[0045] A second connecting steel plate 7, which is plugged into the first connecting steel plate 10 and has a pin hole 13;
[0046] The fixed pin shaft 12 is driven by a driving device, passes through the first connecting steel plate 10 and is inserted into the pin hole 13 .
[0047] The temporary pier connection device 5 provided by the present invention is used to connect the segment 1 and the foundation 2 of the temporary pier. The fixed pin 12 is driven by the driving device to pass through the first connecting steel plate 10 and then inserted into the pin hole 13 on the second connecting steel plate 7 to achieve the connection between the segment 1 and the foundation 2. The first connecting steel plate 10 can be pre-buried in the segment 1, and the second connecting steel plate 7 can be pre-buried in the foundation 2.
[0048] In the present invention, the driving device comprises:
[0049] Control shaft 4;
[0050] A transmission shaft 9, one end of which is meshed and connected with the control shaft 4, and the other end of which is meshed and connected with the fixed pin 12;
[0051] The control shaft 4 is rotated to drive the transmission shaft 9 to rotate and drive the fixing pin 12 to be inserted into the pin hole 13 .
[0052] In the present invention, the control shaft 4 includes:
[0053] A connecting rod 18 is provided with a control knob 17 at one end and a control gear 16 at the other end.
[0054] In the present invention, the transmission shaft 9 comprises:
[0055] The transmission rod 15 has transmission gears 14 at both ends thereof.
[0056] In the present invention, a gear slot 19 for meshing with the transmission gear 14 is formed on the fixing pin 12 .
[0057] In the present invention, the first connecting steel plate 10 and the second connecting steel plate 7 are plugged into each other via a slot 11 .
[0058] On the other hand, the present invention provides a quick-detachable plug-in type temporary bridge pier, comprising a segment 1 and a foundation 2;
[0059] The segment 1 and the foundation 2 are connected by the temporary pier connection device 5 mentioned above;
[0060] The first connecting steel plate 10 is pre-buried in the segment, and the second connecting steel plate 7 is pre-buried in the foundation.
[0061] In the present invention, adjacent segments 1 are connected via the temporary pier connection device 5;
[0062] The adjacent segments are pre-buried with a first connecting steel plate 10 , a fixing pin shaft 12 and a driving device, and the driving device drives the fixing pin shaft 12 to be inserted into the pin hole 13 of the first connecting steel plate 10 .
[0063] The quick-detachable and pluggable temporary bridge pier provided by the present invention can be composed of a foundation and a plurality of segments 1. The foundation and the segments as well as adjacent segments are connected by the plurality of temporary pier connection devices 5.
[0064] In the present invention, a foundation opening 6 is opened on the foundation, and the second connecting steel plate 7 is pre-buried in the foundation opening 6 .
[0065] In the present invention, a segment connection port 8 is formed on the segment, and the first connection steel plate 10 is pre-buried in the segment connection port 8. The segment 1 is preferably a concrete cylinder 3.
[0066] The first connecting steel plate 10 is embedded in the segment, and at least the upper part or the lower part should be exposed. Correspondingly, if the upper part is exposed, the second connecting steel plate 7 is embedded in the foundation, and the upper part is exposed, so that the second connecting steel plate 7 can enter from the segment connection port 8 and plug into the lower part of the first connecting steel plate 10. If the lower part is exposed, the second connecting steel plate 7 is embedded in the foundation, and the first connecting steel plate 10 enters from the foundation opening 6 and plugs into the second connecting steel plate 7.
[0067] The installation method of the present invention is:
[0068] First, the first connecting steel plate 10 and the driving device in the temporary pier connecting device 5 are embedded in the segment, and the lower part of the first connecting steel plate 10 is exposed. The second connecting steel plate 7 is embedded in the foundation.
[0069] Secondly, the segment 1 is connected to the foundation 2 through the temporary pier connection device 5, that is, the lower part of the first connecting steel plate 10 is inserted into the second connecting steel plate 7 through the foundation opening 6 on the foundation (for example, by opening slots 11 on the first connecting steel plate 10 and the second connecting steel plate 7, and cross-plugging them together through the two slots 11). The transmission shaft 9 is driven to rotate by rotating the control shaft 4, so that the fixing pin shaft 12 passes through the pin hole 13 on the first connecting steel plate 10 and then inserts into the pin hole 13 on the second connecting steel plate 7, completing the connection between the segment and the foundation.
[0070] Finally, the connection between each segment is unified by pre-embedding the first connecting steel plate 10 (such as Figure 3 As shown), enter through the segment connection port 8 of the adjacent stage, the first connecting steel plate 10 has slots 11 and pin holes 13 on the upper and lower parts, and the slots 11 are plugged into each other, and the rotating shaft 4 is rotated to drive the fixed pin shaft 12 to be inserted into the pin hole 13 to complete the connection between the segments.
[0071] During dismantling, the fixing pin 12 can be extracted by rotating the control shaft 4, and each segment can be pulled out to achieve dismantling and reuse.
[0072] The above are only preferred specific implementations of the present invention; however, the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical solutions and improved concepts of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A temporary pier connection device, characterized in that: include: A first connecting steel plate; A second connecting steel plate, which is plugged into the first connecting steel plate and has a pin hole; A fixed pin shaft is driven by a driving device, passes through the first connecting steel plate and is inserted into the pin hole.
2. A temporary pier connection device according to claim 1, characterized in that: The driving device comprises: Control the shaft; A transmission shaft, one end of which is meshed and connected with the control shaft, and the other end of which is meshed and connected with the fixed pin shaft; The control shaft is rotated to drive the transmission shaft to rotate and drive the fixed pin shaft to be inserted into the pin hole.
3. A temporary pier connection device according to claim 2, characterized in that: The control shaft comprises: A connecting rod is provided with a control knob at one end and a control gear at the other end.
4. A temporary pier connection device according to claim 2, characterized in that: The transmission shaft comprises: The transmission rod has transmission gears at both ends.
5. A temporary pier connection device according to claim 4, characterized in that: The fixed pin shaft is provided with a gear slot for meshing with the transmission gear.
6. A temporary pier connection device according to claims 1-5, characterized in that: The first connecting steel plate and the second connecting steel plate are plugged into each other via a slot.
7. A quick-release plug-in temporary bridge pier, characterized in that: Includes segments and foundations; The segment and the foundation are connected by a temporary pier connection device as described in any one of claims 1 to 6; The first connecting steel plate is pre-buried in the segment, and the second connecting steel plate is pre-buried in the foundation.
8. The quick-detachable plug-in temporary bridge pier according to claim 7, characterized in that: Adjacent segments are connected via the temporary pier connection device; The adjacent segments are pre-buried with a first connecting steel plate, a fixing pin shaft and a driving device, and the driving device drives the fixing pin shaft to be inserted into the pin hole of the first connecting steel plate.
9. The quick-detachable plug-in temporary bridge pier according to claim 7, characterized in that: A foundation opening is formed on the foundation, and the second connecting steel plate is pre-buried in the foundation opening.
10. A quick-detachable plug-in temporary bridge pier according to any one of claims 7 to 9, characterized in that: A segment connection opening is provided on the segment, and the first connection steel plate is pre-buried in the segment connection opening.