Port bulk to container loading and unloading process system and control method

By designing a port bulk-to-container loading and unloading process system, including hydraulic unloading platforms, stackers and telescopic pipes and other equipment, the impact of carbon dust on the environment and operator safety in coke and coal transportation is solved, and efficient and automated loading and unloading process.

CN113800272BInactive Publication Date: 2025-02-07RIZHAO PORT CONTAINER DEV CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202111024012.4
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-09-02
Publication Date
2025-02-07
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

In port transportation between coke and coal, the existing technology is difficult to effectively solve the impact of carbon dust on the environment and the safety of operators, and the loading and unloading process has problems such as low efficiency and insufficient equipment performance.

Method used

A port bulk-to-container unloading process system was designed, including unloading system, material stacking system, boxing system, box delivery system and transfer system, using hydraulic unloading platform, underground funnel, material stacking machine, loading belt machine and telescopic slide The equipment such as pipes and other equipment, combined with PLC control and data acquisition devices, realizes an automated and intelligent loading and unloading process.

Benefits of technology

By optimizing the loading and unloading process and equipment performance, the degree of automation is improved, manpower and material resources are saved, the environmental impact of carbon dust is reduced, the operation safety is improved, and the loading and unloading efficiency is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113800272B_ABST
    Figure CN113800272B_ABST
Patent Text Reader

Abstract

The present invention provides a bulk-to-container loading and unloading process system and a control method for the port. The bulk-to-container loading and unloading process system for the port includes a car unloading system, a material stacking system, a box loading system, a box delivery system and a transfer system; the control method of the bulk-to-container loading and unloading process system for the port includes the following steps: step I: unloading; step II: material stacking; step III: box loading; step IV: box delivery. The advantages of the present invention are: 1. The process of each process link is optimized, the degree of automation is improved, and manpower and material resources are saved; 2. Dust removal and dust suppression measures are added to each link, which is beneficial to environmental protection and meets environmental protection requirements; 3. The equipment used in each process is optimized to improve performance and safety.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to equipment used in coke and coal loading and unloading processes and a control method thereof.

[0002] Specifically, it involves a bulk-to-container loading and unloading process system and a control method at a port. Background Art

[0003] In recent years, many measures have been taken to enhance environmental protection in the port transportation of coke and coal. Among them, the initiative to change the bulk transportation of coke and coal to container transportation is called the "bulk to container" project. During the project implementation, it was found that there was a need to improve the process optimization and the various equipment used. In addition, the impact of carbon dust on the environment and the safety of operators needed to be resolved during the project operation. Summary of the invention

[0004] The purpose of the present invention is to overcome the shortcomings of the above-mentioned traditional technology and provide a port bulk to container loading and unloading process system and control method for improving the overall project.

[0005] The purpose of the present invention is achieved through the following technical measures:

[0006] The port bulk to container loading and unloading process system is characterized by: including unloading system, stacking system, box loading system, box delivery system and transfer system;

[0007] The unloading system is used for unloading bulk cargo in trucks;

[0008] The stacking system is used to stack the unloaded bulk cargo as required;

[0009] The box packing system is used to pack bulk cargo into containers;

[0010] The container delivery system is used to deliver containers;

[0011] The transfer system includes a first conveying device and a second conveying device. The first conveying device is used to transfer the bulk cargo unloaded by the unloading system to the stacking system, and the second conveying device is used to transfer the bulk cargo stacked by the stacking system to the boxing system.

[0012] A specific optimization scheme, the unloading system includes a pit, a hydraulic unloading platform, an underground funnel and a hydraulic flip platform;

[0013] The hydraulic unloading platform includes an unloading platform and an unloading hydraulic cylinder. The unloading platform is covered and arranged above the pit. One end of the unloading platform is hinged to the pit through a rotating shaft, and the other end of the unloading platform is in contact with the pit. The upper end of the unloading hydraulic cylinder is hinged to the middle of the unloading platform, and the lower end of the unloading hydraulic cylinder is hinged to the lower part of the pit.

[0014] The underground funnel is adjacent to the pit and is located on the side close to the rotating shaft. The hydraulic flip platform is covered and arranged above the underground funnel and allows vehicles to pass through and drive to the top of the hydraulic unloading platform. The hydraulic flip platform includes a sub-plate, a main plate and a flip hydraulic cylinder. The sub-plate and the main plate are hingedly arranged. The sub-plate is arranged close to the rotating shaft. One end of the sub-plate away from the main plate is slidably connected to the underground funnel. One end of the main plate away from the sub-plate is hingedly arranged to the upper part of the underground funnel. The upper part of the flip hydraulic cylinder is movably connected to the main plate through a connecting piece, and the lower part of the flip hydraulic cylinder is hingedly arranged to the underground funnel.

[0015] The number of unloading systems is at least one;

[0016] In addition to one or more unloading systems, there is also an unloading dust removal system, which includes an unloading dust removal shed, and a medium-pressure micro-mist dust suppression system is provided on the unloading dust removal shed;

[0017] The unloading system also includes an unloading control system, which includes a local unloading control device and an unloading monitoring device. The local unloading control device includes an unloading control button for controlling the unloading hydraulic cylinder and a flipping control button for controlling the flipping hydraulic cylinder. The unloading monitoring device includes a monitoring room, a display and multiple cameras. The display is arranged in the monitoring room, and the multiple cameras are arranged close to the unloading system. The cameras and the display are connected by cables.

[0018] A specific optimization scheme, the stacking system includes a stacking machine and a stacking control system, the stacking machine includes a walking mechanism, a cantilever belt conveyor, a tail car belt conveyor, a rotating mechanism and a pitching mechanism, and the stacking control system includes a PLC and a data acquisition device;

[0019] The data acquisition device includes a photographing device, a height sensor, a pressure sensor and a wireless signal transmission module. The photographing device and the height sensor are located at the center of the outside of the stack, and the pressure sensor is located underground at the center of the stack. The photographing device, the height sensor and the pressure sensor are connected to the wireless signal transmission module through a signal transmission line, and the wireless signal transmission module is connected to the PLC in a wireless manner.

[0020] The PLC controls the start and stop of the traveling mechanism, cantilever belt conveyor, tail car belt conveyor, rotating mechanism and pitching mechanism by wireless and / or wired means.

[0021] A specific optimization scheme, the packing system includes a main frame, a feeding mechanism is installed on the upper end of the main frame, and a plurality of material guiding mechanisms are installed below the feeding mechanism; the feeding mechanism includes a feeding belt conveyor and a material dividing assembly, the material dividing assembly includes a material dividing belt conveyor and a rail car, and the upper end of the rail car is equipped with a material dividing belt conveyor; a slide rail is installed on the upper end of the main frame, and the rail car cooperates with the slide rail; the material guiding mechanism includes a buffer bin and a telescopic chute, and a plurality of linearly evenly distributed buffer bins are fixedly installed on the main frame, and the discharge port of the buffer bin is connected to the telescopic chute;

[0022] The rail vehicle includes a frame, rail wheels and a driving device. The frame is equipped with multiple sets of rail wheels. The driving device is installed on the frame. The driving device is connected to the rail wheels through a transmission mechanism. A material dividing belt conveyor is installed on the upper end of the frame.

[0023] A head hopper is installed at the discharge end of the feeding belt conveyor;

[0024] The head hopper includes a hopper shell and a guide plate. The lower half of the hopper shell is provided with an inclined wall. The guide plate is installed on the wall opposite to the inclined wall of the hopper shell. The upper end of the guide plate is hinged to the inner wall of the hopper shell. A threaded sleeve is installed on the outer wall of the hopper shell. The threaded sleeve cooperates with a limiting screw. The limiting screw passes through the threaded through hole of the threaded sleeve and is pressed against the back of the guide plate.

[0025] The discharge port of the buffer bin is connected to the telescopic chute through a discharge gate;

[0026] Four linearly evenly distributed buffer bins are installed on the main frame, and the hoppers at both ends of the material distribution belt conveyor are located directly above the two buffer bins;

[0027] The four buffer bins are divided into two groups, with two non-adjacent buffer bins forming one group. The hoppers at both ends of the material distribution belt conveyor are located directly above one of the buffer bins in one group;

[0028] The main frame is equipped with travel switches at both ends of the motion track of the rail car, and a touch scale is installed on the frame of the rail car;

[0029] The telescopic chute includes a connecting sleeve, an inner chute, a dust-removing cloth cylinder and an automatic lifting device. A feed port is arranged on the upper part of the connecting sleeve, an inner sleeve is installed at the feed port, a dust-removing interface is arranged on the side of the connecting sleeve, the lower part of the connecting sleeve is connected with the dust-removing cloth cylinder and the discharge pipe in sequence, the lower end of the inner sleeve is connected with the inner chute, and the inner side of the dust-removing cloth cylinder is connected with the inner chute through a connecting ring; the connecting sleeve and the discharge pipe are connected through an automatic lifting device; the characteristic is that: the inner chute is composed of a plurality of conical cylinders, the plurality of conical cylinders are sleeved in sequence head to tail, the uppermost conical cylinder is fixedly connected with the inner sleeve in the connecting sleeve, and the remaining conical cylinders are hinged with the connecting ring;

[0030] The automatic lifting device comprises a pulley, a wire rope drum and a reduction motor. The pulley and the wire rope drum are arranged outside the connecting sleeve. The wire rope drum is connected to the reduction motor. The wire rope passes around the lower end of the pulley and is connected to the discharge pipe.

[0031] The conical cylinder and the connecting ring are hinged in such a way that a rotating shaft is installed on both sides of the conical cylinder respectively, and two rotating sleeves are symmetrically installed on the connecting ring. The rotating sleeves are provided with axial blind holes, and the rotating shaft is inserted into the axial blind holes of the rotating sleeves to rotate with them.

[0032] The outer wall of the rotating sleeve is provided with an arc-shaped through hole communicating with the axial blind hole, the outer end of the rotating shaft is vertically connected to the limiting shaft, and the limiting shaft is placed in the arc-shaped through hole of the rotating sleeve;

[0033] The rotation axes of two adjacent conical cylinders are vertically distributed;

[0034] The lower end of the discharge pipe is sleeved with the dustproof cover plate;

[0035] It also includes an electric control system for a container bulk cargo packing device, which includes a data acquisition device, an information processing module, a control module and a drive circuit relay; the data acquisition device includes a material level sensor, a load-bearing module and a wireless signal transmission module, the load-bearing module is provided with a pressure sensor, the load-bearing module is located at the lower end of the container, the material level sensor and the pressure sensor are connected to the wireless signal transmission module through a signal transmission wire, the wireless signal transmission module and the information processing module are connected by wireless signals, the information processing module and the control module are connected by wired or wireless means, the control module and the drive circuit relay are connected by wired or wireless means, and the drive circuit relay is connected to the drive device of the feeding mechanism and the material guiding mechanism.

[0036] A specific optimization solution, the container delivery system includes a gantry straddle carrier and a container tipper;

[0037] The container turning machine includes a base, a standing platform, a hydraulically controlled door closing arm, a weighing sensor device, a hydraulic station and an electric control system. A turning mechanism and a power mechanism are arranged on the base. The turning mechanism includes a bracket, a load-bearing plate, a connecting rod and a rotating rod.

[0038] The brackets are symmetrically arranged at the middle positions on both sides of the base, and the brackets and the base are fixedly connected together; the base is mainly composed of a turning area and a loading area, and the turning area and the loading area are respectively located on both sides of the bracket;

[0039] A load-bearing plate is pivotally connected between the brackets, and the load-bearing plate is located above the base;

[0040] The connecting rod is fixedly connected to the lower side of the standing platform, and the connecting rod is symmetrically arranged on both sides of the standing platform; the connecting rod and the bracket are arranged in parallel; one end of the connecting rod is pivotally connected to the end of the bearing plate away from the loading area;

[0041] One end of the rotating rod is pivotally connected to the other end of the connecting rod, and the other end of the rotating rod is pivotally connected to the bracket; the rotating rod and the load-bearing plate are arranged in parallel;

[0042] The power mechanism is arranged between the base and the load-bearing plate, and the power mechanism is symmetrically arranged on both sides of the base and the load-bearing plate; the power mechanism includes a main hydraulic push rod and an auxiliary hydraulic push rod; one end of the main hydraulic push rod is pivotally connected to a side of the base close to the loading area through a pivotal member, and the other end of the main hydraulic push rod is pivotally connected to an end of the load-bearing plate close to the flipping area through a pivotal member; one end of the auxiliary hydraulic push rod is pivotally connected to a side of the base close to the flipping area through a pivotal member, and the other end of the auxiliary hydraulic push rod is pivotally connected to an end of the load-bearing plate close to the loading area through a pivotal member;

[0043] Container locks are arranged at the four corners of the load-bearing plate; hydraulically controlled door closing arms are symmetrically arranged below one end of the load-bearing plate close to the standing platform;

[0044] The main hydraulic push rod, the auxiliary hydraulic push rod and the hydraulically controlled door closing arm are connected to the hydraulic station through oil pipes respectively;

[0045] The weighing sensor device comprises a weighing sensor, which is arranged at the upper end of the loading area of ​​the base;

[0046] The standing platform is mainly composed of a ladder frame part and an operating part, the operating part is fixedly connected to a side close to the connecting rod, and the ladder frame part is connected and fixed to a side far from the connecting rod;

[0047] A reinforcing plate is fixedly connected between the base and the bracket;

[0048] The electric control system includes an electric control box, an operating station, a remote control device, a solenoid valve, a pressure overload protection device and an emergency stop device.

[0049] A specific optimization scheme, the first conveying device includes a first belt conveyor and a first transfer room, the first belt conveyor is arranged at the lower part of the underground funnel, and the first belt conveyor discharge end and the tail car belt conveyor feed end are cooperatively arranged in the first transfer room;

[0050] The second conveying device includes a loader, a reserved belt conveyor, a second belt conveyor, a third belt conveyor, a second transfer machine room and a third transfer machine room. The loader is used to transfer the materials stacked in the stacking system to the second belt conveyor. The discharge end of the second belt conveyor and the feed end of the third belt conveyor are cooperatedly arranged in the second transfer machine room. The discharge end of the third belt conveyor is connected to the packing system. The second belt conveyor is arranged underground, and the reserved belt conveyor is arranged on the ground. The reserved belt conveyor and the second belt conveyor are cooperatedly arranged in the third transfer machine room. The number of the reserved belt conveyor, the second belt conveyor, the third belt conveyor, the second transfer machine room and the third transfer machine room are all two and are symmetrically arranged on both sides of the stacking system.

[0051] A specific optimization scheme, the control system includes a main control room, and the main control room is electrically connected to the unloading system, the stacking system, the box loading system, the box delivery system and the transfer system or connected through wireless communication equipment.

[0052] The control method of the bulk-to-container loading and unloading process system of a port is characterized by comprising the following steps:

[0053] Step Ⅰ: Unloading;

[0054] A truck loaded with bulk coke and coal is driven into the unloading system, and the unloading platform turns the truck over to unload the bulk cargo into the underground hopper. The truck then drives away, and the bulk cargo in the underground hopper is sent to the ground through the first conveying device and transferred to the stockpiling system.

[0055] Step II: Stacking;

[0056] The stockpiling system operates to stack bulk cargo into stockpiles of predetermined sizes;

[0057] Step III: Packing;

[0058] The second transfer device delivers the bulk cargo from the stockpile to the packing system, and the packing system packs the bulk cargo into containers;

[0059] Step IV: Send the box;

[0060] The container delivery system delivers empty containers to the loading station and transports full containers away for storage.

[0061] A specific optimization scheme, step II adopts the following stockpile control method:

[0062] Step A, system information settings:

[0063] A1. Establish position coordinate system;

[0064] According to the position information in the stockpile yard, along the walking direction of the stocker, the walking starting point and the walking ending point are set, and the walking starting point is used as the coordinate origin to establish a coordinate system, and the stacks in the stockpile yard are numbered one by one, and the stacks on the left side of the stocker are numbered as l1, l2...ln, and the stacks on the right side of the stocker are numbered as r1, r2, r3...rn, and each stack is respectively provided with a corresponding shooting device, a height sensor, a pressure sensor and a wireless signal transmission module, and corresponding to the stack number, the shooting device number is lp1, lp2...lpn, rp1, rp2...rpn, the height sensor number is lh1, lh2...lhn, rh1, rh2...rhn, and the corresponding pressure sensor number is lg1, lg2...lgn, rg1, rg2...rgn, and after the stack number and the position information are matched one by one, the stack number and the position information are stored in the PLC;

[0065] A2. Correct the stockpiling parameters;

[0066] The data acquisition device acquires real-time image information, real-time height information and real-time gravity information of each stacking position in the stockpile yard, and updates and stores the acquired information in the PLC;

[0067] A3. Set the stacking information;

[0068] Pre-set a material coding mechanism in the PLC, encode the material information of the materials to be stacked, enter the material code into the PLC before stacking, and then calculate the upper limit value Hmax of the stacking height and the upper limit value Gmax of the stacking gravity corresponding to each stack position according to the information obtained in A1 and A2, and set them in the PLC;

[0069] Step B: Automatic stacking control:

[0070] B1. Stacking preparation;

[0071] The PLC sends an instruction, the traveling mechanism and the rotating mechanism are started, the stacker moves to the first stack position and then stops, the pitching mechanism is started, the stacker is adjusted to the stacking position, and then the data acquisition device is triggered and obtains real-time image information, real-time height information and real-time gravity information again, and then transmits the obtained information to the PLC;

[0072] B2. Stacking judgment;

[0073] The PLC receives the real-time information and makes a judgment. If the obtained height information 0 < H < Hmax or the gravity information 0 < G < Gmax, it is necessary to further judge whether stacking is required for this stack position and perform operation B3; if the obtained gravity information G = 0 and the height information H = 0, it is determined that stacking is required for this stack position and perform operation B4;

[0074] B3. Further stacking judgment;

[0075] When 0 < H < Hmax or 0 < G < Gmax, there are already materials at this stack position. Compare the material code information obtained in real time with the material code information to be stacked this time. If they are exactly the same, it is determined that stacking can be performed and operation B4 is executed; if they are not exactly the same, it is determined that stacking cannot be performed and operation B5 is executed;

[0076] B4. Stacking;

[0077] The PLC sends an instruction, the cantilever belt conveyor and the tail car belt conveyor are started, the stacker performs the stacking operation, the data acquisition device obtains real-time image information, real-time height information and real-time gravity information in real time and transmits them to the PLC. The PLC makes a real-time judgment. When either H = Hmax or G = Gmax is achieved, it is determined that the stacking is completed and the stacking is stopped, and then operation B5 is executed;

[0078] B5. Execute the next stacking preparation;

[0079] When stacking is completed or cannot be completed, the PLC sends a command, the walking mechanism and the rotating mechanism start, the stacker moves to the next stacking position and then stops, and repeats operations B1-B5. The movement sequence of the stacker is l1, r1, l2, r2...ln, rn, until stacking is completed on all stacking positions.

[0080] A specific optimization scheme, step III adopts the following packing control method:

[0081] Step 1: The information processing module is set to record the maximum height Hmax and the maximum mass Mmax of the container materials, and wait for the container to be turned over;

[0082] Step 2: Turn over the container and place it on the load-bearing module. The pressure sensor transmits the detected data to the information processing platform through the wireless signal transmission module. The information processing platform analyzes the acquired data and calculates the empty container mass M0. The control module sends a descending signal to the drive circuit relay to control the telescopic chute to descend until the dust cover at the lower end of the telescopic chute is buckled at the opening of the container. The material level sensor signal is transmitted to the information processing module through the wireless signal transmission module. The data information platform analyzes and calculates the empty container height H0.

[0083] Step 3: After data collection is completed, the control module transmits signals to the rail car and the unloading gate respectively, controls the unloading gate to open, and enables the rail car to drive the material distribution belt conveyor to move to the travel switch position. At this time, the two end hoppers of the material distribution belt conveyor are located directly above a group of buffer bins. The rail car touches the travel switch, and the travel switch transmits the signal to the control module. The control module sends a signal to the loading belt conveyor and the material distribution belt conveyor, so that they transport the materials into the container. The material level sensor and pressure sensor monitor the height and quality of the container materials in real time.

[0084] Step 4: When either Hmax or Mmax reaches the maximum value, the control module sends a stop unloading signal to the drive circuit relay to control the unloading gate to close. The control module sends a lifting signal to the drive circuit relay to control the telescopic slide and the dust cover to lift to the initial position to complete the container loading operation.

[0085] Step 5: The control module transmits a signal to the material distribution belt conveyor to make it rotate in the opposite direction to load the container at the other end. When any of the Hmax and Mmax values ​​of the other container reaches the maximum value, the control module sends a stop unloading signal to the drive circuit relay to control the unloading gate to close. The control module sends a lifting signal to the drive circuit relay to control the telescopic chute and the dust cover to lift to the initial position, completing the container loading operation and thus completing a set of container loading operations.

[0086] Step six: The control module transmits a signal to the rail car, causing the rail car to drive the material distribution belt conveyor to move above the other two containers. At this time, the rail car touches the travel switch, and the travel switch transmits a signal to the control module. The control module sends a signal to the loading belt conveyor and the material distribution belt conveyor, causing them to repeat steps four and five to complete the loading operation for another group of containers.

[0087] Due to the adoption of the above technical solution, compared with the prior art, the advantages of the present invention are:

[0088] 1. Optimized the process of each process link, improved the degree of automation, and saved manpower and material resources;

[0089] Second, adding dust removal and suppression measures in each link is beneficial to protecting the environment and meeting environmental protection requirements;

[0090] 3. Optimized the equipment used in each process to improve performance and safety.

[0091] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0092] Attached Figure 1 It is a plan layout diagram of the port bulk-to-container loading and unloading process system of the present invention.

[0093] Attached Figure 2 It is a structural schematic diagram of the unloading system of the present invention.

[0094] Attached Figure 3 It is a structural schematic diagram of the stacking system of the present invention.

[0095] Attached Figure 4 It is a schematic diagram of the distribution of material piles and information acquisition devices in the material yard of the present invention.

[0096] Attached Figure 5 It is a schematic diagram of the operation flow of the stockpile control system of the present invention.

[0097] Attached Figure 6 It is a structural schematic diagram of the packing system of the present invention.

[0098] Attached Figure 7 It is a side structural schematic diagram of the packing system of the present invention.

[0099] Attached Figure 8 It is a schematic structural diagram of the head hopper part of the packing system of the present invention.

[0100] Attached Fig. 9 It is a structural schematic diagram of the material distribution assembly part of the packing system of the present invention.

[0101] Attached Fig.10 It is a structural schematic diagram of the telescopic slide pipe part of the packing system of the present invention.

[0102] Attached Fig.11 It is a schematic diagram of the structure of the slide pipe part in the packing system of the present invention. DETAILED DESCRIPTION

[0103] Embodiment 1: As attached Figure 1-11 As shown, the port bulk-to-container loading and unloading process system includes a truck unloading system, a stacking system, a box loading system, a box delivery system and a transshipment system. The truck unloading system is used to unload bulk cargo from trucks; the stacking system is used to stack the unloaded bulk cargo according to demand; the box loading system is used to load the bulk cargo into containers; the box delivery system is used to transport containers; the transshipment system includes a first conveying device and a second conveying device, the first conveying device is used to transfer the bulk cargo unloaded by the truck unloading system to the stacking system, and the second conveying device is used to transfer the bulk cargo stacked by the stacking system to the box loading system.

[0104] As attached Figure 2 As shown, the unloading system includes a pit 11, a hydraulic unloading platform 12, an underground funnel 15 and a hydraulic flip platform 16;

[0105] The hydraulic unloading platform 12 includes an unloading platform 12 and an unloading hydraulic cylinder 14. The unloading platform 12 is arranged above the pit 11. One end of the unloading platform 12 is hinged to the pit 11 through a rotating shaft 13. The other end of the unloading platform 12 is in contact with the pit 11. The upper end of the unloading hydraulic cylinder 14 is hinged to the middle of the unloading platform 12. The lower end of the unloading hydraulic cylinder 14 is hinged to the lower part of the pit 11.

[0106] The underground funnel 15 is adjacent to the pit 11 and is located on a side close to the rotating shaft 13. The hydraulic flip platform 16 is arranged above the underground funnel 15 and allows vehicles to pass through and drive to the top of the hydraulic unloading platform 12. The hydraulic flip platform 16 includes a sub-plate 161, a main plate 162 and a flip hydraulic cylinder 163. The sub-plate 161 and the main plate 162 are hingedly arranged. The sub-plate 161 is arranged close to the rotating shaft 13. One end of the sub-plate 161 away from the main plate 162 is slidably connected to the underground funnel 15. One end of the main plate 162 away from the sub-plate 161 is hingedly arranged to the upper part of the underground funnel 15. The upper part of the flip hydraulic cylinder 163 is movably connected to the main plate 162 through a connecting piece, and the lower part of the flip hydraulic cylinder 163 is hingedly arranged to the underground funnel 15.

[0107] A conveying device is provided at the bottom of the underground funnel 15 .

[0108] The pit 11 includes a plurality of support columns for supporting the unloading platform 12, and the plurality of support columns are evenly distributed along the inner circumference of the pit 11;

[0109] A mounting groove is provided in the middle of the pit 11, and embedded parts matching with the unloading hydraulic cylinder 14 are provided in the mounting groove, and a ladder is provided on the side wall of the mounting groove;

[0110] A combined mounting column for mounting the rotating shaft 13 is provided at the end of the pit 11, and an embedded part matching the rotating shaft 13 is provided on the combined mounting column;

[0111] The pit 11 also includes a drainage well, which is arranged on one side of the pit 11 and is arranged in the installation groove, and the height of the drainage well is greater than the height of the installation groove;

[0112] One side of the pit 11 is also connected to a pump room.

[0113] The unloading platform 12 is provided with a blocking mechanism 18, which includes a blocking hydraulic cylinder 181 and a baffle 182. The upper end of the blocking hydraulic cylinder 181 is hinged with the baffle 182, and the blocking hydraulic cylinder 181 is fixedly connected to the unloading platform 12. A groove matching the baffle 182 is provided on the blocking platform. The number of baffles 182 is at least one, and the position of the baffle 182 is matched with the position of the wheel.

[0114] The unloading platform 12 is provided with dust and leak-proof belts in the circumference.

[0115] There are two unloading hydraulic cylinders 14 , one of which is located on one side of the unloading platform 12 , and the other is located on the other side of the unloading platform 12 .

[0116] The pit 11 is equipped with a hydraulic station system, which is connected to the unloading hydraulic cylinder 14, the turning hydraulic cylinder 163 and the blocking hydraulic cylinder 181 respectively.

[0117] A tugboat track 17 matching the hydraulic overturning platform 16 is provided on the upper side of the outer wall of the underground funnel 15 .

[0118] There are two flipping hydraulic cylinders 163, which are symmetrically arranged on both sides of the main board 162, and the distance between the two flipping hydraulic cylinders 163 is greater than the distance between the two unloading hydraulic cylinders 14;

[0119] There are two connecting pieces, which are bent, with both ends of the connecting piece fixedly connected to the main board 162 respectively, and the middle of the connecting piece is arranged away from the main board 162 and the underground funnel 15, and the turning hydraulic cylinder 163 is hinged to the middle of the connecting piece.

[0120] The number of unloading systems is one or more.

[0121] When there are multiple pits 11 , the multiple pits 11 are arranged side by side.

[0122] It also includes a car unloading dust removal shed 19, which is set outside one or more car unloading systems and is equipped with a medium-pressure micro-mist dust suppression system.

[0123] The unloading system also includes an unloading control system, which includes a local unloading control device and an unloading monitoring device. The local unloading control device includes an unloading control button for controlling the unloading hydraulic cylinder 14 and a flip control button for controlling the flip hydraulic cylinder 163. The unloading monitoring device includes a monitoring room, a display and multiple cameras. The display is arranged in the monitoring room, and the multiple cameras are arranged close to the unloading system. The cameras and the display are connected by cables.

[0124] The local unloading control device allows the driver to operate the buttons by himself. Compared with the traditional additional unloading workers, it effectively reduces labor costs and improves efficiency. The unloading monitoring device can monitor the entire site to prevent accidents and incomplete unloading.

[0125] When in use, the incoming vehicle drives into the unloading platform 12 positioning point, the driver opens the car and then opens the door, and then the driver presses the system start switch, and can choose the remote control and local control working modes according to the needs, the blocking mechanism 18 extends to fix the vehicle tires, the unloading hydraulic cylinder 14 extends, and the unloading platform 12 stops tipping after it is lifted to the set angle, and the bulk materials in the car slide out of the car box and fall into the funnel; after all the materials in the car box are unloaded, the unloading platform 12 falls back and resets. The blocking mechanism 18 is reset, and the driver can drive the car away; one unloading cycle is completed.

[0126] After the hydraulic unloading platform 12 unloads the materials in the bulk truck into the underground hopper 15, the vibrating feeder feeds the materials to the belt conveyor arranged underground. The belt conveyor climbs out of the ground, transfers at the transfer room, and then performs other operations.

[0127] The advantages of the unloading system are: 1. It adopts underground storage and transportation to prevent dust from rising from the ground, and is convenient for dust collection, which is beneficial to protecting the working environment and the health of workers; 2. Through the underground funnel and the flip platform set on it, the whole is more convenient to adapt to the site, convenient for vehicles to enter and exit, and convenient for collecting coke debris. The flip platform directly presses the folding plate against the top and folds it to be stored at the end of the pit away from the truck unloading port. It has a stable structure and is easy to operate. It can effectively solve the problem of the flap hindering the unloading of goods into the pit in the prior art, and the materials scattered around are sent to the pit for the second time, which improves work efficiency.

[0128] As attached Figure 3-5 As shown, the stacking system includes a stacking machine and a stacking control system. The stacking machine includes a walking mechanism 21, a cantilever belt conveyor 22, a tail car belt conveyor 23, a rotating mechanism 24 and a pitching mechanism 25. The stacking control system includes a PLC and a data acquisition device.

[0129] The data acquisition device includes a shooting device, a height sensor, a pressure sensor and a wireless signal transmission module. The shooting device and the height sensor are located at the center position outside the stack, and the pressure sensor is located underground at the center position of the stack. The shooting equipment, the height sensor and the pressure sensor are connected to the wireless signal transmission module through a signal transmission line, and the wireless signal transmission module is connected to the PLC in a wireless manner.

[0130] The PLC controls the start and stop of the walking mechanism 21, the cantilever belt conveyor 22, the tail car belt conveyor 23, the rotating mechanism 24 and the pitching mechanism 25 in a wireless and / or wired manner.

[0131] The lower part of the cantilever belt conveyor 22 is arranged on the traveling mechanism 21 through a rotating mechanism 24 and a pitching mechanism 25. The upper feeding end of the cantilever belt conveyor 22 is connected to the upper discharging end of the tail car belt conveyor 23. The lower part of the tail car belt conveyor 23 is supported on the traveling mechanism 21 through a wheel group.

[0132] The traveling mechanism 21 includes a traveling track, a traveling trolley, and a traveling driving device. The traveling driving device drives the traveling trolley to move back and forth along the traveling track. The traveling driving device includes a traveling motor and a reducer.

[0133] The cantilever belt conveyor 22 includes an arm, a cantilever conveyor belt, cantilever rollers, and a cantilever drive device. The cantilever rollers are rotatably arranged on the upper side of the arm. There are at least two cantilever rollers. The cantilever conveyor belt transmission is arranged on multiple cantilever rollers. The cantilever drive device includes a cantilever motor, which is transmission-connected to one of the cantilever rollers.

[0134] The tail car belt conveyor 23 includes a tail frame, a tail car conveyor belt, a tail car roller, a tail car redirecting roller, a ground roller, and a tail car driving device. The tail car conveyor belt is arranged on the tail car roller, the tail car redirecting roller, and the ground roller. The tail car roller and the tail car redirecting roller are rotatably arranged above the tail frame. The tail car conveyor belt is redirected to the ground through the tail car redirecting roller. The tail car driving device includes a tail car motor, which is transmission-connected to the ground roller.

[0135] The rotating mechanism 24 includes a rotating platform, a rotating bearing, a rotating ring gear, a rotating gear and a rotating driving device. The rotating driving device drives the rotating gear to rotate. The rotating gear is meshed with the outer ring gear of the rotating ring gear. The inner circumference of the rotating ring gear is fixedly connected to the outer circumference of the rotating bearing. The outer rotating side of the rotating bearing is fixedly connected to the walking trolley. The inner rotating side of the rotating bearing is fixedly connected to the rotating platform. The upper part of the rotating platform is hinged to the boom through a tower. The rotating driving device includes a rotating motor, and the rotating motor is connected to the rotating gear in a transmission manner.

[0136] The pitch mechanism 25 comprises a pitch hydraulic cylinder, one end of which is hinged to the rotating platform, and the other end of which is hinged to the boom. There are at least two pitch hydraulic cylinders, which are symmetrically arranged on both sides of the boom.

[0137] The PLC is wirelessly controlled or wiredly controlled with the travel motor, cantilever motor, tail car motor, rotating motor and pitch hydraulic cylinder. Specifically, a wireless signal receiver can be set on the travel motor, cantilever motor, tail car motor, rotating motor and pitch hydraulic cylinder, and an electronic switch can be connected to control the opening and closing of the above components.

[0138] A head cover 26 and a short chute 27 are provided at the upper end of the cantilever belt conveyor 22. A closed chute 28 and a material guide trough 29 are used at the junction of the cantilever belt conveyor 22 and the tail car belt conveyor 23. Rubber curtains are provided at the inlet and outlet of the material guide trough 29.

[0139] The above-mentioned supporting dust removal device can effectively improve the environmental protection performance.

[0140] The invention has the functions of rotating and pitching material stacking, and can realize material stacking on both sides; it has the function of remote operation control, and can realize operation without people getting on the machine, and has high safety performance.

[0141] In actual use, a position sensor can also be placed on each stack, and the cantilever belt conveyor 22 can be used to trigger the position sensor, and then the data acquisition device of the stack can be started; of course, the data acquisition device can also be controlled to start and close using a power switch and set to a normally open mode.

[0142] By using photographic equipment, height sensors and pressure sensors, real-time information on material piles in the material yard can be obtained and transmitted to the PLC for calculation and identification of material information in the material pile. The PLC automatically controls the stacker to move, rotate, discharge and stop discharging. There is no need to leave staff at the material discharge site, which reduces labor costs and improves the safety factor.

[0143] like Figure 3-5 As shown, the box packing system includes a main frame 31, a loading mechanism and a material guiding mechanism.

[0144] A feeding mechanism is installed at the upper end of the main frame 31, and a plurality of material guiding mechanisms are installed below the feeding mechanism.

[0145] The feeding mechanism includes a feeding belt conveyor 34 and a material dividing assembly. The material dividing assembly includes a material dividing belt conveyor 32 and a rail car 33. The rail car 33 includes a frame 3302, rail wheels 3303 and a driving device 3301. Multiple groups of rail wheels 3303 are respectively installed on both sides of the lower end of the frame 3302. The driving device 3301 is installed on the frame 3302. The driving device 3301 is connected to the rail wheels 3303 through a transmission mechanism. The material dividing belt conveyor 32 is installed at the upper end of the frame 3302.

[0146] Two slide rails are installed on the upper end of the main frame 31, and the track wheels 3303 of the track vehicle 33 cooperate with the slide rails.

[0147] The discharge end of the feeding belt conveyor 34 is provided with a head hopper 39, and the bulk materials conveyed by the feeding belt conveyor 34 can fall into the center of the material distribution belt conveyor 32 through the head hopper 39. The head hopper 39 comprises a hopper shell 3901 and a guide plate 3902. The lower half of the hopper shell 3901 is provided with an inclined wall, and the guide plate 3902 is installed on the wall opposite to the inclined wall of the hopper shell 3901. The upper end of the guide plate 3902 is hinged to the inner wall of the hopper shell 3901, and a threaded sleeve 3905 is installed on the outer wall of the hopper shell 3901. The threaded sleeve 3905 is provided with a threaded through hole that penetrates the cavity of the hopper shell 3901.

[0148] The threaded sleeve 3905 is matched with the limiting screw 3904, and the limiting screw 3904 passes through the threaded through hole of the threaded sleeve 3905 and is connected to the top block 3903, and the top block 3903 is pressed against the back of the guide plate 3902. By rotating and adjusting the limiting screw 3904, the angle of the guide plate 3902 can be adjusted, so that the material can first fall from the feeding belt conveyor 34 to the guide plate 3902 of the head hopper 39, and then flow from the guide plate 3902 to the inclined wall of the hopper shell 3901, and finally fall from the discharge port of the hopper shell 3901 to the distribution belt conveyor 32.

[0149] The material guiding mechanism includes a buffer bin 36 and a telescopic chute 37 . A plurality of linearly evenly distributed buffer bins 36 are fixedly mounted on the main frame 31 . The discharge port of the buffer bin 36 is connected to the telescopic chute 37 via a discharge gate 38 .

[0150] In this embodiment, four linearly evenly distributed buffer bins 36 are fixedly mounted on the main frame 31, and the hoppers at both ends of the material distribution belt conveyor 32 are respectively located directly above the two buffer bins 36. The four buffer bins 36 are divided into two groups, and two non-adjacent buffer bins 36 form a group, and the hoppers at both ends of the material distribution belt conveyor 32 are located directly above one of the buffer bins 36 in one group.

[0151] The main frame 31 is respectively provided with travel switches at both ends of the motion track of the rail car 33, and a touch ruler is installed on the frame 3302 of the rail car 33. When the touch ruler touches the travel switch, the rail car 33 stops moving, so that the two end hoppers of the material distribution belt conveyor 32 are respectively located directly above the two buffer bins 36. At this time, the material distribution belt conveyor 32 is started, and the bulk materials enter the buffer bin 36 from the end hopper at one end of the material distribution belt conveyor 32, and then are input into the container through the buffer bin 36 and the telescopic chute 37. When the container is full, the material distribution belt conveyor 32 is started, and the belt conveyor rotates in the opposite direction, so that the bulk materials enter the other buffer bin 36 from the end hopper at the other end of the material distribution belt conveyor 32, thereby filling another container.

[0152] When the two containers below the material dividing belt conveyor 32 are loaded, the rail car 33 drives the material dividing belt conveyor 32 to move along the slide rail, so that the material dividing belt conveyor 32 moves to the square of the other two buffer bins 36, and then the other two containers are loaded in turn.

[0153] The telescopic chute 37 includes a connecting sleeve 3701, an inner chute, a dust removal cloth cylinder 3702 and an automatic lifting device. A feed port is provided on the upper part of the connecting sleeve 3701, and an inner sleeve is installed at the feed port. A dust removal interface is provided on the side of the connecting sleeve 3701. The lower part of the connecting sleeve 3701 is connected to the dust removal cloth cylinder 3702, and the lower end of the dust removal cloth cylinder 3702 is connected to the discharge pipe 3708. The lower end of the inner sleeve is connected to the inner chute, and the inner side of the dust removal cloth cylinder 3702 is connected to the inner chute through a connecting ring 3704.

[0154] The connecting sleeve 3701 is connected to the discharge pipe 3708 through an automatic lifting device, which includes a pulley 3707, a wire rope drum 3705 and a reduction motor 3706. The outside of the connecting sleeve 3701 is provided with a pulley 3707 and a wire rope drum 3705, the wire rope drum 3705 is connected to the reduction motor 3706, the wire rope passes around the pulley 3707, and the lower end of the wire rope is fixedly connected to the discharge pipe 3708. The dust removal interface is connected to the dust collector through a pipeline, which can absorb the dust generated during the feeding process, thereby reducing dust pollution.

[0155] The inner chute is composed of multiple conical cylinders 3703, which are connected end to end in sequence. The uppermost conical cylinder 3703 is fixedly connected to the inner sleeve in the connecting sleeve 3701, and the remaining conical cylinders 3703 are hinged to the connecting ring 3704 so that the conical cylinder 3703 can swing.

[0156] A rotating shaft 3711 is respectively installed on both sides of the conical cylinder 3703, and two rotating sleeves 3712 are symmetrically installed on the connecting ring 3704. The rotating sleeve 3712 is provided with an axial blind hole, and an arc-shaped through hole is provided on the outer wall of the rotating sleeve 3712 to communicate with the axial blind hole. The rotating shaft 3711 is inserted into the axial blind hole of the rotating sleeve 3712 to rotate with it. The outer end of the rotating shaft 3711 is vertically connected to the limit shaft 3710, and the limit shaft 3710 is placed in the arc-shaped through hole of the rotating sleeve 3712, so as to limit the rotation angle of the rotating shaft 3711.

[0157] In this embodiment, the rotation axes 3711 of the adjacent upper and lower conical cylinders 3703 are vertically distributed, so that the rotation directions of the two conical cylinders 3703 can be vertical, avoiding all the conical cylinders 3703 from deflecting in one direction and interfering with each other.

[0158] The dust cover 3709 is provided with a through hole at the center, and the lower end of the discharge pipe 3708 is provided with a flange, the outer diameter of the flange is larger than the diameter of the through hole of the dust cover 3709, the lower end of the discharge pipe 3708 passes through the through hole of the dust cover 3709 and the flange is pressed against the lower end of the dust cover 3709, and a material level sensor is installed at the lower end of the dust cover 3709, and the material level sensor is connected to the reduction motor 3706 through a circuit, and the height of the telescopic chute 37 is automatically raised and lowered according to the loading material level. When the material level sensor contacts the material, a signal is output to control the telescopic chute 37 to rise, and it stops after rising to a preset height.

[0159] The dust removal interface of the telescopic chute 37 is connected to the dust collector through a pipeline, which can reduce dust pollution during the material conveying process.

[0160] The operation process is as follows: when using the device of the present invention to load a container, place the container under the four buffer bins 36, start the telescopic chute 37, so that it drives the dust cover 3709 to snap into the upper opening of the container, use the loading belt conveyor 34 to transport the bulk materials to the dividing belt conveyor 32, the dividing belt conveyor 32 will put the bulk materials into the buffer bin 36, and then enter the container through the telescopic chute 37 for loading.

[0161] The present invention also includes an electric control system for controlling the action steps of the present invention. The electric control system includes a data acquisition device, an information processing module, a control module and a drive circuit relay; the data acquisition device includes a material level sensor, a load-bearing module and a wireless signal transmission module, the load-bearing module is provided with a pressure sensor, the load-bearing module is located at the lower end of the container, the material level sensor and the pressure sensor are connected to the wireless signal transmission module through a signal transmission wire, the wireless signal transmission module and the information processing module are connected by wireless signals, the information processing module and the control module are connected by wire or wireless means, the control module and the drive circuit relay are connected by wire or wireless means, and the drive circuit relay is connected to the drive device 3301 of the feeding mechanism and the material guiding mechanism.

[0162] The packing system has the following outstanding beneficial effects: 1. The present invention loads materials into the container through the feeding belt conveyor and the dividing belt conveyor. During the whole loading process, it is only necessary to drive the dividing belt conveyor to move to the upper end of the container through the rail car to load the materials. The hoppers at both ends of the dividing belt conveyor are respectively located directly above the two buffer bins. When the dividing belt conveyor fills the container at one end, the dividing belt conveyor is turned over to load the container at the other end, so that the dividing belt conveyor can move once to complete the loading operation of two containers, which greatly improves the loading efficiency; 2. There are four buffer bins placed under the material distribution belt conveyor. The four buffer bins are divided into two groups. Each pair of non-adjacent buffer bins forms a group. The hoppers at both ends of the material distribution belt conveyor are located directly above one of the buffer bins. When the present invention completes loading of the container under one of the buffer bins, it only needs to move a distance between two adjacent containers to move to the top of another buffer bin to continue loading the container. At this time, the group of containers that have completed loading is replaced. In this way, the above operation method can load the container uninterruptedly, greatly improving the loading efficiency. Advantages of telescopic chute: 1. The conical barrel of the present invention is hinged with the connecting ring. When the material impacts the inner wall of the conical barrel, the conical barrel can swing, thereby producing a certain buffering effect on the material; 2. The rotation axes of the adjacent upper and lower conical barrels of the present invention are vertically distributed, so that the rotation directions of the two conical barrels can be vertical, avoiding all the conical barrels from deflecting in one direction and interfering with each other.

[0163] The container delivery system includes a gantry straddle carrier and a container turner. The gantry straddle carrier is used to transfer containers. Compared with container trucks, it can be used for multiple purposes. The gantry straddle carrier can increase the height of the container, saving the handling device in the vertical direction, and is convenient for use with the container turner.

[0164] like Figure 10-11 As shown, the container turning machine includes a base 41, a standing platform 43, a hydraulically controlled door closing arm 47, a weighing sensor device, a hydraulic station and an electric control system. A turning mechanism 42 and a power mechanism 45 are arranged on the base 41;

[0165] The flip mechanism 42 includes a bracket 421, a load-bearing plate 422, a connecting rod 423 and a rotating rod 424; the brackets 421 are symmetrically arranged at the middle positions on both sides of the base 41, the brackets 421 and the base 41 are fixedly connected together, and a reinforcing plate 44 is fixedly connected between the base 41 and the bracket 421, which effectively ensures the stability of the bracket 421 and the base 41; the base 41 is mainly composed of a flipping area 411 and a loading area 412, and the flipping area 411 and the loading area 412 are respectively located on both sides of the bracket 421; the brackets 421 are pivotally connected with a load-bearing plate 422, and the load-bearing plate 422 is located above the base 41;

[0166] The connecting rod 423 is fixedly connected to the lower side of the standing platform 43, and the connecting rod 423 is symmetrically arranged on both sides of the standing platform 43; the connecting rod 423 and the bracket 421 are arranged in parallel; one end of the connecting rod 423 is pivotally connected to the end of the bearing plate 422 away from the loading area 412;

[0167] One end of the rotating rod is pivotally connected to the other end of the connecting rod 423, and the other end of the rotating rod is pivotally connected to the bracket 421; the rotating rod and the bearing plate 422 are arranged in parallel; one end of the connecting rod 423 is pivotally connected to the end of the bearing plate 422 away from the loading area 412;

[0168] One end of the rotating rod is pivotally connected to the other end of the connecting rod 423, and the other end of the rotating rod is pivotally connected to the bracket 421; the rotating rod and the load-bearing plate 422 are arranged in parallel; it can be seen that the turning mechanism 42 adopts the design of a parallelogram mechanism, when the turning machine turns over the container installed above the load-bearing plate 422, the standing platform 43 will be driven to move by the turning mechanism 42, but the standing platform 43 will always remain horizontal with the ground when moving, so that the staff on the standing platform 43 can open and close the container door above the load-bearing plate 422;

[0169] The standing platform 43 is mainly composed of a ladder frame part 431 and an operating part 432. The operating part 432 is fixedly connected to a side close to the connecting rod 423, and the ladder frame part 431 is connected and fixed to a side away from the connecting rod 423.

[0170] The power mechanism 45 is arranged between the base 41 and the load-bearing plate 422, and the power mechanism 45 is symmetrically arranged on both sides of the base 41 and the load-bearing plate 422; the power mechanism 45 includes a main hydraulic push rod 451 and an auxiliary hydraulic push rod 452; one end of the main hydraulic push rod 451 is pivoted to one side above the base 41 near the loading area 412 through a pivot joint, and the other end of the main hydraulic push rod 451 is pivoted to one end below the load-bearing plate 422 near the flipping area 411 through a pivot joint; one end of the auxiliary hydraulic push rod 452 is pivoted to one side above the base 41 near the flipping area 411 through a pivot joint, and the other end of the auxiliary hydraulic push rod 452 is pivoted to one end below the load-bearing plate 422 near the loading area 412 through a pivot joint; the main hydraulic push rod 451 and the auxiliary hydraulic push rod 452 are respectively connected to the hydraulic station through oil pipes, and the power mechanism 45 is driven by the hydraulic station to push and pull the two ends of the load-bearing plate 422 to realize the flipping movement of the container;

[0171] Container locks 46 are provided at the four corners of the load-bearing plate 422; hydraulically controlled door closing arms 47 are symmetrically provided below one end of the load-bearing plate 422 close to the standing platform 43, and the hydraulically controlled door closing arms 47 are connected to the hydraulic station through an oil pipe. After the container is loaded, the hydraulic station drives the hydraulically controlled door closing arms 47 to close the container door, and the staff only needs to lock the container door, which effectively improves the work efficiency;

[0172] The weighing sensor device includes a weighing sensor 48 and a weighing sensor host (not shown in the figure). The weighing sensor 48 is arranged at the upper end of the loading area 412 of the base 41. The weighing sensor device has a trade delivery measurement function. The data detected by the weighing sensor 48 is uploaded to the weighing sensor host in real time. The weighing sensor host can display in real time and automatically generate a signal to stop the loading when the loading reaches the set value.

[0173] The electric control system (not shown in the figure) includes an electric control box, an operating station, a remote control device, a solenoid valve, a pressure overload protection device and an emergency stop device; the pressure overload protection device adopts a pressure switch installed on the power mechanism 45 and various parts of the hydraulic station. When the equipment exceeds the set pressure value, the pressure switch will send a signal to the electric control box, and the electric control box will send a signal after receiving it, so that the main motor control power supply is separated and turned off. At this time, the oil pump motor in the hydraulic station stops running, which can prevent high pressure from damaging hydraulic components and pipelines, thereby protecting the equipment and extending the service life of the equipment;

[0174] The emergency stop device adopts a tripping disconnect switch, and an emergency stop button is configured on the electric control box. In an emergency, press the emergency stop button, which sends a signal to the controller. After receiving the signal, the controller sends a signal to the tripping disconnect switch to cut off the power, directly cutting off the main power supply.

[0175] The operating station is also equipped with a remote control device. The remote control device adopts a portable integrated backpack remote control, which can remotely control the integrated reversing valve in the hydraulic station. The integrated reversing valve adopts a combination of proportional reversing valve and manual reversing valve. The structure is a chip combination, electro-hydraulic proportional control, load sensitivity, and post-valve compensation LUDV, which can realize stepless speed regulation of the flipping speed and solve the pressure chatter to the greatest extent.

[0176] In a specific embodiment, the container is first transported to the top of the load-bearing plate 422 by means of a transporting device, with the container door close to the direction of the standing platform 43. Then, the container lock 46 is manually operated to fix the container above the load-bearing plate 422. After that, the hydraulic station is manually started at the operating station. The hydraulic station drives the main hydraulic push rod 451 to push the load-bearing plate 422 close to one end of the flipping area 411, and drives the auxiliary hydraulic push rod 452 to pull the load-bearing plate 422 close to one end of the loading area 412. The load-bearing plate 422 is driven to flip ninety degrees by the flipping mechanism 42, and the load-bearing plate 422 drives the container to flip to the flipping area 411. While the flipping machine is flipping, the staff on the standing platform 43 is driven to move to the working position by the flipping mechanism 42. The flipping mechanism 42 uses the principle of a parallelogram mechanism, and the standing platform 43 always keeps level with the ground during the movement. During the flipping movement of the flipping machine, the staff can remotely control the load-bearing plate 422 to rotate ninety degrees. The control device is used to perform stepless speed regulation on the tipping machine; after that, the staff opens the container door and starts loading; during the loading work, the staff can observe the loading status of the container in real time through the weighing sensor device. When the container is loaded to the set weight or the set height, the weighing sensor 48 or the height detector in the loading equipment sends a signal to the weighing sensor host, and the weighing sensor host sends a signal after receiving the signal to stop the loading equipment from loading; next, the staff drives the hydraulic station through the electronic control system, and the hydraulic station drives the hydraulically controlled door closing arm 47 to close the door, and then the staff located on the standing platform 43 locks the door; next, the staff drives the hydraulic station through the electronic control system, and the hydraulic station first resets the hydraulically controlled door closing arm 47, and then resets the power mechanism 45, and the power mechanism 45 drives the tipping mechanism 42, and the tipping mechanism 42 drives the container to reset, and finally the container is transported to the transportation equipment through the handling equipment and taken away.

[0177] The container delivery system is also designed with a hydraulically controlled door-closing arm. After the container is loaded, the hydraulically controlled door-closing arm can close the container door. The staff only needs to lock the container door, which effectively improves work efficiency. The advantages include a standing platform that moves with the container flipping, which is convenient for the staff to stand and work, and effectively reduces the probability of falling and getting injured due to improper operation during work. The design of the hydraulically controlled door-closing arm reduces the labor intensity of the staff and improves work efficiency.

[0178] The first conveying device includes a first belt conveyor and a first transfer room 55. The first belt conveyor is arranged at the lower part of the underground hopper. The discharge end of the first belt conveyor 51 and the feed end of the tail car belt conveyor are cooperatively arranged in the first transfer room 55.

[0179] The second conveying device includes a loader, a reserved belt conveyor 54, a second belt conveyor 52, a third belt conveyor 53, a second transfer room 56 and a third transfer room 57. The loader is used to transfer the materials piled in the stacking system to the second belt conveyor 52. The discharge end of the second belt conveyor 52 and the feed end of the third belt conveyor 53 are cooperatedly arranged in the second transfer room 56. The discharge end of the third belt conveyor 53 is connected to the packing system. The second belt conveyor 52 is arranged underground, and the reserved belt conveyor 54 is arranged on the ground. The reserved belt conveyor 54 and the second belt conveyor 52 are cooperatedly arranged in the third transfer room 57. The number of the reserved belt conveyor 54, the second belt conveyor 52, the third belt conveyor 53, the second transfer room 56 and the third transfer room 57 are all two and are symmetrically arranged on both sides of the stacking system.

[0180] The control system includes a main control room, which is respectively connected to the unloading system, the stacking system, the box loading system, the box delivery system and the transfer system electrically or through wireless communication equipment.

[0181] Embodiment 2: A control method for a bulk-to-container loading and unloading process system at a port comprises the following steps:

[0182] Step I: Unloading: The truck loaded with bulk coke and coal is driven into the unloading system. The unloading platform turns the truck over and unloads the bulk cargo into the underground hopper. The truck then drives away. The bulk cargo in the underground hopper is sent to the ground through the first belt conveyor, and then transferred in the transfer room to be sent to the tail truck belt conveyor.

[0183] Step II: Stacking: The stacking system operates, the tail car belt conveyor delivers the bulk cargo to the boom belt conveyor, and the boom belt conveyor stacks the bulk cargo into a pile of predetermined specifications and sizes;

[0184] Step III: Packing; the loader delivers the bulk cargo from the stockpile to the second belt conveyor, the second belt conveyor feeds the cargo to the third belt conveyor in the second transfer room, the third belt conveyor delivers the cargo to the packing system, and the packing system loads the bulk cargo into the container;

[0185] Step IV: Delivering containers; the gantry straddle carrier delivers the empty containers to the loading station and transports the full containers away for storage.

[0186] Step II adopts the following stockpile control method, including the following steps:

[0187] Step A, system information settings:

[0188] A1. Establish position coordinate system;

[0189] According to the position information in the stockyard, set the walking starting point and the walking ending point along the walking direction of the stacker. Taking the walking starting point as the coordinate origin, establish a coordinate system, number each stack position in the stockyard one by one, and after corresponding the stack position number with the position information one by one, store the stack position number and the position information in the PLC;

[0190] A2. Modify the stacking parameters;

[0191] The data acquisition device acquires the real-time image information, real-time height information and real-time gravity information of each stack position in the stockyard, and updates and stores the acquired information in the PLC;

[0192] A3. Set the stacking information;

[0193] Pre-set a material coding mechanism in the PLC, encode the material information to be stacked, input the material code into the PLC before stacking, and then calculate the upper limit value Hmax of the stacking height and the upper limit value Gmax of the stacking gravity corresponding to each stack position according to the information obtained in A1 and A2, and set them in the PLC;

[0194] Step B: Automatic stacking control:

[0195] B1. Stacking preparation;

[0196] The PLC sends an instruction, the walking mechanism and the rotating mechanism are started, the stacker moves to the first stack position and then stops, the pitching mechanism is started, the stacker is adjusted to the stacking position, and then the data acquisition device is triggered and acquires the real-time image information, real-time height information and real-time gravity information again, and then transmits the acquired information to the PLC;

[0197] B2. Stacking judgment;

[0198] The PLC receives the real-time information and makes a judgment. If the acquired height information 0 < H < Hmax or the gravity information 0 < G < Gmax, it is necessary to further judge whether stacking is required for this stack position and perform operation B3; if the acquired gravity information G = 0 and the height information H = 0, it is determined that stacking is required for this stack position and perform operation B4;

[0199] B3. Further stacking judgment;

[0200] When 0 < H < Hmax or 0 < G < Gmax, there are already materials at this stack position. Compare the real-time acquired material code information with the material code information to be stacked this time. If they are exactly the same, it is determined that stacking can be carried out and perform operation B4; if they are not exactly the same, it is determined that stacking cannot be carried out and perform operation B5;

[0201] B4. Stacking;

[0202] The PLC sends a command, the cantilever belt conveyor and the tail car belt conveyor start, the stacker performs the stacking operation, and the data acquisition device obtains real-time image information, real-time height information and real-time gravity information in real time, and transmits them to the PLC. The PLC makes a real-time judgment. When either H=Hmax or G=Gmax is achieved, it determines that the stacking is completed and stops stacking, and then executes the B5 operation;

[0203] B5. Carry out the next stockpile preparation;

[0204] When stacking is completed or cannot be completed, the PLC sends a command, the walking mechanism and the rotating mechanism start, so that the stacker moves to the next stacking position and then stops, and repeats B1-B5 operations until stacking is completed on all stacking positions.

[0205] In step A1, the stacking positions on the left side of the stacker are numbered as l1, l2, ..., ln, and the stacking positions on the right side of the stacker are numbered as r1, r2, r3, ..., rn.

[0206] Each stack is respectively provided with a photographing device, a height sensor, a pressure sensor and a wireless signal transmission module, and has corresponding stack number, the photographing device number is lp1, lp2...lpn, rp1, rp2...rpn, the height sensor number is lh1, lh2...lhn, rh1, rh2...rhn, and the corresponding pressure sensor number is lg1, lg2...lgn, rg1, rg2...rgn, the photographing equipment, height sensor and pressure sensor are connected to the wireless signal transmission module through a signal transmission line, and the wireless signal transmission module is connected to the PLC wirelessly.

[0207] In the repeated operation of step B5, the moving order of the stacker is l1, r1, l2, r2...ln, rn.

[0208] In step A2, the real-time height H1 of the pile is calculated based on the real-time image information, and the real-time height H2 of the pile is calculated based on the height information. The calculated heights H1 and H2 of the pile are compared. When the data are consistent, the equipment is judged to be in normal use. When the data are inconsistent, the actual height H is re-acquired and compared with the heights H1 and H2. The equipment with the correct value is selected for continued use, and the equipment with erroneous data is repaired in time.

[0209] In step B4, the PLC calculates the swing amplitude of the pitch mechanism according to the acquired real-time image information, real-time height information and real-time gravity information, and sends instructions to the pitch mechanism, and the pitch mechanism executes according to the instructions.

[0210] Step III adopts the following packing control method, including the following steps:

[0211] Step 1: The information processing module is set to record the maximum height Hmax and the maximum mass Mmax of the container materials, and wait for the container to be turned over;

[0212] Step 2: Turn over the container and place it on the load-bearing module. The pressure sensor transmits the detected data to the information processing platform through the wireless signal transmission module. The information processing platform analyzes the acquired data and calculates the empty container mass M0. The control module sends a descending signal to the drive circuit relay to control the telescopic chute to descend until the dust cover at the lower end of the telescopic chute is buckled at the opening of the container. The material level sensor signal is transmitted to the information processing module through the wireless signal transmission module. The data information platform analyzes and calculates the empty container height H0.

[0213] Step 3: After data collection is completed, the control module transmits signals to the rail car and the unloading gate respectively, controls the unloading gate to open, and enables the rail car to drive the material distribution belt conveyor to move to the travel switch position. At this time, the two end hoppers of the material distribution belt conveyor are located directly above a group of buffer bins. The rail car touches the travel switch, and the travel switch transmits the signal to the control module. The control module sends a signal to the loading belt conveyor and the material distribution belt conveyor, so that they transport the materials into the container. The material level sensor and pressure sensor monitor the height and quality of the container materials in real time.

[0214] Step 4: When either Hmax or Mmax reaches the maximum value, the control module sends a stop unloading signal to the drive circuit relay to control the unloading gate to close. The control module sends a lifting signal to the drive circuit relay to control the telescopic slide and the dust cover to lift to the initial position to complete the container loading operation.

[0215] Step 5: The control module transmits a signal to the material distribution belt conveyor to make it rotate in the opposite direction to load the container at the other end. When any of the Hmax and Mmax values ​​of the other container reaches the maximum value, the control module sends a stop unloading signal to the drive circuit relay to control the unloading gate to close. The control module sends a lifting signal to the drive circuit relay to control the telescopic chute and the dust cover to lift to the initial position, completing the container loading operation and thus completing a set of container loading operations.

[0216] Step six: The control module transmits a signal to the rail car, causing the rail car to drive the material distribution belt conveyor to move above the other two containers. At this time, the rail car touches the travel switch, and the travel switch transmits a signal to the control module. The control module sends a signal to the loading belt conveyor and the material distribution belt conveyor, causing them to repeat steps four and five to complete the loading operation for another group of containers.

[0217] The above is a detailed description of an embodiment of the present invention, but the content is only a preferred embodiment of the present invention and cannot be considered to limit the scope of implementation of the present invention. All equivalent changes and improvements made within the scope of the present invention should fall within the scope of the patent coverage of the present invention.

Claims

1. Port bulk to container loading and unloading process system, characterized by: Including unloading system, stacking system, box loading system, box delivery system and transfer system; The unloading system is used for unloading bulk cargo in trucks; The stacking system is used to stack the unloaded bulk cargo as required; The box packing system is used to pack bulk cargo into containers; The container delivery system is used to deliver containers; The transfer system includes a first conveying device and a second conveying device, wherein the first conveying device is used to transfer the bulk cargo unloaded by the unloading system to the stacking system, and the second conveying device is used to transfer the bulk cargo stacked by the stacking system to the packing system; The unloading system includes a pit, a hydraulic unloading platform, an underground hopper and a hydraulic tipping platform; The hydraulic unloading platform includes an unloading platform and an unloading hydraulic cylinder. The unloading platform is covered and arranged above the pit. One end of the unloading platform is hinged to the pit through a rotating shaft, and the other end of the unloading platform is in contact with the pit. The upper end of the unloading hydraulic cylinder is hinged to the middle of the unloading platform, and the lower end of the unloading hydraulic cylinder is hinged to the lower part of the pit. The underground funnel is adjacent to the pit and is located on the side close to the rotating shaft. The hydraulic flip platform is covered and arranged above the underground funnel and allows vehicles to pass through and drive to the top of the hydraulic unloading platform. The hydraulic flip platform includes a sub-plate, a main plate and a flip hydraulic cylinder. The sub-plate and the main plate are hingedly arranged. The sub-plate is arranged close to the rotating shaft. One end of the sub-plate away from the main plate is slidably connected to the underground funnel. One end of the main plate away from the sub-plate is hingedly arranged to the upper part of the underground funnel. The upper part of the flip hydraulic cylinder is movably connected to the main plate through a connecting piece, and the lower part of the flip hydraulic cylinder is hingedly arranged to the underground funnel. The number of unloading systems is at least one; In addition to one or more unloading systems, there is also an unloading dust removal system, which includes an unloading dust removal shed, and a medium-pressure micro-mist dust suppression system is provided on the unloading dust removal shed; The unloading system also includes an unloading control system, which includes an unloading local control device and an unloading monitoring device. The unloading local control device includes an unloading control button for controlling the unloading hydraulic cylinder and a flip control button for controlling the flip hydraulic cylinder. The unloading monitoring device includes a monitoring room, a display and multiple cameras. The display is arranged in the monitoring room, and the multiple cameras are arranged close to the unloading system. The cameras are connected to the display through cables. The packing system includes a main frame, a feeding mechanism is installed on the upper end of the main frame, and a plurality of material guiding mechanisms are installed below the feeding mechanism; the feeding mechanism includes a feeding belt conveyor and a material dividing assembly, and the material dividing assembly includes a material dividing belt conveyor and a rail car, and the material dividing belt conveyor is installed on the upper end of the rail car; a slide rail is installed on the upper end of the main frame, and the rail car cooperates with the slide rail; the material guiding mechanism includes a buffer bin and a telescopic chute, and a plurality of linearly evenly distributed buffer bins are fixedly installed on the main frame, and the discharge port of the buffer bin is connected to the telescopic chute; The rail vehicle includes a frame, rail wheels and a driving device. The frame is equipped with multiple sets of rail wheels. The driving device is installed on the frame. The driving device is connected to the rail wheels through a transmission mechanism. A material dividing belt conveyor is installed on the upper end of the frame. A head hopper is installed at the discharge end of the feeding belt conveyor; The head hopper includes a hopper shell and a guide plate. The lower half of the hopper shell is provided with an inclined wall. The guide plate is installed on the wall opposite to the inclined wall of the hopper shell. The upper end of the guide plate is hinged to the inner wall of the hopper shell. A threaded sleeve is installed on the outer wall of the hopper shell. The threaded sleeve cooperates with a limiting screw. The limiting screw passes through the threaded through hole of the threaded sleeve and is pressed against the back of the guide plate. The discharge port of the buffer bin is connected to the telescopic chute through a discharge gate; Four linearly evenly distributed buffer bins are installed on the main frame, and the hoppers at both ends of the material distribution belt conveyor are located directly above the two buffer bins; The four buffer bins are divided into two groups, with two non-adjacent buffer bins forming one group. The hoppers at both ends of the material distribution belt conveyor are located directly above one of the buffer bins in one group; The main frame is equipped with travel switches at both ends of the motion track of the rail car, and a touch scale is installed on the frame of the rail car; The telescopic chute includes a connecting sleeve, an inner chute, a dust-removing cloth cylinder and an automatic lifting device. A feed port is arranged on the upper part of the connecting sleeve, an inner sleeve is installed at the feed port, a dust-removing interface is arranged on the side of the connecting sleeve, the lower part of the connecting sleeve is connected with the dust-removing cloth cylinder and the discharge pipe in sequence, the lower end of the inner sleeve is connected with the inner chute, and the inner side of the dust-removing cloth cylinder is connected with the inner chute through a connecting ring; the connecting sleeve and the discharge pipe are connected through an automatic lifting device; the characteristic is that: the inner chute is composed of a plurality of conical cylinders, the plurality of conical cylinders are sleeved in sequence head to tail, the uppermost conical cylinder is fixedly connected with the inner sleeve in the connecting sleeve, and the remaining conical cylinders are hinged with the connecting ring; The automatic lifting device comprises a pulley, a wire rope drum and a reduction motor. The pulley and the wire rope drum are arranged outside the connecting sleeve. The wire rope drum is connected to the reduction motor. The wire rope passes around the lower end of the pulley and is connected to the discharge pipe. The conical cylinder and the connecting ring are hinged in such a way that a rotating shaft is installed on both sides of the conical cylinder respectively, and two rotating sleeves are symmetrically installed on the connecting ring. The rotating sleeves are provided with axial blind holes, and the rotating shaft is inserted into the axial blind holes of the rotating sleeves to rotate with them. The outer wall of the rotating sleeve is provided with an arc-shaped through hole communicating with the axial blind hole, the outer end of the rotating shaft is vertically connected to the limiting shaft, and the limiting shaft is placed in the arc-shaped through hole of the rotating sleeve; The rotation axes of two adjacent conical cylinders are vertically distributed; The lower end of the discharge pipe is sleeved with the dustproof cover plate; It also includes an electric control system for the packing system, which includes a data acquisition device, an information processing module, a control module and a drive circuit relay; the data acquisition device includes a material level sensor, a load-bearing module and a wireless signal transmission module, the load-bearing module is provided with a pressure sensor, the load-bearing module is located at the lower end of the container, the material level sensor and the pressure sensor are connected to the wireless signal transmission module through a signal transmission wire, the wireless signal transmission module and the information processing module are connected by wireless signals, the information processing module and the control module are connected by wired or wireless means, the control module and the drive circuit relay are connected by wired or wireless means, and the drive circuit relay is connected to the drive device of the feeding mechanism and the material guiding mechanism.

2. The port bulk to container loading and unloading process system according to claim 1 is characterized by: The stacking system includes a stacker and a stacking control system. The stacker includes a walking mechanism, a cantilever belt conveyor, a tail car belt conveyor, a rotating mechanism and a pitching mechanism. The stacking control system includes a PLC and a data acquisition device. The data acquisition device includes a photographing device, a height sensor, a pressure sensor and a wireless signal transmission module. The photographing device and the height sensor are located at the center of the outside of the stack, and the pressure sensor is located underground at the center of the stack. The photographing device, the height sensor and the pressure sensor are connected to the wireless signal transmission module through a signal transmission line, and the wireless signal transmission module is connected to the PLC in a wireless manner. The PLC controls the start and stop of the traveling mechanism, cantilever belt conveyor, tail car belt conveyor, rotating mechanism and pitching mechanism by wireless and / or wired means.

3. The port bulk to container loading and unloading process system according to claim 2 is characterized by: The container delivery system includes a gantry straddle carrier and a container tipper; The container turning machine includes a base, a standing platform, a hydraulically controlled door closing arm, a weighing sensor device, a hydraulic station and an electric control system. A turning mechanism and a power mechanism are arranged on the base. The turning mechanism includes a bracket, a load-bearing plate, a connecting rod and a rotating rod. The brackets are symmetrically arranged at the middle positions on both sides of the base, and the brackets and the base are fixedly connected together; the base is mainly composed of a turning area and a loading area, and the turning area and the loading area are respectively located on both sides of the bracket; A load-bearing plate is pivotally connected between the brackets, and the load-bearing plate is located above the base; The connecting rod is fixedly connected to the lower side of the standing platform, and the connecting rod is symmetrically arranged on both sides of the standing platform; the connecting rod and the bracket are arranged in parallel; one end of the connecting rod is pivotally connected to the end of the bearing plate away from the loading area; One end of the rotating rod is pivotally connected to the other end of the connecting rod, and the other end of the rotating rod is pivotally connected to the bracket; the rotating rod and the load-bearing plate are arranged in parallel; The power mechanism is arranged between the base and the load-bearing plate, and the power mechanism is symmetrically arranged on both sides of the base and the load-bearing plate; the power mechanism includes a main hydraulic push rod and an auxiliary hydraulic push rod; one end of the main hydraulic push rod is pivotally connected to a side of the base close to the loading area through a pivotal member, and the other end of the main hydraulic push rod is pivotally connected to an end of the load-bearing plate close to the flipping area through a pivotal member; one end of the auxiliary hydraulic push rod is pivotally connected to a side of the base close to the flipping area through a pivotal member, and the other end of the auxiliary hydraulic push rod is pivotally connected to an end of the load-bearing plate close to the loading area through a pivotal member; Container locks are arranged at the four corners of the load-bearing plate; hydraulically controlled door closing arms are symmetrically arranged below one end of the load-bearing plate close to the standing platform; The main hydraulic push rod, the auxiliary hydraulic push rod and the hydraulically controlled door closing arm are connected to the hydraulic station through oil pipes respectively; The weighing sensor device comprises a weighing sensor, which is arranged at the upper end of the loading area of ​​the base; The standing platform is mainly composed of a ladder frame part and an operating part, the operating part is fixedly connected to a side close to the connecting rod, and the ladder frame part is connected and fixed to a side far from the connecting rod; A reinforcing plate is fixedly connected between the base and the bracket; The electric control system includes an electric control box, an operating station, a remote control device, a solenoid valve, a pressure overload protection device and an emergency stop device.

4. The port bulk to container loading and unloading process system according to claim 3 is characterized by: The first conveying device includes a first belt conveyor and a first transfer room, the first belt conveyor is arranged at the lower part of the underground funnel, and the discharge end of the first belt conveyor and the feed end of the tail car belt conveyor are cooperatively arranged in the first transfer room; The second conveying device includes a loader, a reserved belt conveyor, a second belt conveyor, a third belt conveyor, a second transfer machine room and a third transfer machine room. The loader is used to transfer the materials stacked in the stacking system to the second belt conveyor. The discharge end of the second belt conveyor and the feed end of the third belt conveyor are cooperatedly arranged in the second transfer machine room. The discharge end of the third belt conveyor is connected to the packing system. The second belt conveyor is arranged underground, and the reserved belt conveyor is arranged on the ground. The reserved belt conveyor and the second belt conveyor are cooperatedly arranged in the third transfer machine room. The number of the reserved belt conveyor, the second belt conveyor, the third belt conveyor, the second transfer machine room and the third transfer machine room are all two and are symmetrically arranged on both sides of the stacking system.

5. The port bulk to container loading and unloading process system according to claim 4 is characterized by: The control system includes a main control room, which is respectively connected to the unloading system, the stacking system, the box loading system, the box delivery system and the transfer system electrically or through wireless communication equipment.

6. The control method of the port bulk to container loading and unloading process system according to claim 5 is characterized in that: The following steps are involved: Step Ⅰ: Unloading; A truck loaded with bulk coke and coal is driven into the unloading system, and the unloading platform turns the truck over to unload the bulk cargo into the underground hopper. The truck then drives away, and the bulk cargo in the underground hopper is sent to the ground through the first conveying device and transferred to the stockpiling system. Step II: Stacking; The stockpiling system operates to stack bulk cargo into stockpiles of predetermined sizes; Step III: Packing; The second conveying device delivers the bulk cargo from the stockpile to the packing system, and the packing system packs the bulk cargo into the container; Step IV: Send the box; The container delivery system delivers empty containers to the loading station and transports full containers away for storage.

7. The control method of the port bulk to container loading and unloading process system according to claim 6 is characterized in that: Step II adopts the following stockpile control method, including the following steps: Step A, system information settings: A1. Establish position coordinate system; According to the position information in the stockpile yard, along the walking direction of the stocker, the walking starting point and the walking ending point are set, and the walking starting point is used as the coordinate origin to establish a coordinate system, and the stacks in the stockpile yard are numbered one by one, and the stacks on the left side of the stocker are numbered as l1, l2...ln, and the stacks on the right side of the stocker are numbered as r1, r2, r3...rn, and each stack is respectively provided with a corresponding shooting device, a height sensor, a pressure sensor and a wireless signal transmission module, and corresponding to the stack number, the shooting device number is lp1, lp2...lpn, rp1, rp2...rpn, the height sensor number is lh1, lh2...lhn, rh1, rh2...rhn, and the corresponding pressure sensor number is lg1, lg2...lgn, rg1, rg2...rgn, and after the stack number and the position information are matched one by one, the stack number and the position information are stored in the PLC; A2. Correct the stockpiling parameters; The data acquisition device acquires real-time image information, real-time height information and real-time gravity information of each stacking position in the stockpile yard, and updates and stores the acquired information in the PLC; A3. Set the stacking information; Set up a material coding mechanism in the PLC in advance, encode the material information that needs to be stacked, enter the material code into the PLC before stacking, and then calculate the upper limit value Hmax of the stacking height and the upper limit value Gmax of the stacking gravity corresponding to each stack position according to the information obtained by A1 and A2, and set them in the PLC; Step B: Automatic stacking control: B1. Stacking preparation; The PLC sends an instruction, the traveling mechanism and the rotating mechanism are started, the stacker moves to the first stack position and then stops, the pitching mechanism is started, the stacker is adjusted to the stacking position, and then the data acquisition device is triggered and obtains real-time image information, real-time height information and real-time gravity information again, and then transmits the obtained information to the PLC; B2. Stacking judgment; The PLC receives the real-time information and makes a judgment. If the obtained height information is 0 < H < Hmax or the gravity information is 0 < G < Gmax, it is necessary to further judge whether stacking is required for this stack position and perform operation B3; if the obtained gravity information is G = 0 and the height information is H = 0, it is determined that stacking is required for this stack position and operation B4 is performed; B3. Further stacking judgment; When 0 < H < Hmax or 0 < G < Gmax, there is already material at this stack position. Compare the real-time obtained material code information with the material code information that needs to be stacked this time. If they are exactly the same, it is determined that stacking can be performed and operation B4 is performed; if they are not exactly the same, it is determined that stacking cannot be performed and operation B5 is performed; B4. Stacking; The PLC sends an instruction, the cantilever belt conveyor and the tail car belt conveyor are started, the stacker performs the stacking operation, the data acquisition device obtains real-time image information, real-time height information and real-time gravity information in real time and transmits them to the PLC. The PLC makes a real-time judgment. When either H = Hmax or G = Gmax is achieved, it is determined that the stacking is completed and the stacking is stopped, and then operation B5 is performed; B5. Perform the next stacking preparation; When the stacking is completed or stacking cannot be performed, the PLC sends an instruction, the traveling mechanism and the rotating mechanism are started, the stacker moves to the next stack position and then stops, and operations B1 - B5 are repeated. The moving order of the stacker is l1, r1, l2, r2... ln, rn until the stacking on all stack positions is completed.

8. The control method of the port bulk to container loading and unloading process system according to claim 6, characterized in that: Step III adopts the following packing control method, including the following steps: Step 1: The information processing module sets and records the maximum value Hmax of the material height and the maximum value Mmax of the material mass in the container, and waits for the container to complete flipping; Step 2: Flip the container. The container is placed on the load-bearing module. The data detected by the pressure sensor is transmitted to the information processing module through the wireless signal transmission module. The information processing module analyzes the obtained data to calculate the empty box mass M0 of the container. The control module sends a descending signal to the driving circuit relay to control the telescopic chute to descend until the dust-proof cover at the lower end of the telescopic chute is buckled at the opening of the container. The signal of the level sensor is transmitted to the information processing module through the wireless signal transmission module. The information processing module analyzes and calculates to obtain the empty box height H0 of the container; Step 3: After data collection is completed, the control module transmits signals to the rail car and the unloading gate respectively, controls the unloading gate to open, and enables the rail car to drive the material distribution belt conveyor to move to the travel switch position. At this time, the hoppers at both ends of the material distribution belt conveyor are located directly above a group of buffer bins. The rail car touches the travel switch, and the travel switch transmits the signal to the control module. The control module sends a signal to the feeding belt conveyor and the material distribution belt conveyor, so that they transport the materials into the container. The material level sensor and the pressure sensor monitor the height and quality of the container materials in real time; Step 4: When either Hmax or Mmax reaches the maximum value, the control module sends a stop unloading signal to the drive circuit relay to control the unloading gate to close, and the control module sends a lifting signal to the drive circuit relay to control the telescopic slide and the dust cover to lift to the initial position, completing the container loading operation; Step 5: The control module transmits a signal to the material distribution belt conveyor to make it rotate in the opposite direction to load the container at the other end. When any value of Hmax and Mmax of the other container reaches the maximum value, the control module sends a stop unloading signal to the drive circuit relay to control the unloading gate to close. The control module sends a lifting signal to the drive circuit relay to control the telescopic slide pipe and the dust cover to be lifted to the initial position to complete the container loading operation, thereby completing a set of container loading operations; Step six: The control module transmits a signal to the rail car, causing the rail car to drive the material distribution belt conveyor to move above the other two containers. At this time, the rail car touches the travel switch, and the travel switch transmits a signal to the control module. The control module sends a signal to the loading belt conveyor and the material distribution belt conveyor, causing them to repeat steps four and five to complete the loading operation for another group of containers.