A construction method for vertical section type dismantling of inner support
A construction method and vertical technology, applied in excavation, artificial islands, water conservancy projects, etc., can solve problems that restrict project progress and affect economic benefits, and achieve the effect of shortening the absolute construction period
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Publication Date
- 2022-07-05
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention belongs to the field of deep foundation pit support, in particular to a construction method for dismantling an inner support in a vertical section type. Background technique
[0002] With the increasing shortage of urban land and the continuous development of high-rise and super high-rise buildings, deep foundation pits are more and more widely used in urban construction. However, the demolition of the inner support of the deep foundation pit has always been a major difficulty in the project, and it is a key process that restricts the progress of the project. The traditional demolition process of the inner support is generally to remove the upper side of the layer after the strength of the main structure of each layer reaches 80% after the construction is completed. The inner support, the main structure and the inner support all need to be constructed and demolished on the whole floor. When the area of the main structure is large, it i...
Examples
Embodiment
[0086] The embodiment is as follows: a construction method for removing inner support in vertical section, the inner support of the foundation pit includes four corner inner supports, which are respectively designed at the four corners of the foundation pit. The inner support of the corners in the foundation pit includes a total of three layers of inner support structures according to a layered design, and the main structure includes a total of four layers in a vertical layered design in the foundation pit. The main structure includes the raft 21 and the upper side of the raft. The basement floor slab 22 and the replacement bracing structure of the same level as the basement floor slab.
[0087] like figure 1 As shown in the previous construction section, the main structure in the foundation pit is divided into nine construction areas, each area is constructed at the same time, and the construction is flowing, which facilitates the turnover of materials in the construction sta...