UPFC addressing method, apparatus, server, system and computer-readable storage medium
By comprehensively considering the peak load in the power grid data and the load factor influence coefficient during N-1 fault, transmission capacity improvement index and resource index, the problem of poor resource utilization in the existing UPFC site selection method is solved and a more efficient Grid resource allocation and power system stability improvement.
Patent Information
- Application Number
- CN202110780063.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-07-09
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2041-07-09
AI Technical Summary
The existing UPFC site selection method only considers the load factor, resulting in poor utilization of power grid resources and failing to effectively improve the safe and stable operation of the power grid.
By obtaining the power grid data of the target area, the line power flow and load factor under peak load are calculated, and combined with the load factor influence coefficient, transmission capacity improvement index and resource index during N-1 fault, UPFC site selection is comprehensively considered to rationally allocate power grid resources. .
It improves the utilization rate of power grid resources and the voltage stability of the power system, provides a more scientific UPFC site selection plan, and enhances the safe and stable operation capability of the power grid.
Smart Images

Figure CN113690890B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of power grids, and in particular to a UPFC site selection method, device, server, system and computer-readable storage medium. Background Art
[0002] With the continuous development of resources, the demand for power resources in both production and life has greatly increased. Therefore, the allocation of power grid resources is very important. Scientific and reasonable planning can maximize the use of power resources and give full play to their maximum effectiveness. At the same time, reasonable power design, including reasonable design of operating parameters and operating standards, can improve the safe operation of the power system and provide residents with a more stable and reliable power supply. Therefore, to ensure the safety of the power grid, it is necessary to do a good job in perfect power grid planning and scientific power design.
[0003] As the proportion of electricity in energy consumption continues to increase, many regions are increasingly dependent on external power input, and the power input includes a considerable proportion of renewable energy such as hydropower, wind power, and photovoltaics. As the characteristics of the receiving-end power grid at the load center become more and more obvious, the increasing proportion of external power supply has brought new challenges to the operation and planning of the receiving-end power grid. Under the constraints of various factors such as line corridors and environmental protection, the means of improving the safe and stable operation capacity of the receiving-end power grid by building new transmission lines has become less and less applicable. The use of new power system devices including UPFC (Unified Power Flow Controller) and tapping the potential of existing power grid equipment is a realistic choice for the development of the power grid.
[0004] UPFC, this device combines and expands the control means and functions of two flexible AC transmission systems (FACTS), static synchronous series compensator (SSSC) and static synchronous compensator (STATCOM). It can achieve parallel compensation, series compensation and phase shifting functions only by changing the control law. UPFC can reasonably control the line flow and realize the reasonable distribution of the transmission capacity of each transmission line on the section. UPFC can also generate reactive power to maintain node voltage stability, thereby improving the voltage stability and power angle stability of the power system.
[0005] The existing UPFC site selection method usually uses simulation calculation methods in engineering to perform N-1 calculations on the lines in a certain area of the power grid, find the places where the power flow is blocked, and optimize to obtain the suitable installation location of the UPFC. However, the current site selection method usually statically considers the changes in the load rate of other lines on the same transmission section after the line N-1 occurs, and only considers the load rate factor, resulting in poor resource utilization of the power grid. Summary of the invention
[0006] In view of this, the present invention provides a UPFC site selection method, device, server, system and computer-readable storage medium, which can comprehensively consider the transmission capacity improvement index, resource utilization index and load rate impact index of the UPFC address when selecting the UPFC site, so as to achieve the purpose of reasonable allocation of power grid resources.
[0007] A first aspect of an embodiment of the present invention provides a UPFC site selection method, comprising: acquiring power grid data of a target area, and calculating a line flow under peak load according to the power grid data; calculating a load rate under peak load and a load rate when an N-1 fault occurs according to the line flow under peak load and the line transmission capacity;
[0008] Calculate the load rate impact coefficient when the N-1 fault occurs according to the load rate under the peak load and the load rate when the N-1 fault occurs; calculate the transmission capacity improvement index according to the load rate under the peak load and the total number of lines; calculate the line resource index according to the line length and the total number of lines;
[0009] Calculate the line location index according to the load rate impact coefficient when the N-1 fault occurs, the transmission capacity improvement index and the resource index;
[0010] The line with the largest line site selection index value is taken as the recommended UPFC installation line.
[0011] In combination with the first aspect, in some embodiments, calculating the load rate at the peak load and the load rate when the N-1 fault occurs according to the line flow at the peak load and the line transmission capacity includes:
[0012] Calculating the load rate under the peak load according to the line flow under the peak load and the line transmission capacity;
[0013] Calculate the line power flow when N-1 faults occur based on the line power flow under the peak load;
[0014] Calculating the line load rate when the N-1 fault occurs according to the line power flow when the N-1 fault occurs and the line transmission capacity;
[0015] The load rate under the peak load is:
[0016]
[0017] Among them, a i is the load rate of line i at peak load, 1≤i≤n, and n is the total number of lines;
[0018] The load rate when N-1 fault occurs is:
[0019]
[0020] Among them, B i is the load rate when line i has N-1 faults, B i =[b i1 b i2 … a i … b in ], b ik When line k has N-1 faults, the load rate of the i-th line is recorded as b ik , 1≤k≤n, when i=k, b ik =a i .
[0021] In combination with the first aspect, in some embodiments, calculating the load rate influence coefficient when the N-1 fault occurs according to the load rate under the peak load and the load rate when the N-1 fault occurs includes:
[0022] Calculate the ratio between the load rate when N-1 faults occur in the target area and the load rate under peak load; where the ratio is
[0023]
[0024] The load rate influence coefficient when the N-1 fault occurs is calculated according to the ratio and the first formula; wherein the first formula is:
[0025]
[0026] Wherein, γ is the load rate influence coefficient when the N-1 fault occurs.
[0027] In combination with the first aspect, in some embodiments, calculating the transmission capacity improvement index according to the load rate under the peak load and the total number of lines includes:
[0028] The transmission capacity improvement index is calculated according to the load rate under the peak load, the total number of lines, the thermal stability limit transmission capacity of each line, the line transmission capacity of each line load rate and the second formula, wherein the second formula is:
[0029]
[0030] Where: i is the transmission capacity improvement index of line i, a imax is the thermal stability limit transmission capacity of line i, a ieco Deliver capacity to the line.
[0031] In combination with the first aspect, in some embodiments, calculating the line resource indicator according to the line length and the total number of lines includes:
[0032] The line resource index is calculated according to the line length, the total number of lines and a third formula, wherein the third formula is:
[0033]
[0034] Among them, λ i is the resource index of line i, l i is the length of line i;
[0035] The calculating of the line site selection index according to the load rate influence coefficient when the N-1 fault occurs, the transmission capacity improvement index and the resource index comprises:
[0036] For each line, the product value of the load rate impact coefficient of the line when N-1 faults occur, the power transmission capacity improvement index and the resource index is calculated as the line site selection index of the line.
[0037] In combination with the first aspect, in some embodiments, the power grid data of the target area is obtained, and the calculating of the line flow under the peak load includes:
[0038] The power grid data includes: power source, load, grid structure, operation mode, thermal stability limit transmission capacity, line transmission capacity and line length of each line in the target area.
[0039] A second aspect of an embodiment of the present invention provides a device, including:
[0040] The first module is used to obtain power grid data of the target area and calculate the line flow under peak load according to the power grid data;
[0041] The second module is used to calculate the load rate under the peak load and the load rate when N-1 fault occurs according to the line flow under the peak load and the line transmission capacity;
[0042] The third module is used to calculate the load rate influence coefficient when the N-1 fault occurs according to the load rate under the peak load and the load rate when the N-1 fault occurs;
[0043] A fourth module is used to calculate a transmission capacity improvement index according to the load rate under the peak load and the total number of lines;
[0044] A fifth module is used to calculate a line resource index according to the line length and the total number of the lines;
[0045] The sixth module is used to calculate the line site selection index according to the load rate influence coefficient when the N-1 fault occurs, the power transmission capacity improvement index and the resource index;
[0046] And a seventh module is used to select the line with the largest line site selection index value as the recommended installation line for UPFC.
[0047] A third aspect of an embodiment of the present invention provides a server, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, the steps of the UPFC site selection method as described in any one of the first aspects are implemented.
[0048] A fourth aspect of an embodiment of the present invention provides a UPFC site selection system, including: a power grid data storage device, a server, and a terminal;
[0049] The terminal is used to send a UPFC site selection request to the server, wherein the UPFC site selection request includes an identifier of a target area;
[0050] The server is used to send a data acquisition request to the power grid data storage device, wherein the data acquisition request includes an identifier of a target area;
[0051] The power grid data storage device is used to send the power grid data of the target area to the server according to the identifier of the target area;
[0052] The server is further used to calculate the line flow under peak load according to the power grid data, and calculate the load rate under peak load and the load rate when N-1 fault occurs according to the line flow under peak load and the line transmission capacity;
[0053] The server is further configured to calculate a load rate impact coefficient when an N-1 fault occurs according to the load rate under the peak load and the load rate when the N-1 fault occurs, calculate a power transmission capacity improvement index according to the load rate under the peak load and the total number of lines, and calculate a line resource index according to the line length and the total number of lines;
[0054] The server is further used to calculate the line site selection index according to the load rate influence coefficient when the N-1 fault occurs, the power transmission capacity improvement index and the resource index;
[0055] The server is further used to select the line with the largest line site selection index value as the UPFC recommended installation line;
[0056] The server is further used to send an identification of a UPFC recommended installation line to the terminal;
[0057] The terminal is also used to display the identification of the UPFC recommended installation line.
[0058] A fifth aspect of an embodiment of the present invention provides a computer-readable storage medium, wherein the computer-readable storage medium stores a computer program, and when the computer program is executed by a processor, the steps of the UPFC site selection method as described in any one of the first aspects are implemented.
[0059] Compared with the prior art, the present invention has the following beneficial effects:
[0060] The UPFC site selection method provided by the present invention obtains basic data of the target area by acquiring power grid data. The power grid data includes: power supply, load, grid structure, operation mode, thermal stability limit transmission capacity, line transmission capacity and line length. The above data has been determined in the early stage of the design stage, so the data is easy to obtain. Through the above information, the line flow, the load rate under peak load, the line flow when a fault occurs and the load rate when a fault occurs can be mined, and the data mining form is simple.
[0061] The UPFC site selection method provided by the present invention obtains the load rate of the line under the peak load of the target area through the line transmission capacity and the peak power load. The transmission capacity and the peak power load have been planned in the early stage of design, and the data are easy to obtain. The load rate at the time of N-1 fault can be determined through the grid structure of the power grid and the power flow on the line, and the calculation method is simple.
[0062] The UPFC site selection method provided by the present invention can reflect the rate of change of the load of the remaining lines when the line fails by establishing the load rate when the N-1 fault occurs. The UPFC site selection method provided by the present invention can quickly determine the transmission capacity improvement index through the load rate under the peak load of the target area, the thermal stability limit transmission capacity and the line transmission capacity. The larger the value of the transmission improvement capacity index, the more room for improvement.
[0063] The UPFC site selection method provided by the present invention uses the line length of a certain line and the average line length as indicators for evaluating the resource characteristics of a certain line. The line length has been determined in the early stage of planning, and the calculation method is simple and can reflect the resource indicators of the line.
[0064] The UPFC site selection method provided by the present invention multiplies the load rate influence coefficient, the transmission capacity improvement index and the resource index to obtain the site selection index, which can reflect the transmission capacity improvement capability and resource characteristics of setting up UPFC on different lines.
[0065] The UPFC site selection method provided by the present invention obtains the largest one or more lines as recommended installation lines by sorting the site selection indicators. The data of the entire site selection process is convenient to obtain, the calculation method is relatively simple, and the obtained results are more scientific, which has important reference significance for UPFC site selection. BRIEF DESCRIPTION OF THE DRAWINGS
[0066] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.
[0067] Figure 1 is a flow chart of a UPFC site selection method provided by an embodiment of the present invention;
[0068] Figure 2 is a functional block diagram of a UPFC site selection system provided by an embodiment of the present invention;
[0069] Figure 3 It is a functional block diagram of a UPFC site selection device provided in an embodiment of the present invention;
[0070] Figure 4 It is a functional block diagram of a UPFC site selection server provided in an embodiment of the present invention. DETAILED DESCRIPTION
[0071] In the following description, specific details such as specific system structures, technologies, etc. are provided for the purpose of illustration rather than limitation, so as to provide a thorough understanding of the embodiments of the present invention. However, it should be clear to those skilled in the art that the present invention may be implemented in other embodiments without these specific details. In other cases, detailed descriptions of well-known systems, devices, circuits, and methods are omitted to prevent unnecessary details from obstructing the description of the present invention.
[0072] In order to make the purpose, technical solutions and advantages of the present invention more clear, specific embodiments will be described below in conjunction with the accompanying drawings.
[0073] See also Figure 1 , detailed as follows: A UPFC site selection method includes steps 101 to 107.
[0074] Step 101, obtaining power grid data of a target area, and calculating line flow under peak load according to the power grid data;
[0075] In some implementations, calculating the line flow under peak load in the target area includes:
[0076] Obtain the target area power grid data, and calculate the line flow under peak load in the target area based on the power grid data. The power grid data includes: power source, load, grid structure, operation mode, thermal stability limit transmission capacity, line transmission capacity and line length information of each line in the target area.
[0077] Exemplarily, the UPFC site selection method of the present invention obtains basic data of the target area by acquiring power grid data, and the power grid data includes: power supply, load, grid structure, operation mode, thermal stability limit transmission capacity, line transmission capacity and line length information. The above data has been determined in the early stage of the design stage, so the data is easy to obtain. Through the above information, the line flow, the load rate under peak load, the line flow when a fault occurs, and the load rate when a fault occurs can be mined, and the data mining form is simple.
[0078] Step 102, calculating the load rate at the peak load and the load rate when N-1 fault occurs according to the line flow at the peak load and the line transmission capacity;
[0079] In some implementations, calculating the load rate at the peak load and the load rate when N-1 faults occur according to the line flow at the peak load and the line transmission capacity includes:
[0080] Calculating the load rate under the peak load according to the line flow under the peak load and the line transmission capacity;
[0081] Calculate the line power flow when N-1 faults occur based on the line power flow under the peak load;
[0082] Calculating the line load rate when the N-1 fault occurs according to the line power flow when the N-1 fault occurs and the line transmission capacity;
[0083] The load rate under the peak load is:
[0084]
[0085] Among them, a i is the load rate of line i at peak load, 1≤i≤n, and n is the total number of lines;
[0086] The load rate when N-1 fault occurs is:
[0087]
[0088] Among them, B i is the load rate when line i has N-1 faults, B i =[b i1 b i2 … a i … b in ], b ik When line k has N-1 faults, the load rate of the i-th line is recorded as b ik , 1≤k≤n, when i=k, b ik =a i .
[0089] Exemplarily, the load rate of a line = the flow on the line / the transmission capacity of the line. The peak load of line i is usually obtained by calculating the normal flow of the power grid under the peak load in summer, and the transmission capacity of the line is based on the basic design parameters planned in the initial stage. The load rate A under the peak load of the target area can be obtained through the above two items. When a line k fails, the load rate of each line can be calculated in combination with the grid structure of the power grid, thereby obtaining the load rate B when N-1 failures occur in the target area.
[0090] The UPFC site selection method provided by the present invention obtains the load rate of the line under the peak load of the target area through the line transmission capacity and the peak power load. The transmission capacity and the peak power load have been planned in the early stage of design, and the data are easy to obtain. The load rate B at the time of N-1 fault can be determined through the grid structure of the power grid and the power flow on the line, and the calculation is simple.
[0091] Step 103, calculating a load rate influence coefficient when an N-1 fault occurs according to the load rate under the peak load and the load rate when an N-1 fault occurs;
[0092] In some implementations, calculating the load rate impact coefficient when the N-1 fault occurs according to the load rate under the peak load and the load rate when the N-1 fault occurs includes:
[0093] Calculate the ratio between the load rate when N-1 faults occur in the target area and the load rate under peak load; where the ratio is
[0094]
[0095] The load rate influence coefficient when the N-1 fault occurs is calculated according to the ratio and the first formula; wherein the first formula is:
[0096]
[0097] Wherein, γ is the load rate influence coefficient when the N-1 fault occurs.
[0098] Step 104, calculating a transmission capacity improvement index according to the load rate under the peak load and the total number of lines;
[0099] In some implementations, the calculating the transmission capacity improvement index according to the load rate under the peak load and the total number of lines includes:
[0100] The transmission capacity improvement index is calculated according to the load rate under the peak load, the total number of lines, the thermal stability limit transmission capacity of each line, the line transmission capacity of each line load rate and the second formula, wherein the second formula is:
[0101]
[0102] Where: i is the transmission capacity improvement index of line i, a imax is the thermal stability limit transmission capacity of line i, a ieco Deliver capacity to the line.
[0103] Exemplarily, the UPFC site selection method provided by the present invention is based on the load rate a under the peak load of the target area. i , thermal stability limit transmission capacity and line transmission capacity, can quickly determine the transmission capacity improvement index. The larger the transmission capacity improvement index value, the more room for improvement.
[0104] Step 105, calculating a line resource index according to the line length and the total number of lines;
[0105] In some implementations, calculating the line resource index based on the line length and the total number of lines includes:
[0106] The line resource index is calculated according to the line length, the total number of lines and a third formula, wherein the third formula is:
[0107]
[0108] Among them, λ i is the resource index of line i, l i is the length of line i.
[0109] Exemplarily, the UPFC site selection method provided by the present invention uses the line length of a certain line and the average line length as the resource index for evaluating a certain line. The line length has been determined at the initial stage of planning, and the calculation method is simple and can reflect the resource index of the line.
[0110] Step 106, calculating a line location index according to the load rate impact coefficient when the N-1 fault occurs, the power transmission capacity improvement index, and the resource index;
[0111] In some implementations, the calculating of the line site selection index according to the load rate impact coefficient when the N-1 fault occurs, the transmission capacity improvement index, and the resource index includes:
[0112] For each line, the product value of the load rate impact coefficient when the N-1 fault occurs, the transmission capacity improvement index and the resource index of the line is calculated as the line site selection index of the line:
[0113] η i =γ i ·δ i ·λ i .
[0114] Exemplarily, the UPFC site selection method provided by the present invention multiplies the above-mentioned load rate influence coefficient, transmission capacity improvement index and resource index to obtain a site selection index, which can reflect the transmission capacity improvement capability and resource characteristics of setting up UPFC on different lines.
[0115] Step 107: The line with the largest line site selection index value is used as the UPFC recommended installation line.
[0116] Exemplarily, the site selection indexes of the various lines are ranked, and the first few lines with the largest index values are the recommended installation lines for UPFC.
[0117] The UPFC site selection method provided by the present invention obtains the largest one or more lines as recommended installation lines by sorting the site selection indicators. The data of the entire site selection process is convenient to obtain, the calculation method is relatively simple, and the obtained results are more scientific, which has important reference significance for UPFC site selection.
[0118] See also Figure 2 , Figure 2 The UPFC site selection system provided by the embodiment of the present invention is shown. For the convenience of description, only the parts related to the embodiment of the present invention are shown, which are described in detail as follows:
[0119] A UPFC site selection system includes: a power grid data storage device 21, a server 22 and a terminal 23;
[0120] The terminal 23 is used to send a UPFC site selection request to the server 22, wherein the UPFC site selection request includes an identifier of a target area;
[0121] The server 22 is used to send a data acquisition request to the power grid data storage device 21, wherein the data acquisition request includes an identifier of a target area;
[0122] The power grid data storage device 21 is used to send the power grid data of the target area to the server 22 according to the identifier of the target area;
[0123] The server 22 is further used to calculate the line flow under peak load according to the power grid data, and calculate the load rate under peak load and the load rate when N-1 fault occurs according to the line flow under peak load and the line transmission capacity;
[0124] The server 22 is further configured to calculate a load rate impact coefficient when an N-1 fault occurs according to the load rate under the peak load and the load rate when the N-1 fault occurs, calculate a transmission capacity improvement index according to the load rate under the peak load and the total number of lines, and calculate a line resource index according to the line length and the total number of lines;
[0125] The server 22 is further configured to calculate a line location index according to the load rate impact coefficient when the N-1 fault occurs, the power transmission capacity improvement index, and the resource index;
[0126] The server 22 is further used to select the line with the largest line site selection index value as the UPFC recommended installation line;
[0127] The server 22 is further used to send the identifier of the UPFC recommended installation line to the terminal 23;
[0128] The terminal 23 is also used to display the identification of the UPFC recommended installation line.
[0129] See also Figure 3 , Figure 3 The embodiment of the present invention provides a UPFC site selection device. For the convenience of description, only the parts related to the embodiment of the present invention are shown, which are described in detail as follows:
[0130] The first module 31 is used to obtain power grid data of a target area and calculate the line flow under peak load according to the power grid data;
[0131] The second module 32 is used to calculate the load rate under the peak load and the load rate when N-1 fault occurs according to the line flow under the peak load and the line transmission capacity;
[0132] The third module 33 is used to calculate the load rate influence coefficient when the N-1 fault occurs according to the load rate under the peak load and the load rate when the N-1 fault occurs;
[0133] A fourth module 34 is used to calculate a transmission capacity improvement index according to the load rate under the peak load and the total number of lines;
[0134] A fifth module 35 is used to calculate a line resource index according to the line length and the total number of lines;
[0135] The sixth module 36 is used to calculate the line location index according to the load rate influence coefficient when the N-1 fault occurs, the power transmission capacity improvement index and the resource index;
[0136] And the seventh module 37 is used to select the line with the largest line site selection index value as the UPFC recommended installation line.
[0137] It can be seen from the above that the present invention implements the UPFC site selection method of the present invention through the above modules, and it should be understood that the above functional modules are a physical implementation of the method of the present invention.
[0138] The following is an embodiment of the server of the present invention. For details not described in detail, reference may be made to the corresponding method embodiments described above.
[0139] See also Figure 4 , which is a schematic diagram of a server provided in an embodiment of the present invention. The server 4 of this embodiment includes: a processor 40, a memory 41, and a computer program 42 stored in the memory 41 and executable on the processor 40. When the processor 40 executes the computer program 42, the steps in the above-mentioned method embodiments are implemented. Alternatively, when the processor 40 executes the computer program 42, the functions of the modules / units in the above-mentioned device embodiments are implemented, such as Figure 3 The functions of units 31 to 37 are shown.
[0140] Exemplarily, the computer program 42 may be divided into one or more modules / units, which are stored in the memory 41 and executed by the processor 40 to implement the present invention. The one or more modules / units may be a series of computer program instruction segments capable of implementing specific functions, which are used to describe the execution process of the computer program 42 in the server 4.
[0141] The server 4 may be a computing device such as a desktop computer, a notebook, a PDA, or a cloud server. The server may include, but is not limited to, a processor 40 and a memory 41. Those skilled in the art will appreciate that Figure 4 It is only an example of the server 4 and does not constitute a limitation on the server 4. It may include more or fewer components than shown in the figure, or a combination of certain components, or different components. For example, the terminal may also include input and output devices, network access devices, buses, etc.
[0142] The processor 40 may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor may be a microprocessor or any conventional processor, etc.
[0143] The memory 41 may be an internal storage unit of the server 4, such as a hard disk or memory of the server 4. The memory 41 may also be an external storage device of the server 4, such as a plug-in hard disk, a smart media card (SMC), a secure digital (SD) card, a flash card, etc. equipped on the server 4. Further, the memory 41 may also include both an internal storage unit and an external storage device of the server 4. The memory 41 is used to store the computer program and other programs and data required by the server. The memory 41 may also be used to temporarily store data that has been output or is to be output.
[0144] The technicians in the relevant field can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example for illustration. In practical applications, the above-mentioned function allocation can be completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above. The functional units and modules in the embodiment can be integrated in a processing unit, or each unit can exist physically separately, or two or more units can be integrated in one unit. The above-mentioned integrated unit can be implemented in the form of hardware or in the form of software functional units. In addition, the specific names of the functional units and modules are only for the convenience of distinguishing each other, and are not used to limit the scope of protection of this application. The specific working process of the units and modules in the above-mentioned system can refer to the corresponding process in the aforementioned method embodiment, which will not be repeated here.
[0145] In the above embodiments, the description of each embodiment has its own emphasis. For parts that are not described or recorded in detail in a certain embodiment, reference can be made to the relevant descriptions of other embodiments.
[0146] Those skilled in the art will appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.
[0147] In the embodiments provided by the present invention, it should be understood that the disclosed devices / terminals and methods can be implemented in other ways. For example, the device / terminal embodiments described above are only schematic. For example, the division of the modules or units is only a logical function division. There may be other division methods in actual implementation, such as multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, indirect coupling or communication connection of devices or units, which can be electrical, mechanical or other forms.
[0148] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0149] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0150] If the integrated module / unit is implemented in the form of a software functional unit and sold or used as an independent product, it can be stored in a computer-readable storage medium. Based on this understanding, the present invention implements all or part of the processes in the above-mentioned embodiment method, and can also be completed by instructing the relevant hardware through a computer program. The computer program can be stored in a computer-readable storage medium, and the computer program can implement the steps of the above-mentioned various method embodiments when executed by the processor. Among them, the computer program includes computer program code, and the computer program code can be in source code form, object code form, executable file or some intermediate form. The computer-readable medium may include: any entity or device capable of carrying the computer program code, recording medium, U disk, mobile hard disk, disk, optical disk, computer memory, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), electric carrier signal, telecommunication signal and software distribution medium. It should be noted that the content contained in the computer-readable medium can be appropriately increased or decreased according to the requirements of legislation and patent practice in the jurisdiction. For example, in some jurisdictions, according to legislation and patent practice, computer-readable media do not include electric carrier signals and telecommunication signals.
[0151] The embodiments described above are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention, and should all be included in the protection scope of the present invention.
Claims
1. A UPFC site selection method, characterized in that: include: Acquire power grid data of a target area, and calculate line flow under peak load according to the power grid data; Calculate the load rate under peak load and the load rate when N-1 fault occurs according to the line flow under peak load and the line transmission capacity; Calculate the load rate impact coefficient when the N-1 fault occurs according to the load rate under the peak load and the load rate when the N-1 fault occurs; calculate the transmission capacity improvement index according to the load rate under the peak load and the total number of lines; calculate the line resource index according to the line length and the total number of lines; Calculate the line location index according to the load rate impact coefficient when the N-1 fault occurs, the transmission capacity improvement index and the resource index; The line with the largest line site selection index value is selected as the UPFC recommended installation line; in, Calculating the load rate at the peak load and the load rate when N-1 faults occur according to the line flow at the peak load and the line transmission capacity, including: Calculating the load rate under the peak load according to the line flow under the peak load and the line transmission capacity; Calculate the line power flow when N-1 faults occur based on the line power flow under the peak load; Calculating the line load rate when the N-1 fault occurs according to the line power flow when the N-1 fault occurs and the line transmission capacity; The load rate under the peak load is: ; in, a i For line i Load factor at peak load, 1≤ i ≤ n , n is the total number of the lines; The load rate when N-1 fault occurs is: in, B i For line i Load factor when N-1 failure occurs, , b ik For line k N-1 failure occurs, at this time i The load factor of the line is b ik , 1≤k≤n, when i = k hour b ik = a i ; in, Calculating the load rate influence coefficient when the N-1 fault occurs according to the load rate under the peak load and the load rate when the N-1 fault occurs, including: Calculate the ratio between the load rate when N-1 faults occur in the target area and the load rate under peak load; where the ratio is ; The load rate influence coefficient when the N-1 fault occurs is calculated according to the ratio and the first formula; wherein the first formula is: Wherein, γ is the load rate influence coefficient when the N-1 fault occurs.
2. The UPFC site selection method according to claim 1, characterized in that: The calculation of the transmission capacity improvement index according to the load rate under the peak load and the total number of lines includes: The transmission capacity improvement index is calculated according to the load rate under the peak load, the total number of lines, the thermal stability limit transmission capacity of each line, the line transmission capacity of each line load rate and the second formula, wherein the second formula is: in: For line i Transmission capacity improvement indicators, For line i The thermal stability limit transport capacity, Deliver capacity to the line.
3. The UPFC site selection method according to claim 2, characterized in that: The calculating of the line resource index according to the line length and the total number of lines includes: The line resource index is calculated according to the line length, the total number of lines and a third formula, wherein the third formula is: in, For line i Resource indicators, l i For line i Length; The calculating of the line site selection index according to the load rate influence coefficient when the N-1 fault occurs, the transmission capacity improvement index and the resource index comprises: For each line, the product value of the load rate impact coefficient of the line when N-1 faults occur, the power transmission capacity improvement index and the resource index is calculated as the line site selection index of the line.
4. The UPFC site selection method according to any one of claims 1 to 3, characterized in that: Obtaining power grid data of a target area, wherein calculating the line flow under peak load includes: The power grid data includes: power source, load, grid structure, operation mode, thermal stability limit transmission capacity, line transmission capacity and line length of each line in the target area.
5. A device for implementing the UPFC site selection method according to claim 1, characterized in that: include: The first module is used to obtain power grid data of the target area and calculate the line flow under peak load according to the power grid data; The second module is used to calculate the load rate under the peak load and the load rate when N-1 fault occurs according to the line flow under the peak load and the line transmission capacity; The third module is used to calculate the load rate influence coefficient when the N-1 fault occurs according to the load rate under the peak load and the load rate when the N-1 fault occurs; A fourth module is used to calculate a transmission capacity improvement index according to the load rate under the peak load and the total number of lines; A fifth module is used to calculate a line resource index according to the line length and the total number of the lines; The sixth module is used to calculate the line site selection index according to the load rate influence coefficient when the N-1 fault occurs, the power transmission capacity improvement index and the resource index; And a seventh module is used to select the line with the largest line site selection index value as the recommended installation line for UPFC.
6. A server comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the steps of the UPFC site selection method according to any one of claims 1 to 4 are implemented.
7. A UPFC site selection system, characterized in that: Used to implement the UPFC site selection method according to any one of claims 1 to 4, the UPFC site selection system comprises: a power grid data storage device, a server and a terminal; The terminal is used to send a UPFC site selection request to the server, wherein the UPFC site selection request includes an identifier of a target area; The server is used to send a data acquisition request to the power grid data storage device, wherein the data acquisition request includes an identifier of a target area; The power grid data storage device is used to send the power grid data of the target area to the server according to the identifier of the target area; The server is further used to calculate the line flow under peak load according to the power grid data, and calculate the load rate under peak load and the load rate when N-1 fault occurs according to the line flow under peak load and the line transmission capacity; The server is further configured to calculate a load rate impact coefficient when an N-1 fault occurs according to the load rate under the peak load and the load rate when the N-1 fault occurs, calculate a power transmission capacity improvement index according to the load rate under the peak load and the total number of lines, and calculate a line resource index according to the line length and the total number of lines; The server is further used to calculate the line site selection index according to the load rate influence coefficient when the N-1 fault occurs, the power transmission capacity improvement index and the resource index; The server is further used to select the line with the largest line site selection index value as the UPFC recommended installation line; The server is further configured to send an identification of a UPFC recommended installation line to the terminal; The terminal is also used to display the identification of the UPFC recommended installation line.
8. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the steps of the UPFC site selection method as described in any one of claims 1 to 4 are implemented.
Citation Information
Patent Citations
UPFC address practical method
CN105119277A
Power injection model of power flow controller under direct current power flow model and addressing method thereof