A buffer energy absorption support composite structure

By introducing reinforced steel cables, long strips and protective mechanisms into the U-shaped steel frame, the problem of U-shaped steel frame being easily broken under high ground stress is solved, and the high confining pressure bearing capacity and construction safety of the structure are improved.

CN113622946BActive Publication Date: 2024-11-05ZHEJIANG SCI RES INST OF TRANSPORT
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111091954.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-09-17
Publication Date
2024-11-05
Estimated Expiration
2041-09-17

AI Technical Summary

Technical Problem

In the construction of existing underground deep tunnels, the U-shaped steel frame is prone to breaking the two side walls due to no protective mechanism under high ground stress, losing the buffering and energy absorption function, reducing the support performance, and posing a major safety hazard.

Method used

A buffered energy-absorbing support composite structure is designed. By introducing reinforced steel cables, long strips, protective mechanisms and telescopic columns into the U-shaped steel frame, it ensures that the force can be effectively transferred and allocated under high surrounding rock pressure, and avoids U-shaped steel frame. The two side walls of the steel frame exceed the maximum deformation value, improving the strength and safety of the structure.

Benefits of technology

It effectively improves the bearing capacity of the support composite structure under high confining pressure, extends the service life of U-shaped steel, reduces the risk of surrounding rock collapse, and ensures construction safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113622946B_ABST
    Figure CN113622946B_ABST
Patent Text Reader

Abstract

The present invention discloses a buffering energy-absorbing support composite structure, comprising a U-shaped steel frame, the U-shaped steel frame comprising a first U-shaped steel and a second U-shaped steel, the first U-shaped steel being fixedly connected to both sides of the bottom end of the second U-shaped steel, a bottom plate being connected to the bottom end between the two first U-shaped steels, the opening surfaces of the first U-shaped steel and the second U-shaped steel both facing the inner wall of the tunnel, a reinforcing steel cable being arranged in the first U-shaped steel and the second U-shaped steel, a long strip being arranged between the first U-shaped steel and the tunnel and between the second U-shaped steel and the tunnel, a protective mechanism being fixedly connected to the side of the long strip away from the inner wall of the tunnel, the protective mechanism being away from one end of the long strip facing the reinforcing steel cable, the distance between the protective mechanism and the reinforcing steel cable being away from one end of the long strip being less than the maximum distance of the outward expansion of the two side walls of the U-shaped steel frame; by installing a fixed column between the long strip and the reinforcing steel cable, the confining pressure is absorbed and released and transferred to the entire U-shaped steel frame. The buffering energy-absorbing support composite structure of the present invention is suitable for high confining pressure conditions, can improve the safety of underground construction, and reduce the risk of confining pressure collapse.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to an underground engineering support structure, in particular to a buffering energy-absorbing support composite structure. Background Art

[0002] While large-scale infrastructure has effectively promoted human civilization and social progress, it has also made resources and the environment unsustainable, and global environmental problems have become increasingly prominent. The Netherlands proposed a "green heartland" to build only underground projects to minimize damage to the existing landscape. Infrastructure construction is showing a trend of leaping from the ground to the underground. As a "new type of land resource", more and more countries are beginning to pay attention to the development and utilization of deep (50-100m) space. However, the construction technology of the middle and even deep underground layers is difficult. Compared with ground projects, the problem of high ground stress in the deep underground layer is more prominent. When encountering special hydrogeological conditions, it will cause the excavation tunnel to deform strongly, and even cause the tunnel section to be severely "necked", which seriously threatens the life safety of underground construction technicians.

[0003] In order to improve the safety performance of underground tunnel construction with high ground stress, a buffering energy-absorbing support composite structure is installed in the tunnel. When the force acting on the U-shaped steel frame in the existing support composite structure is too large, due to the lack of a protective mechanism, once the maximum deformation of the two side walls of the U-shaped steel frame is exceeded, it will directly cause the two side walls of the U-shaped steel frame to break, causing the U-shaped steel frame to lose its buffering energy-absorbing function, reducing its support performance, and posing a major safety hazard. Summary of the invention

[0004] In order to overcome the shortcomings of the prior art, the present invention provides a buffering energy-absorbing support composite structure, which can solve the technical problem that when the U-shaped steel frame in the existing support composite structure is subjected to too large a force, due to the lack of a protective mechanism, once the maximum deformation of the two side walls of the U-shaped steel frame is exceeded, it will directly cause the two side walls of the U-shaped steel frame to break, causing the U-shaped steel frame to lose its buffering energy-absorbing function, thereby reducing its support performance and posing a great safety hazard.

[0005] To solve the above technical problems, the present invention provides the following technical solutions: a buffer energy absorption support composite structure, comprising a U-shaped steel frame, the U-shaped steel frame comprising a first U-shaped steel and a second U-shaped steel, the first U-shaped steel being fixedly connected to both sides of the bottom end of the second U-shaped steel, a bottom plate being connected to the bottom ends of the two first U-shaped steels, the opening surfaces of the first U-shaped steel and the second U-shaped steel both facing the inner wall of the tunnel, reinforcing steel cables are arranged in the first U-shaped steel and the second U-shaped steel, the reinforcing steel cables are connected end to end to form a tunnel cross-sectional shape, the reinforcing steel cables are used to enhance the strength of the combined connection structure of the entire support composite structure, long strips are arranged between the first U-shaped steel and the tunnel and between the second U-shaped steel and the tunnel, a protective mechanism is fixedly connected to the side of the long strip away from the inner wall of the tunnel, the end of the protective mechanism away from the long strip faces the reinforcing steel cable, and the distance between the end of the protective mechanism away from the long strip and the reinforcing steel cable is less than the maximum distance of the outward expansion of the two side walls of the U-shaped steel frame.

[0006] As a preferred technical solution of the present invention, the protective mechanism includes a fixed column, which is fixedly connected to the side of the long plate away from the inner wall of the tunnel, and the fixed column is connected to an arc block at one end away from the long plate, and the open end of the arc block faces the reinforcing steel cable, and the distance between the arc block and the reinforcing steel cable is less than the maximum distance of the outward expansion of the two side walls of the U-shaped steel frame.

[0007] As a preferred technical solution of the present invention, the shape of the second U-shaped steel is consistent with the shape of the tunnel top surface.

[0008] As a preferred technical solution of the present invention, the long strips are evenly distributed on the outside of the first U-shaped steel and the outside of the second U-shaped steel.

[0009] As a preferred technical solution of the present invention, angle plates are arranged on both inner and outer sides of the connection between the first U-shaped steel and the second U-shaped steel, and the two angle plates connect the first U-shaped steel and the second U-shaped steel together through bolts and nuts.

[0010] As a preferred technical solution of the present invention, a rubber pad is arranged inside the arc block.

[0011] As a preferred technical solution of the present invention, a telescopic column is installed between the fixed column and the arc block, and an active cavity is provided at one end of the fixed column close to the arc block. An installation cavity that is interconnected with the active cavity is provided on the inner side of the active cavity, and a spring is provided in the installation cavity. One end of the telescopic column extends into the active cavity and is connected to the spring, and the telescopic column can move in the active cavity.

[0012] As a preferred technical solution of the present invention, the distance between the end of the telescopic column away from the arc block and the opening end of the installation cavity is also smaller than the maximum distance of the outward expansion of the two side walls of the first U-shaped steel.

[0013] As a preferred technical solution of the present invention, the opening end of the movable cavity is embedded in a cleaning ring, and cleaning bristles are connected to the inside of the cleaning ring at equal intervals, and the free ends of the cleaning bristles are in contact with the outer surface of the telescopic column.

[0014] Compared with the prior art, the present invention can achieve the following beneficial effects:

[0015] (1) By installing a fixed column between the long plate and the reinforcing steel cable, the long plate transmits the surrounding rock pressure to the second U-shaped steel through the long plate, and the two side walls of the second U-shaped steel are deformed under compression, absorbing and buffering the surrounding rock pressure. During the process of the two side walls of the second U-shaped steel being deformed under compression, the long plate will also move with the deformation of the two side walls of the second U-shaped steel, and the long plate will drive the fixed column to move, and the fixed column will drive the arc block to move toward the reinforcing steel cable. When the two side walls of the second U-shaped steel are about to reach the maximum deformation value, the arc block is in close contact with the reinforcing steel cable, and the force is transmitted to the reinforcing steel cable through the fixed column and the arc block. At this time, the reinforcing steel cable can also transfer part of the force to the first U-shaped steel while improving the strength of the combined connection structure of the entire support composite structure, thereby avoiding the force on the second U-shaped steel exceeding the maximum deformation value of its two side walls, prolonging the service life of the second U-shaped steel, and at the same time improving the overall performance of the support composite structure to withstand high confining pressure, reducing the risk of surrounding rock collapse;

[0016] (2) By installing a telescopic column between the fixed column and the arc block, the spring provides support to the telescopic column, so that the arc block is always attached to the outer surface of the reinforcement steel cable. When the long plate moves with the deformation of the two side walls of the second U-shaped steel, it can be ensured that the arc block will not be misaligned with the reinforcement steel cable, and the reinforcement steel cable can effectively transmit the force and distribute the surrounding rock pressure, further ensuring the function of the support composite structure and safe construction;

[0017] (3) A cleaning ring is embedded in the open end of the movable cavity, and cleaning bristles are connected to the inside of the cleaning ring at equal intervals. The free ends of the cleaning bristles are in contact with the outer surface of the telescopic column. The cleaning bristles sweep away dust adsorbed on the outer surface of the telescopic column, reduce dust from entering the installation cavity, and ensure smooth movement of the telescopic column in the installation cavity. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic diagram of the supporting composite structure of the present invention;

[0019] Figure 2 is a schematic diagram of a protection mechanism in a first embodiment of the present invention;

[0020] Figure 3 is a schematic diagram of a protection mechanism in a second embodiment of the present invention;

[0021] Figure 4 It is a schematic diagram of the cross-sectional structure of the active cavity of the present invention;

[0022] Figure 5 for Figure 4 The enlarged structural diagram at a in FIG.

[0023] Among them: 10, U-shaped steel frame; 1, first U-shaped steel; 2, second U-shaped steel; 3, bottom plate; 4, long strip plate; 5, angle plate; 6, reinforcement steel cable; 71, fixed column; 72, arc block; 73, rubber pad; 74, telescopic column; 75, movable cavity; 76, installation cavity; 77, spring; 8, cleaning ring; 81, cleaning bristles. DETAILED DESCRIPTION

[0024] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific embodiments, but the following embodiments are only preferred embodiments of the present invention, not all. Based on the embodiments in the implementation mode, other embodiments obtained by those skilled in the art without creative work all belong to the protection scope of the present invention. The experimental methods in the following embodiments, unless otherwise specified, are conventional methods, and the materials, reagents, etc. used in the following embodiments, unless otherwise specified, can all be obtained from commercial channels.

[0025] Please refer to Figure 1 As shown, the present invention provides a buffer energy absorption support composite structure, including a U-shaped steel frame 10, the U-shaped steel frame 10 includes a first U-shaped steel 1 and a second U-shaped steel 2, the first U-shaped steel 1 is fixedly connected to both sides of the bottom end of the second U-shaped steel 2, a bottom plate 3 is connected to the bottom end between the two first U-shaped steels 1, the shape of the second U-shaped steel 2 is consistent with the shape of the tunnel top surface, fits the tunnel top surface, the opening surfaces of the first U-shaped steel 1 and the second U-shaped steel 2 are both facing the inner wall of the tunnel, a reinforcing steel cable 6 is arranged in the first U-shaped steel 1 and the second U-shaped steel 2, the reinforcing steel cable 6 is connected end to end to form the shape of the tunnel cross section, the reinforcing steel cable 6 is used to improve the strength of the combined connection structure of the entire support composite structure, and a reinforcing steel cable 6 is arranged between the first U-shaped steel 1 and the tunnel and between the second U-shaped steel 2 and the tunnel. The long strips 4 are equidistantly distributed on the outside of the first U-shaped steel 1 and the outside of the second U-shaped steel 2. The long strips 4 are fixedly connected to a fixed column 71 on the side away from the inner wall of the tunnel. The fixed column 71 is connected to an arc block 72 on the end away from the long strips 4. The open end of the arc block 72 faces the reinforcing steel cable 6. The distance between the arc block 72 and the reinforcing steel cable 6 is less than the maximum distance of the two side walls of the U-shaped steel frame 10 expanding outward, that is, the maximum deformation value of the two side walls of the first U-shaped steel 1 and the second U-shaped steel 2. This can effectively prevent the first U-shaped steel 1 from being subjected to excessive pressure, exceeding the maximum deformation value of the first U-shaped steel 1 and the second U-shaped steel 2, directly causing the two side walls of the first U-shaped steel 1 to break or be unable to be reset, causing the first U-shaped steel 1 and the second U-shaped steel 2 to lose or reduce their buffering performance.

[0026] When in use, the long plate 4 will be subjected to the force of the tunnel and transmitted to the second U-shaped steel 2 through the long plate 4. The two side walls of the second U-shaped steel 2 will be compressed and deformed, absorbing and slowly releasing the confining pressure. During the compression and deformation process of the two side walls of the second U-shaped steel 2, the long plate 4 will also move with the deformation of the two side walls of the second U-shaped steel 2. At the same time, the long plate 4 drives the fixed column 71 to move, and the fixed column 71 drives the arc block 72 to move toward the reinforcement cable 6. When the two side walls of the second U-shaped steel 2 are about to reach the maximum deformation value, the arc block 72 is in close contact with the reinforcement cable 6, and the confining pressure is passed through the long plate 4. The force is transmitted to the reinforcing steel cable 6 through the fixed column 71 and the arc block 72. At this time, the reinforcing steel cable 6 can not only enhance the strength of the combined connection structure of the entire supporting composite structure, but also transfer and distribute the confining pressure to the first U-shaped steel 1, thereby preventing the force on the second U-shaped steel 2 from exceeding the maximum deformation value of its two side walls, thereby improving the service life of the second U-shaped steel and improving the overall performance of the supporting composite structure in withstanding high confining pressure, thereby reducing the risk of surrounding rock collapse. When the first U-shaped steel 1 is subjected to excessive confining pressure, the confining pressure is similarly transferred and dispersed to the second U-shaped steel 2.

[0027] See also Figure 1 As shown, angle plates 5 are provided on both inner and outer sides of the connection between the first U-shaped steel 1 and the second U-shaped steel 2. The two angle plates 5 connect the first U-shaped steel 1 and the second U-shaped steel 2 together through bolts and nuts, so as to facilitate the assembly of the first U-shaped steel 1 and the second U-shaped steel 2.

[0028] See also Figure 2 As shown, a rubber pad 73 is provided inside the arc block 72 to prevent the arc block 72 from directly contacting the reinforcing steel cable 6 , thereby reducing the wear of the arc block 72 on the reinforcing steel cable 6 .

[0029] See also Figure 3 and Figure 4 As shown, a telescopic column 74 is installed between the fixed column 71 and the arc block 72, and a movable cavity 75 is provided at one end of the fixed column 71 close to the arc block 72. A mounting cavity 76 which is interconnected with the movable cavity 75 is provided inside the movable cavity 75. A spring 77 is provided in the mounting cavity 76. One end of the telescopic column 74 extends into the movable cavity 75 and is connected to the spring 77. The telescopic column 74 can move in the movable cavity 75. The distance between the end of the telescopic column 74 away from the arc block 72 and the open end of the mounting cavity 76 is also less than the maximum distance of the outward expansion of the two side walls of the U-shaped steel frame 10.

[0030] When in use, the spring 77 provides support for the telescopic column 74, so that the arc block 72 is always attached to the outer surface of the reinforcing steel cable 6, and moves when the long plate 4 moves with the deformation of the two side walls of the second U-shaped steel 2. This can ensure that the arc block 72 will not be misaligned with the reinforcing steel cable 6, and ensure that the reinforcing steel cable 6 can effectively bear and transmit the force, and distribute the received surrounding rock pressure, thereby further ensuring the function of the support composite structure and safe construction.

[0031] See also Figure 4 and Figure 5 As shown, a cleaning ring 8 is embedded in the open end of the movable cavity 75, and cleaning bristles 81 are connected to the inside of the cleaning ring 8 at equal intervals. The free ends of the cleaning bristles 81 are in contact with the outer surface of the telescopic column 74. When in use, the cleaning bristles 81 sweep away dust adsorbed on the outer surface of the telescopic column 74, reduce the dust from entering the installation cavity 76, and ensure smooth movement of the telescopic column 74 in the installation cavity 76.

[0032] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.

[0033] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited by the above embodiments. The above embodiments and descriptions are only preferred examples of the present invention and are not intended to limit the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A buffer energy absorption support composite structure, comprising a U-shaped steel frame (10), the U-shaped steel frame (10) comprising a first U-shaped steel (1) and a second U-shaped steel (2), the first U-shaped steel (1) being fixedly connected to both sides of the bottom end of the second U-shaped steel (2), a bottom plate (3) being connected between the bottom ends of the two first U-shaped steels (1), the opening surfaces of the first U-shaped steel (1) and the second U-shaped steel (2) both facing the inner wall of the tunnel, a reinforcing steel cable (6) being arranged in the first U-shaped steel (1) and the second U-shaped steel (2), the reinforcing steel cable (6) being connected end to end to form a tunnel cross-sectional shape, the reinforcing steel cable (6) being used to enhance the strength of the combined connection structure of the entire support composite structure, a long strip plate (4) being arranged between the first U-shaped steel (1) and the tunnel and between the second U-shaped steel (2) and the tunnel, characterized in that: A protective mechanism is fixedly connected to the side of the long board (4) away from the inner wall of the tunnel, and one end of the protective mechanism away from the long board (4) faces the reinforcing steel cable (6), and the distance between the end of the protective mechanism away from the long board (4) and the reinforcing steel cable (6) is less than the maximum distance of the outward expansion of the two side walls of the U-shaped steel frame (10); The protection mechanism comprises a fixed column (71), wherein the fixed column (71) is fixedly connected to a side of the long plate (4) away from the inner wall of the tunnel, and an arc block (72) is connected to one end of the fixed column (71) away from the long plate (4), wherein an open end of the arc block (72) faces the reinforcing steel cable (6), and a distance between the arc block (72) and the reinforcing steel cable (6) is less than a maximum distance of outward expansion of two side walls of the U-shaped steel frame (10); Angle plates (5) are provided on both inner and outer sides of the connection between the first U-shaped steel (1) and the second U-shaped steel (2), and the two angle plates (5) connect the first U-shaped steel (1) and the second U-shaped steel (2) together by means of bolts and nuts; A telescopic column (74) is installed between the fixed column (71) and the arc block (72); an active cavity (75) is provided at one end of the fixed column (71) close to the arc block (72); an installation cavity (76) which is interpenetrating with the active cavity (75) is provided inside the active cavity (75); a spring (77) is provided inside the installation cavity (76); one end of the telescopic column (74) extends into the active cavity (75) and is connected to the spring (77); and the telescopic column (74) can move in the active cavity (75); The opening end of the movable cavity (75) is embedded in a cleaning ring (8), and cleaning bristles (81) are connected to the inside of the cleaning ring (8) at equal intervals, and the free ends of the cleaning bristles (81) are in contact with the outer surface of the telescopic column (74).

2. The buffer energy absorption support composite structure according to claim 1, characterized in that: The shape of the second U-shaped steel (2) is consistent with the shape of the tunnel top surface.

3. A buffer energy absorption support composite structure according to claim 2, characterized in that: The long strips (4) are evenly distributed on the outside of the first U-shaped steel (1) and the outside of the second U-shaped steel (2).

4. The buffer energy absorption support composite structure according to claim 1, characterized in that: A rubber pad (73) is arranged inside the arc block (72).

5. The buffer energy absorption support composite structure according to claim 1, characterized in that: The distance between the end of the telescopic column (74) away from the arc-shaped block (72) and the opening end of the installation cavity (76) is also smaller than the maximum distance of the outward expansion of the two side walls of the first U-shaped steel (1).