A circuit assembly process for mobile communication base station equipment

By introducing automated processing into the 5G base station line processing and assembly process, and using line vehicles and multiple mechanical mechanisms to realize automatic assembly and assembly of lines, the problems of complex processes and low efficiency in the existing technology are solved, and production efficiency is improved and reduced. The cost.

CN113675691BActive Publication Date: 2024-11-19HEBEI YUNHAI STEEL STRUCTURE CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110987545.6
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-08-26
Publication Date
2024-11-19
Estimated Expiration
2041-08-26

AI Technical Summary

Technical Problem

The existing 5G base station line processing and assembly process is complex and cumbersome, and fully automated production cannot be achieved, resulting in low work efficiency and high manual labor intensity, and lack of effective connection solutions.

Method used

Automatic processing is carried out using line carrier conveyor lines and various mechanical mechanisms (such as drive belts, cylinders, flip mechanisms, solder paste welding devices, etc.), including feeding, cutting, tin plating, solder paste welding and unloading, to achieve the steps of loading, cutting, and tin plating, solder paste welding and unloading. Automatic assembly and assembly of lines.

Benefits of technology

Through automated processes, manual operation is saved, line production efficiency is improved, production costs are reduced, and line assembly is seamlessly connected, enhancing market application value.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113675691B_ABST
    Figure CN113675691B_ABST
Patent Text Reader

Abstract

The present invention discloses a circuit assembly process on a mobile communication base station device, and the specific steps are as follows: step S1, a feeding and conveying process of a circuit carrier; step S2, a circuit driving process that causes the circuit to enter an empty carrier; step S3, a circuit pressing and arranging process; step S4, a carrier transmission process; step S5, a process of flipping and tinning the circuit on the carrier; step S6, a process of soldering and pressing the circuit on the carrier with solder paste; step S7, a process of combing the circuit by pressing the carrier; step S8, a process of unloading the finished circuit; step S9, a process of collecting and recycling the empty carrier; the present invention has a high degree of automation, can effectively assemble the circuit arrangement by tinning, greatly improves the production efficiency and the product qualification rate, and has good market application value.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of communication base station line technology, and in particular to a line assembly technology on mobile communication base station equipment. Background Art

[0002] 5G base stations are public mobile communication base stations that are dedicated to providing 5G network services. According to the logical function division, 5G base stations can be divided into 5G baseband units and 5G radio frequency units, which can be connected through CPRI or eCPRI interfaces; as of June 2021, nearly 850,000 5G base stations have been built, forming the world's largest 5G independent networking network.

[0003] As 5G base stations are being built in large numbers, a large number of wiring harnesses are needed. When processing the lines, the rolled wiring harnesses usually need to be cut into a certain length first, and then one end of the cut wiring harnesses needs to be processed and assembled, galvanized and pressed with solder paste, and then the assembled wiring harnesses are applied to the base station. The processing and assembly of one end of the wiring harness usually includes a series of actions such as wiring, cutting, tinning, and pressing. The process is quite complicated and cumbersome.

[0004] Currently, the equipment on the market cannot achieve effective connection, and most of them require manual operation to achieve. The processing and assembly of the lines cannot achieve fully automated production. Not only is the work efficiency low, but the labor intensity is also high. Therefore, the existing process has defects and needs to be improved. Summary of the invention

[0005] The present invention provides a circuit assembly process on mobile communication base station equipment to solve the above-mentioned problem.

[0006] To solve the above problems, the technical solution provided by the present invention is as follows:

[0007] A circuit assembly process on a mobile communication base station device, the specific assembly steps are as follows:

[0008] Step S1, feeding and conveying process of line carrier;

[0009] Step S2, the line is driven so that the line enters an empty carrier process;

[0010] Step S3, line compaction and arrangement process;

[0011] Step S4, carrier transmission process;

[0012] Step S5, performing a tinning process on the circuit on the carrier;

[0013] Step S6, performing a circuit solder paste welding and press-fitting process on the circuit on the carrier;

[0014] Step S7, the carrier compresses the line to comb the process;

[0015] Step S8, finished product line cutting process;

[0016] Step S9: empty carrier material collection and recycling process.

[0017] Preferably, before step S1, step S0 is also included, a verification step to verify whether the operator has the right to start the control panel; the verification step includes an authentication operation, and when it is determined that the authentication is passed, subsequent steps are executed; when it is determined that the authentication is not passed, any one or any two or more combinations of voice, sound and light alarm signals, and sending alarm information to the background terminal are executed; the authentication operation is any one or any two or more combinations of user name and password, face recognition, and pupil recognition, and the program can be started only after the authentication is passed.

[0018] 1. Preferably, in step S1, the feeding and conveying process of the line carrier includes step S11, a carrier feeding and conveying step, wherein the driving motor 1 causes the driving belt to rotate on the conveying track, and the empty carrier on the conveying track is sent to the right end of the conveying track to wait for feeding;

[0019] Step S12, the carrier loading step, the rodless cylinder drives the carrier carrying plate to move downward to one side of the conveying track, the driving motor rotates the driving belt to transfer the empty carrier on the driving belt to the carrier carrying plate, and then the rodless cylinder drives the carrier carrying plate upward to the carrier transmission mechanism, and then the telescopic cylinder drives the loading push column to push the empty carrier on the carrier carrying plate to the carrier conveying track on the carrier transmission mechanism.

[0020] 2. Preferably, in step S2, the line driving causes the line to enter the empty carrier process; including step S21, line arrangement and transportation step, driving motor 3 to drive the conveying positioning seat to move backward along the conveying sliding plate so that the line enters the line conveying plate, and then driving motor 3 to move back to move the conveying positioning seat to one side of the carrier conveying track 1;

[0021] Step S22, the line loading carrier step, the driving motor 4 drives the lower roller of the line to rotate, the downward pressure cylinder 1 drives the upper roller of the line to move downward to contact the line in the line conveying plate, and the driving motor 4 drives the lower roller of the line to drive the upper roller of the line to rotate to convey the line in the line conveying plate into the carrier;

[0022] Step S23, line cutting and resetting step, after the line enters the carrier, the second pressing cylinder and the first lifting cylinder respectively drive the upper cutting plate and the lower cutting plate to cut the line.

[0023] Preferably, after step S3 and before step S4, step S35 is also included, which is a step of neatly cutting the end. The downward pressure cylinder eight is fixed on the downward pressure positioning plate eight, and the upper shear is driven by the downward pressure cylinder eight to cooperate with the lower shear knife fixed on the shear positioning plate to neatly cut the line at one end of the carrier.

[0024] 3. Preferably, in step S5, the circuit on the carrier is subjected to a flip tinning process; including step S51, a carrier flipping step, a jacking cylinder 3 is fixed on a jacking positioning plate 3, the jacking cylinder 3 drives the flipping wheel to rotate, the flipping wheel drives the flipping shaft to rotate, so that the carrier conveying track 2 fixed on the flipping shaft rotates, and after the carrier conveying track 2 is flipped, one end of the carrier thereon is flipped downward;

[0025] Step S52, preliminary tinning step, the lifting cylinder 4 drives the tin box pushing plate to move upward, so that the tin-plating box 1 fixed on the tin box pushing plate moves upward, so that the circuit at one end of the carrier invades the tin-plating box 1 for preliminary tinning;

[0026] Step S53, the line arrangement step at the rear end of the carrier, while the carrier conveying track 2 is flipped, the left and right clamping cylinders on the line clamping assembly arrange the line at the rear end of the carrier through the L-shaped clamping plate;

[0027] Step S54, carrier pressing and conveying step, the downward pressing cylinder 4 drives the sliding plate to move downward, so that the pushing sliding plate contacts the carrier, and the telescopic cylinder 3 drives the pushing sliding plate to move forward, and the circuit that has been initially tinned is sent to the secondary tinning device;

[0028] Step S55, after the secondary tinning step and the carrier flipping step are repeated, the downward pressure cylinder 6 drives the secondary tinning support arm to move upward, so that the circuit at one end of the carrier invades the tinning box 2;

[0029] Step S56, the step of deburring the line end, the lifting cylinder five drives the lifting cylinder six to move up and down, and the lifting cylinder six drives the line scraping plate to move forward and backward to scrape and deburr the line at one end of the carrier.

[0030] 4. Preferably, in step S6, the circuit on the carrier is subjected to a circuit solder paste welding and press-fitting process; including step S6, a solder paste feeding step, step S62, a solder paste spot welding step, and a telescopic cylinder 4 on the solder paste feeding device pushing the solder paste to move in the solder paste feeding slideway, so that the solder paste can move back and forth in the solder paste feeding slideway;

[0031] Step S63, solder paste pushing and spot welding step, the driving motor 4 drives the ball screw 1 to rotate so that the spot welding slide moves back and forth on one side of the solder paste feeding slide; then the driving motor 5 drives the ball screw 2 to rotate so that the welding gun support plate moves downward along the ball screw 2, and the spot welding gun fixed on the welding gun support plate performs spot welding on the solder paste;

[0032] Step S64, solder paste conveying step, a lifting cylinder 7 is fixedly provided at the right end of the solder paste feeding slideway, the lifting cylinder 7 drives the solder paste lifting plate to deliver the solder paste to the solder paste transmission track assembly, and the driving motor 6 drives the solder paste conveyor belt to move, so that the solder paste moves along the solder paste conveyor belt in the solder paste track;

[0033] Step S65, solder paste unloading step 1, the telescopic cylinder 5 on the solder paste unloading device drives the solder paste unloading plate to move, so that the unloading push block fixed on the solder paste unloading plate pushes the solder paste to the bottom of the solder paste pressing device;

[0034] Step S66, a step of press-fitting the solder paste and one end of the circuit, wherein the downward pressure cylinder 7 on the solder paste press-fitting device drives the press-fitting positioning block to move downward, so that the press-fitting head fixed on the press-fitting positioning block press-fits the circuit and the solder paste at one end of the carrier together;

[0035] Step S67, solder paste unloading step 2, the telescopic cylinder 5 on the solder paste unloading device continues to drive the unloading push block to move to the right, pushing the pressed solder paste to the feeding rear of the solder paste unloading track, and the solder paste is sent to the solder paste unloading track.

[0036] Preferably, in step S7, the carrier is pressed to comb the line; the pushing cylinder on the carrier pressing mechanism drives the positioning plate to press the carrier, and at the same time the slide cylinder drives the line combing claw to comb the line at one end of the carrier.

[0037] Preferably, after step S8, step S88 and a CCD inspection step are also included. A CCD inspection light and a defective rejection device are installed on one side of the circuit feeding device. The circuit after the solder paste is pressed is inspected by the CCD inspection light. That is, in step S8, if the CCD inspection light shows a good result when inspecting the appearance of the circuit, the defective rejection device does not work. If the CCD inspection result is poor, the defective rejection device works to directly reject the defective products.

[0038] 5. Preferably, in step S9, the empty carrier receiving and recycling process also includes step S91, an empty carrier unloading step, after unloading of the line in the carrier is completed, the rodless cylinder on the carrier unloading mechanism drives the carrier receiving plate to move to the second position of the carrier transmission mechanism, and the empty carrier is transported to the carrier receiving plate, and the empty carrier is lifted into the carrier receiving and conveying line by the lifting of the unloading cylinder;

[0039] Step S92, empty carrier transport step, the drive motor on the carrier receiving conveyor line drives the receiving belt to rotate, and the empty carrier is stored in the receiving belt.

[0040] Compared with the beneficial effects of the prior art, the present invention loads the carrier by setting a line carrier conveyor line, sends the carrier to the carrier conveying track on the carrier transmission mechanism through the carrier upper mechanism, sends the arranged lines to the line conveying plate, and loads the lines in the line conveying plate by means of rollers, so that the lines can be sent to the empty carrier, and then the lines at one end of the carrier are cut off, and then the lines at one end of the carrier are tightened by the finger cylinder on the line clamping device to ensure that the lines are neat in the carrier, and the carrier conveying track sends the carrier to the carrier flip After the carrier is turned out, the carrier is flipped twice by the carrier flipping mechanism, and the circuit at one end of the carrier is preliminarily tinned and secondarily tinned respectively. During the second tinning, the circuit at one end of the carrier can also be deburred to ensure the neatness of the circuit at one end of the carrier. Subsequently, the circuit at one end of the carrier is pressed with solder paste through the circuit soldering mechanism to form a finished wire harness, and finally the finished circuit is unloaded through the circuit unloading device, which seamlessly connects each process, saves labor, greatly improves the production efficiency of the line, saves the production cost of the enterprise, and has good market application value. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] In order to more clearly illustrate the technical solutions in the embodiments or the prior art, the drawings required for use in the embodiments or the prior art descriptions are briefly introduced below. Obviously, the drawings described below are only some embodiments of the invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0042] Figure 1 It is a schematic diagram of the overall structure of the present invention;

[0043] Figure 2 This is a schematic diagram of the structure of the carrier feeding mechanism of the present invention;

[0044] Figure 3 It is a schematic diagram of the structure of the circuit driving mechanism of the present invention;

[0045] Figure 4 This is a schematic diagram of the structure of the line pressing device of the present invention;

[0046] Figure 5 It is a structural schematic diagram of a carrier transmission mechanism of the present invention;

[0047] Figure 6 It is a schematic diagram of the structure of the carrier flipping mechanism of the present invention;

[0048] Figure 7 This is a schematic diagram of the structure of the line push positioning mechanism of the present invention;

[0049] Figure 8 This is a schematic diagram of the structure of the terminal tinning mechanism of the present invention;

[0050] Fig. 9 This is a schematic diagram of the circuit solder paste welding mechanism of the present invention;

[0051] Fig.10 It is a structural schematic diagram of the carrier clamping mechanism of the present invention;

[0052] Fig.11 This is a schematic diagram of the structure of the line feeding device of the present invention;

[0053] Working plate 1; line carrier conveyor line 2; carrier feeding mechanism 3; carrier unloading mechanism 4; line driving mechanism 5; line clamping device 6; line laser machine 7; carrier transmission mechanism one 8; carrier transmission mechanism two 9; carrier flipping mechanism 10; line pushing and positioning mechanism 11; end tinning mechanism 12; line solder paste welding mechanism 13; carrier clamping mechanism 14; line unloading device 15; feeding support plate 31; carrier stop cover 32; rodless cylinder one 33; telescopic cylinder one 34; carrier bearing plate 35; line conveying frame 51; line conveying plate 52; conveying positioning seat 53; line lower roller 54; line upper roller 55; downward pressure cylinder one 56; downward pressure cylinder two 57; Lifting cylinder 1 58; upper cutting plate 59; lower cutting plate 510; cable arrangement positioning plate 511; clamping support frame 61; finger cylinder 62; upper clamping seat 63; lower pressing cylinder 3 64; lower pressing top shaft 65; telescopic cylinder 2 81; carrier conveying track 1 82; carrier conveying bottom plate 83; carrier conveying bar 84; track positioning column 85; carrier receiving plate 86; carrier push block 87; flip bottom plate 101; flip support plate 102; lifting cylinder 3 103; lifting positioning plate 3 104; carrier conveying track 2 105; flip support seat 106; flip shaft 107; flip wheel 108; push support frame 111; push positioning plate 112; telescopic cylinder 3 113 ; Pushing sliding seat 114; Pushing sliding plate 115; Pressing cylinder four 116; Initial plating bottom plate 121; Initial plating support frame 122; Lifting cylinder four 123; Tin box support seat 124; Tinning box one 125; Tin box pushing plate 126; Secondary tinning bottom plate 127; Secondary tinning mounting seat 128; Secondary tinning positioning plate 129; Pressing cylinder six 1210; Secondary tinning sliding seat 1211; Secondary tinning support arm 1212; Lifting cylinder six 1213; Secondary tinning push plate 1214; Welding support frame 131; Driving motor four 132; Solder paste feeding support frame 133; Telescopic cylinder four 134; Solder paste feeding slide 135; Spot welding sliding seat 136; Welding Gun support plate 137; spot welding gun 138; drive motor five 139; press cylinder seven 1310; press-fitting positioning block 1311; press-fitting head 1312; telescopic cylinder five 1313; solder paste unloading track 1314; solder paste unloading plate 1315; drive motor six 1316; solder paste track 1317; carrier clamping support column 141; carrier clamping positioning plate 142; slide cylinder 143; slide support plate 144; line combing claw 145; push cylinder 146; push slide plate 147; push positioning plate 148; line unloading support frame 151; line receiving slide 152; line unloading positioning plate 153; line unloading slide plate 154; clamping cylinder 155. DETAILED DESCRIPTION

[0054] It should be noted that the above-mentioned technical features are further combined with each other to form various embodiments not listed above, which are all deemed to be within the scope of the present invention; and, for ordinary technicians in this field, they can be improved or transformed according to the above description, and all these improvements and transformations should fall within the scope of protection of the claims attached to the present invention.

[0055] In order to facilitate the understanding of the present invention, the present invention is described in more detail below in conjunction with the accompanying drawings and specific embodiments. Preferred embodiments of the present invention are provided in the accompanying drawings. However, the present invention can be implemented in many different forms and is not limited to the embodiments described in this specification. On the contrary, the purpose of providing these embodiments is to make the understanding of the disclosure of the present invention more thorough and comprehensive.

[0056] It should be noted that when an element is referred to as being "fixed to" another element, it may be directly on the other element or there may be a central element. When an element is considered to be "connected to" another element, it may be directly connected to the other element or there may be a central element at the same time. The terms "vertical", "horizontal", "left", "right" and similar expressions used in this specification are for illustrative purposes only.

[0057] Unless otherwise defined, all technical and scientific terms used in this specification have the same meaning as those commonly understood by those skilled in the art of the present invention. The terms used in this specification in the specification of the present invention are only for the purpose of describing specific embodiments and are not intended to limit the present invention.

[0058] The present invention will be described in detail below in conjunction with the accompanying drawings.

[0059] like Figure 1An embodiment shown: a line assembly device on a mobile communication base station device, including a working plate 1, a line carrier conveyor line 2, a carrier loading mechanism 3, a carrier unloading mechanism 4, a line driving mechanism 5, a line clamping device 6, a line laser machine 7, a carrier transmission mechanism 1 8, a carrier transmission mechanism 2 9, a carrier flipping mechanism 10, a line pushing and positioning mechanism 11, an end shearing device, an end tinning mechanism 12, a line solder paste welding mechanism 13, a carrier clamping mechanism 14 and a line unloading device 15; the line carrier conveyor line 2 is fixed to the bottom of the working plate 1, the carrier loading mechanism 3 and the carrier unloading mechanism 4 are respectively installed on the left and right sides of the working plate 1, and the carrier transmission mechanism 1 is fixed to the bottom of the working plate 1, and the carrier loading mechanism 3 and the carrier unloading mechanism 4 are respectively installed on the left and right sides of the working plate 1. The conveying mechanism 18, the carrier turning mechanism 10 and the carrier transmission mechanism 29 are installed in the middle part of the working plate 1 from front to back in sequence; the line driving mechanism 5 and the line clamping device 6 are respectively installed on the front and rear sides of the carrier transmission mechanism 18, the line laser machine 7 is installed on the left side of the line clamping device 6, the line pushing and positioning mechanism 11 and the end tinning mechanism 12 are respectively installed on the front and rear sides of the carrier turning mechanism 10, the end shearing device is installed on the right side of the end tinning mechanism 12, the carrier clamping mechanism 14 and the line feeding device 15 are respectively installed on the front and rear sides of the carrier transmission mechanism 29, and the line solder paste welding mechanism 13 is installed on the right side of the line feeding device 15.

[0060] Example 2 is based on Example 1, and the line carrier conveyor line 2 includes a carrier feeding conveyor line and a carrier receiving conveyor line; the carrier feeding conveyor line and the carrier receiving conveyor line are installed at the bottom of the working plate 1 in sequence; the carrier feeding conveyor line includes a driving motor 1, a reducer, a conveying track, a conveying belt and a driving belt; the conveying track is installed at the bottom of the working plate 1 through a number of track support plates, and the front and rear ends of the conveying track are rotatably connected to the conveying shaft, the conveying belt is sleeved on the conveying shaft, and a driven wheel is arranged on the conveying shaft at the right end of the conveying track, the reducer is installed at the right end of the conveying track, and a driving wheel is arranged at the output end of the reducer, the output shaft of the driving motor 1 is connected to the reducer, and the driving road and the driven wheel are sleeved by a synchronous belt.

[0061] The carrier receiving conveyor line has the same structure as the carrier feeding conveyor line.

[0062] like Figure 2As shown, Example 3 is based on Example 1, and the carrier feeding mechanism 3 includes a feeding support plate 31, a carrier stop cover 32, a rodless cylinder 33, a telescopic cylinder 34, a telescopic positioning plate 1, a feeding top column and a carrier bearing plate 35; the feeding support plate 31 is vertically installed on the working plate 1, the carrier stop cover 32 is installed on the top of the feeding support plate 31, the rodless cylinder 33 is vertically installed on the feeding support plate 31, a sliding hole is provided in the middle of the feeding support plate 31, the bottom of the carrier receiving plate 86 is fixedly connected to the rodless cylinder 33, the telescopic positioning plate 1 is installed on the rear wall of the feeding support plate 31, the telescopic cylinder 34 is installed on the telescopic positioning plate 1, and the feeding top column is installed on the output shaft of the telescopic cylinder 34.

[0063] like Figure 3 As shown, Example 4 is based on Example 1, and the line driving mechanism 5 includes a line conveying frame 51, a line cutting component, a line arranging and conveying device, a second driving motor, a wire arranging and positioning plate 511 and a feeding conveyor belt; the line conveying frame 51 is installed on one side of the working plate 1, the line arranging and conveying device is slidably installed on the right end of the line conveying frame 51 through the sliding seat at the bottom, the wire arranging and positioning plate 511 is installed on the left end of the line conveying frame 51, the line cutting component is installed on the right side of the line arranging and conveying device, the second driving motor is installed at the bottom end of the line conveying frame 51, the output end of the second driving motor is fixedly connected to the line driving wheel, the middle part of the line conveying frame 51 is provided with a line driven wheel, the feeding conveyor belt is sleeved on the line driving wheel and the line driven wheel, the feeding conveyor belt is fixed with a locking block, the upper end of the locking block is provided with a conveying extension plate, and the top of the conveying extension plate is fixedly connected to the bottom of the line arranging and conveying device.

[0064] Furthermore, the line arrangement and conveying device includes a conveying sliding plate, a cutting support plate, a conveying positioning seat 53, a lower line roller 54, an upper line roller 55, a driving motor three, a driving positioning plate three, a downward pressure cylinder one 56 and a line conveying plate 52; the conveying positioning seat 53 is installed on the conveying sliding plate, the lower line roller 54 is rotatably installed on the lower end of the conveying positioning seat 53, the upper line roller 55 is located at the upper end of the conveying positioning seat 53, there is a gap between the upper line roller 55 and the lower line roller 54, the line conveying plate 52 is installed in the gap, the driving motor three is installed on one side of the conveying sliding plate through the driving positioning plate three, and the output shaft of the driving motor three is fixedly connected to one end of the lower line roller 54, the cutting support plate is installed on the right end of the line conveying frame 51, the downward pressure cylinder one 56 is installed oppositely on the cutting support plate, and the output end of the downward pressure cylinder one 56 is rotatably connected to the upper line roller 55.

[0065] Furthermore, the line cutting assembly includes a downward pressure cylinder 2 57, a lifting cylinder 1 58, an upper cutting plate 59 and a lower cutting plate 510; the downward pressure cylinder 2 57 is vertically installed on the top of the cutting support plate, the upper cutting plate 59 is installed on the output end of the downward pressure cylinder 2 57, the lifting cylinder 2 is installed on the lower end of the cutting support plate, the lower cutting plate 510 is installed on the output end of the lifting cylinder 2, and cutting knives are provided on both the upper cutting plate 59 and the lower cutting plate.

[0066] like Figure 4 As shown, Example 5 is based on Example 1, and the line clamping device 6 includes a clamping support frame 61, a finger cylinder 62, an upper clamping seat 63, a lower clamping cylinder three 64 and a lower clamping top shaft 65; the clamping support frame 61 is installed on one side of the carrier transmission mechanism 8, the finger cylinder 62 is installed on the clamping support frame 61, the upper clamping seat 63 is installed on the top of the clamping support frame 61, the lower clamping cylinder three 64 is fixed on the upper clamping seat 63 through a lower clamping positioning plate three, and the lower clamping top shaft 65 is installed on the output end of the lower clamping cylinder three 64.

[0067] like Figure 5 As shown, Example 6 is based on Example 1, and the carrier transmission mechanism 1 8 includes a telescopic cylinder 2 81, a carrier conveying track 1 82, a carrier conveying base plate 83, a carrier conveying bar 84 and a plurality of track positioning columns 85; the carrier conveying base plate 83 is installed on the working plate 1, and a track receiving plate is installed on the rear side of the carrier conveying base plate 83, the carrier conveying track 1 82 is installed on the carrier receiving plate 86 through the track positioning columns 85, the carrier conveying bar 84 is slidably installed in the slide rail of the front wall of the carrier receiving plate 86, and a plurality of carrier push blocks 87 are provided on the carrier conveying bar 84, and a push plate is embedded in the carrier push blocks 87, the telescopic cylinder 2 81 is horizontally installed on the carrier conveying base plate 83, and the output end of the telescopic cylinder 2 81 is connected to the carrier conveying bar 84 through a carrier extension plate.

[0068] like Figure 6As shown, Example 7 is based on Example 1, and the carrier flipping mechanism 10 includes a flip base plate 101, two flip support plates 102, a lifting cylinder three 103, a lifting positioning plate three 104, a carrier conveying track two 105, two flip support seats 106, a flip shaft 107, a flip wheel 108, a flip sliding seat and a flip positioning block; the flip base plate 101 is installed on the working plate 1 through a flip positioning column, the flip support seat 106 is respectively installed at the left and right ends of the flip base plate 101, the two ends of the flip shaft 107 are respectively rotatably connected in the flip support seat 106, and the flip wheel 108 It is fixedly sleeved on the flip shaft 107, and the two flip support plates 102 are respectively fixedly sleeved on the two ends of the flip shaft 107, the carrier conveying track 105 is fixed on the flip support plate 102, the jacking positioning plate 3 104 is vertically installed on one side of the flip bottom plate 101, the jacking cylinder 3 103 is fixed to the bottom end of the jacking positioning plate 3 104, the flip sliding seat is slidably connected to the slide rail on the jacking positioning plate 3 104, the output end of the jacking cylinder 3 103 is fixedly connected to the bottom of the flip sliding seat, one end of the flip positioning block is connected to the flip sliding seat, and the other end is fixedly connected to the flip wheel 108.

[0069] Furthermore, a line clamping assembly is arranged on the rear side of the carrier flipping mechanism 10; the line clamping assembly includes a clamping support bar, a left clamping cylinder 155 and a right clamping cylinder 155; the clamping support bar is installed on the line pushing and positioning mechanism, and the left clamping cylinder 155 and the right clamping cylinder 155 are respectively installed on the left and right ends of the clamping support bar, and L-shaped clamping plates are arranged on the clamping hands of the left clamping cylinder 155 and the right clamping cylinder 155.

[0070] like Figure 7As shown, Example 8 is based on Example 1, and the line push positioning mechanism 11 includes a push support frame 111, a push positioning plate 112, a telescopic cylinder three 113, a push sliding seat 114, a push sliding plate 115, a downward pressing cylinder four 116 and a downward pressing positioning plate four; the push support frame 111 is fixed on the working plate 1, the push positioning plate 112 is installed on the push support frame 111, the telescopic cylinder three 113 is horizontally installed on the push positioning plate 112 through the telescopic positioning plate three, and the push sliding seat 114 is connected to the push positioning plate 1 through the bottom slide seat The slide rail on 12 is slidably connected, the output end of the telescopic cylinder three 113 is fixedly connected to one end of the pushing sliding seat 114, the downward pressing positioning plate four is fixed to the top of the pushing sliding seat 114, the downward pressing cylinder four 116 is vertically fixed on the downward pressing positioning plate four, the pushing sliding plate 115 is slidably connected to the slide rail on the pushing sliding seat 114 through the bottom sliding seat, the output shaft of the downward pressing cylinder four 116 passes through the downward pressing positioning plate four and is fixedly connected to the pushing sliding plate; the right end of the pushing positioning plate 112 is provided with a downward pressing cylinder five, and the output end of the downward pressing cylinder five is fixedly connected to the pushing clamping block.

[0071] like Figure 8 As shown, Example 9 is based on Example 1, and the end tinning mechanism 12 includes a preliminary tinning device and a secondary tinning device; the preliminary tinning device and the secondary tinning device are installed on the working plate 1 from left to right in sequence; the preliminary tinning device includes a preliminary tinning base plate 121, a preliminary plating support frame 122, a lifting cylinder four 123, a tin box support seat 124, a tinning box 125 and a tin box pushing plate 126; the preliminary plating base plate 121 is installed on the working plate 1, the preliminary plating support frame 122 is installed on the preliminary plating base plate 121, the lifting cylinder four 123 and the tin box support seat 124 are respectively installed at the front and rear ends of the preliminary plating support frame 122, one end of the tin box pushing plate 126 is installed on the output end of the lifting cylinder four 123, and the other end is connected to the tinning box 125, and the tinning box 125 is placed in the groove of the tin box support seat 124.

[0072] Furthermore, the secondary tinning device includes a secondary tinning bottom plate 127, a secondary tinning mounting seat 128, a second tinning box, a secondary tinning positioning plate 129, a sixth pressing cylinder 1210, a secondary tinning slide seat 1211, a secondary tinning support arm 1212, a fifth lifting cylinder, a sixth lifting cylinder 1213 and a secondary tinning push plate 1214; the secondary tinning bottom plate 127 is mounted on the working plate 1, the secondary tinning mounting seat 128 is mounted on the secondary tinning bottom plate 127, the secondary tinning positioning plate 129 is mounted on the rear side of the secondary tinning mounting seat 128, and the sixth pressing cylinder 1210 is mounted on the working plate 1. 10 is vertically installed on the top of the secondary tinning positioning plate 129, the secondary tinning slide 1211 is slidably connected to the slide rail on the secondary tinning positioning plate 129 through the slide at the bottom, one end of the secondary tinning support arm 1212 is horizontally installed on the secondary tinning slide 1211, and the other end is connected to the tinning box two, the lifting cylinder five is installed on the right side of the secondary tinning mounting seat 128, the lifting cylinder six 1213 is installed on the output end of the lifting cylinder five, the secondary tinning push rod is installed on the lifting cylinder six 1213, and the secondary tinning push plate 1214 is located above the tinning box two.

[0073] like Fig. 9 As shown, Example 10 is based on Example 1, and the circuit solder paste welding mechanism 13 includes a welding support frame 131, a solder paste feeding device, a solder paste pressing device, a solder paste unloading device and a solder paste receiving slide; the welding support frame 131 is installed on the working plate 1, the solder paste feeding device is installed at the left end of the welding support frame 131, the solder paste pressing device is installed at the front end of the welding support frame 131, the solder paste unloading device is installed below the solder paste receiving device, and the solder paste receiving slide is installed on the right side of the solder paste unloading device; the solder paste feeding device includes a telescopic cylinder 134, a solder paste feeding support frame 133, a solder paste A feeding slide 135, a solder paste transmission track assembly, a lifting cylinder seven, a solder paste lifting plate and a solder paste spot welding assembly; the solder paste feeding support frame 133 is installed on the welding support frame 131, the solder paste spot welding assembly is installed at the front end of the solder paste feeding support frame 133, the solder paste feeding slide 135 is installed at the rear end of the solder paste feeding support frame 133, the telescopic cylinder four 134 is installed on one side of the solder paste feeding slide 135, the lifting cylinder seven is installed at the right end of the solder paste feeding support frame 133, the solder paste lifting plate is installed at the output end of the lifting cylinder seven, and the solder paste transmission track assembly is installed on one side of the solder paste feeding slide 135.

[0074] Furthermore, the solder paste spot welding assembly includes a drive motor 4 132, a ball screw 1, a screw nut seat 1, a solder paste extension plate, a spot welding sliding seat 136, a drive motor 5 139, a ball screw 2, a screw nut seat 2, a welding gun support plate 137 and a spot welding gun 138; the spot welding sliding seat 136 is slidably connected to the slide rail on the solder paste feeding support frame 133 through the sliding seat at the bottom, the drive motor 4 132 is installed at the bottom of the solder paste feeding support frame 133, one end of the ball screw 1 is connected to the solder paste feeding support frame 133, and the other end is connected to the output shaft of the drive motor 4 132 The screw nut seat is sleeved on the ball screw, one end of the solder paste extension plate is connected to the screw nut seat one, and the other end is connected to the spot welding sliding seat 136; the drive motor five 139 is installed on the top of the spot welding sliding seat 136 through the drive positioning plate five, and the two ends of the ball screw two are rotatably connected to the spot welding sliding seat 136, the output end of the drive motor five 139 is connected to one end of the ball screw two, the screw nut seat two is sleeved on the ball screw two, the welding gun support plate 137 is installed on the screw nut seat two, and the spot welding gun 138 is installed on the welding gun support plate 137.

[0075] Furthermore, the solder paste transmission track assembly includes a solder paste track 1317, a solder paste transmission belt, a drive motor 6 1316 and a drive positioning plate 6; the solder paste track 1317 is installed on one side of the solder paste feeding slide 135, the drive positioning plate 6 is installed below the solder paste spot welding assembly, the drive motor 6 1316 is installed on the drive positioning plate 6, the output end of the drive motor 6 1316 is installed with a drive roller, the front and rear ends of the solder paste track 1317 are both provided with solder paste rotating shafts, and the solder paste conveyor belt is sleeved on the solder paste rotating shaft and the drive roller.

[0076] Furthermore, the solder paste pressing device includes a pressing support frame, a pressing plate, a downward pressing cylinder 1310, a pressing positioning block 1311 and a pressing head 1312; the pressing support frame is installed on the solder paste support frame, the pressing plate is installed on the pressing support frame, the downward pressing cylinder 1310 is vertically installed on the top of the pressing support frame, the pressing positioning block 1311 is installed on the output end of the downward pressing cylinder 1310, and the pressing head 1312 is installed on the bottom of the pressing positioning block 1311.

[0077] Furthermore, the solder paste unloading device includes a solder paste unloading track 1314, an unloading mounting plate, a telescopic cylinder five 1313, a telescopic positioning plate five and a solder paste unloading plate 1315; the solder paste unloading track 1314 is installed at the front end of the press-fitting plate, the telescopic positioning plate five is installed at the bottom of the press-fitting plate, the telescopic cylinder five 1313 is installed at one end of the telescopic positioning plate five, the solder paste unloading plate 1315 is slidably connected to the slide rail on the telescopic positioning plate five through the sliding seat at the bottom, the output end of the telescopic cylinder five 1313 is fixedly connected to the right end of the solder paste unloading plate 1315, one end of the solder paste unloading plate 1315 is fixedly connected to a unloading push block, and the unloading push block is embedded in the solder paste unloading track 1314; a feed port is set on one side of the solder paste unloading track 1314, and the feed port corresponds to the discharge port of the solder paste track 1317.

[0078] Further, such as Fig.10 As shown, the carrier clamping mechanism 14 includes a carrier clamping support column 141, a carrier clamping positioning plate 142, a slide cylinder 143, a slide support plate 144, a line combing claw 145, a pushing cylinder 146, a pushing slide plate 147 and a pushing positioning plate 148; the carrier clamping support column 141 is installed on the working plate 1, the carrier clamping positioning plate 142 is installed on the upper end of the carrier clamping support column 141, and the pushing cylinder 146 is horizontally installed on the carrier clamping positioning plate 14 2, the pushing slide plate 147 is slidably connected with the slide rail on the carrier pressing positioning plate 142 through the sliding seat at the bottom, the pushing positioning plate 148 is vertically installed on the pushing sliding plate 115, the output end of the pushing cylinder 146 is fixedly connected to the right end of the pushing sliding plate 115, the slide cylinder 143 is installed on one side of the carrier support column, the slide support plate 144 is installed on the lower end of the slide cylinder 143, and the line combing claw 145 is installed on the slide support plate 144.

[0079] Further, such as Fig.11As shown, the line material unloading device 15 includes a line material unloading support frame 151, a line material receiving slide 152, a driving motor 8, a line material unloading positioning plate 153, a line material unloading slide 154, a clamping cylinder 155 and a material unloading belt; the line material unloading support frame 151 is installed on the working plate 1, the line material receiving slide 152 is installed on one side of the line material unloading support frame 151, the line material unloading positioning plate 153 is installed on the upper end of the line material unloading support frame 151, and the line material unloading slide 154 is connected to the line material unloading support frame 151 through the slide seat at the bottom. The slide rail on the line unloading positioning plate 153 is slidably connected, the clamping cylinder 155 is installed on the line unloading slide plate 154, the front end of the line unloading positioning plate 153 is rotatably connected to the line unloading wheel, the driving motor eight is installed at the rear end of the line unloading positioning plate 153, and the output shaft of the driving motor eight is connected to the line unloading driving wheel, the unloading belt is sleeved on the line unloading driving wheel and the line unloading wheel, and the unloading belt is fixed with a locking plate, and the top of the locking plate is connected to the bottom end of the line unloading sliding plate.

[0080] Furthermore, the end shearing device includes a shearing positioning plate, a downward pressure cylinder eight, a downward pressure positioning plate eight, an upper shearing knife and a lower shearing knife; the shearing positioning plate is installed on the working plate, the downward pressure positioning plate eight is installed on the top of the shearing positioning plate, the downward pressure cylinder eight is vertically installed on the downward pressure positioning plate eight, and the upper shearing knife is fixed to the output end of the downward pressure cylinder eight, and the lower shearing knife is installed at the lower end of the shearing positioning plate, corresponding to the upper shearing knife.

[0081] The circuit assembly process on mobile communication base station equipment is as follows:

[0082] Step S0, a verification step to verify whether the operator has the right to start the control panel; wherein the verification step includes an authentication operation, and when it is determined that the authentication is passed, subsequent steps are executed; when it is determined that the authentication is not passed, any one or any two or more combinations of voice, sound and light alarm signals, and sending alarm information to the background terminal are executed; the authentication operation is any one or any two or more combinations of user name and password, face recognition, and pupil recognition, and the program can be started only after the authentication is passed.

[0083] 6. In step S1, the feeding and conveying process of the line carrier includes step S11, a carrier feeding and conveying step, wherein the driving motor 1 causes the driving belt to rotate on the conveying track, and the empty carrier on the conveying track is sent to the right end of the conveying track to wait for feeding;

[0084] Step S12, the carrier loading step, the rodless cylinder drives the carrier carrying plate to move downward to one side of the conveying track, the driving motor rotates the driving belt to transfer the empty carrier on the driving belt to the carrier carrying plate, and then the rodless cylinder drives the carrier carrying plate upward to the carrier transmission mechanism, and then the telescopic cylinder drives the loading push column to push the empty carrier on the carrier carrying plate to the carrier conveying track on the carrier transmission mechanism.

[0085] 7. In step S2, the line driving causes the line to enter the empty carrier process; including step S21, line arrangement and transportation step, driving motor 3 to drive the conveying positioning seat to move backward along the conveying sliding plate, so that the line enters the line conveying plate, and then driving motor 3 to move back to move the conveying positioning seat to one side of the carrier conveying track 1;

[0086] Step S22, the line loading carrier step, the driving motor 4 drives the lower roller of the line to rotate, the downward pressure cylinder 1 drives the upper roller of the line to move downward to contact the line in the line conveying plate, and the driving motor 4 drives the lower roller of the line to drive the upper roller of the line to rotate to convey the line in the line conveying plate into the carrier;

[0087] Step S23, line cutting and resetting step, after the line enters the carrier, the second pressing cylinder and the first lifting cylinder respectively drive the upper cutting plate and the lower cutting plate to cut the line.

[0088] Step S3, line compaction and arrangement process;

[0089] Step S35, the step of neatly cutting the end, the downward pressure cylinder eight is fixed on the downward pressure positioning plate eight, and the downward pressure cylinder eight drives the upper shear to cooperate with the lower shear knife fixed on the shear positioning plate to neatly cut the line at one end of the carrier.

[0090] Step S4, carrier transmission process; the telescopic cylinder 2 on the carrier transmission mechanism 1 drives the carrier conveying bar to slide along the slide rail in the carrier receiving plate, and the carrier push block on the carrier conveying bar pushes the carrier forward to the next process;

[0091] In step S5, the circuit on the carrier is subjected to a flip tinning process; including step S51, a carrier flipping step, a jacking cylinder 3 is fixed on a jacking positioning plate 3, and the jacking cylinder 3 drives the flipping wheel to rotate, and the flipping wheel drives the flipping shaft to rotate, so that the carrier conveying track 2 fixed on the flipping shaft rotates, and after the carrier conveying track 2 is flipped, one end of the carrier thereon is flipped downward;

[0092] Step S52, preliminary tinning step, the lifting cylinder 4 drives the tin box pushing plate to move upward, so that the tin-plating box 1 fixed on the tin box pushing plate moves upward, so that the circuit at one end of the carrier invades the tin-plating box 1 for preliminary tinning;

[0093] Step S53, the line arrangement step at the rear end of the carrier, while the carrier conveying track 2 is flipped, the left and right clamping cylinders on the line clamping assembly arrange the line at the rear end of the carrier through the L-shaped clamping plate;

[0094] Step S54, carrier pressing and conveying step, the downward pressing cylinder 4 drives the sliding plate to move downward, so that the pushing sliding plate contacts the carrier, and the telescopic cylinder 3 drives the pushing sliding plate to move forward, and the circuit that has been initially tinned is sent to the secondary tinning device;

[0095] Step S55, after the secondary tinning step and the carrier flipping step are repeated, the downward pressure cylinder 6 drives the secondary tinning support arm to move upward, so that the circuit at one end of the carrier invades the tinning box 2;

[0096] Step S56, the step of deburring the line end, the lifting cylinder five drives the lifting cylinder six to move up and down, and the lifting cylinder six drives the line scraping plate to move forward and backward to scrape and deburr the line at one end of the carrier.

[0097] 8. In step S6, the circuit on the carrier is subjected to a circuit soldering and press-fitting process; including step S6, a solder paste feeding step, step S62, a solder paste spot welding step, and a telescopic cylinder 4 on the solder paste feeding device pushing the solder paste to move in the solder paste feeding slideway, so that the solder paste can move back and forth in the solder paste feeding slideway;

[0098] Step S63, solder paste pushing and spot welding step, the driving motor 4 drives the ball screw 1 to rotate so that the spot welding slide moves back and forth on one side of the solder paste feeding slide; then the driving motor 5 drives the ball screw 2 to rotate so that the welding gun support plate moves downward along the ball screw 2, and the spot welding gun fixed on the welding gun support plate performs spot welding on the solder paste;

[0099] Step S64, solder paste conveying step, a lifting cylinder 7 is fixedly provided at the right end of the solder paste feeding slideway, the lifting cylinder 7 drives the solder paste lifting plate to deliver the solder paste to the solder paste transmission track assembly, and the driving motor 6 drives the solder paste conveyor belt to move, so that the solder paste moves along the solder paste conveyor belt in the solder paste track;

[0100] Step S65, solder paste unloading step 1, the telescopic cylinder 5 on the solder paste unloading device drives the solder paste unloading plate to move, so that the unloading push block fixed on the solder paste unloading plate pushes the solder paste to the bottom of the solder paste pressing device;

[0101] Step S66, a step of press-fitting the solder paste and one end of the circuit, wherein the downward pressure cylinder 7 on the solder paste press-fitting device drives the press-fitting positioning block to move downward, so that the press-fitting head fixed on the press-fitting positioning block press-fits the circuit and the solder paste at one end of the carrier together;

[0102] Step S67, solder paste unloading step 2, the telescopic cylinder 5 on the solder paste unloading device continues to drive the unloading push block to move to the right, pushing the pressed solder paste to the feeding rear of the solder paste unloading track, and the solder paste is sent to the solder paste unloading track.

[0103] Step S8, finished product line unloading process; the driving motor 8 on the line unloading device drives the line unloading positioning block to move forward, so that the clamping cylinder clamps the line at one end of the carrier, and then drives the motor 8 to move back, pulls out the line in the carrier and places it in the line receiving slide;

[0104] In step S7, the carrier is pressed to comb the line; the pushing cylinder on the carrier pressing mechanism drives the positioning plate to press the carrier, and at the same time the slide cylinder drives the line combing claw to comb the line at one end of the carrier.

[0105] Step S88, CCD inspection step, a CCD inspection light and a defective rejection device are installed on one side of the circuit feeding device, and the circuit after the solder paste is pressed is inspected by the CCD inspection light, that is, in step S8, if the CCD inspection light shows a good result when inspecting the appearance of the circuit, the defective rejection device does not work, and if the CCD inspection result is bad, the defective rejection device works to directly reject the defective products.

[0106] In step S9, the empty carrier receiving and recycling process also includes step S91, an empty carrier unloading step. After unloading the line in the carrier is completed, the rodless cylinder on the carrier unloading mechanism drives the carrier receiving plate to move to the second position of the carrier transmission mechanism, and the empty carrier is transported to the carrier receiving plate, and the empty carrier is lifted into the carrier receiving and conveying line by the unloading cylinder;

[0107] Step S92, empty carrier transport step, the drive motor on the carrier receiving conveyor line drives the receiving belt to rotate, and the empty carrier is stored in the receiving belt.

[0108] It should be noted that the above-mentioned technical features are further combined with each other to form various embodiments not listed above, which are all deemed to be within the scope of the present invention; and, for ordinary technicians in this field, they can be improved or transformed according to the above description, and all these improvements and transformations should fall within the scope of protection of the claims attached to the present invention.

Claims

1. A line assembly process on a mobile communication base station device, characterized in that: The specific assembly steps are as follows: Step S1, feeding and conveying process of line carrier; Step S2, the line is driven so that the line enters an empty carrier process; Step S3, line compaction and arrangement process; Step S4, carrier transmission process; Step S5, performing a tinning process on the circuit on the carrier; Step S6, performing a circuit solder paste welding and press-fitting process on the circuit on the carrier; Step S7, the carrier compresses the line to comb the process; Step S8, finished product line cutting process; Step S9, empty carrier material collection and recycling process; The circuit solder paste welding mechanism includes a welding support frame, a solder paste feeding device, a solder paste pressing device, a solder paste unloading device and a solder paste receiving slide; the welding support frame is installed on the working plate, the solder paste feeding device is installed on the left end of the welding support frame, the solder paste pressing device is installed on the front end of the welding support frame, the solder paste unloading device is installed below the solder paste receiving device, and the solder paste receiving slide is installed on the right side of the solder paste unloading device; the solder paste feeding device includes a telescopic cylinder 4, a solder paste feeding support frame, a solder paste feeding slide, a solder paste The solder paste transmission track assembly, the lifting cylinder seven, the solder paste lifting plate and the solder paste spot welding assembly; the solder paste feeding support frame is installed on the welding support frame, the solder paste spot welding assembly is installed at the front end of the solder paste feeding support frame, the solder paste feeding slideway is installed at the rear end of the solder paste feeding support frame, the telescopic cylinder four is installed on one side of the solder paste feeding slideway, the lifting cylinder seven is installed on the right end of the solder paste feeding support frame, the solder paste lifting plate is installed on the output end of the lifting cylinder seven, and the solder paste transmission track assembly is installed on one side of the solder paste feeding slideway; The solder paste spot welding assembly includes a drive motor 4, a ball screw 1, a screw nut seat 1, a solder paste extension plate, a spot welding sliding seat, a drive motor 5, a ball screw 2, a screw nut seat 2, a welding gun support plate and a spot welding gun; the spot welding sliding seat is slidably connected to the slide rail on the solder paste feeding support frame through the sliding seat at the bottom, the drive motor 4 is installed at the bottom of the solder paste feeding support frame, one end of the ball screw 1 is connected to the solder paste feeding support frame, and the other end is connected to the output shaft of the drive motor 4, the screw nut The seat is sleeved on the ball screw, one end of the solder paste extension plate is connected to the screw nut seat one, and the other end is connected to the spot welding sliding seat; the driving motor five is installed on the top of the spot welding sliding seat through the driving positioning plate five, the two ends of the ball screw two are rotatably connected to the spot welding sliding seat, the output end of the driving motor five is connected to one end of the ball screw two, the screw nut seat two is sleeved on the ball screw two, the welding gun support plate is installed on the screw nut seat two, and the spot welding gun is installed on the welding gun support plate; The solder paste transmission track assembly includes a solder paste track, a solder paste transmission belt, a drive motor 6 and a drive positioning plate 6; the solder paste track is installed on one side of the solder paste feeding slideway, the drive positioning plate 6 is installed below the solder paste spot welding assembly, the drive motor 6 is installed on the drive positioning plate 6, the output end of the drive motor 6 is installed with a drive roller, the front and rear ends of the solder paste track are both provided with solder paste rotating shafts, and the solder paste conveyor belt is sleeved on the solder paste rotating shaft and the drive roller; The solder paste pressing device comprises a pressing support frame, a pressing plate, a pressing cylinder seven, a pressing positioning block and a pressing head; the pressing support frame is installed on the solder paste supporting frame, the pressing plate is installed on the pressing support frame, the pressing cylinder seven is vertically installed on the top of the pressing support frame, the pressing positioning block is installed on the output end of the pressing cylinder seven, and the pressing head is installed on the bottom of the pressing positioning block; The solder paste feeding device includes a solder paste feeding track, a feeding mounting plate, a telescopic cylinder five, a telescopic positioning plate five and a solder paste feeding plate; the solder paste feeding track is installed at the front end of the press-fitting plate, the telescopic positioning plate five is installed at the bottom of the press-fitting plate, the telescopic cylinder five is installed at one end of the telescopic positioning plate five, the solder paste feeding plate is slidably connected to the slide rail on the telescopic positioning plate five through the sliding seat at the bottom, the output end of the telescopic cylinder five (1313) is fixedly connected to the right end of the solder paste feeding plate, one end of the solder paste feeding plate is fixedly connected to a feeding push block, and the feeding push block is embedded in the solder paste feeding track; a feeding port is set on one side of the solder paste feeding track, and the feeding port corresponds to the feeding port of the solder paste track.

2. According to claim 1, a circuit assembly process on a mobile communication base station device is characterized in that: Before step S1, step S0 is also included, a verification step to verify whether the operator has the right to start the control panel; The verification step includes an authentication operation, and subsequent steps are executed when it is determined that the authentication is passed; when it is determined that the authentication is not passed, any one or any combination of two or more of the following methods are executed: voice, sound and light alarm signals, and sending alarm information to the background terminal; the authentication operation is any one or any combination of two or more of the following methods: user name and password, face recognition, and pupil recognition. The program can only be started after the authentication is passed.

3. According to claim 1, a circuit assembly process on a mobile communication base station device is characterized in that: In step S1, the feeding and conveying process of the line carrier includes step S11, a carrier feeding and conveying step, wherein the driving motor 1 causes the driving belt to rotate on the conveying track, and the empty carrier on the conveying track is sent to the right end of the conveying track to wait for feeding; Step S12, the carrier loading step, the rodless cylinder drives the carrier carrying plate to move downward to one side of the conveying track, the driving motor rotates the driving belt to transfer the empty carrier on the driving belt to the carrier carrying plate, and then the rodless cylinder drives the carrier carrying plate upward to the carrier transmission mechanism, and then the telescopic cylinder drives the loading push column to push the empty carrier on the carrier carrying plate to the carrier conveying track on the carrier transmission mechanism.

4. According to claim 1, a circuit assembly process on a mobile communication base station device is characterized in that: In step S2, the line driving causes the line to enter the empty carrier process; including step S21, line arrangement and transportation step, driving motor 3 to drive the conveying positioning seat to move backward along the conveying sliding plate, so that the line enters the line conveying plate, and then driving motor 3 to move back to move the conveying positioning seat to one side of the carrier conveying track 1; Step S22, the line loading carrier step, the driving motor 4 drives the lower roller of the line to rotate, the downward pressure cylinder 1 drives the upper roller of the line to move downward to contact the line in the line conveying plate, and the driving motor 4 drives the lower roller of the line to drive the upper roller of the line to rotate to convey the line in the line conveying plate into the carrier; Step S23, line cutting and resetting step, after the line enters the carrier, the second pressing cylinder and the first lifting cylinder respectively drive the upper cutting plate and the lower cutting plate to cut the line.

5. The circuit assembly process on a mobile communication base station device according to claim 1, characterized in that: After step S3 and before step S4, step S35 is also included, which is a step of neatly cutting the end. The downward pressure cylinder eight is fixed on the downward pressure positioning plate eight, and the downward pressure cylinder eight drives the upper shear to cooperate with the lower shear knife fixed on the shear positioning plate to neatly cut the line at one end of the carrier.

6. The circuit assembly process on a mobile communication base station device according to claim 1, characterized in that: In step S5, the circuit on the carrier is subjected to a reverse tinning process; The method comprises step S51, a carrier flipping step, wherein a lifting cylinder 3 is fixed on a lifting positioning plate 3, and a flipping wheel is driven by the lifting cylinder 3 to rotate, and the flipping wheel drives a flipping shaft to rotate, so that a carrier conveying track 2 fixed on the flipping shaft rotates, and after the carrier conveying track 2 is flipped, one end of the carrier thereon is flipped downward; Step S52, preliminary tinning step, the lifting cylinder 4 drives the tin box pushing plate to move upward, so that the tin-plating box 1 fixed on the tin box pushing plate moves upward, so that the circuit at one end of the carrier invades the tin-plating box 1 for preliminary tinning; Step S53, the line arrangement step at the rear end of the carrier, while the carrier conveying track 2 is flipped, the left and right clamping cylinders on the line clamping assembly arrange the line at the rear end of the carrier through the L-shaped clamping plate; Step S54, carrier pressing and conveying step, the downward pressing cylinder 4 drives the sliding plate to move downward, so that the pushing sliding plate contacts the carrier, and the telescopic cylinder 3 drives the pushing sliding plate to move forward, and the circuit that has been initially tinned is sent to the secondary tinning device; Step S55, after the secondary tinning step and the carrier flipping step are repeated, the downward pressure cylinder 6 drives the secondary tinning support arm to move upward, so that the circuit at one end of the carrier invades the tinning box 2; Step S56, the step of deburring the line end, the lifting cylinder five drives the lifting cylinder six to move up and down, and the lifting cylinder six drives the line scraping plate to move forward and backward to scrape and deburr the line at one end of the carrier.

7. The circuit assembly process on a mobile communication base station device according to claim 1, characterized in that: In step S6, the circuit on the carrier is subjected to a circuit solder paste welding and pressing process; including step S6, a solder paste feeding step, step S62, a solder paste spot welding step, and a telescopic cylinder 4 on the solder paste feeding device pushes the solder paste to move in the solder paste feeding slideway, so that the solder paste can move back and forth in the solder paste feeding slideway; Step S63, solder paste pushing and spot welding step, the driving motor 4 drives the ball screw 1 to rotate so that the spot welding slide moves back and forth on one side of the solder paste feeding slide; then the driving motor 5 drives the ball screw 2 to rotate so that the welding gun support plate moves downward along the ball screw 2, and the spot welding gun fixed on the welding gun support plate performs spot welding on the solder paste; Step S64, solder paste conveying step, a lifting cylinder 7 is fixedly provided at the right end of the solder paste feeding slideway, the lifting cylinder 7 drives the solder paste lifting plate to deliver the solder paste to the solder paste transmission track assembly, and the driving motor 6 drives the solder paste conveyor belt to move, so that the solder paste moves along the solder paste conveyor belt in the solder paste track; Step S65, solder paste unloading step 1, the telescopic cylinder 5 on the solder paste unloading device drives the solder paste unloading plate to move, so that the unloading push block fixed on the solder paste unloading plate pushes the solder paste to the bottom of the solder paste pressing device; Step S66, a step of press-fitting the solder paste and one end of the circuit, wherein the downward pressure cylinder 7 on the solder paste press-fitting device drives the press-fitting positioning block to move downward, so that the press-fitting head fixed on the press-fitting positioning block press-fits the circuit and the solder paste at one end of the carrier together; Step S67, solder paste unloading step 2, the telescopic cylinder 5 on the solder paste unloading device continues to drive the unloading push block to move to the right, pushing the pressed solder paste to the feeding rear of the solder paste unloading track, and the solder paste is sent to the solder paste unloading track.

8. The circuit assembly process on a mobile communication base station device according to claim 1, characterized in that: In step S7, the carrier is pressed to comb the line; the pushing cylinder on the carrier pressing mechanism drives the positioning plate to press the carrier, and at the same time the slide cylinder drives the line combing claw to comb the line at one end of the carrier.

9. The circuit assembly process on a mobile communication base station device according to claim 1, characterized in that: After step S8, it also includes step S88 and CCD inspection step. A CCD inspection light and a defective rejection device are installed on one side of the circuit feeding device. The circuit after the solder paste is pressed is inspected by the CCD inspection light. That is, in step S8, if the CCD inspection light shows a good result when inspecting the appearance of the circuit, the defective rejection device does not work. If the CCD inspection result is poor, the defective rejection device works to directly reject the defective products.

10. The circuit assembly process on a mobile communication base station device according to claim 1, characterized in that: In step S9, the material collection and recovery process of the empty carrier also includes step S91, the empty carrier unloading step. After the unloading of the line in the carrier is completed, the rodless cylinder on the carrier unloading mechanism drives the carrier receiving plate to move to the second position of the carrier transmission mechanism, and the empty carrier is transported to the carrier receiving plate, and the empty carrier is lifted into the carrier receiving conveyor line by the lifting of the unloading cylinder; step S92, the empty carrier transportation step, the driving motor on the carrier receiving conveyor line drives the receiving belt to rotate, and the empty carrier is stored in the receiving belt.