Analysis and control method of sealing time of post-casting zone after settlement
Through the combination of finite element analysis and Kalman filtering formula, the theory and measured data are corrected in real time, the problem of closing time of the post-subsidence pouring belt in super high-rise buildings is solved, and the precise control and prediction of differential deformation is achieved, and engineering efficiency is improved and reduced are reduced. The cost.
Patent Information
- Application Number
- CN202111025754.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-09-02
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2041-09-02
AI Technical Summary
In the design of super high-rise buildings, due to the large differences in load and structural stiffness between the main building and the podium, the settlement deformation is inconsistent. It is difficult and accurate to determine the closing time of the casting tape after settlement in the existing technology, which affects construction efficiency and cost.
By combining the theoretical differential deformation curve and measured data, the differential deformation value is corrected in real time to determine the enclosure time of the casting tape after settlement to ensure that the differential deformation meets the enclosure requirements.
It realizes the precise control of the differential deformation of settlement between the main building of the super-high-rise building and the podium and the effective prediction of future differential deformation, ensuring the optimal control of the enclosure time of the casting belt after settlement, improving engineering efficiency, reducing costs and construction difficulty.
Smart Images

Figure CN113806842B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to a method for analyzing and controlling the closing time of a settlement post-casting strip. Background Art
[0002] During the design and construction of super high-rise buildings, one or more high-rise buildings and low-rise podiums are usually built on large underground buildings. Due to the large differences in load and structural stiffness between high-rise buildings and podiums, large differential settlement deformations are generated. Usually, setting up settlement post-casting strips is an effective means to coordinate the deformation of the main building and the podium. When the settlement on both sides of the settlement post-casting strip tends to be stable, the sealing operation of the settlement post-casting strip can be carried out. However, considering that the retention of the settlement post-casting strip will greatly affect the organization of traffic lines, material transportation, electromechanical settings, interior decoration, etc. at the construction site, from the perspective of engineering construction, the benefits of early closure of the post-casting strip are obvious. It can be seen that there is a contradiction between the early closure and late closure of the settlement post-casting strip.
[0003] During the construction process, the differential deformation between the main building and the settlement post-cast strip is generally monitored. When the trend of the differential deformation slows down, the strip is closed. However, due to the long construction time of the main building, the post-cast strip is generally closed late, which has an adverse effect on the on-site construction. Or the post-cast strip is artificially closed too early, resulting in a large differential deformation between the main building and the podium, affecting its stress state. Summary of the invention
[0004] The purpose of the present invention is to provide a method for analyzing and controlling the closing time of a post-casting zone of settlement.
[0005] In order to solve the above problems, the present invention provides a method for analyzing and controlling the closing time of a post-casting zone after settlement, comprising:
[0006] According to the construction conditions of the main building and the podium of the super high-rise building, the finite element analysis of the construction phase was carried out based on the construction parameter values of the main building, and the theoretical difference deformation curve between the settlement of the main building and the settlement of the podium under real conditions was calculated;
[0007] During the current stage of construction of the main building and the podium, the actual difference deformation value between the settlement of the main building and the settlement of the podium during the current stage of construction is measured using preset equipment and measurement methods;
[0008] Based on the theoretical difference deformation curve between the settlement at the main building position and the settlement at the podium position under real conditions, the theoretical value noise variance of the theoretical difference deformation value is determined;
[0009] Based on the actual differential deformation value between the settlement at the main building position and the settlement at the podium position during the current stage of the construction process, the measurement noise variance of the actual differential deformation value is determined;
[0010] After the construction of the main building and the next stage of the podium, the preset equipment and measurement method are used to measure the actual difference deformation value between the settlement of the main building and the settlement of the podium in the next stage of the construction process, and the theoretical difference deformation curve, the measured actual difference deformation value between the settlement of the main building and the settlement of the podium in the next stage of the construction process, the theoretical value noise variance of the theoretical difference deformation value and the measurement noise variance of the actual difference deformation value are substituted into the Kalman filter formula to obtain a corrected theoretical difference deformation curve; this step is repeated after the construction of the main building and each next stage of the podium until the slope of the corrected theoretical difference deformation curve is less than the preset threshold.
[0011] Furthermore, in the above method, based on the theoretical difference deformation curve between the settlement at the main building position and the settlement at the podium position under real conditions, the theoretical value noise variance of the theoretical difference deformation value is determined;
[0012] Taking a preset percentage range of the construction parameter value of the main building, and taking each preset percentage as one level in the preset percentage range, performing finite element analysis in the construction stage based on the construction parameter value of the main building of each level, and calculating and obtaining a theoretical difference deformation curve between the settlement of the main building position and the settlement of the podium position of each level;
[0013] The theoretical difference deformation curves between the settlement at the main building position and the settlement at the podium position of each level and the theoretical difference deformation curves between the settlement at the main building position and the settlement at the podium position under actual conditions are summarized and the variance is calculated to obtain the theoretical value noise variance of the theoretical difference deformation value.
[0014] Furthermore, in the above method, the preset percentage range is 60% to 140%.
[0015] Furthermore, in the above method, the preset percentage is 10%.
[0016] Furthermore, in the above method, based on the actual differential deformation value between the settlement at the main building position and the settlement at the podium position during the current stage of the construction process, the measurement noise variance of the actual differential deformation value is determined, including:
[0017] When the main building and the podium are both in a stopped construction state, the preset equipment and measurement method are used to measure the actual difference deformation value between the settlement at the main building position and the settlement at the podium position for multiple consecutive times at preset intervals;
[0018] The actual differential deformation values between the settlement of the main building and the settlement of the podium obtained from each measurement when both the main building and the podium were in a state of stopped construction, and the actual differential deformation values between the settlement of the main building and the settlement of the podium in the current stage of the construction process were summarized and calculated for variance to obtain the measurement noise variance of the actual differential deformation values.
[0019] Furthermore, in the above method, the construction parameters of the main building may include: the number of leading construction floors of the main building, the deadweight value of the concrete of the main building, and the shrinkage creep value of the concrete at the location of the post-casting zone of the main building.
[0020] Furthermore, in the above method, until the slope of the corrected theoretical difference deformation curve is less than a preset threshold, the method comprises:
[0021] Until the slope of the corrected theoretical difference deformation curve is equal to 0.
[0022] Compared with the prior art, the present invention relies on both theoretical data and measured data of the differential deformation between the main building and the podium to perform real-time filtering operations. On the one hand, the theoretical differential deformation can be corrected, and on the other hand, a theoretical basis can be provided for the use of measured data in determining the closure time.
[0023] The present invention can achieve accurate control of the settlement differential deformation between the main building and the podium of a super high-rise building, and can effectively predict the differential deformation that will occur in the future, so that the closing time control of the post-settlement cast-in-place strip is optimal.
[0024] The present invention provides an effective solution to the technical problem of sealing the post-casting zone after settlement; when the differential deformation meets the sealing requirements, the sealing time can be accurately determined early, which is of great value in improving engineering efficiency, accelerating engineering progress, reducing engineering costs and construction difficulty; the present invention has simple calculation and high precision, and can ensure sufficient real-time performance even in the case of automated measurement. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 It is a flow chart of a method for analyzing and controlling the closing time of a post-casting zone of settlement according to an embodiment of the present invention. DETAILED DESCRIPTION
[0026] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.
[0027] like Figure 1 As shown, the present invention provides a method for analyzing and controlling the closing time of a post-casting zone after settlement, comprising:
[0028] Step S1, for the construction of the main building and the podium of the super high-rise building, a finite element analysis is performed in the construction phase based on the construction parameter value of the main building, and a theoretical difference deformation curve between the settlement of the main building and the settlement of the podium under real conditions is calculated;
[0029] Here, finite element analysis can be performed during the construction phase for the main building construction and the podium construction of super high-rise buildings to calculate the theoretical difference deformation value between the settlement at the main building location and the settlement at the podium location. The theoretical difference deformation curve should take time as the horizontal coordinate and the theoretical difference deformation value between the settlement at the main building location and the settlement at the podium location as the vertical coordinate. The number of leading construction floors of the main building and the deadweight of concrete considered in this calculation should match the actual construction situation to obtain the theoretical difference deformation curve between the settlement at the main building location and the settlement at the podium location under real conditions. The theoretical difference deformation value between the settlement at the main building location and the settlement at the podium location at each time point can be extracted from the theoretical difference deformation curve between the settlement at the main building location and the settlement at the podium location under real conditions, and the time point can be accurate to the hour level.
[0030] The construction parameters of the main building may include: the number of leading construction floors of the main building, the self-weight value of the concrete of the main building, and the shrinkage and creep value of the concrete at the location of the post-casting zone of the main building.
[0031] Step S2, during the current stage of the construction of the main building and the podium, using a preset device and measurement method, the actual difference deformation value between the settlement of the main building and the settlement of the podium during the current stage of the construction process is measured;
[0032] Here, the measured value of the actual difference deformation value between the settlement at the main building location and the settlement at the podium location and the measurement time can be recorded by manual means or automatic means;
[0033] Step S3, determining a theoretical value noise variance of the theoretical difference deformation value based on a theoretical difference deformation curve between the settlement at the main building position and the settlement at the podium position under real conditions;
[0034] Here, step S3 may include:
[0035] Step S31, taking 60% to 140% of the construction parameter value of the main building, and performing finite element analysis in the construction phase based on the construction parameter value of the main building in each level of 10% in the range of 60% to 140%, and calculating the theoretical difference deformation curve between the settlement of the main building position and the settlement of the podium position in each level;
[0036] Step S32, summarizing the variance calculation of the theoretical difference deformation curves between the settlement at the main building position and the settlement at the podium position of each file, and the theoretical difference deformation curves between the settlement at the main building position and the settlement at the podium position under actual conditions, to obtain the theoretical value noise variance of the theoretical difference deformation value.
[0037] Here, the noise variance is calculated by adjusting various parameters such as the number of leading construction floors of the main building, the deadweight of the main building concrete, and the shrinkage creep of the concrete at the location of the main building settlement post-casting zone (generally, the construction parameter value of the main building in step S1 can be adjusted to 60% to 140%, divided into 10% each level), and the theoretical difference deformation under each level of parameter adjustment results is calculated. The theoretical difference deformation after parameter adjustment is used as a sample, and the theoretical difference deformation sample calculated under the actual conditions obtained in step S1 is summarized to perform variance calculation as the theoretical value noise variance. The theoretical value noise variance is relatively large, indicating that the calculation error of the theoretical difference deformation is relatively large.
[0038] Step S4, determining the measurement noise variance of the actual differential deformation value based on the actual differential deformation value between the settlement at the main building position and the settlement at the podium position during the current stage of the construction process;
[0039] Here, step S4 includes:
[0040] Step S41, when both the main building and the podium are in a stopped construction state, the preset equipment and measurement method are used to measure the actual difference deformation value between the settlement of the main building and the settlement of the podium for a plurality of consecutive times at preset intervals;
[0041] Step S42, summarizing the variance calculation of the actual differential deformation values between the settlement of the main building and the settlement of the podium obtained from each measurement when both the main building and the podium are in a state of stopping construction, and the actual differential deformation values between the settlement of the main building and the settlement of the podium during the current stage of the construction process, so as to obtain the measurement noise variance of the actual differential deformation values;
[0042] Here, the measurement noise variance in step S41 can be obtained by using the same equipment and the same measurement method as step S2. When both the main building and the podium are in a state of stopping construction, the difference deformation value is measured for a certain period of time (such as 1 hour) every hour for a continuous multiple times, and the actual difference deformation value between the settlement of the main building position and the settlement of the podium position in the current stage of the construction process of step S2 is summarized, and the variance of each measurement result sample is calculated as the measurement value noise variance. Here, a relatively small measurement value noise variance is obtained, indicating that the measurement error of the actual difference deformation value is relatively small.
[0043] Step S5, after the main building construction and the next stage of the podium construction process, the actual differential deformation value between the settlement of the main building position and the settlement of the podium position in the next stage of the construction process is measured using a preset device and a measurement method, and the theoretical differential deformation curve, the measured actual differential deformation value between the settlement of the main building position and the settlement of the podium position in the next stage of the construction process, the theoretical value noise variance of the theoretical differential deformation value, and the measurement noise variance of the actual differential deformation value are substituted into the Kalman filter formula to obtain a corrected theoretical differential deformation curve;
[0044] Step S5 is repeated after each next stage of the main building construction and the podium construction process until the slope of the corrected theoretical difference deformation curve is less than a preset threshold.
[0045] Here, after the next stage of main building construction and podium construction, the actual differential deformation value can be measured, and the theoretical differential deformation value and the actual differential deformation value of the theoretical differential deformation curve of step S1 can be substituted into the Kalman filter formula to obtain the filtered estimated value of the differential deformation of the post-settlement cast-in-place strip. At the same time, the theoretical value noise variance and the measured value noise variance can also be substituted into the Kalman filter formula to obtain the corrected theoretical differential deformation curve.
[0046] The operation of step S5 can be repeated in each construction stage, and the differential deformation of the settlement post-casting strip can be continuously corrected theoretically and measured, and the closure time of the settlement post-casting strip can be determined based on the corrected data, for example, when the slope of the corrected theoretical differential deformation curve is equal to 0.
[0047] Since the filter estimation variance is independent of the measured value and only related to the noise variance, the filter estimation variance can be calculated in advance, and then the corrected differential deformation curve can be given in advance as a judgment principle for the final closing time of the post-casting zone after settlement; at the same time, the estimated value of the differential deformation of the post-casting zone after settlement is curve fitted (continuously corrected) as a judgment principle for the final closing time of the post-casting zone after settlement.
[0048] The present invention relies on both theoretical data and measured data of the differential deformation between the main building and the podium to perform real-time filtering operations. On the one hand, the theoretical differential deformation can be corrected, and on the other hand, a theoretical basis can be provided for the use of measured data in determining the closure time.
[0049] The present invention can achieve accurate control of the settlement differential deformation between the main building and the podium of a super high-rise building, and can effectively predict the differential deformation that will occur in the future, so that the closing time control of the post-settlement cast-in-place strip is optimal.
[0050] The present invention provides an effective solution to the technical problem of sealing the post-casting zone after settlement; when the differential deformation meets the sealing requirements, the sealing time can be accurately determined early, which is of great value in improving engineering efficiency, accelerating engineering progress, reducing engineering costs and construction difficulty; the present invention has simple calculation and high precision, and can ensure sufficient real-time performance even in the case of automated measurement.
[0051] The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments. The same or similar parts between the various embodiments can be referenced to each other.
[0052] Professionals may further realize that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, computer software, or a combination of the two. In order to clearly illustrate the interchangeability of hardware and software, the composition and steps of each example have been generally described in the above description according to the function. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention. Obviously, those skilled in the art can make various changes and modifications to the invention without departing from the spirit and scope of the present invention. Thus, if these modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include these modifications and variations.
Claims
1. A method for analyzing and controlling the closing time of post-casting belts after settlement. It is characterized in that include: According to the construction conditions of the main building and the podium of the super high-rise building, the finite element analysis of the construction phase was carried out based on the construction parameter values of the main building, and the theoretical difference deformation curve between the settlement of the main building and the settlement of the podium under real conditions was calculated; During the current stage of construction of the main building and the podium, the actual difference deformation value between the settlement of the main building and the settlement of the podium during the current stage of construction is measured using preset equipment and measurement methods; Based on the theoretical difference deformation curve between the settlement at the main building position and the settlement at the podium position under real conditions, the theoretical value noise variance of the theoretical difference deformation value is determined; Based on the actual differential deformation value between the settlement at the main building position and the settlement at the podium position during the current stage of the construction process, the measurement noise variance of the actual differential deformation value is determined; After the construction of the main building and the next stage of the podium, the preset equipment and measurement method are used to measure the actual difference deformation value between the settlement of the main building and the settlement of the podium in the next stage of the construction process, and the theoretical difference deformation curve, the measured actual difference deformation value between the settlement of the main building and the settlement of the podium in the next stage of the construction process, the theoretical value noise variance of the theoretical difference deformation value and the measurement noise variance of the actual difference deformation value are substituted into the Kalman filter formula to obtain a corrected theoretical difference deformation curve; this step is repeated after the construction of the main building and each next stage of the podium until the slope of the corrected theoretical difference deformation curve is less than the preset threshold.
2. The method for analyzing and controlling the closing time of the post-casting zone of settlement as claimed in claim 1, It is characterized in that Based on the theoretical difference deformation curve between the settlement at the main building position and the settlement at the podium position under real conditions, the theoretical value noise variance of the theoretical difference deformation value is determined; Taking a preset percentage range of the construction parameter value of the main building, and taking each preset percentage as one level in the preset percentage range, performing finite element analysis in the construction stage based on the construction parameter value of the main building of each level, and calculating and obtaining a theoretical difference deformation curve between the settlement of the main building position and the settlement of the podium position of each level; The theoretical difference deformation curves between the settlement at the main building position and the settlement at the podium position of each level and the theoretical difference deformation curves between the settlement at the main building position and the settlement at the podium position under actual conditions are summarized and the variance is calculated to obtain the theoretical value noise variance of the theoretical difference deformation value.
3. The method for analyzing and controlling the closing time of the post-casting zone of settlement as claimed in claim 2, It is characterized in that The preset percentage range is 60% to 140%.
4. The method for analyzing and controlling the closing time of the post-casting zone of settlement as claimed in claim 2, It is characterized in that The preset percentage is 10%.
5. The method for analyzing and controlling the closing time of the post-casting zone of settlement as claimed in claim 1, It is characterized in that Based on the actual differential deformation value between the settlement of the main building position and the settlement of the podium position during the current stage of the construction process, the measurement noise variance of the actual differential deformation value is determined, including: When the main building and the podium are both in a stopped construction state, the preset equipment and measurement method are used to measure the actual difference deformation value between the settlement at the main building position and the settlement at the podium position for multiple consecutive times at preset intervals; The actual differential deformation values between the settlement of the main building and the settlement of the podium obtained from each measurement when both the main building and the podium were in a state of stopped construction, and the actual differential deformation values between the settlement of the main building and the settlement of the podium in the current stage of the construction process were summarized and calculated for variance to obtain the measurement noise variance of the actual differential deformation values.
6. The method for analyzing and controlling the closing time of the post-casting zone of settlement as claimed in claim 1, It is characterized in that The construction parameters of the main building include: the number of leading construction floors of the main building, the self-weight value of the concrete of the main building, and the shrinkage and creep value of the concrete at the location of the post-casting zone of the main building.
7. The method for analyzing and controlling the closing time of the post-casting zone of settlement as claimed in claim 1, It is characterized in that Until the slope of the corrected theoretical difference deformation curve is less than a preset threshold, including: Until the slope of the corrected theoretical difference deformation curve is equal to 0.