A battery pack pre-charging test circuit and method

By designing multiple parallel precharge test circuits in the battery pack, charging and discharging can be replaced with no intervals or short time intervals, which solves the problem of low precharge test efficiency in the existing technology and improves test efficiency and vehicle safety. sex.

CN113296004BActive Publication Date: 2024-10-29TONGMIN INT ENERGY TECH (SHENZHEN) CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202110573602.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-05-25
Publication Date
2024-10-29
Estimated Expiration
2041-05-25

AI Technical Summary

Technical Problem

In the existing technology, the pre-charging test efficiency of electric vehicles is low, and it is necessary to wait for the capacitor to be completely discharged before the next test can be carried out, resulting in a long time interval and limited test capabilities.

Method used

Design a precharge test circuit for the battery pack, including multiple parallel precharge test circuits. Each circuit contains a charging branch and a discharging branch. The control module starts the discharging branch immediately after the charging is completed, and completes the discharging after the charging is completed. Then start the next charging branch to realize the replacement test without interval or short time interval.

Benefits of technology

It significantly improves the efficiency of precharge testing, can set test intervals according to different test requirements, meets the capability verification of power battery precharge function, reduces the safety management pressure of the battery management system, and improves the safety of the entire vehicle.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113296004B_ABST
    Figure CN113296004B_ABST
Patent Text Reader

Abstract

The present application discloses a pre-charge test circuit and method for a battery pack, the circuit includes a control module and a plurality of pre-charge test loops connected in parallel at both ends of the battery pack; each pre-charge test loop includes a charging branch and a discharging branch for the respective pre-charge capacity; during the pre-charge cycle test of the battery pack, after the charging branch of the current pre-charge test loop is started and the charging is completed and disconnected, the control module is used to start the discharge branch of the current pre-charge test loop, and start the charging branch of another pre-charge test loop to start the next pre-charge test, until the preset target number of tests is reached. The present application is based on a plurality of pre-charge test loops, so that the time interval between two pre-charge tests can be arbitrarily set according to different test requirements, which greatly improves the efficiency of the pre-charge test, can meet the capability verification of the pre-charge function of different power batteries, and promotes the technological progress and promotion and application of the new energy vehicle industry.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of new energy technology, and in particular to a pre-charging test circuit and method for a battery pack. Background Art

[0002] Energy crisis and environmental pollution are increasing day by day. The impact of automobiles on energy consumption and environmental pollution cannot be ignored. The development of clean electric vehicles with high efficiency, energy saving, low noise and zero emission has become an inevitable trend in the development of the domestic and foreign automobile industries. In order to improve the power and energy utilization of electric vehicles, the voltage of power batteries is getting higher and higher, from tens of volts to hundreds of volts now, so a special system is needed to manage the safety of the high-voltage system. Electric vehicles not only need to be equipped with a special on-board high-voltage electrical safety management system, but also a special safety test system should be designed to monitor the on-board high-voltage electrical safety management system to conduct irregular safety status monitoring.

[0003] According to the high-voltage safety requirements of electric vehicles, pre-charging management is an essential and important link in new energy vehicles. The main function of electric vehicle pre-charging is to charge the large capacitor of the motor controller (i.e. inverter) to reduce spark arcing when the contactor contacts, reduce impact and increase safety.

[0004] During the design process, it is necessary to conduct precise and reasonable tests on the pre-charging of electric vehicles to ensure the safety and effectiveness of the pre-charging process. In current technology, the detection scheme for the pre-charging function is generally to wait for the discharge to be completed before repeating the next pre-charging test. After the capacitor is pre-charged once, it is necessary to wait until the capacitor is fully discharged before the next pre-charging test can be performed. Therefore, the time interval between the two pre-charging tests is long, the test efficiency is low, and the test capacity is limited.

[0005] In view of this, providing a solution to the above-mentioned technical problems has become an urgent concern for those skilled in the art. Summary of the invention

[0006] The purpose of the present application is to provide a pre-charging test circuit and method for a battery pack, so as to effectively improve the test efficiency of the pre-charging test of an automotive power battery.

[0007] In order to solve the above technical problems, on the one hand, the present application discloses a pre-charge test circuit of a battery pack, comprising a control module and a plurality of pre-charge test circuits connected in parallel at both ends of the battery pack; each of the pre-charge test circuits comprises a charging branch and a discharging branch for a respective pre-charge capacitor;

[0008] During the pre-charging cycle test of the battery pack, after the charging branch of the current pre-charging test circuit is started and disconnected after charging is completed, the control module is used to start the discharge branch of the current pre-charging test circuit and start the charging branch of another pre-charging test circuit to start the next pre-charging test until the preset target number of tests is reached.

[0009] Optionally, each charging branch of the pre-charging test loop includes: a pre-charging switch and a pre-charging capacitor connected in series at both ends of the battery pack;

[0010] The discharge branch of each pre-charge test loop includes: a discharge switch and a discharge resistor connected in series at both ends of the pre-charge capacitor.

[0011] Optionally, the pre-charging switch and the discharging switch are both relays whose control ends are connected to the control module.

[0012] Optionally, each of the pre-charging test loops further includes:

[0013] The voltage sensor connected in parallel with the pre-charge capacitor is used to monitor the voltage of the pre-charge capacitor and send the monitoring data to the control module so that the control module disconnects the charging branch after determining that charging is completed based on the monitoring data, and disconnects the discharging branch after determining that discharging is completed.

[0014] Optionally, the control module is further used for:

[0015] After starting the charging branch of any pre-charging test circuit, start the timer to start charging timing in order to determine whether a pre-charging timeout fault occurs.

[0016] Optionally, the control module is specifically used for:

[0017] After starting the discharge branch of the current pre-charging test loop, start the timer to start the discharge timing; after waiting for a preset target time, start the charging branch of another pre-charging test loop to start the next pre-charging test.

[0018] Optionally, it also includes:

[0019] The alarm module connected to the control module is used to issue a fault alarm for the corresponding pre-charging test circuit after the control module determines that a pre-charging timeout fault occurs.

[0020] In another aspect, the present application further discloses a pre-charging test method for a battery pack, which is applied to a control module in any pre-charging test circuit as described above, comprising:

[0021] Start the charging branch of the current pre-charging test circuit to charge;

[0022] After charging is completed, disconnect the charging branch of the current pre-charging test loop;

[0023] Determine whether the current number of tests has reached the preset target number of tests;

[0024] If not, the discharge branch of the current pre-charge test loop is started to discharge, and the charge branch of another pre-charge test loop is started to charge to start the next pre-charge test;

[0025] If so, the discharge branch of the current pre-charge test loop is started to discharge, and the test is ended after the discharge is completed.

[0026] Optionally, starting the charging branch of another pre-charging test loop to charge to start the next pre-charging test specifically includes:

[0027] The charging branches of different pre-charging test circuits are selected in turn and cyclically according to a preset sequence to start the next pre-charging test.

[0028] Optionally, each of the pre-charge test loops further includes a voltage sensor connected in parallel with the pre-charge capacitor, for monitoring the voltage of the pre-charge capacitor; and disconnecting the charging branch of the current pre-charge test loop after charging is completed includes:

[0029] Determining whether the pre-charge capacitor is fully charged based on the monitoring data of the voltage sensor received in real time;

[0030] If so, the charging branch of the current pre-charging test loop is disconnected.

[0031] The beneficial effects of the pre-charging test circuit and method of the battery pack provided in the present application are as follows: the present application is based on multiple pre-charging test circuits, and can start another pre-charging test circuit for the next pre-charging test at any time after the current pre-charging test circuit finishes charging, so that the time interval between the two pre-charging tests can be arbitrarily set according to different test requirements, and even the test can be replaced without interval, which greatly improves the efficiency of the pre-charging test, can meet the capacity verification of the pre-charging function of different power batteries, and promotes the technological progress and promotion and application of the new energy vehicle industry. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] In order to more clearly illustrate the technical solutions in the prior art and the embodiments of the present application, the drawings required for use in the description of the prior art and the embodiments of the present application are briefly introduced below. Of course, the drawings described below in relation to the embodiments of the present application are only part of the embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on the provided drawings without creative work, and the obtained other drawings also belong to the protection scope of the present application.

[0033] Figure 1 A schematic diagram of the structure of a pre-charging test circuit for a battery pack disclosed in an embodiment of the present application;

[0034] Figure 2 A circuit structure diagram of a pre-charging test circuit for a battery pack disclosed in an embodiment of the present application;

[0035] Figure 3 This is a flow chart of a pre-charging test method for a battery pack disclosed in an embodiment of the present application. DETAILED DESCRIPTION

[0036] The core of this application is to provide a pre-charging test circuit and method for a battery pack, so as to effectively improve the test efficiency of the pre-charging test of the automotive power battery.

[0037] In order to describe the technical solutions in the embodiments of the present application more clearly and completely, the technical solutions in the embodiments of the present application will be introduced below in conjunction with the drawings in the embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.

[0038] See also Figure 1 As shown, the embodiment of the present application discloses a pre-charge test circuit of a battery pack, which mainly includes a control module 101 and a plurality of pre-charge test loops 102 connected in parallel at both ends of the battery pack; each pre-charge test loop 102 includes a charging branch and a discharging branch for its respective pre-charge capacitor;

[0039] During the pre-charging cycle test of the battery pack, after the charging branch of the current pre-charging test circuit 102 is started and the charging is completed and then disconnected, the control module 101 is used to start the discharging branch of the current pre-charging test circuit 102, and start the charging branch of another pre-charging test circuit 102 to start the next pre-charging test until the preset target number of tests is reached.

[0040] The battery pack in this application may be specifically a power storage battery of a new energy electric vehicle, which generally outputs a high voltage of tens of volts or hundreds of volts. The control module 101 in the pre-charging test circuit provided in this application may be specifically a battery management system (BMS) equipped in a new energy electric vehicle.

[0041] It should be noted that in the pre-charge test circuit of the battery pack provided in the present application, a plurality of pre-charge test loops 102 are designed, each pre-charge test loop 102 is provided with a pre-charge capacitor, and a charging branch and a discharging branch are provided. Among them, the charging branch can use the battery pack to charge the pre-charge capacitor, and the discharging branch can provide a discharge channel for the pre-charge capacitor. The circuit structure of each pre-charge test loop 102 can be the same.

[0042] Since a large number of cycle tests are required for pre-charging of the battery pack during the production design process, which takes a long time, in order to effectively improve the efficiency of the pre-charging test, the present application is based on a designed multi-channel pre-charging test circuit 102, which can perform pre-charging and discharging tests in an uninterrupted cycle.

[0043] Specifically, after the current pre-charging test loop 102, that is, the pre-charging test loop 102 that has been pre-charged in this pre-charging test, has finished charging, its discharge branch is turned on for discharge; and the other pre-charging test loop 102 can start charging without waiting for the current pre-charging test loop 102 to finish discharging, and can even specifically take over charging without interval at the initial moment of the current pre-charging test loop 102 discharging. In this way, the present application saves the time of waiting for the current pre-charging test loop 102 to finish discharging, thereby effectively shortening the time interval between the two pre-charging tests, realizing a fast conversion between the two pre-charging tests, and improving the efficiency of the pre-charging test.

[0044] It can be seen that the pre-charging test circuit of the battery pack provided in the present application is based on multiple pre-charging test loops, and can start another pre-charging test loop to perform the next pre-charging test at any time after the current pre-charging test loop finishes charging, so that the time interval between the two pre-charging tests can be arbitrarily set according to different test requirements, and even the test can be replaced without interval, which greatly improves the efficiency of the pre-charging test, can meet the capacity verification of the pre-charging function of different power batteries, and promotes the technological progress and promotion and application of the new energy vehicle industry.

[0045] The detection method can determine whether the pre-charging process is successful, and can also judge charging failure before the vehicle starts, identify the type and location of possible faults, reduce the safety management pressure of the battery management system and vehicle controller, improve the safety of the vehicle, and promote the promotion of the new energy vehicle industry as soon as possible.

[0046] See also Figure 2 As shown, Figure 2 This is a circuit diagram of a pre-charging test circuit for a battery pack disclosed in an embodiment of the present application. Figure 2 The pre-charge test circuit shown specifically includes three pre-charge test loops.

[0047] As a specific embodiment, the pre-charge test circuit of the battery pack provided in the embodiment of the present application is based on the above content, and the charging branch of each pre-charge test loop includes: a pre-charge switch and a pre-charge capacitor connected in series at both ends of the battery pack;

[0048] The discharge branch of each pre-charge test loop includes: a discharge switch and a discharge resistor connected in series at both ends of the pre-charge capacitor.

[0049] As a specific embodiment, the pre-charging switch and the discharging switch are both relays whose control ends are connected to the control module 101 .

[0050] Specifically, by default, all switches are in the off state. When the pre-charge switch in a pre-charge test loop is closed (the discharge switch is disconnected by default), the battery pack, pre-charge switch, and pre-charge capacitor form a charging channel, and the pre-charge capacitor begins to charge. When the pre-charge switch is disconnected and the discharge switch is closed, the pre-charge capacitor, discharge switch, and discharge resistor form a discharge channel, and the energy stored in the pre-charge capacitor is consumed by the discharge resistor.

[0051] It should also be noted that those skilled in the art can set the series order of the pre-charge switch and the pre-charge capacitor by themselves, that is, the pre-charge switch can be set between the positive electrode of the battery pack and the pre-charge capacitor, or between the negative electrode of the battery pack and the pre-charge capacitor. Similarly, those skilled in the art can also set the series order of the discharge switch and the discharge resistor by themselves, that is, the discharge switch can be set between the positive electrode of the pre-charge capacitor and the discharge resistor, or between the negative electrode of the pre-charge capacitor and the discharge resistor.

[0052] As a specific embodiment, the pre-charge test circuit of the battery pack provided in the embodiment of the present application is based on the above content, and each pre-charge test circuit further includes:

[0053] The voltage sensor connected in parallel with the pre-charge capacitor is used to monitor the voltage of the pre-charge capacitor and send the monitoring data to the control module 101 so that the control module 101 disconnects the charging branch after determining that charging is completed according to the monitoring data, and disconnects the discharging branch after determining that discharging is completed.

[0054] For details, please refer to Figure 2 The first pre-charge test circuit is provided with a pre-charge switch S11, a pre-charge capacitor C11, a voltage sensor U11, a discharge switch S12, and a discharge resistor R11; the second pre-charge test circuit is provided with a pre-charge switch S21, a pre-charge capacitor C21, a voltage sensor U21, a discharge switch S22, and a discharge resistor R21; the third pre-charge test circuit is provided with a pre-charge switch S31, a pre-charge capacitor C31, a voltage sensor U31, a discharge switch S32, and a discharge resistor R31.

[0055] As a specific embodiment, the pre-charging test circuit of the battery pack provided in the embodiment of the present application is based on the above content, and the control module 101 is further used for:

[0056] After starting the charging branch of any pre-charging test circuit, start the timer to start charging timing in order to determine whether a pre-charging timeout fault occurs.

[0057] Specifically, after each pre-charging starts, the control module 101 can automatically count the time, so as to use the conventional charging time set according to experience to determine whether a pre-charging timeout failure occurs, so that the operation and maintenance personnel can promptly troubleshoot the failure and ensure the safe operation of the system.

[0058] As a specific embodiment, the pre-charging test circuit of the battery pack provided in the embodiment of the present application is based on the above content, and the control module 101 is specifically used for:

[0059] After starting the discharge branch of the current pre-charge test loop, start the timer to start the discharge timing; after waiting for a preset target time, start the charging branch of another pre-charge test loop to start the next pre-charge test.

[0060] Specifically, as mentioned above, the present application can adaptively set the time interval between two pre-charging tests according to the test requirements. That is, those skilled in the art can start another pre-charging test circuit to charge the branch circuit at the initial discharge moment of the current pre-charging test circuit, or start another pre-charging test circuit to charge the branch circuit after waiting for the discharge to be performed for a target time.

[0061] As a specific embodiment, the pre-charge test circuit of the battery pack provided in the embodiment of the present application further includes:

[0062] The alarm module connected to the control module 101 is used to issue a fault alarm for the corresponding pre-charging test circuit after the control module 101 determines that a pre-charging timeout fault occurs.

[0063] Specifically, when it is determined that a pre-charging timeout fault occurs, the alarm module can be used to issue a fault alarm in the form of light, sound, text display, etc.

[0064] See also Figure 3 As shown, the embodiment of the present application discloses a pre-charging test method for a battery pack, which is applied to a control module in the pre-charging test circuit as above, and mainly includes:

[0065] S201: Start the charging branch of the current pre-charging test circuit to charge.

[0066] S202: After charging is completed, disconnect the charging branch of the current pre-charging test circuit.

[0067] S203: Determine whether the current number of tests has reached the preset target number of tests; if not, proceed to S204; if so, proceed to S205.

[0068] S204: starting the discharge branch of the current pre-charge test loop to discharge, and starting the charge branch of another pre-charge test loop to charge to start the next pre-charge test.

[0069] S205: Start the discharge branch of the current pre-charge test loop to discharge, and end the test after the discharge is completed.

[0070] It is easy to understand that after the discharge branch is started to discharge, the discharge branch must be closed again when the discharge is completed in order to restore to the default state.

[0071] It can be seen that the pre-charging test method for the battery pack provided in the present application is based on multiple pre-charging test circuits, and can start another pre-charging test circuit to perform the next pre-charging test at any time after the current pre-charging test circuit finishes charging, so that the time interval between the two pre-charging tests can be arbitrarily set according to different test requirements, and even the test can be replaced without interval, which greatly improves the efficiency of the pre-charging test, can meet the capacity verification of the pre-charging function of different power batteries, and promotes the technological progress and promotion and application of the new energy vehicle industry.

[0072] For specific contents of the pre-charging test method of the above-mentioned battery pack, please refer to the detailed introduction of the pre-charging test circuit of the battery pack mentioned above, which will not be repeated here.

[0073] As a specific embodiment, the pre-charging test method of the battery pack disclosed in the embodiment of the present application is based on the above content, and the charging branch of each pre-charging test circuit includes: a pre-charging switch and a pre-charging capacitor connected in series at both ends of the battery pack; the discharging branch of each pre-charging test circuit includes: a discharging switch and a discharging resistor connected in series at both ends of the pre-charging capacitor.

[0074] As a specific embodiment, the pre-charging test method of the battery pack disclosed in the embodiment of the present application is based on the above content, and the pre-charging switch and the discharging switch are both relays whose control ends are connected to the control module.

[0075] As a specific embodiment, the pre-charge test method of the battery pack disclosed in the embodiment of the present application is based on the above content, and each pre-charge test loop also includes a voltage sensor connected in parallel with the pre-charge capacitor to monitor the voltage of the pre-charge capacitor; after charging is completed, the charging branch of the current pre-charge test loop is disconnected, including:

[0076] Determining whether the pre-charge capacitor is fully charged based on the monitoring data of the voltage sensor received in real time;

[0077] If so, the charging branch of the current pre-charging test circuit is disconnected.

[0078] As a specific embodiment, the pre-charging test method of the battery pack disclosed in the embodiment of the present application is based on the above content, and after starting the charging branch of any pre-charging test circuit, it also includes:

[0079] Update the start timer to start charging timing in order to determine whether a pre-charge timeout fault occurs.

[0080] As a specific embodiment, the pre-charging test method of the battery pack disclosed in the embodiment of the present application starts charging of another charging branch of the pre-charging test circuit to start the next pre-charging test based on the above content, specifically including:

[0081] After starting the discharge branch of the current pre-charge test loop, start the timer to start the discharge timing; after waiting for a preset target time, start the charging branch of another pre-charge test loop to start the next pre-charge test.

[0082] As a specific embodiment, the pre-charging test method of the battery pack disclosed in the embodiment of the present application starts charging of another charging branch of the pre-charging test circuit to start the next pre-charging test based on the above content, specifically including:

[0083] The charging branches of different pre-charging test circuits are selected in turn and cyclically according to a preset sequence to start the next pre-charging test.

[0084] Specifically, for Figure 2 The pre-charge test circuit shown has three pre-charge test loops, and can perform pre-charge test in a cycle in the order of the first, second, and third pre-charge test loops.

[0085] In a specific embodiment, the test process may specifically include the following steps:

[0086] Start the first pre-charge test loop:

[0087] a: First, close the pre-charge switch S11 and open the discharge switch S12. The battery pack starts to charge the pre-charge capacitor C11. The voltage sensor U11 collects the voltage across the pre-charge capacitor C11 in real time.

[0088] b: After the pre-charge starts, the control module automatically starts timing. If the set regular charging time is exceeded, the system reports a pre-charge timeout fault and the test stops, otherwise it goes to the next step;

[0089] c: After the pre-charging is completed, the pre-charging switch S11 is turned off, the discharge switch S12 is turned on, the pre-charging capacitor C11 is discharged through the discharge resistor R11, and the next step is carried out at the same time;

[0090] d: The control module determines whether the current number of tests has reached the target setting value. If it has reached the set number of tests, the test ends; otherwise, it proceeds to the next step to start the second pre-charging test circuit.

[0091] Start the second pre-charge test loop:

[0092] e: First, close the pre-charge switch S21 and open the discharge switch S22. The battery pack starts to charge the pre-charge capacitor C21. The voltage sensor U21 collects the voltage across the pre-charge capacitor C21 in real time.

[0093] f: After the pre-charge starts, the control module automatically starts timing. If the set regular charging time is exceeded, the system reports a pre-charge timeout fault and the test stops, otherwise it goes to the next step;

[0094] g: After the pre-charging is completed, the pre-charging switch S21 is turned off, the discharge switch S22 is turned on, and the pre-charging capacitor C21 is discharged through the discharge resistor R21, and the next step is carried out at the same time;

[0095] h: The control module determines whether the current number of tests has reached the target setting value. If it has reached the set number of times, the test ends, otherwise it goes to the next step to start the third pre-charging test circuit.

[0096] Start the third pre-charge test loop:

[0097] i: First, the pre-charge switch S31 is closed, and the discharge switch S32 is opened. The battery pack starts to charge the pre-charge capacitor C31, and the voltage sensor U31 collects the voltage across the pre-charge capacitor C31 in real time;

[0098] j: After the pre-charge starts, the control module automatically starts timing. If the set regular charging time is exceeded, the system reports a pre-charge timeout fault and the test stops, otherwise it goes to the next step;

[0099] k: After the pre-charging is completed, the pre-charging switch S31 is turned off, and the discharge switch S32 is turned on. The pre-charging capacitor C31 is discharged through the discharge resistor R31, and the next step is carried out at the same time;

[0100] 1: The control module determines whether the current test times have reached the target setting value. If so, the test ends. Otherwise, it repeats step a to start the first pre-charging test loop. The cycle continues in sequence.

[0101] In this application, each embodiment is described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the embodiments can be referred to each other. For the device disclosed in the embodiment, since it corresponds to the method disclosed in the embodiment, the description is relatively simple, and the relevant parts can be referred to the method part.

[0102] It should also be noted that, in this application document, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. In addition, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the statement "comprises a ..." does not exclude the presence of other identical elements in the process, method, article or device including the element.

[0103] The technical solution provided by the present application is described in detail above. The principle and implementation method of the present application are described in detail using specific examples herein, and the description of the above embodiments is only used to help understand the method and core idea of ​​the present application. It should be pointed out that for ordinary technicians in this technical field, without departing from the principle of the present application, several improvements and modifications can be made to the present application, and these improvements and modifications also fall within the scope of protection of the present application.

Claims

1. A pre-charge test circuit for a battery pack, characterized in that: It includes a control module and a plurality of pre-charge test circuits connected in parallel at both ends of the battery pack; each of the pre-charge test circuits includes a charging branch and a discharging branch for the respective pre-charge capacitor; During the pre-charging cycle test of the battery pack, after the charging branch of the current pre-charging test loop is started and the charging is completed and then disconnected, the control module is used to start the discharge branch of the current pre-charging test loop, and start the charging branch of another pre-charging test loop to start the next pre-charging test, until the preset target number of tests is reached; The charging branch of each pre-charging test loop includes: a pre-charging switch and a pre-charging capacitor connected in series at both ends of the battery pack; the discharging branch of each pre-charging test loop includes: a discharging switch and a discharging resistor connected in series at both ends of the pre-charging capacitor; the pre-charging switch and the discharging switch are both relays whose control ends are connected to the control module; Each of the pre-charge test circuits also includes: a voltage sensor connected in parallel with the pre-charge capacitor, for monitoring the voltage of the pre-charge capacitor and sending the monitoring data to the control module, so that the control module disconnects the charging branch after determining that charging is completed based on the monitoring data, and disconnects the discharging branch after determining that discharging is completed.

2. The precharge test circuit according to claim 1, characterized in that: The control module is also used for: After starting the charging branch of any pre-charging test circuit, start the timer to start charging timing in order to determine whether a pre-charging timeout fault occurs.

3. The precharge test circuit according to claim 2, characterized in that: The control module is specifically used for: After starting the discharge branch of the current pre-charging test loop, start the timer to start the discharge timing; after waiting for a preset target time, start the charging branch of another pre-charging test loop to start the next pre-charging test.

4. The precharge test circuit according to claim 2, characterized in that: Also includes: The alarm module connected to the control module is used to issue a fault alarm for the corresponding pre-charge test circuit after the control module determines that a pre-charge timeout fault occurs.

5. A pre-charge test method for a battery pack, characterized in that: A control module used in the pre-charge test circuit according to claim 1, comprising: Start the charging branch of the current pre-charging test circuit to charge; After charging is completed, disconnect the charging branch of the current pre-charging test loop; Determine whether the current number of tests has reached the preset target number of tests; If not, the discharge branch of the current pre-charge test loop is started to discharge, and the charge branch of another pre-charge test loop is started to charge to start the next pre-charge test; If yes, then start the discharge branch of the current pre-charge test loop to discharge, and end the test after the discharge is completed; Each of the pre-charge test loops further includes a voltage sensor connected in parallel with the pre-charge capacitor, for monitoring the voltage of the pre-charge capacitor; the method of disconnecting the charging branch of the current pre-charge test loop after charging is completed includes: Determining whether the pre-charge capacitor is fully charged based on the monitoring data of the voltage sensor received in real time; If so, the charging branch of the current pre-charging test loop is disconnected.

6. The pre-charge test method according to claim 5, characterized in that: The step of starting the charging branch of another pre-charging test loop to charge to start the next pre-charging test specifically includes: The charging branches of different pre-charging test circuits are selected in turn and cyclically according to a preset sequence to start the next pre-charging test.

Citation Information

Patent Citations

  • Test device of pre-charging circuit

    CN210199245U

  • Automatic test circuit for pre-charging loop of power battery system

    CN211348540U