A leveling method and a leveling platform using the same
By employing calibration, calculation, coarse adjustment, and fine adjustment steps in the leveling platform, and combining data from the inclinometer and encoder, the problem of insufficient real-time performance of the inclinometer was solved, enabling fast and accurate leveling and improving equipment installation efficiency.
Patent Information
- Application Number
- CN202111026776.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-09-02
- Publication Date
- 2024-11-19
- Estimated Expiration
- 2041-09-02
AI Technical Summary
The existing leveling platform uses an inclinometer as the level detection sensor, which is not real-time enough. This results in a large delay when measuring dynamic targets, inaccurate measurements, and affects the quality of workpiece processing.
A leveling method is adopted, including calibration, calculation, coarse adjustment and fine adjustment steps. By rotating the azimuth stage, inner frame and outer frame, the x-axis of the inclinometer is aligned with the rotation axis of the outer frame. The rotation angle is calculated and the platform components are rotated in sequence to gradually approach the zero position. Feedback control is performed in combination with encoder data.
By combining coarse and fine adjustments, the leveling time was significantly shortened, the equipment installation efficiency was improved, and the platform was leveled quickly and accurately.
Smart Images

Figure CN113739761B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of workbench leveling, and in particular to a leveling method and a leveling platform using the method. Background Art
[0002] At present, in the machinery manufacturing industry, the work surface of precision equipment will be affected by the working environment, such as temperature, humidity, vibration and load. If the flatness of the work surface cannot be effectively controlled, it will affect the processing quality of the workpiece. Therefore, a quick leveling device is more conducive to product processing.
[0003] Due to structural and cost factors, the existing leveling platforms mostly use inclinometers as level detection sensors. However, the inclinometers bring a serious problem: insufficient real-time performance. The inclinometers can only measure the inclination in a static state. When measuring moving targets, there is a large delay and the measurement is inaccurate. Summary of the invention
[0004] In order to solve the above technical problems, a leveling method and a leveling platform using the method are provided. The technical solution solves the problem that the existing leveling platform proposed in the above background technology mostly uses an inclinometer as a horizontal detection sensor due to structural and cost factors. However, the inclinometer brings a serious problem, which is the lack of real-time performance. That is, the inclinometer can only measure the inclination in a static state. When measuring a moving target, there is a large delay and the measurement is inaccurate.
[0005] In order to achieve the above purpose, the technical solution adopted by the present invention is:
[0006] A leveling method for a leveling platform comprises the following steps:
[0007] Calibration: By rotating the azimuth table, inner frame and outer frame, the x-axis of the inclinometer is aligned with the rotation axis of the outer frame, and the y-axis of the inclinometer is aligned with the rotation axis of the inner frame;
[0008] Solution: According to the position of the base, calculate the rotation angle of the outer frame, inner frame and azimuth table;
[0009] Coarse adjustment: According to the calculated rotation angle, rotate the outer frame, inner frame and azimuth platform in sequence to make the azimuth platform initially level;
[0010] Fine-tuning: After the azimuth platform is initially leveled, take the negative value of the inclinometer and then half of it as the target axis angle of the inner and outer frames. Rotate the inner and outer frames in a cycle several times to make the inclinometer value gradually approach zero.
[0011] Preferably, the specific steps of the calibration are as follows:
[0012] Use a level to level the base;
[0013] Adjust the azimuth by rotating the azimuth table so that when the inner frame moves, the x value of the inclinometer changes while the y value remains unchanged. This position is zero;
[0014] Adjust the outer frame and the inner frame so that the x and y readings of the inclinometer are both 0. At this time, set the outer frame to zero and the inner frame to zero. The calibration is now completed. The x-axis of the inclinometer is aligned with the rotation axis of the outer frame, and the y-axis of the inclinometer is aligned with the rotation axis of the inner frame.
[0015] Preferably, the specific steps of the solution are:
[0016] Coordinate system establishment: When the outer frame, inner frame and azimuth platform are all calibrated at zero position, a geodetic coordinate system is established; a base system is established at the base position; a target coordinate system is established at the leveling position; the geodetic coordinate system is rotated along the y-axis by an angle μ to obtain a virtual coordinate system; the virtual coordinate system is rotated along the x-axis by an angle ν to obtain a base system; the base system is rotated along the outer frame rotation axis by an angle α to obtain an outer frame system; the outer frame system is rotated along the inner frame rotation axis by an angle β to obtain an inner frame system; the inner frame system is rotated along the azimuth platform rotation axis by an angle θ to obtain a target system;
[0017] Initial position parameters: Move the outer frame, inner frame and orientation of the leveling platform to zero position. After the inclinometer is stable, record the y-axis display angle a0 and the x-axis display angle b0 of the inclinometer.
[0018] Numerical solution: Angle α and angle β are calculated according to the angle calculation formula.
[0019] The angle calculation formula is:
[0020] Furthermore, a leveling platform is proposed, which is suitable for the leveling method as mentioned above, and includes a base, an outer frame, an inner frame and an orientation platform, the outer frame is installed on the upper end of the base, the inner frame is installed on the upper end of the base, the orientation platform is installed on the upper end of the inner frame, the left end of the outer frame is rotatably connected to the outer frame rotation axis, the rear end of the inner frame is rotatably connected to the inner frame rotation axis, the outer frame rotation axis and the inner frame rotation axis are perpendicular to each other, and the middle part of the lower end of the orientation platform is rotatably connected to the inner frame.
[0021] Optionally, an inclinometer is installed on the upper end of the azimuth platform, the x-axis of the inclinometer corresponds to the rotation axis of the outer frame, and the y-axis of the inclinometer corresponds to the inner frame rotation axis of the inner frame.
[0022] Compared with the prior art, the advantages of the present invention are: when leveling the platform, coarse adjustment is first performed, and the theoretical motor movement target angle is calculated based on the data of the inclinometer and the encoder when it is stationary, and then fine adjustment is performed, and the data of the inclinometer is directly used as feedback. The moving motor makes the inclinometer data tend to 0, that is, horizontal. With the coarse adjustment step, the time required for fine adjustment can be greatly shortened, which can greatly shorten the platform leveling time and improve the equipment installation efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] Figure 1 This is a schematic diagram of the three-dimensional structure of the leveling platform proposed by the present invention;
[0024] Figure 2 A flow chart of the leveling method proposed by the present invention;
[0025] Figure 3 This is a rotation relationship diagram of each coordinate system in the leveling method proposed by the present invention.
[0026] The numbers in the figure are:
[0027] 1. Base; 2. Outer frame; 201. Outer frame rotation axis; 3. Inner frame; 301. Inner frame rotation axis; 4. Azimuth table. DETAILED DESCRIPTION
[0028] The following description is used to disclose the present invention so that those skilled in the art can implement the present invention. The preferred embodiments described below are only examples, and those skilled in the art may think of other obvious variations.
[0029] Reference Figure 1 As shown, a leveling platform is characterized in that it includes a base 1, an outer frame 2, an inner frame 3 and an azimuth platform 4, the outer frame 2 is installed on the upper end of the base 1, the inner frame 3 is installed on the upper end of the base 1, the azimuth platform 4 is installed on the upper end of the inner frame 3, the left end of the outer frame 2 is rotatably connected to the outer frame rotation axis 201, the rear end of the inner frame 3 is rotatably connected to the inner frame rotation axis 301, the outer frame rotation axis 201 and the inner frame rotation axis 301 are perpendicular to each other, the middle part of the lower end of the azimuth platform 4 is rotatably connected to the inner frame 3, and an inclinometer is installed on the upper end of the azimuth platform 4, the x-axis of the inclinometer corresponds to the outer frame rotation axis 201, and the y-axis of the inclinometer corresponds to the inner frame rotation axis 301 of the inner frame.
[0030] See also Figure 2-3 As shown, a leveling method is further proposed, comprising the following steps:
[0031] Calibration: Use a level to level the base;
[0032] Adjust the azimuth by rotating the azimuth table 4 so that when the inner frame 3 moves, the x value of the inclinometer changes while the y value remains unchanged, and this position is zero;
[0033] Adjust the outer frame 2 and the inner frame 3 so that the inclinometer readings x and y are both 0. At this time, set the outer frame 2 to zero and the inner frame 3 to zero. The calibration is now completed. The x-axis of the inclinometer is aligned with the outer frame rotation axis 201, and the y-axis of the inclinometer is aligned with the inner frame rotation axis 301 of the inner frame.
[0034] Solution: Coordinate system establishment: The outer frame 2, inner frame 3, and azimuth platform 4 are all calibrated at zero position, and the earth coordinate system is established. The base system is established at the base position, and the target coordinate system is established at the leveling position. The earth coordinate system is rotated along the y-axis by an angle μ to obtain the virtual coordinate system, and the virtual coordinate system is rotated along the x-axis by an angle ν to obtain the base system. The base system is rotated along the outer frame rotation axis 201 by an angle α to obtain the outer frame system, and the outer frame system is rotated along the inner frame rotation axis 301 by an angle β to obtain the inner frame system. The inner frame system is rotated along the azimuth platform 4 rotation axis by an angle θ to obtain the target system.
[0035] Initial position parameters: Move the outer frame, inner frame and orientation of the leveling platform to zero position. After the inclinometer is stable, record the y-axis display angle a1 and the x-axis display angle b1 of the inclinometer.
[0036] Numerical solution: Angle α and angle β are calculated according to the angle calculation formula.
[0037] Rough adjustment: According to the calculated rotation angle, rotate the outer frame 2, the inner frame 3 and the azimuth platform 4 in sequence to make the azimuth platform 4 initially level.
[0038] Fine tuning: After the azimuth platform 4 is initially leveled, the value of the inclinometer is negative and then halved, which is used as the target axis angle of the inner frame 3 and the outer frame 2. The inner frame 3 and the outer frame 2 are rotated multiple times in a cycle to make the inclinometer value gradually approach zero.
[0039] The angle calculation formula is:
[0040] The calculation process of the angle calculation formula is:
[0041] In the target system, take vector a5 = [1,0,0] in the same direction as the x-axis, and vector b5 = [0,1,0] in the same direction as the y-axis, where the subscript 5 indicates the representation in the target system. Then the representation of the vector in the geodetic coordinate system is:
[0042]
[0043] in The rotation matrix from the earth coordinate system to the target system is:
[0044]
[0045] in
[0046]
[0047]
[0048]
[0049]
[0050]
[0051] Then take vector g0 = [0,0,1] in the geodetic coordinate system, then: the angle between vectors a0 and g0 is 90° plus the x-axis reading of the inclinometer, and the angle between vectors b0 and g0 is 90° plus the y-axis reading of the inclinometer. Since the modulus of vectors a0, b0, and g0 is 1, we have: The goal of leveling the platform is to keep a and b in the above equation equal to 0 by adjusting α, β, and θ regardless of how the base changes. It is easy to see that when When the first four matrices are multiplied, they become the unit matrix. Regardless of the value of θ, It can be further obtained that a and b are both 0, that is, no matter how the foundation changes, for the inclinometer, only the azimuth rotates, and the azimuth does not affect the inclination value, that is, the inclinometer is leveled, but how to determine u, ν, that is, the change of the base? Before starting leveling, you can first set the outer frame, inner frame, and azimuth of the platform to 0, and after the inclinometer readings are stable, record the values a and b of the inclinometer. At this time is the unit matrix. According to the above relationship, we can get: After getting u and v, we can get the adjustment values of the outer frame and inner frame.
[0052] In summary, the advantages of the present invention are: when leveling the platform, rough adjustment is performed first. With the rough adjustment step, the time required for fine adjustment can be greatly shortened, the platform leveling time can be greatly shortened, and the equipment installation efficiency can be improved.
[0053] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions only describe the principles of the present invention. The present invention may be subject to various changes and improvements without departing from the spirit and scope of the present invention. These changes and improvements fall within the scope of the present invention. The scope of protection claimed by the present invention is defined by the attached claims and their equivalents.
Claims
1. A leveling method for a leveling platform, characterized in that: The steps include: Calibration: by rotating the azimuth platform (4), the inner frame (3) and the outer frame (2), the x-axis of the inclinometer is aligned with the outer frame rotation axis (201), and the y-axis of the inclinometer is aligned with the inner frame rotation axis (301) of the inner frame; Calculation: According to the position of the base (1), the rotation angles of the outer frame (2), the inner frame (3) and the azimuth platform (4) are calculated; Coarse adjustment: according to the calculated rotation angle, the outer frame (2), the inner frame (3) and the azimuth platform (4) are rotated in sequence to make the azimuth platform (4) preliminarily leveled; Fine adjustment: after the azimuth platform (4) is initially leveled, the value of the inclinometer is taken as negative and then half, which is used as the target axis angle of the inner frame (3) and the outer frame (2). The inner frame (3) and the outer frame (2) are rotated repeatedly so that the value of the inclinometer gradually approaches zero. The specific steps of the calibration are as follows: Use a level to level the base; Adjust the orientation by rotating the orientation table (4) so that when the inner frame (3) moves, the x value of the inclinometer changes while the y value remains unchanged, and this position is zero; Adjust the outer frame (2) and the inner frame (3) so that the readings x and y of the inclinometer are both 0, then set the outer frame (2) to zero and the inner frame (3) to zero, and the calibration is now complete, the x-axis of the inclinometer is aligned with the outer frame rotation axis (201), and the y-axis of the inclinometer is aligned with the inner frame rotation axis (301) of the inner frame; The specific steps of the solution are: Coordinate system establishment: when the outer frame (2), the inner frame (3) and the azimuth platform (4) are all calibrated at zero positions, a geodetic coordinate system is established, a base system is established at the base position, and a target coordinate system is established at the leveling position. The geodetic coordinate system is rotated along the y-axis by an angle μ to obtain a virtual coordinate system, the virtual coordinate system is rotated along the x-axis by an angle ν to obtain a base system, the base system is rotated along the outer frame rotation axis (201) by an angle α to obtain an outer frame system, the outer frame system is rotated along the inner frame rotation axis (301) by an angle β to obtain an inner frame system, and the inner frame system is rotated along the azimuth platform (4) rotation axis by an angle θ to obtain a target system; Initial position parameters: Move the outer frame, inner frame and orientation of the leveling platform to zero position. After the inclinometer is stable, record the y-axis display angle a0 and the x-axis display angle b0 of the inclinometer. Numerical solution: Angle α and angle β are calculated according to the angle calculation formula; The angle calculation formula is:
2. A leveling platform, suitable for the leveling method according to claim 1, characterized in that: The invention comprises a base (1), an outer frame (2), an inner frame (3) and an orientation platform (4), wherein the outer frame (2) is mounted on the upper end of the base (1), the inner frame (3) is mounted on the upper end of the base (1), the orientation platform (4) is mounted on the upper end of the inner frame (3), the left end of the outer frame (2) is rotatably connected to an outer frame rotation axis (201), the rear end of the inner frame (3) is rotatably connected to an inner frame rotation axis (301), the outer frame rotation axis (201) and the inner frame rotation axis (301) are perpendicular to each other, and the middle part of the lower end of the orientation platform (4) is rotatably connected to the inner frame (3).
3. A leveling platform according to claim 2, characterized in that: An inclinometer is installed on the upper end of the azimuth platform (4), wherein the x-axis of the inclinometer corresponds to the outer frame rotation axis (201), and the y-axis of the inclinometer corresponds to the inner frame rotation axis (301) of the inner frame.