Device and method for rapid prototyping of polymer micropile in emergency and disaster relief situations
Through the rapid forming device of polymer micro piles, the combination of pile-based outer casing and anti-sliding pile molds is used to achieve rapid reinforcement of slopes in emergency rescue and disaster relief, and solves the problem that the existing technology is difficult to quickly and effectively strengthen the slopes. Achieve efficient and economical slope reinforcement effect.
Patent Information
- Application Number
- CN202110507288.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-05-10
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2041-05-10
AI Technical Summary
Under emergency rescue and disaster relief, existing slope management measures such as clearing landslide bodies, building drainage projects, sliding zone land improvement and weight reduction counterpressure reduction are difficult to quickly and effectively strengthen the slope, especially under special terrain and geological conditions, and construction of branches It is difficult to implement the blocking project in an emergency.
Provide a high polymer micro pile rapid molding device, including pile-based outer casing, anti-sliding pile mold and limit locking unit, which is driven into the soil by a pile driver and grouting to form to achieve rapid reinforcement of the slope, and adopts polyurethane slurry Anhydrous reaction, with high pull force, high shear force and pile group synergistic force.
It has achieved rapid reinforcement of slopes in emergency rescue and disaster relief, fast forming speed, economical and durable, able to withstand adverse geological influences, short construction period and few equipment, suitable for special terrain and geological conditions, and has the advantages of flexible setting and low cost.
Smart Images

Figure CN113152443B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of geotechnical engineering pile foundation and landslide control, and specifically relates to a polymer micropile rapid prototyping device and method in emergency and disaster relief situations. Background Art
[0002] my country has a vast territory and complex terrain. Nearly 70% of the country's land area is plateau, hills or mountains, and there are a large number of natural soil slopes. At the same time, with the rapid development of the country's social economy and the continuous extension of human activities, in order to promote the balance of development in various regions, my country has built and rebuilt a large number of infrastructure, resulting in a large number of engineering soil slopes, such as road cutting slopes, highway roadbed slopes, embankments, etc. According to the China Statistical Yearbook released by the National Bureau of Statistics, the investment in geological disaster prevention and control from 2000 to 2018 has increased year by year. Among the geological disasters that occur each year, the proportion of landslide disasters is much higher than that of other geological disasters, and the investment in geological disaster control has basically increased year by year. When the slope is damaged (landslide), it not only causes damage to the local environment, but also endangers the safety of people's lives and property, and often leads to serious damage to infrastructure such as roads and railways, bringing huge losses to economic construction. my country is also a country with frequent earthquakes. Earthquake disaster research shows that earthquakes are one of the key factors that induce landslides. Earthquakes have a huge impact on slope stability, and the prevention and control of landslide disasters is very severe. Therefore, strengthening the prevention and control of landslide disasters and actively exploring new materials, new technologies and new equipment for landslide disaster treatment have become important issues that urgently need to be addressed.
[0003] Landslide disease generally refers to the disease caused by the low strength of the rock and soil, high water content, or the unfavorable structural surface and free surface, which causes the slope to be unable to maintain stability under the existing slope. For engineering slopes, it generally refers to the range of the disease occurring at a certain level of the slope, and a small part will extend to the adjacent upper and lower artificial platforms to form a slope disease at about two levels. The range of the disease mostly occurs within the relaxation zone, and the scale is relatively small, mainly including landslides, collapses and small collapses.
[0004] In view of the main causes of landslide, the commonly used slope control measures can be summarized as clearing the landslide body, building drainage projects, improving the sliding belt soil, reducing weight and counter pressure, and building retaining projects. In some emergency rescue situations, when the slope needs to be urgently reinforced, clearing the landslide body, building drainage projects, improving the sliding belt soil, and reducing weight and counter pressure cannot meet the reinforcement requirements in time. Building retaining projects is the most direct and effective method. The advantage of using polyurethane polymer micro-anti-slide piles is that in some special terrains and geology, such as high altitude areas and expansive soil areas, polyurethane polymer micro-anti-slide piles are easier to implement than anchor cables and ordinary anti-slide piles, and the pile body is formed quickly, has no water reaction, is durable, can resist the damage caused by bad geology to the pile body, and has a certain pre-reinforcement effect on the landslide, and has less disturbance to the landslide. The mechanical properties have the characteristics of high pull-out force, high shear force and group pile synergy. The grouting molding method is adopted, and the vertical construction is convenient, and the on-site construction can be carried out quickly. It has the advantages of flexible setting and relatively low cost. Summary of the invention
[0005] The purpose of the present invention is to address the above-mentioned problems and shortcomings and to provide a device and method for rapid prototyping of polymer micropiles in emergency rescue situations, which can cope with the emergency reinforcement of slopes in emergency rescue situations, achieve fast prototyping speed, no water reaction, economic durability, convenient process, and can resist adverse geological influences and reinforce the micro-anti-slip pile support structure of the slope.
[0006] To achieve the above purpose, the technical solution adopted is:
[0007] A polymer micropile rapid prototyping device for emergency and disaster relief, comprising:
[0008] Pile foundation outer casing;
[0009] an anti-sliding pile mold, which is matched and arranged in the outer sleeve of the pile foundation, a drill bit is arranged at the lower end of the anti-sliding pile mold, and a grouting hole is arranged in the middle of the anti-sliding pile mold; and
[0010] A limit locking unit is used to relatively fix the pile foundation outer sleeve and the anti-sliding pile mold during the sinking process, and the anti-sliding pile mold can be freely pulled upward relative to the pile foundation outer sleeve.
[0011] According to the polymer micropile rapid prototyping device for emergency and disaster relief situations of the present invention, preferably, the pile foundation outer casing is a steel mesh; or the pile foundation outer casing is a steel pipe with mesh holes.
[0012] According to the polymer micropile rapid prototyping device for emergency and disaster relief situations of the present invention, preferably, the drill bit is a spiral drill bit, and a discharge gap is provided between the pile foundation outer sleeve and the anti-slip pile mold.
[0013] According to the polymer micropile rapid prototyping device for emergency and disaster relief situations of the present invention, preferably, 3-6 grouting holes are arranged on the anti-slip pile mold.
[0014] According to the polymer micropile rapid prototyping device for emergency and disaster relief situations of the present invention, preferably, the limit locking unit comprises a conical limit sleeve arranged at the lower part of the pile foundation outer sleeve, and the conical limit sleeve matches and fits with the drill bit for support.
[0015] According to the polymer micropile rapid prototyping device for emergency rescue, preferably, the limit locking unit comprises a tenon arranged on the pile foundation outer sleeve and a mortise arranged on the outer wall of the anti-slip pile mold, and the tenon and the mortise are assembled in a matching manner.
[0016] According to the polymer micropile rapid prototyping device for disaster relief situations of the present invention, preferably, the drill bit and the anti-slip pile mold are an integrated structure or a split structure, and the inner diameter of the pile foundation outer sleeve is larger than the outer diameters of the anti-slip pile mold and the drill bit.
[0017] A method for rapid prototyping of polymer micropile in emergency and disaster relief situations, using the above-mentioned rapid prototyping device for polymer micropile in emergency and disaster relief situations to carry out construction, comprising the following steps:
[0018] a. Determine the pile foundation distribution location and pile foundation size according to the slope geological environment, and select the corresponding size of pile foundation outer casing and anti-slip pile mold;
[0019] b. Assembling the pile foundation outer sleeve and the anti-slip pile mold, and driving the assembled pile foundation outer sleeve and the anti-slip pile mold into the soil by a pile driver;
[0020] c. Connecting the grouting equipment to the grouting holes on the anti-sliding pile mold through the grouting pipe, starting grouting and gradually lifting the anti-sliding pile mold until the anti-sliding pile mold is completely separated from the pile foundation outer casing, completing the construction of the pile foundation and the recovery of the anti-sliding pile mold;
[0021] d. Repeat steps b and c to construct the next pile foundation until the slope reinforcement is completed.
[0022] According to the rapid prototyping polymer micropile forming method of the present invention, preferably, the pile foundation distribution adopts a plum blossom-shaped pile arrangement.
[0023] According to the rapid prototyping polymer micropile forming method of the present invention, preferably, the grouting mode of the grouting equipment is pressure grouting, and the slurry in the grouting equipment includes at least two polyurethane slurries. The different polyurethane slurries are injected into the lower part of the anti-sliding pile mold through the grouting holes and then mixed and reacted.
[0024] The beneficial effects achieved by adopting the above technical solution are:
[0025] This application can be used in some special terrains and geologies, such as high-altitude areas and expansive soil areas. Compared with anchor cables and ordinary anti-slide piles, polymer micro anti-slide piles are easier to implement, have a fast pile body forming speed, are water-free, durable, and can resist damage to the pile body caused by poor geology. They also have a certain pre-reinforcement effect on landslides and cause less disturbance to landslides. The mechanical properties have the characteristics of high pull-out force, high shear force, and group pile synergy. Grouting molding is adopted, vertical construction is convenient, and on-site construction can be carried out quickly. They have the advantages of flexible setting and relatively low cost.
[0026] Through the setting of the pile foundation outer sleeve and the anti-slip pile mold, the present application can make it flexible to assemble, the anti-slip pile mold can be recycled, and the density and structural strength of the polymer slurry after the reaction during the grouting process can be guaranteed, and it can be fully combined with the pile foundation outer sleeve and the soil, so as to improve the stability of the soil structure around the pile foundation and reduce the influence of the crushing of the soil around the pile on the pile body forming. The pile foundation outer sleeve in the present application adopts a steel pipe, and the internal protrusion (the tenon of the mortise and tenon structure) inside the steel pipe can not only play the role of fixing the mold, but also play the role of reinforcement, so as to improve the bending resistance of the micro-pile after forming. The specific size of the protrusion (mortise and tenon structure) can be designed according to the requirements of the bending resistance in the actual project.
[0027] This application has a short construction period and requires less construction equipment, which can facilitate overall turnover and transportation in adverse terrain environments. The disturbance to the slope during the forming process is small, which is more convenient for flexible construction operations and has high reliability. BRIEF DESCRIPTION OF THE DRAWINGS
[0028] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the following briefly introduces the drawings of the embodiments of the present invention, wherein the drawings are only used to illustrate some embodiments of the present invention, but not to limit all embodiments of the present invention thereto.
[0029] Figure 1 It is one of the front structural schematic diagrams of the anti-sliding pile mold according to an embodiment of the present invention.
[0030] Figure 2 for Figure 1 Schematic diagram of the transverse cross-sectional structure.
[0031] Figure 3 This is the second schematic front view of the anti-sliding pile mold according to an embodiment of the present invention.
[0032] Figure 4 for Figure 3 Schematic diagram of the transverse cross-sectional structure.
[0033] Figure 5 This is one of the schematic diagrams of the assembly structure of the anti-sliding pile mold and the pile foundation outer sleeve according to an embodiment of the present invention.
[0034] Figure 6 This is the second schematic diagram of the assembly structure of the anti-sliding pile mold and the pile foundation outer sleeve according to an embodiment of the present invention.
[0035] Figure 7 This is one of the structural schematic diagrams of the pile foundation outer casing according to an embodiment of the present invention.
[0036] Figure 8 This is the second structural schematic diagram of the pile foundation outer casing according to an embodiment of the present invention.
[0037] Fig. 9 It is a schematic diagram of the structure of the polyurethane polymer micro-pile after molding according to an embodiment of the present invention.
[0038] Fig.10 This is a schematic diagram of the structure of polyurethane polymer micropiles for slope reinforcement according to an embodiment of the present invention.
[0039] Serial number in the picture:
[0040] 100 is the outer sleeve of the pile foundation, 101 is the mesh, 102 is the conical limiting sleeve, and 103 is the tenon;
[0041] 200 is an anti-sliding pile mold, 201 is a grouting hole, 202 is a drill bit, and 203 is a mortise and tenon;
[0042] 300 is the reserved gap;
[0043] 400 is a polymer micropile. DETAILED DESCRIPTION
[0044] The following will be combined with the drawings of specific embodiments of the present invention to clearly and completely describe the exemplary scheme of the embodiment of the present invention. Unless otherwise defined, the technical terms or scientific terms used in the present invention should be the common meanings understood by people with ordinary skills in the field.
[0045] It should be noted that when one element is “connected”, “coupled” or “connected” to another element, it may mean that they are directly connected, coupled or connected, but it should be understood that there may be intermediate elements between the two; that is, the positional relationships of direct connection and indirect connection are covered.
[0046] It should be noted that the use of "a" or "an" and similar words does not necessarily indicate a quantitative limitation. "Include" or "comprising" and similar words mean that the elements or objects preceding the word include the elements or objects listed after the word and their equivalents, but do not exclude other elements or objects.
[0047] It should be noted that terms such as "up", "down", "left" and "right" indicating orientation or positional relationship are only used to indicate relative positional relationship. This is for the convenience of describing the present invention and does not mean that the device or element must have a specific orientation, be constructed and operated in a specific orientation. When the absolute position of the object being described changes, the relative positional relationship may also change accordingly.
[0048] See also Figure 1-Figure 10 The present application discloses a polymer micropile rapid prototyping device for emergency rescue and disaster relief situations, including a pile foundation outer sleeve 100, an anti-slip pile mold 200 and a limit locking unit. The anti-slip pile mold is matched and arranged in the pile foundation outer sleeve 100. A drill bit 202 is arranged at the lower end of the anti-slip pile mold 200, and a grouting hole 201 is arranged in the middle of the anti-slip pile mold 200. The limit locking unit is used to make the pile foundation outer sleeve 100 and the anti-slip pile mold 200 relatively fixed during the sinking process, and the anti-slip pile mold 200 can be freely pulled upward relative to the pile foundation outer sleeve 100.
[0049] The outer sleeve of the pile foundation in this embodiment is a steel mesh. Figure 6 and Figure 8 As shown; or the pile foundation outer casing is a steel pipe with mesh, such as Figure 5 and Figure 7 shown.
[0050] In addition, in order to facilitate drilling and remove excess soil, the drill bit of the present application is a spiral drill bit, and a discharge gap is provided between the pile foundation outer casing and the anti-slip pile mold.
[0051] Furthermore, 3-6 grouting holes are arranged on the anti-slip pile mold, and grouting is distributed through different grouting holes to improve the mixing effect of different polyurethane slurries, thereby improving the sufficiency of the reaction and the structural strength of the polymer micropile after the reaction.
[0052] The limit locking unit in this embodiment includes a conical limit sleeve arranged at the lower part of the pile foundation outer sleeve, and the conical limit sleeve matches and fits with the drill bit for support. The conical limit sleeve can realize the overall sinking of the pile foundation outer sleeve and the anti-slip pile mold, has good integrity, and is simple in structure. Figure 6 As shown, it is used in conjunction with the outer sleeve of the pile foundation using a steel mesh. After grouting, the polyurethane can fit closely with the soil through the mesh holes of the steel mesh, achieving the effect of expansion and compaction, and realizing the structural characteristics of the polyurethane micropile, steel mesh and soil as a whole being stable and integrated. It is used to stabilize the loose soil around the pile during lifting and reduce the influence of soil crushing around the pile on the formation of the pile.
[0053] The structure of the limit locking unit may also be in other forms, such as Figure 5As shown, the position limiting locking unit in this embodiment includes a tenon 103 arranged on the pile foundation outer sleeve 100 and a mortise 203 arranged on the outer wall of the anti-sliding pile mold 200, and the tenon 103 and the mortise 203 are assembled in a snap fit. The tenon in the above structure is a plurality of reinforcing ribs with a T-shaped structure distributed circumferentially on the inner wall of the pile foundation outer sleeve, and the mortise is a plurality of grooves with a T-shaped structure arranged on the outer wall of the anti-sliding pile mold; the pile foundation outer sleeve in this application adopts a steel pipe, and the internal protrusion (the tenon of the mortise and tenon structure) inside the steel pipe can not only play the role of fixing the mold, but also play the role of reinforcement, thereby improving the bending resistance of the micro pile after molding, and the specific size of the protrusion (mortise and tenon structure) can be designed according to the requirements of the bending resistance in the actual project.
[0054] Furthermore, the mortise and tenon structure in the above structure can be a tight fit to achieve locking and fixing, or a limit block can be set on the anti-slip pile mold on the upper part of the mortise to limit the upper end of the tenon from sliding out of the mortise, so that the anti-slip pile mold and the pile foundation outer casing can be ensured to move synchronously as a whole during the pile sinking process.
[0055] The drill bit 202 and the anti-sliding pile mold 200 are an integrated structure or a separate structure, and the inner diameter of the pile foundation outer sleeve 100 is larger than the outer diameters of the anti-sliding pile mold 200 and the drill bit 202 .
[0056] Based on the above structure, this application uses a steel pipe with a mesh as the outer sleeve of the pile foundation, a spiral drill bit, and a mortise and tenon connection structure as an implementation method, and provides a detailed description of the working principle: the outer diameter of the anti-slip pile mold is generally not more than 200 mm, the lower part of the pile body is spiral, and a mortise and tenon-like structure is reserved around it, which is conducive to pile sinking and is used to fix special steel pipes. During the working process, the maximum diameter of the spiral drill bit is the same as the inner diameter of the steel pipe. During the pile sinking process, the excess soil is sent out. A grouting hole for fixing the grouting pipe is reserved in the middle of the anti-slip pile mold. A mortise and tenon-like structure is reserved around the anti-slip pile mold for combining with the steel pipe. The grouting slurry is a grouting material of polyurethane liquid A and liquid B in a certain ratio. The outer surface of the steel pipe has mesh holes of a certain size for better contact with the surrounding soil after the polyurethane slurry is injected. There are protrusions similar to the mortise and tenon structure inside, which are used to combine with the anti-slip pile mold to support the stability of the soil around the pile during the grouting process, and prevent the soil around the pile from being broken and scattered in large quantities during the forming process of the polyurethane polymer micro-pile, affecting the pile. The micro-pile is formed by reaction of two polyurethane slurries, polyurethane liquid A and liquid B, mixed in a certain proportion. The slurry is injected by pressure grouting, and the anti-slip pile mold and the grouting pipe are lifted at the same time during the grouting process, which is more conducive to the combination of the polyurethane polymer micro-pile and the soil between the piles to exert an anti-slip reinforcement effect.
[0057] Polyurethane slurry has a fast reaction speed, good fluidity, and no water reaction. After molding, it has a certain strength and elastic modulus to form a micro-pile group. The soil between the piles cooperates to resist the thrust of the landslide and play the role of reinforcing the slope. Under different slurry ratios, the mechanical properties, expansion properties, and whether they react with water are different. The flexible properties can better adapt to the different needs of the project. At the same time, polyurethane polymer micro-piles can resist the damage of poor soil to anti-slide piles, such as expansive soil and other poor soils.
[0058] The anti-slip pile mold can adopt an assembled structure or an integral structure. In general, it is designed according to the length of the micropile, and the number of reserved grouting holes is designed according to the pile diameter, the volume of the required slurry, etc. At the same time, the mold can also be reused. The mesh size of the steel pipe is designed according to the properties of the soil where the polyurethane polymer micro anti-slip pile is located. The mesh size of the steel pipe is generally not more than 0.5cm2, and the diameter of the steel pipe needs to be larger than the mold diameter, so that it is convenient for the soil to be discharged during the pile driving process. The grouting method is to lift the anti-slip pile mold while grouting, so that the polyurethane slurry combines with the soil between the piles to play a synergistic anti-slip reinforcement effect. At the same time, the steel mesh or steel pipe is not lifted, and is used to stabilize the loose soil around the pile during lifting, reducing the impact of the soil crushing around the pile on the pile body.
[0059] The present application also discloses a method for rapid prototyping of polymer micro-piles in emergency and disaster relief situations, which uses the above-mentioned rapid prototyping device for polymer micro-piles in emergency and disaster relief situations to carry out construction, comprising the following steps:
[0060] a. According to the geological environment of the slope, determine the distribution position and size of the pile foundation, and select the corresponding size of the pile foundation outer sleeve and anti-slip pile mold; the pile foundation is distributed in a plum blossom shape to form a micro pile group with a certain strength and elastic modulus that can play an anti-slip reinforcement effect;
[0061] b. Assembling the pile foundation outer sleeve and the anti-slip pile mold, and driving the assembled pile foundation outer sleeve and the anti-slip pile mold into the soil by a pile driver;
[0062] c. Connecting the grouting equipment with the grouting holes on the anti-sliding pile mold through the grouting pipe, starting grouting and gradually lifting the anti-sliding pile mold until the anti-sliding pile mold is completely separated from the pile foundation outer casing, completing the construction of the pile foundation and the recovery of the anti-sliding pile mold; the grouting method of the grouting equipment is pressure grouting, and the slurry in the grouting equipment includes at least two polyurethane slurries, and the different polyurethane slurries are injected into the lower part of the anti-sliding pile mold through the grouting holes and then mixed and reacted;
[0063] d. Repeat steps b and c to construct the next pile foundation until the slope reinforcement is completed.
[0064] The preferred embodiments for implementing the present invention have been described in detail above, but it should be understood that the role of these embodiments is only to exemplify, and is not intended to limit the scope, applicability or configuration of the present invention in any way. The protection scope of the present invention is defined by the attached claims and their equivalents. A person of ordinary skill in the art can make many changes to the above embodiments under the guidance of the present invention, and these changes all fall within the protection scope of the present invention.
Claims
1. A polymer micropile rapid prototyping method for emergency and disaster relief, the method utilizing a polymer micropile rapid prototyping device for emergency and disaster relief to carry out construction, the polymer micropile rapid prototyping device for emergency and disaster relief comprising: Pile foundation outer casing; An anti-slip pile mold, which is matched and arranged in the outer sleeve of the pile foundation, a drill bit is arranged at the lower end of the anti-slip pile mold, and a grouting hole is arranged in the middle of the anti-slip pile mold; as well as A limit locking unit, which is used to relatively fix the pile foundation outer sleeve and the anti-slip pile mold during the sinking process, and the anti-slip pile mold can be freely pulled upward relative to the pile foundation outer sleeve; Characterized in that the method comprises the following steps: a. Determine the pile foundation distribution location and pile foundation size according to the slope geological environment, and select the corresponding size of pile foundation outer casing and anti-slip pile mold; b. Assembling the pile foundation outer sleeve and the anti-slip pile mold, and driving the assembled pile foundation outer sleeve and the anti-slip pile mold into the soil by a pile driver; c. Connecting the grouting equipment to the grouting holes on the anti-sliding pile mold through the grouting pipe, starting grouting and gradually lifting the anti-sliding pile mold until the anti-sliding pile mold is completely separated from the pile foundation outer casing, completing the construction of the pile foundation and the recovery of the anti-sliding pile mold; d. Repeat steps b and c to construct the next pile foundation until the slope reinforcement is completed.
2. The rapid prototyping method for polymer micropile in emergency and disaster relief situations according to claim 1, characterized in that: The pile foundation is distributed in a plum blossom shape.
3. The rapid prototyping method for polymer micropile in emergency and disaster relief situations according to claim 1, characterized in that: The grouting method of the grouting equipment is pressure grouting. The slurry in the grouting equipment includes at least two polyurethane slurries. Different polyurethane slurries are injected into the lower part of the anti-sliding pile mold through the grouting holes and then mixed and reacted.
4. The rapid prototyping method for polymer micropile in emergency and disaster relief situations according to claim 1, characterized in that: The pile foundation outer casing is a steel mesh; or the pile foundation outer casing is a steel pipe with mesh holes.
5. The rapid prototyping method for polymer micropile in emergency and disaster relief situations according to claim 1, characterized in that: The drill bit is a spiral drill bit, and a discharge gap is arranged between the pile foundation outer sleeve and the anti-slip pile mold.
6. The rapid prototyping method for polymer micropiles in emergency and disaster relief situations according to claim 1, characterized in that: The anti-sliding pile mold is provided with 3-6 grouting holes.
7. A method for rapid prototyping of polymer micropiles in emergency and disaster relief situations according to any one of claims 1 or 4-6, characterized in that: The limit locking unit comprises a conical limit sleeve arranged at the lower part of the pile foundation outer sleeve, and the conical limit sleeve matches and fits with the drill bit for support.
8. The method for rapid prototyping of polymer micropile in emergency and disaster relief situations according to any one of claims 1 or 4-6, characterized in that: The position limiting locking unit comprises a tenon arranged on the outer sleeve of the pile foundation and a mortise arranged on the outer wall of the anti-slip pile mold, and the tenon and the mortise are fitted together.
9. The method for rapid prototyping of polymer micropiles in emergency and disaster relief situations according to claim 1, characterized in that: The drill bit and the anti-slip pile mold are an integrated structure or a split structure, and the inner diameter of the pile foundation outer sleeve is larger than the outer diameters of the anti-slip pile mold and the drill bit.
Citation Information
Patent Citations
Polymer multi-edge pile grouting method
CN103233473A
Large-diameter cavity long spiral thin-wall pouring pile sleeve and pile-forming construction method
CN104005409A
High polymer micro pile rapid forming device under emergency rescue and disaster relief conditions
CN214832609U