A floor-to-ceiling door-type integrated support system for large refrigeration rooms and its construction method
Through the comprehensive floor-standing gantry bracket system and detailed construction methods, the structural damage and safety hazards of hoisted gantry brackets in large refrigeration machines are solved, and a more stable, beautiful and convenient maintenance bracket design is achieved.
Patent Information
- Application Number
- CN202110798473.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-07-15
- Publication Date
- 2024-12-06
- Estimated Expiration
- 2041-07-15
AI Technical Summary
The existing hoisting door-type comprehensive brackets have structural damage, safety hazards, poor integrity, no reserved installation space and construction difficulties in computer rooms with large pipe sizes and dense lines.
Adopt a floor-standing door-type comprehensive bracket system, including two columns, crossbars and connecting steel plates. The top and bottom of the columns are equipped with top steel plates and floor-standing steel plates. They are fixed by DN200 steel pipes and M16 expansion bolts. The crossbars are 20# I-shaped steel, connected The steel plate is an isosceles right-angle triangle steel plate, and the column feet are covered with waterproof mortar. The construction methods include measurement and positioning, column installation, cross-gear positioning, connection welding and anti-rust treatment.
It eliminates the damage to the structure by rear anchor bolts, increases the stability and integrity of the structure, reserves pipe space for maintenance, is simple and safe to construct, and avoids the burden on the structure of bracket collapse and anchor bolts.
Smart Images

Figure CN113653182B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of electromechanical installation construction brackets, and in particular relates to a floor-to-ceiling door-type integrated bracket system for a large refrigeration room and a construction method thereof. Background Art
[0002] As the requirements for project quality increase, the requirements for the rationality and aesthetics of the integrated pipeline layout in the computer room also increase. Although the existing projects have taken the overall aesthetics of the computer room layout into consideration and adopted the traditional hoisting portal integrated bracket system, for computer rooms with large pipe sizes and dense pipelines, the hoisting portal integrated bracket may not be the best choice.
[0003] The existing formwork support and reinforcement system has the following shortcomings: 1. The damage to the structure caused by the post-anchor bolts caused by hoisting cannot be ignored, affecting the safety of the structure's stress. 2. The pipeline operation has dynamic loads, which will affect the connection between the post-anchor bolts and the structure over the years, easily causing the support to collapse and cause safety accidents. 3. Even if the rooting points of the support are pre-buried in the structure before, the load cannot be underestimated after the pipe section is full of water. As long as the support is rooted in the upper structure system, it is bound to cause varying degrees of damage to the structure. 4. The supports are independent of each other and have poor integrity. 5. This integrated support only takes into account the existing pipeline layout and does not reserve installation space for pipelines to be added in the future. 6. The large integrated support has a large deformation during welding and is difficult to hoist.
[0004] In view of the above technical problems, improvements need to be made. Summary of the invention
[0005] The present invention aims to overcome the defects of the above-mentioned existing technologies and provides a simple, convenient and practical floor-to-ceiling door integrated support system and construction method for large refrigeration rooms. It is used for the construction of rooms with large pipelines and dense lines, and makes the quality problems that are difficult to avoid become one of the highlights of the room visit.
[0006] In order to achieve the above purpose, the technical solution adopted by the present invention is: a floor-to-ceiling door-type integrated bracket system for a large refrigeration room, including two columns arranged relatively to each other, at least one cross bar fixed between the two columns, and a connecting steel plate fixed between the cross bar and the columns; a top steel plate is arranged on the top of the column, and a floor-to-ceiling steel plate is fixed at the bottom of the column.
[0007] As a preferred solution of the present invention, two crossbars are provided, and a space is left between the two crossbars.
[0008] As a preferred solution of the present invention, the crossbar is a 20# I-beam, and the crossbar is fixed to the column side or the steel pipe side of the column.
[0009] As a preferred solution of the present invention, a column foot bun bag is sleeved on the bottom of the column, and the column foot bun bag is used to cover the ground-to-ground steel plate.
[0010] As a preferred solution of the present invention, the column is a DN200 steel pipe.
[0011] As a preferred solution of the present invention, the connecting steel plate is an isosceles right triangle steel plate with a side length of 100 mm and a thickness of 100 mm.
[0012] As a preferred solution of the present invention, the top steel plate is fixed to the column by four M16 expansion bolts, and the top steel plate is a 300×300×10mm steel plate.
[0013] As a preferred solution of the present invention, the floor-standing steel plate is a steel plate of 300×300×10 mm.
[0014] As a preferred solution of the present invention, the column foot bun is made of cement mortar.
[0015] A construction method for a floor-to-ceiling door-type integrated support system for a large refrigeration room comprises the following steps:
[0016] Step 1: Construction preparation; clean and dry the garbage and dust on the floor of the computer room; use a three-phase five-wire system to install construction power lines and set up nighttime construction lighting fixtures; prepare and debug construction machinery, including measuring tools, electric welders, grinders, manual hoists, and cutting machines; arrange and arrange integrated pipelines according to the design drawings, draw detailed models of the single-product bracket method of the computer room and the overall model of the floor-standing integrated bracket system; determine the elevation and quantity of the bracket crossbars according to the model profile, and conduct a force review again after the layout is completed; and report to the construction, supervision, and design units to confirm the construction method;
[0017] Step 2: Measurement and positioning; on-site measurement and layout to determine the center position of the steel pipe landing point; in consideration of the layout of the upper integrated pipelines, the landing position of the column foot must also be taken into account; the foundations of each equipment and the 100mm wide drainage ditch along the edge of the foundation, the drainage branch ditch to the main ditch and then the water collection well are all projects that need to be taken into account; ensure that the road for personnel to pass reaches a net width of 1200mm to facilitate daily maintenance; consider the range of yellow and black warning bands on both sides of the road; for aesthetics and overall force stability considerations, the steel pipe column is required to be located at the midpoint of the straight line segment of the two structural columns as much as possible, and should be aligned in the vertical and horizontal directions; after obtaining the final positioning plan, now lay out on the ground, use the "cross line method" to draw the position of the column center, and then draw a 300×300mm square; measure from the ground to the top plate; after drawing a group, it is necessary to re-measure and verify in time, and there is only one reference point for the rows of points in the same direction; the error range is guaranteed to be within 5mm;
[0018] Step 3: Install the columns; according to the center point, use 300×300×10mm steel plates to fix them to the concrete bottom plate and the upper structure respectively, and then weld the DN200 steel pipe and the steel plate; similarly weld 300×300×10mm steel plates to fix them to the structure; the upper and lower ends of the steel columns are both against the structure to enhance support; according to the layout position, install 300×300×10mm steel plates as the rooting points of the brackets; use four M16 expansion bolts to fix them at the four corners of the steel plates; install steel pipe columns, weld steel pipe cutting, and remove rust; set up a manual hoist on the top plate as a traction device to stand up the steel pipe; use an infrared level to calibrate the verticality of the steel pipe columns; fix the top and bottom of the steel pipe with spot welding, and then start welding along the pipeline to firmly connect the columns to the top and bottom steel plates;
[0019] Step 4: Position the crossbar; Use 20# I-beam as the crossbar of the bracket, one end of which can be fixed on the side of the concrete structure column and the other end on the steel pipe; or both ends can be welded to the steel pipe; Cut and rust the 20# I-beam, dig arc surfaces with a diameter of DN200 on both ends, and make single-sided bevels along the upper and lower horizontal arc surfaces of the "I" character, and double-sided bevels along the vertical steel plate in the middle of the "I" character; find the elevation position of the crossbar surface according to the section drawing, and mark it on the column respectively; use an infrared level to calibrate whether the marks at both ends of the crossbar are on the same horizontal line; with the help of the manual hoist on the top plate, lift the 4-meter-long 20# I-beam to the specified position, and fix it by spot welding when it is adjusted to the appropriate position;
[0020] Step 5, connect the crossbar and the column; Considering the problem of weak force at right angles formed by welding of arc surface and I-shaped surface, and also to avoid deformation caused by stress concentration, a 5# angle iron, an isosceles right triangle with a length of 100mm and a thickness of 100mm, is spot welded to the column and the crossbar respectively, and the added side steel plate is used as force compensation to further enhance the stability of the bracket; welding at the groove requires two layers of surfacing to complete; welding follows the principle of symmetrical welding: first weld the waist side of the "I" character, and then weld the upper and lower legs of the "I" character; in this way, the first layer of welding is completed; wait for the weld to cool thoroughly, knock off the surface welding slag, and start the second layer of welding, and the order is the same as the first layer of welding; it is recommended to weld the brackets at both ends of the crossbar at the same time, and the welding direction should be consistent; after the second layer of weld is completely cooled, knock off the welding slag, and check whether the weld quality meets the standard. According to the actual situation on site, if the crossbar just encounters the structural column, it can be directly fixed on the side of the structural column;
[0021] Step 6, weld slag removal and anti-corrosion; after using a polisher to remove the welding slag and checking the weld quality, we apply the first coat of anti-rust paint to all weld positions; after the first coat of anti-rust paint on the weld is completely dry, apply two coats of anti-rust paint and two coats of white topcoat to all columns and crossbars; each coat of paint must be applied after the previous coat is completely dry; use cement mortar to make DN300 and 50MM thick column piers to avoid water accumulation at the column foot, causing steel corrosion and affecting the overall stress of the support structure; in order to achieve the purpose of anti-collision warning, paint yellow and black warning color rings within 1 meter above the column completion surface;
[0022] Step 7: Establish a support system; take such a first-class support as a unit, and combine multiple floor-to-ceiling integrated support units into a "floor-to-ceiling integrated support system"; after each weld is treated with anti-rust treatment separately, apply two coats of anti-rust paint to the entire support system, and the second coat of paint can only be applied after the first coat is dry;
[0023] Step 8: Column foot treatment. Considering that the floor of the machine room is damp, water and rust are easy to accumulate at the column foot. We wrap the column foot with waterproof mortar to make a "steamed bun" to protect the stability of the column foot structure and extend the service life of the bracket system.
[0024] The beneficial effects of the present invention are:
[0025] 1. The present invention has a simple structure and an ingenious design. The floor-to-ceiling door integrated support system for large refrigeration rooms of the present invention substantially eliminates the damage to the original structure caused by implanted post-anchor bolts. Its establishment not only protects the integrity of the structure, but also strengthens its stress stability.
[0026] 2. The support of the present invention transmits force through steel pipe columns, directly transferring the pipeline load to the foundation without adding stress burden to the original structure.
[0027] 3. The support system of the present invention has good overall stability and high rigidity; the rows of steel pipes are laid on the ground in an orderly and beautiful manner.
[0028] 4. The present invention has sufficient reserved pipeline space, which is convenient for maintenance; it is simple to make and easy to construct. BRIEF DESCRIPTION OF THE DRAWINGS
[0029] Figure 1 It is a schematic diagram of the structure of the present invention;
[0030] Figure 2 It is a large-scale drawing of welding of the uprights, crosspieces and connecting steel plates of the present invention;
[0031] Figure 3 This is a large-scale drawing of welding the column and the connecting steel plate of the present invention;
[0032] Figure 4It is a partial enlarged view of AA of the present invention;
[0033] Figure 5 This is a construction process flow chart of a floor-to-ceiling door-type integrated support system for a large refrigeration room according to an embodiment of the invention;
[0034] The reference numerals in the figure are: column 1, cross bar 2, connecting steel plate 3, top steel plate 4, ground steel plate 5, column foot bun bag 6. DETAILED DESCRIPTION
[0035] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0036] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0037] Example:
[0038] like Figure 1-4 As shown, a floor-to-ceiling door-type integrated support system for a large refrigeration room comprises two columns 1 arranged relatively to each other, at least one cross bar 2 is fixedly arranged between the two columns 1 for supporting the columns 1 and the cross bar 2, the cross bar 2 is a 20# I-beam, and the cross bar 2 is fixed to the column side or the steel pipe side of the column 1; the number and elevation of the cross bars are set according to the arrangement of the pipelines; the number of intermediate steel pipe columns is set according to the spacing between the structural columns and the layout of the pipelines; in this embodiment, two cross bars 2 are provided, and a spacing is left between the two cross bars 2; in this way, sufficient space is reserved for the pipelines, which is convenient for people to inspect and repair; the production is simple and the construction is convenient.
[0039] Column 1 is composed of two DN200 steel pipes. As vertical supports, they are usually set to be pushed up and down to the structural surface, which is actually determined by the site conditions. Under normal circumstances, the steel pipes are pushed up and down to the structural surface, but because of the pipeline layout, the top of the local steel pipe can be extended to the first cross-surface elevation cutoff, which is very maneuverable.
[0040] The support of the present invention transmits force through the steel pipe column, directly transferring the pipeline load to the foundation without adding a stress burden to the original structure.
[0041] A connecting steel plate 3 is fixed between the crosspiece 2 and the column 1; the connecting steel plate 3 is an isosceles right triangle steel plate with a side length of 100 mm and a thickness of 100 mm; the two columns 1 are fixed to the crosspiece 2 and the connecting steel plate 3 by welding, wherein the welding is performed by manual arc welding.
[0042] When the crosspiece meets the structural column, it is fixed to the side of the column, and when it meets the steel pipe column, it is welded to one side. In order to enhance its stability, we also appropriately set a batch of crosspieces in the area without pipelines according to the structural requirements to ensure that there are crosspieces connected in the XY direction of the horizontal plane. In this way, a ground-type integrated support system is formed; the present invention basically eliminates the damage to the original structure due to the implantation of post-anchor bolts. Its establishment not only protects the integrity of the structure, but also strengthens its stress stability.
[0043] A top steel plate 4 is arranged on the top of the column 1, and the top steel plate 4 is fixed to the column 1 with four M16 expansion bolts. The top steel plate 4 is a 300×300×10mm steel plate.
[0044] A ground-mounted steel plate 5 is fixedly provided at the bottom of the column 1, and the ground-mounted steel plate 5 is a steel plate of 300×300×10 mm.
[0045] A column foot bun bag 6 is sleeved at the bottom of the column 1, and the column foot bun bag 6 is used to cover the ground steel plate 5; the column foot bun bag 6 is used to prevent the column 1 and the ground steel plate 5 from rusting; the column foot bun bag 6 is a circle of the column foot wrapped with waterproof mortar.
[0046] The invention is easy to manufacture and install, has a safe structure, and the formed floor-to-ceiling door-type integrated bracket system has good integrity, high space utilization, and saves later operation and maintenance costs. It is universal for computer room projects directly located on the foundation, can be promoted and applied, and has significant comprehensive social benefits.
[0047] like Figure 5 As shown, the present embodiment provides a construction process flow chart of a floor-to-ceiling door-type integrated support system for a large refrigeration room; specifically, it includes construction preparation → measurement and positioning → column installation → crossbar positioning → connection of crossbars and columns → weld slag removal and anti-corrosion → support system establishment → column foot treatment.
[0048] Among them, a construction method for a floor-to-ceiling door-type integrated support system for a large refrigeration room includes the following steps:
[0049] Step 1: Construction preparation; clean and dry the garbage and dust on the floor of the computer room; use a three-phase five-wire system to install construction power lines, and set up nighttime construction lighting fixtures. Prepare and debug construction machinery, including measuring tools, electric welders, grinders, manual hoists, cutting machines, etc. Arrange and arrange integrated pipelines according to the design drawings, draw detailed models of the single-product bracket method of the computer room and the overall model of the floor-standing integrated bracket system. According to the model profile, determine the elevation and quantity of the bracket crossbars, and re-check the force after the layout is completed. Report to the construction, supervision, and design units to confirm the construction methods.
[0050] Step 2: Measurement and positioning; on-site measurement and layout to determine the center position of the steel pipe landing point. In addition to considering the layout of the upper integrated pipelines, the landing position of the column foot must also be taken into account. The foundations of each equipment and the 100mm wide drainage ditch along the edge of the foundation, the drainage branch ditch to the main ditch and then to the water collection well are all projects that need to be taken into account. Ensure that the road for personnel to pass reaches a net width of 1200mm to facilitate daily maintenance. Consider the range of yellow and black warning bands on both sides of the road. For the sake of aesthetics and overall force stability, the steel pipe column is required to be located at the midpoint of the straight line segment of the two structural columns as much as possible, and should be aligned in the vertical and horizontal directions. After obtaining the final positioning plan, now lay out on the ground, use the "cross line method" to draw the position of the column center, and then draw a 300*300mm square. Lead the measurement from the ground to the top plate. After drawing a group, it is necessary to re-measure and verify in time, and there is only one reference point for the rows of points in the same direction. The error range is guaranteed to be within 5mm.
[0051] Step three, column installation; according to the center point position, use 300×300×10mm steel plates to fix them to the concrete bottom plate and the upper structure (beam bottom or plate bottom), and then weld the DN200 steel pipe and steel plate. Similarly, weld 300×300×10mm steel plates to fix them to the structure. The upper and lower ends of the steel column are both against the structure to enhance support. According to the layout position, install 300×300×10mm steel plates as the rooting points of the bracket. Use four M16 expansion bolts to fix them at the four corners of the steel plate; install steel pipe columns, weld steel pipe cutting, and remove rust. Set up a manual hoist on the top plate as a traction device to stand up the steel pipe. Use an infrared level to calibrate the verticality of the steel pipe column; fix the top and bottom of the steel pipe with spot welding, and then start welding along the pipeline to make the column firmly connected to the top and bottom steel plates.
[0052] Step 4, horizontal bar positioning; select 20# I-beam as the bracket horizontal bar, one end of which can be fixed on the side of the concrete structure column and the other end on the steel pipe; or both ends can be welded to the steel pipe. Cut and rust the 20# I-beam, dig arc surfaces with a diameter of DN200 on both ends, and make single-sided bevels along the upper and lower horizontal arc surfaces of the "I" character, and double-sided bevels along the vertical steel plate in the middle of the "I" character; find the elevation position of the horizontal bar surface according to the section drawing, and mark them on the columns respectively. Use an infrared level to calibrate whether the marks at both ends of the horizontal bar are on the same horizontal line; with the help of the manual hoist on the top plate, lift the 4-meter-long 20# I-beam to the specified position, and fix it with spot welding when it is adjusted to the appropriate position.
[0053] Step 5, connect the crossbar and the column; Considering the problem of weak right-angle force formed by welding the arc surface and the I-shaped surface, and also to avoid deformation caused by the formation of stress concentration, a 5# angle iron, an isosceles right triangle with a length of 100mm and a thickness of 100mm, is spot welded to the column and the crossbar respectively. The added side steel plate is used as a force compensation to further enhance the stability of the bracket. The welding at the groove requires two layers of surfacing to complete. Welding follows the principle of symmetrical welding: first weld the waist side of the "I" character (the left and right sequence is adjustable), and then weld the upper and lower legs of the "I" character. In this way, the first layer of welding is completed. Wait for the weld to cool thoroughly, knock off the surface welding slag, and start the second layer of welding, the order is the same as the first layer of welding. It is recommended to weld the brackets at both ends of the crossbar in the same way, and the welding direction should be consistent. After the second layer of weld is completely cooled, knock off the welding slag and check whether the weld quality meets the standard. According to the actual situation on site, if the crossbar just encounters the structural column, it can be directly fixed on the side of the structural column.
[0054] Step 6, weld slag removal and corrosion protection; after using a polisher to remove the welding slag and checking the weld quality, we apply the first coat of anti-rust paint to all weld positions. After the first coat of anti-rust paint on the weld is completely dry, apply two coats of anti-rust paint and two coats of white topcoat to all columns and crossbars. Each coat of paint must be applied after the previous coat of paint is completely dry. Use cement mortar to make DN300 and 50MM thick column piers to avoid water accumulation at the foot of the column, causing steel corrosion and affecting the overall force of the support structure. In order to serve as an anti-collision warning, a yellow and black warning color ring is painted within 1 meter above the finished surface of the building.
[0055] Step 7: Establish the support system; take this first-class support as a unit, and combine multiple floor-to-ceiling integrated support units into a "floor-to-ceiling integrated support system". After each weld is treated with anti-rust treatment, apply two coats of anti-rust paint to the entire support system. The second coat of paint can only be applied after the first coat is dry.
[0056] Step 8: Column foot treatment: Considering the damp floor of the machine room, the column foot is prone to water accumulation and rust. We use waterproof mortar to wrap the column foot around to make a "steamed bun" to protect the stability of the column foot structure and extend the service life of the bracket system.
[0057] The present invention arranges the integrated pipelines reasonably according to the plan and section drawings of the machine rooms in different projects and sites, optimizes the space and pipe system, and performs the stress analysis of the pipeline load at the same time, taking into account the overall visual coordination. Draw a 1:1 three-dimensional model of the machine room, a detailed model of the single-product bracket method, and an overall model of the floor-standing integrated bracket system. Arrange the footholds of the steel pipe columns on the integrated pipeline model. According to the model profile, determine the elevation and quantity of the bracket crossbars. After the arrangement is completed, conduct a force review again, and report to the construction, supervision, and design units to confirm the construction methods. According to the in-depth plan, section, and three-dimensional model, the construction technology is explained to the operators, and a written record of the explanation is formed.
[0058] After considering the maintenance space, aesthetics and overall stress stability, the final positioning plan is obtained. Now the ground is laid out, and the position of the column center is drawn using the "cross line method", and then a 300×300mm square is drawn. The measurement is drawn from the ground to the top plate. After drawing a group, it is necessary to re-measure and verify in time, and there is only one reference point for the rows of points in the same direction. The error range is guaranteed to be within ±5mm.
[0059] According to the layout position, install a 300×300×10mm steel plate as the rooting point of the bracket. Use four M16 expansion bolts to fix the four corners of the steel plate. Select welded steel pipe DN200 (not limited to pipe diameter DN200 according to force analysis) and remove rust to make bracket columns, and 20# I-beam (I-beam model is selected according to specific force analysis) as the bracket crossbar. Two DN200 steel pipes are vertical supports, usually set to the top and bottom to the structural surface, and can also be partially set to the first crossbar surface elevation, which is determined by the actual situation on site. Set the number of intermediate steel pipe columns according to the spacing between structural columns and pipeline layout.
[0060] I-beam 4 is used as a crossbar. It is made of 20# I-beam and is rust-free. It is fixed to the side of the column when it meets the structural column, and welded to one side of the steel pipe when it meets the steel pipe. Welding follows the principle of symmetrical welding: first weld the waist side of the "I" (the left and right order is adjustable), and then weld the upper and lower legs of the "I". This completes the first layer of welding. Wait for the weld to cool thoroughly, knock off the surface welding slag, and start the second layer of welding in the same order as the first layer. It is recommended to weld the brackets at both ends of the crossbar at the same time, and the welding direction should be consistent. After both ends of the crossbar are fixed, an independent support platform that can be separated from the upper structure can be formed. Set the number and elevation of the crossbars according to the pipeline arrangement.
[0061] The right-angled triangle steel plate 3 is an isosceles right triangle with a side length of 100mm and a thickness of 100mm. It is welded below the connection between the horizontal rail and the vertical steel pipe to compensate for the force. In order to reduce the stress concentration at the connection between the horizontal rail and the column, the steel plate 3 is added at this node. Avoid the phenomenon that the right angle formed by the welding of the vertical steel pipe and the I-shaped surface may be weak in force and stress concentration, resulting in insufficient stability. According to the actual situation on site, if the horizontal rail happens to encounter the structural column, it can be directly fixed on the side of the structural column. Finally, check the welding quality and perform anti-corrosion treatment.
[0062] After the ground-type integrated support system is initially constructed, it needs to be processed in detail. First, each weld is treated with anti-rust treatment separately, and then two coats of anti-rust paint are applied to the entire support system. The second coat of paint can be applied only after the first coat of paint is dry. Finally, in order to prevent the exposed column foot from rusting due to moisture and water accumulation on the machine room floor, a "steamed bun" is made of waterproof mortar to wrap the column foot. The column foot steamed bun 5 is a DN300, 50mm thick column pier made of cement mortar to prevent water accumulation at the column foot, causing steel corrosion, affecting the overall stress of the support structure, and extending the service life of the ground-type integrated support system.
[0063] The above description of the disclosed embodiments enables one skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to one skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention; therefore, the present invention will not be limited to the embodiments shown herein, but rather to the widest scope consistent with the principles and novel features disclosed herein.
[0064] Although the following terms are used more frequently in this article: upright column 1, horizontal rail 2, connecting steel plate 3, top steel plate 4, ground steel plate 5, column foot bun 6, etc., the possibility of using other terms is not excluded. These terms are used only to more conveniently describe and explain the essence of the present invention; interpreting them as any additional limitation is contrary to the spirit of the present invention.
Claims
1. A floor-to-ceiling door integrated support system for a large refrigeration room, characterized by: The invention comprises two columns (1) arranged opposite to each other, at least one crossbar (2) being fixedly arranged between the two columns (1), and a connecting steel plate (3) being fixedly arranged between the crossbar (2) and the columns (1); a top steel plate (4) being arranged on the top of the columns (1), and a floor steel plate (5) being fixedly arranged on the bottom of the columns (1); a construction method for a floor-to-ceiling door-type integrated support system for a large refrigeration room, comprising the following steps: Step 1: Construction preparation; clean and dry the garbage and dust on the floor of the computer room; use a three-phase five-wire system to install construction power lines and set up nighttime construction lighting fixtures; prepare and debug construction machinery, including measuring tools, electric welders, grinders, manual hoists, and cutting machines; arrange and arrange integrated pipelines according to the design drawings, draw detailed models of the single-product bracket method of the computer room and the overall model of the floor-standing integrated bracket system; determine the elevation and quantity of the bracket crossbars according to the model profile, and conduct a force review again after the layout is completed; and report to the construction, supervision, and design units to confirm the construction method; Step 2: Measurement and positioning; on-site measurement and setting out to determine the center position of the steel pipe landing point; in consideration of the layout of the upper integrated pipelines, the landing position of the column foot must also be taken into account; the foundations of each equipment and the 100mm wide drainage ditch along the edge of the foundation, the route from the drainage branch ditch to the main ditch and then to the water collection well are all projects that need to be taken into account; ensure that the road for personnel to pass reaches a net width of 1200mm to facilitate daily maintenance; consider the range of yellow and black warning bands on both sides of the road; for the sake of aesthetics and overall force stability, the steel pipe column is required to be located at the midpoint of the straight line segment of the two structural columns as much as possible, and should be aligned in the vertical and horizontal directions; after obtaining the final positioning plan, now set out on the ground, use the "cross line method" to draw the position of the column center, and then draw a 300×300mm square; measure from the ground to the top plate; after drawing a group, it is necessary to re-measure and verify in time, and there is only one reference point for the rows of points in the same direction; the error range is guaranteed to be within 5 mm; Step 3: Install the columns; according to the center point, use 300×300×10mm steel plates to fix them to the concrete bottom plate and the upper structure respectively, and then weld the DN200 steel pipe and the steel plate; similarly weld 300×300×10mm steel plates to fix them to the structure; the upper and lower ends of the steel columns are both against the structure to enhance support; according to the layout position, install 300×300×10mm steel plates as the rooting points of the brackets; use four M16 expansion bolts to fix them at the four corners of the steel plates; install steel pipe columns, weld steel pipe cutting, and remove rust; set up a manual hoist on the top plate as a traction device to stand up the steel pipe; use an infrared level to calibrate the verticality of the steel pipe columns; fix the top and bottom of the steel pipe with spot welding, and then start welding along the pipeline to firmly connect the columns to the top and bottom steel plates; Step 4: Position the crossbar; select 20# I-beam as the crossbar of the bracket, fix one end on the side of the concrete structure column, and the other end on the steel pipe; weld both ends to the steel pipe; cut and rust the 20# I-beam, dig arc surfaces with a diameter of DN200 on both ends, and make single-sided bevels along the upper and lower horizontal arc surfaces of the "I" character, and double-sided bevels along the vertical steel plate in the middle of the "I" character; find the elevation position of the crossbar surface according to the section drawing, and mark it on the column respectively; use an infrared level to calibrate whether the marks at both ends of the crossbar are on the same horizontal line; with the help of the manual hoist on the top plate, lift the 4-meter-long 20# I-beam to the specified position, and fix it by spot welding when it is adjusted to the appropriate position; Step 5, connect the crossbar and the column; Considering the problem of weak force at right angles formed by welding of arc surface and I-shaped surface, and also to avoid deformation caused by stress concentration, a 5# angle iron, an isosceles right triangle with a length of 100mm and a thickness of 100mm, is spot welded to the column and the crossbar respectively, and the added side steel plate is used as force compensation to further enhance the stability of the bracket; welding at the groove requires two layers of surfacing; welding follows the principle of symmetrical welding: first weld the waist side of the "I" character, and then weld the upper and lower legs of the "I" character; this completes the first layer of welding; wait for the weld to cool thoroughly, knock off the surface welding slag, and start the second layer of welding, the order is the same as the first layer of welding; the brackets at both ends of the crossbar are connected in the same way, and the welding direction should be consistent; after the second layer of weld is completely cooled, knock off the welding slag, and check whether the weld quality meets the standard. According to the actual situation on site, if the crossbar just encounters the structural column, it is directly fixed on the side of the structural column; Step 6, weld slag removal and anti-corrosion; after using a polisher to remove the welding slag and checking the weld quality, we apply the first coat of anti-rust paint to all weld positions; after the first coat of anti-rust paint on the weld is completely dry, apply two coats of anti-rust paint and two coats of white topcoat to all columns and crossbars; each coat of paint must be applied after the previous coat is completely dry; use cement mortar to make DN300 and 50MM thick column piers to avoid water accumulation at the column foot, causing steel corrosion and affecting the overall stress of the support structure; in order to achieve the purpose of anti-collision warning, paint yellow and black warning color rings within 1 meter above the column and the finished surface of the building; Step 7: Establish the support system; take such a first-class support as a unit, and combine multiple floor-to-ceiling integrated support units into a "floor-to-ceiling integrated support system"; after each weld is treated with anti-rust treatment separately, apply 2 coats of anti-rust paint to the entire support system, and the second coat of paint should be applied after the first coat is dry; Step 8: Column foot treatment. Considering that the floor of the machine room is damp, water and rust are easy to accumulate at the column foot. We wrap the column foot with waterproof mortar to make a "steamed bun" to protect the stability of the column foot structure and extend the service life of the bracket system.
2. According to claim 1, a floor-to-ceiling door integrated support system for a large refrigeration room is characterized in that: Two crossbars (2) are provided, and a spacing is left between the two crossbars (2).
3. The floor-to-ceiling door integrated support system for a large refrigeration room according to claim 2 is characterized in that: The crossbar (2) is a 20# I-beam, and the crossbar (2) is fixed to the column side or the steel pipe side of the column (1).
4. The floor-to-ceiling door integrated support system for a large refrigeration room according to claim 1 is characterized in that: A column foot bun bag (6) is sleeved on the bottom of the column (1), and the column foot bun bag (6) is used to cover the ground-standing steel plate (5).
5. The floor-to-ceiling door integrated support system for a large refrigeration room according to claim 4 is characterized in that: The column (1) is a DN200 steel pipe.
6. The floor-to-ceiling door integrated support system for a large refrigeration room according to claim 1 is characterized in that: The connecting steel plate (3) is an isosceles right triangle steel plate with a side length of 100 mm and a thickness of 100 mm.
7. The floor-to-ceiling door integrated support system for a large refrigeration room according to claim 1 is characterized in that: The top steel plate (4) and the column (1) are fixed with four M16 expansion bolts, and the top steel plate (4) is a steel plate with a size of 300×300×10 mm.
8. The floor-to-ceiling door integrated support system for a large refrigeration room according to claim 1 is characterized in that: The floor-standing steel plate (5) is a steel plate of 300×300×10 mm.
9. The floor-to-ceiling door integrated support system for a large refrigeration room according to claim 4, characterized in that: The column foot bun (6) is made of cement mortar.