A MJS skip hole symmetrical reinforcement construction method

By adopting the MJS jump hole symmetric reinforcement method in the construction of subway tunnels, the problems of stress release and soil displacement control in the construction of MJS piles are solved, and efficient reinforcement effect and construction safety are achieved, which is suitable for complex environments close to the operation line.

CN113790053BActive Publication Date: 2024-11-12SHANGHAI CIVIL ENG GRP CO LTD OF CREC
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110924766.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-08-12
Publication Date
2024-11-12
Estimated Expiration
2041-08-12

AI Technical Summary

Technical Problem

In subway tunnel construction, the stress release and soil displacement caused by MJS construction pile construction are difficult to control, especially when approaching the operating line, which can easily cause the shield pipe sheet of the operating line to deform or exceed the limit, and the deformation is controlled within 5mm. Extremely difficult.

Method used

The MJS hole jumping symmetric reinforcement construction method is adopted. By using the longitudinal axis of the operation line tunnel as the reference, the same hole position is added to the radially symmetrical position of the original hole position on the other side, drilling holes at the same time relative to the two hole positions, and jumping piles in turn Carry out construction, use cantilever components and hydraulic cylinder to drive the nozzle to grout to reinforce the inner and outer layer of working piles to ensure equivalent stress changes.

Benefits of technology

It is achieved without changing the basic construction process of MJS construction piles, meeting the reinforcement quality requirements, improving the safety and operability of construction, reducing manual labor intensity, and improving grouting efficiency and stability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113790053B_ABST
    Figure CN113790053B_ABST
Patent Text Reader

Abstract

The present invention discloses a MJS skip hole symmetrical reinforcement construction method, comprising the following steps: cleaning of the operating line tunnel, laying of the MJS skip hole pipe, installation of the reinforcement device and MJS skip hole reinforcement construction. The present invention takes the longitudinal axis of the operating line tunnel as a reference, adds the same hole position at the radially symmetrical position corresponding to the original hole position on the other side, drills holes in two relative hole positions at the same time, and skips the piles in sequence to construct the MJS method piles, so as to achieve the equivalent stress change on both sides by the MJS construction, meet the quality requirements of the reinforcement, do not change the basic construction process of the MJS method piles, have an operability cavity, are easy to promote, and have a high construction safety factor.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to an MJS skip hole symmetrical reinforcement construction method. Background Art

[0002] With the rapid development of the national economy, many large and medium-sized cities in my country are building subways to ease traffic pressure. The subway is deeply loved by the general public for its fast, convenient and punctual characteristics. At the same time, with the increasing pressure of life in the city center, many satellite cities have emerged. One of the best ways to connect these satellite cities with the main urban area is to build subways. In this way, it is inevitable to pass under high-speed railways, tall buildings, national cultural relics and other important structures, which have very high requirements for surface settlement. At present, the MJS method is mainly used for construction. During construction, MJS horizontal rotary spraying cement mortar is used around the shield tunnel to solidify the soil around the shield section to reduce the surface settlement when the shield passes under the building and avoid adverse effects on the building.

[0003] When MJS construction is carried out close to an operating line, due to the extremely high requirements for structural deformation of the operating subway shield tunnel, the stress release caused by the nearby MJS method pile construction may cause even the slightest soil displacement to cause deformation or excessive displacement of the operating line shield segments.

[0004] MJS piles are often used in projects with complex surrounding environments and strict requirements for deformation control. The pile-making process is constantly being improved, but it is extremely difficult to control the deformation within 5mm. Summary of the invention

[0005] The purpose of the present invention is to provide a technical solution for an MJS skip-hole symmetrical reinforcement construction method in view of the deficiencies in the prior art. The construction method takes the longitudinal axis of the operating line tunnel as a reference, adds the same hole position at a radially symmetrical position corresponding to the original hole position on the other side, drills two relative holes at the same time, and skips the piles in turn to construct MJS method piles, so that the MJS construction produces equivalent stress changes on both sides, meets the quality requirements of reinforcement, does not change the basic construction process of the MJS method piles, is easy to operate, and is easy to promote, and has a high construction safety factor.

[0006] In order to solve the above technical problems, the present invention adopts the following technical solutions:

[0007] An MJS skip hole symmetrical reinforcement construction method, characterized by comprising the following steps:

[0008] 1) Operation line tunnel cleaning

[0009] a. First, clean the operating line tunnel and determine the scope of MJS skip hole construction along the inner wall of the operating line tunnel, which is conducive to improving the quality of the entire construction;

[0010] b. Then, two parallel rails are installed horizontally along the bottom of the operating line tunnel to support the reinforcement device;

[0011] 2) MJS jump hole pipe layout

[0012] a. After the tunnel of the operating line is cleared, the MJS jump hole pipe is laid out according to the outside of the tunnel. The MJS jump hole pipe is laid out in two layers inside and outside;

[0013] b. Then, corresponding shotcrete interfaces are opened along the inner wall of the tunnel according to the position of the skip hole pipes of each layer, so that the shotcrete interfaces are connected with the skip hole pipes;

[0014] 3) Installation of reinforcement device

[0015] a. First, process the corresponding support plate according to the design requirements, and install the columns vertically and symmetrically along the bottom surface of the support plate. Install the protective net between the two adjacent columns on the same side. The distance between the two opposite columns is equal to the distance between the two tracks, and install rollers at the bottom of each support column;

[0016] b. Then install the storage box along the top surface of the support plate, and install the slurry pump on the storage box;

[0017] c. Then, the corresponding bracket is processed according to the design requirements, the first hydraulic cylinder is installed symmetrically along the top surface of the support plate, and the bracket is connected to the first hydraulic cylinder through the first piston rod;

[0018] d. Finally, determine the size of the cantilever assembly according to the layout position of the MJS jump hole pipe, and process the corresponding cantilever assembly, install the cantilever assembly on the bracket, install the nozzle on each cantilever assembly, connect the cantilever assembly to the support plate through the fastening assembly, and connect the nozzle to the slurry delivery pump through the slurry delivery pipe;

[0019] 4) MJS jump hole reinforcement construction

[0020] a. First, place the processed reinforcement device on the track, inject the required mud into the storage box, and use the tractor to pull the reinforcement device along the track to the location of MJS jump hole construction;

[0021] b. Then, according to the position of each MJS jump hole pipe, move the nozzle along the cantilever assembly to the required position and fix it;

[0022] c. Then start the first hydraulic cylinder, so that the first piston rod drives the cantilever assembly to rise to the set height position, and then start the second hydraulic cylinders on both sides of the support plate, so that the second piston rod drives the cantilever assembly close to the inner surface of the tunnel, and align the nozzle with and close to the corresponding interface position of the MJS jump hole pipe until it is completely fitted;

[0023] d. Finally, start the slurry pump to transport the slurry in the storage box to the nozzle through the slurry pipe under the action of the slurry pump, control the spraying order of the nozzle, first carry out the grouting reinforcement construction of the inner layer MJS jump hole pipe, and then carry out the grouting reinforcement construction of the outer layer MJS jump hole pipe. When pouring the inner layer MJS construction method pile, follow 1a-2a, 3a-4a, 5a-6a, 7a-8a, 9a-10a, 11a-12a, The construction is carried out in the order of 13a-14a. The inner layer of MJS construction piles adopts 180° half-spraying, and then the outer layer of MJS skip-hole pipe grouting reinforcement construction is carried out. When pouring the outer layer of MJS construction piles, the construction is carried out in the order of 15b-16b, 17b-18b, 19b-20b, 21b-22b, 23b-24b, 25b-26b. The outer layer of MJS construction piles adopts 360° full circle overlap;

[0024] e. After construction is completed, remove the reinforcement device and disassemble it for cleaning.

[0025] This construction method takes the longitudinal axis of the operating line tunnel as the reference, adds the same hole position at the radially symmetrical position corresponding to the original hole position on the other side, drills the two opposite holes at the same time, and constructs MJS method piles in sequence to achieve equivalent stress changes on both sides by MJS construction, meet the quality requirements of reinforcement, do not change the basic construction process of MJS method piles, have operability cavity, are easy to promote, and have a high construction safety factor.

[0026] Furthermore, the cantilever assembly includes an arc guide rail, seven arc guide rails are arranged on the bracket at equal intervals in the horizontal direction, the nozzle is slidably connected to the arc guide rail, a limiting groove is arranged on the outer circumferential side of the arc guide rail, and a through groove is arranged on the limiting groove; through the design of the arc guide rail, the nozzle can be moved along the arc guide rail to meet the grouting reinforcement of different MIS jump hole pipes, reduce the labor intensity of manual operation, and improve the efficiency of grouting at the same time, the limiting groove and the barrel groove are used to limit the nozzle, so as to improve the stability and reliability during grouting.

[0027] Furthermore, the arc guide rail is a semicircular structure, which allows the nozzle to move along the arc guide rail to meet the grouting needs of different MJS jump hole pipes, thereby improving flexibility and reliability during use.

[0028] Furthermore, the nozzle includes a substrate and a nozzle. The nozzle is arranged at the top of the substrate. A guide pipe is arranged in the nozzle and the substrate. The guide pipe is connected to the slurry delivery pipe. A driving mechanism is arranged on the substrate. The bottom of the substrate is connected to the through groove through a limiting assembly. The slurry in the storage box can be transported to the guide pipe through the slurry delivery pipe and then transported to the MJS jump hole pipe. The driving mechanism can drive the nozzle to move along the arc guide rail to meet the actual spraying needs.

[0029] Furthermore, a one-way valve is provided on the guide pipe, and the one-way valve can control the switch of the guide pipe to meet the requirements of MJS skip hole construction, and its control accuracy is high.

[0030] Furthermore, the driving mechanism includes a motor and a guide wheel. The motor is arranged in the substrate, the motor is connected to the guide wheel, the guide wheel is located on both sides of the substrate, and the guide wheel is limited in the slots on both sides of the limit groove. The guide wheel is driven by the motor to rotate, so that the guide wheel can drive the nozzle to move along the arc guide rail.

[0031] Furthermore, the limiting assembly includes an auxiliary wheel, which is arranged below the base plate through a connecting rod, and the connecting rod passes through the through slot. Through the design of the auxiliary wheel and the connecting rod, the stability and reliability of the nozzle during movement can be improved, thereby improving the stability during slurry delivery and avoiding overflow from the nozzle.

[0032] Furthermore, the fastening assembly includes a second hydraulic cylinder and a second piston rod. The second hydraulic cylinder is arranged on the side of the support plate. The second hydraulic cylinder is connected to the cantilever assembly through the second piston rod. The second hydraulic cylinder can drive the second piston rod to move, thereby supporting the cantilever assembly and improving stability and reliability during grouting.

[0033] The present invention has the following beneficial effects due to the adoption of the above technical solution:

[0034] The construction method of the present invention takes the longitudinal axis of the operating line tunnel as a reference, adds the same hole position at a radially symmetrical position corresponding to the original hole position on the other side, drills two relative holes at the same time, and constructs MJS method piles in sequence to achieve equivalent stress changes on both sides by MJS construction, meet the quality requirements of reinforcement, do not change the basic construction process of MJS method piles, have an operability cavity, are easy to promote, and have a high construction safety factor. BRIEF DESCRIPTION OF THE DRAWINGS

[0035] The present invention will be further described below in conjunction with the accompanying drawings:

[0036] Figure 1 A schematic diagram of a skip hole construction in an MJS skip hole symmetrical reinforcement construction method of the present invention;

[0037] Figure 2 It is a schematic diagram of the installation of the reinforcement device in the present invention;

[0038] Figure 3 A schematic diagram of the connection between the bracket and the support plate in the present invention;

[0039] Figure 4 It is a schematic diagram of the connection between the cantilever assembly and the bracket in the present invention;

[0040] Figure 5 It is a schematic diagram of the structure of the arc guide rail in the present invention;

[0041] Figure 6 It is a schematic diagram of the structure of the nozzle in the present invention.

[0042] In the figure: 1-operating line tunnel; 3-cantilever assembly; 4-track; 5-nozzle; 6-first hydraulic cylinder; 7-first piston rod; 8-second hydraulic cylinder; 9-second piston rod; 10-support plate; 11-column; 12-roller; 13-protective net; 14-storage box; 15-slurry pump; 16-slurry pipe; 17-bracket; 18-arc guide rail; 19-limiting groove; 20-through groove; 21-base plate; 22-nozzle; 23-guide pipe; 24-check valve; 25-motor; 26-guide wheel; 27-auxiliary wheel. DETAILED DESCRIPTION

[0043] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present invention will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0044] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only embodiments of a part of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0045] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions.

[0046] like Figures 1 to 6 As shown, an MJS skip hole symmetrical reinforcement construction method of the present invention comprises the following steps:

[0047] 1) Operation line tunnel 1 cleaning

[0048] a. First, clean the operating line tunnel 1 and determine the scope of MJS skip hole construction along the inner wall of the operating line tunnel 1, which is conducive to improving the quality of the entire construction;

[0049] b. Then, two parallel rails 4 are installed horizontally along the bottom of the operating line tunnel 1, and the rails 4 are used to support the reinforcement device;

[0050] 2) MJS jump hole pipe layout

[0051] a. After the operation line tunnel 1 is cleaned, the MJS jump hole pipe is laid out according to the outside of the tunnel. The MJS jump hole pipe is laid out in two layers inside and outside;

[0052] b. Then, corresponding shotcrete interfaces are opened along the inner wall of the tunnel according to the position of the skip hole pipes of each layer, so that the shotcrete interfaces are connected with the skip hole pipes;

[0053] 3) Installation of reinforcement device

[0054] a. First, process the corresponding support plate 10 according to the design requirements, and install the columns 11 vertically and symmetrically along the bottom surface of the support plate 10, install the protection net 13 between two adjacent columns 11 on the same side, the distance between the two opposite columns 11 is equal to the distance between the two tracks 4, and install the roller 12 at the bottom of each support column;

[0055] b. Then, a material storage box 14 is installed along the top surface of the support plate 10, and a slurry delivery pump 15 is installed on the material storage box 14;

[0056] c. Then, the corresponding bracket 17 is processed according to the design requirements, the first hydraulic cylinder 6 is symmetrically installed along the top surface of the support plate 10, and the bracket 17 is connected to the first hydraulic cylinder 6 through the first piston rod 7;

[0057] d. Finally, the size of the cantilever assembly 3 is determined according to the layout position of the MJS jump hole pipe, and the corresponding cantilever assembly 3 is processed, and the cantilever assembly 3 is installed on the bracket 17, and a nozzle 5 is installed on each cantilever assembly 3. The cantilever assembly 3 is connected to the support plate 10 through a fastening assembly, and the nozzle 5 is connected to the slurry delivery pump 15 through a slurry delivery pipe 16;

[0058] The cantilever assembly 3 includes an arc guide rail 18, seven arc guide rails 18 are arranged on the bracket 17 at equal intervals in the horizontal direction, and the nozzle 5 is slidably connected to the arc guide rail 18. A limiting groove 19 is arranged on the outer circumferential side of the arc guide rail 18, and a through groove 20 is arranged on the limiting groove 19; through the design of the arc guide rail 18, the nozzle 5 can be moved along the arc guide rail 18 to meet the grouting reinforcement of different MIS skip hole pipes, reduce the labor intensity of manual operation, and improve the efficiency of grouting. The limiting groove 19 and the barrel groove are used to limit the nozzle 5 to improve the stability and reliability during grouting.

[0059] The arc guide rail 18 is a semicircular structure, and the semicircular structure allows the nozzle 5 to move along the arc guide rail 18 to meet the grouting requirements of different MJS jump hole pipes, thereby improving the flexibility and reliability during use.

[0060] The nozzle 5 includes a substrate 21 and a nozzle 22. The nozzle 22 is arranged at the top of the substrate 21. A guide pipe 23 is arranged in the nozzle 22 and the substrate 21. The guide pipe 23 is connected to the slurry delivery pipe 16. A driving mechanism is arranged on the substrate 21. The bottom of the substrate 21 is connected to the through groove 20 through a limiting component. The slurry in the storage box 14 can be transported to the guide pipe 23 through the slurry delivery pipe 16 and transported to the MJS jump hole pipe. The driving mechanism can drive the nozzle 5 to move along the arc guide rail 18 to meet the actual spraying needs.

[0061] A one-way valve 24 is provided on the flow guide pipe 23, and the one-way valve 24 can control the switch of the flow guide pipe 23, so as to meet the requirements of MJS skip hole construction, and the control accuracy is high.

[0062] The driving mechanism includes a motor 25 and a guide wheel 26. The motor 25 is arranged in the base plate 21. The motor 25 is connected to the guide wheel 26. The guide wheel 26 is located on both sides of the base plate 21. The guide wheel 26 is limited in the slots on both sides of the limiting slot 19. The guide wheel 26 is driven to rotate by the motor 25, so that the guide wheel 26 can drive the nozzle 5 to move along the arc guide rail 18.

[0063] The limiting assembly includes an auxiliary wheel 27, which is arranged below the base plate 21 through a connecting rod. The connecting rod passes through the through groove 20. The design of the auxiliary wheel 27 and the connecting rod can improve the stability and reliability of the nozzle 5 during movement, thereby improving the stability during slurry delivery and avoiding overflow from the nozzle 5.

[0064] The fastening assembly includes a second hydraulic cylinder 8 and a second piston rod 9. The second hydraulic cylinder 8 is arranged on the side of the support plate 10. The second hydraulic cylinder 8 is connected to the cantilever assembly 3 through the second piston rod 9. The second hydraulic cylinder 8 can drive the second piston rod 9 to move, thereby supporting the cantilever assembly 3 and improving stability and reliability during grouting.

[0065] 4) MJS jump hole reinforcement construction

[0066] a. First, place the processed reinforcement device on the track 4, and inject the required mud into the storage box 14, and use the tractor to pull the reinforcement device along the track 4 to the position of the MJS jump hole construction;

[0067] b. Then, according to the position of each MJS jump hole pipe, the nozzle 5 is moved along the cantilever assembly 3 to the required position and then fixed;

[0068] c. Then start the first hydraulic cylinder 6, so that the first piston rod 7 drives the cantilever assembly 3 to rise to the set height position, and then start the second hydraulic cylinders 8 on both sides of the support plate 10, so that the second piston rod 9 drives the cantilever assembly 3 close to the inner surface of the tunnel, and align the nozzle 5 with and close to the corresponding interface position of the MJS jump hole pipe until it is completely fitted;

[0069] d. Finally, start the slurry pump 15, so that the slurry in the storage box 14 is transported to the nozzle 5 through the slurry pipe 16 under the action of the slurry pump 15, and the spraying sequence of the nozzle 5 is controlled. The grouting reinforcement construction of the inner layer MJS jump hole pipe is carried out first, and then the grouting reinforcement construction of the outer layer MJS jump hole pipe is carried out. When pouring the inner layer MJS construction method pile, the grouting reinforcement construction is carried out along 1a-2a, 3a-4a, 5a-6a, 7a-8a, 9a-10a, 11a -12a, 13a-14a, the inner layer of MJS construction piles adopts 180° half-spraying, and then the outer layer of MJS skip-hole pipe grouting reinforcement construction is carried out. When pouring the outer layer of MJS construction piles, the construction is carried out in the order of 15b-16b, 17b-18b, 19b-20b, 21b-22b, 23b-24b, 25b-26b. The outer layer of MJS construction piles adopts 360° full circle overlap;

[0070] e. After construction is completed, remove the reinforcement device and disassemble it for cleaning.

[0071] This construction method takes the longitudinal axis of the operating line tunnel 1 as a reference, adds the same hole position at a radially symmetrical position corresponding to the original hole position on the other side, drills two opposite holes at the same time, and constructs MJS method piles in sequence to achieve equivalent stress changes on both sides during MJS construction, meet the quality requirements of reinforcement, do not change the basic construction process of MJS method piles, have operability, are easy to promote, and have a high construction safety factor.

[0072] The above are only specific embodiments of the present invention, but the technical features of the present invention are not limited thereto. Any simple changes, equivalent replacements or modifications made based on the present invention to achieve basically the same technical effects are all included in the protection scope of the present invention.

Claims

1. A MJS skip hole symmetrical reinforcement construction method, characterized in that The steps include: 1) Operation line tunnel cleaning a. First, clean the operating line tunnel and determine the scope of MJS jump hole construction along the inner wall of the operating line tunnel; b. Then, two parallel rails are installed horizontally along the bottom of the operating line tunnel to support the reinforcement device; 2) MJS jump hole pipe layout a. After the tunnel of the operating line is cleared, the MJS jump hole pipe is laid out according to the outside of the tunnel. The MJS jump hole pipe is laid out in two layers inside and outside; b. Then, corresponding shotcrete interfaces are opened along the inner wall of the tunnel according to the position of the skip hole pipes of each layer, so that the shotcrete interfaces are connected with the skip hole pipes; 3) Installation of reinforcement device a. First, process the corresponding support plate according to the design requirements, and install the columns vertically and symmetrically along the bottom surface of the support plate. Install the protective net between the two adjacent columns on the same side. The distance between the two opposite columns is equal to the distance between the two tracks, and install rollers at the bottom of each support column; b. Then install the storage box along the top surface of the support plate, and install the slurry pump on the storage box; c. Then, the corresponding bracket is processed according to the design requirements, the first hydraulic cylinder is installed symmetrically along the top surface of the support plate, and the bracket is connected to the first hydraulic cylinder through the first piston rod; d. Finally, determine the size of the cantilever assembly according to the layout position of the MJS jump hole pipe, and process the corresponding cantilever assembly, install the cantilever assembly on the bracket, install the nozzle on each cantilever assembly, connect the cantilever assembly to the support plate through the fastening assembly, and connect the nozzle to the slurry delivery pump through the slurry delivery pipe; 4) MJS jump hole reinforcement construction a. First, place the processed reinforcement device on the track, inject the required mud into the storage box, and use the tractor to pull the reinforcement device along the track to the location of MJS jump hole construction; b. Then, according to the position of each MJS jump hole pipe, move the nozzle along the cantilever assembly to the required position and fix it; c. Then start the first hydraulic cylinder, so that the first piston rod drives the cantilever assembly to rise to the set height position, and then start the second hydraulic cylinders on both sides of the support plate, so that the second piston rod drives the cantilever assembly close to the inner surface of the tunnel, and align the nozzle with and close to the corresponding interface position of the MJS jump hole pipe until it is completely fitted; d. Finally, start the slurry pump to transport the slurry in the storage box to the nozzle through the slurry pipe under the action of the slurry pump, and control the spraying sequence of the nozzle. First, carry out the grouting reinforcement construction of the inner layer MJS jump hole pipe, and then carry out the grouting reinforcement construction of the outer layer MJS jump hole pipe. When pouring the inner layer MJS construction pile, the construction is carried out according to the set sequence. The inner layer MJS construction pile adopts 180° half spraying, and then the grouting reinforcement construction of the outer layer MJS jump hole pipe is carried out. When pouring the outer layer MJS construction pile, the construction is carried out according to the set sequence. The outer layer MJS construction pile adopts 360° full circle overlap; e. After construction is completed, remove the reinforcement device and disassemble it for cleaning.

2. According to claim 1, a MJS skip hole symmetrical reinforcement construction method is characterized in that: The cantilever assembly includes an arc guide rail, seven of which are arranged on the bracket at equal intervals in the horizontal direction, the nozzle is slidably connected to the arc guide rail, a limiting groove is arranged on the outer circumferential side surface of the arc guide rail, and a through groove is arranged on the limiting groove.

3. A MJS skip hole symmetrical reinforcement construction method according to claim 2, characterized in that: The arc-shaped guide rail is in a semicircular structure.

4. The MJS skip hole symmetrical reinforcement construction method according to claim 2 is characterized in that: The nozzle includes a base plate and a nozzle, the nozzle is arranged at the top of the base plate, a guide tube is arranged in the nozzle and the base plate, the guide tube is connected to the slurry delivery pipe, a driving mechanism is arranged on the base plate, and the bottom of the base plate is connected to the through groove through a limiting component.

5. The MJS skip hole symmetrical reinforcement construction method according to claim 4 is characterized in that: A one-way valve is arranged on the flow guide pipe.

6. The MJS skip hole symmetrical reinforcement construction method according to claim 4 is characterized in that: The driving mechanism comprises a motor and a guide wheel, wherein the motor is arranged in the base plate, the motor is connected to the guide wheel, the guide wheel is located at two sides of the base plate, and the guide wheel is limited in the clamping grooves at two sides of the limiting groove.

7. The MJS skip hole symmetrical reinforcement construction method according to claim 4 is characterized in that: The limiting assembly comprises an auxiliary wheel, and the auxiliary wheel is arranged below the base plate through a connecting rod, and the connecting rod passes through the through slot.

8. The MJS skip hole symmetrical reinforcement construction method according to claim 1 is characterized by: The fastening assembly includes a second hydraulic cylinder and a second piston rod, wherein the second hydraulic cylinder is disposed on a side surface of the support plate, and the second hydraulic cylinder is connected to the cantilever assembly via the second piston rod.