Patents
Literature
Patsnap Eureka AI that helps you search prior art, draft patents, and assess FTO risks, powered by patent and scientific literature data.

125results about How to "Improve engineering efficiency" patented technology

Material matching method for power distribution network engineering

The invention discloses a material matching method for a power distribution network project, and relates to the technical field of material matching, and the method comprises the following steps: collecting a material image of a completed part in a construction process of the power distribution network project in real time as an initial image; performing preprocessing and target extraction on the initial image to obtain a feature image; training a material matching model based on a support vector machine according to the feature image and a preset power distribution network material drawing, and generating a material matching degree; the material matching degree is compared with a preset material matching threshold value, and whether material matching of the completed power distribution network project is abnormal or not is judged; and when the material matching is abnormal, reworking is performed on the completed power distribution network project, and early warning and adjustment are performed on the power distribution network project to be performed. According to the method, the abnormal condition of material matching of the completed power distribution network is judged, so that material matching errors in the subsequent construction process are reduced, extra cost caused by large rework or repair is reduced, resource utilization is optimized, and budget is saved.
Owner:ECONOMIC TECH RES INST OF STATE GRID ANHUI ELECTRIC POWER

Power distribution cabinet for power transmission

The invention relates to the technical field of power distribution cabinets, and discloses a power distribution cabinet for power transmission, which comprises a cabinet body, the inner wall of the front side of the cabinet body is rotatably connected with a cabinet door, the front side of the cabinet door is fixedly connected with a handle, the two sides of the cabinet body are provided with heat dissipation ports, and the inner wall of the cabinet body is provided with a quick release mechanism. An electrician can pull out the first moving plate, maintenance and installation of circuits and electronic elements are facilitated, the installation time can be greatly shortened, the engineering efficiency is improved, higher function integration can be achieved in a limited space through extension installation, the space utilization rate is improved, meanwhile, the first moving plate drives the fixing rod to clamp the electronic elements, and the installation efficiency is improved. The electric cabinet is prevented from loosening and falling off in the cabinet body, rapid installation is achieved, the assembling time is shortened, replacement and repair are convenient, the maintenance cost is reduced, the equipment downtime is shortened, and the performance and reliability of the electric cabinet are remarkably improved.
Owner:GUANGDONG AHAIFA ELECTRIC CO LTD

Modified fiber mining filling material and preparation method thereof

ActiveCN119528526Aearly hardeningQuick set upSolid waste managementFiberClinker (waste)
According to the modified fiber mining filling material and the preparation method thereof provided by the invention, through a dual modification technology of plasma treatment and a silane coupling agent, the uniform dispersity of fibers in a cementing agent is enhanced, and the properties such as rapid hardening, early strength and compressive strength retention rate of the filling material are remarkably improved. The filling material comprises cement clinker, solid waste, a retarder, an early strength agent, modified fibers, an accelerator, gypsum, a water reducing agent, a suspending agent and other raw materials, the modified fibers are treated through specific steps, surface functional groups are increased, and the compatibility and binding power of the modified fibers and a cementing agent are improved. The filling material disclosed by the invention has the advantages of good transportability, simplicity and convenience in construction, low cost and environmental protection characteristic, conforms to the development trend of green mining industry, is particularly suitable for being applied to mine filling and supporting, and has wide application prospects and social and economic values.
Owner:XUCHEN MINING TECH DEV (XUZHOU) CO LTD

Response surface method-based method for determining proportion of steel slag improved marine silt curing agent

The invention discloses a steel slag improved marine facies sludge curing agent proportion determination method based on a response surface method, which comprises the following steps: carrying out a shear strength test on waste steel slag improved marine dredged sludge under a freezing and thawing cycle, and determining the optimal curing agent mixing amount of the marine dredged sludge; performing an unconfined compressive strength test based on the optimal mixing amount of the curing agent of the marine dredged sludge to obtain the optimal mixing amount range of each component of the curing agent; testing by taking the mixing amount of each component of the curing agent as a main variable and taking 7d compressive strength and 14d compressive strength as response amounts to obtain response value test results under different mixing ratios; performing nonlinear fitting on a response value test result, and establishing a response surface model; obtaining an expected value of each response quantity based on the response surface model; and obtaining the optimal mix proportion of the curing agent based on the expected value of each response amount. Under the condition of considering each index, the optimal mix proportion is found, and the overall performance and the construction effect are improved.
Owner:SHANDONG UNIV OF SCI & TECH

Calculation method for horizontal bearing capacity of offshore wind power five-connected-cylinder foundation

The invention relates to the field of offshore wind power construction, and discloses a method for calculating the horizontal bearing capacity of an offshore wind power five-connected-cylinder foundation, and the method comprises the following steps: determining an ultimate load based on a static balance relation: firstly, enabling the area of the five-connected-cylinder foundation to be equivalent to a single-cylinder foundation, and redefining the distribution of vertical soil resistance; meanwhile, the friction force generated by barrel-soil interaction is considered. The calculation model not only covers the resistance of lateral soil resistance to horizontal load and upsetting moment, but also fully considers the contribution of vertical soil resistance and friction force to bearing capacity. By the adoption of the five-connected-cylinder foundation design, the influence of vertical soil resistance is considered in the method, meanwhile, friction force generated by cylinder-soil interaction is considered, the horizontal load of the wind power generation equipment in the marine environment can be effectively transmitted, the stability of the whole structure is improved, and safe operation of the wind power generation equipment under the severe sea condition is guaranteed.
Owner:TIANJIN UNIV

Electro-osmosis repairing device for decontamination and dehydration of waste sludge and use method of electro-osmosis repairing device

The invention discloses an electroosmosis repairing device for waste sludge decontamination and dehydration and a using method thereof.The electroosmosis repairing device comprises a bottom plate, an anode shell and a top plate which are sequentially connected, an electric rotor is arranged on the surface of the side, away from the anode shell, of the top plate, and a cathode electrode is arranged in the anode shell; one end of the cathode electrode extends out of the top plate and is connected with a vacuum water storage barrel which is connected with a vacuum pump; the anode shell and the cathode electrode are connected with a power supply; a sludge collecting barrel is arranged on one side of the bottom plate away from the anode shell; and a plurality of rotating rods and water collecting grooves are arranged on the surface of the cathode electrode. The use method comprises the following steps: pouring the waste sludge and the additive; the sludge is stirred; closing the electric rotor, carrying out electroosmosis treatment, and pumping water in vacuum; stirring at intervals; collecting the slurry; and power-off cleaning. According to the invention, reduction solidification, harmless treatment and resource recovery in the sludge treatment process are combined into an integrated process, so that the engineering efficiency is greatly improved, and the energy loss is reduced.
Owner:JIANGSU UNIV OF SCI & TECH

Fabricated composite floor slab

The utility model relates to an assembly type composite floor slab. The assembly type composite floor slab comprises a shear wall tension brace combined formwork system, a multi-rod synchronous adjustment unit type independent supporting system, a post-cast strip wet connection hanging formwork system, a three-dimensional container type stacking frame, a height-adjustable composite floor slab and a composite floor slab overhanging I-steel local stiffness reinforcing and fixing system which are adopted for assembly type composite floor slab construction. By the adoption of a modular assembly mode, time and labor cost can be saved, engineering efficiency can be improved, construction is convenient and fast, the device has great significance in improving the construction period, reducing waste and promoting environment-friendly practice, and the device has wide application prospects.
Owner:ZHONGZHENG CONSTR GRP CO LTD

Drill jumbo control method and device, electronic equipment and storage medium

The embodiment of the invention provides a drill jumbo control method and device, electronic equipment and a storage medium. An excavation face is scanned and modeled through a laser radar, and a first point cloud model for the current cycle of the excavation face is generated; when it is judged that the drill jumbo does not work on the excavation face for the first time, registration is conducted on the first point cloud model and a second point cloud model generated in the last cycle of work, and a first target point cloud model is generated; converting the first target point cloud model into a first engineering coordinate parameter, and determining the first engineering coordinate parameter as first spatial position information of the drill jumbo; obtaining first tunnel face point cloud data based on the first target point cloud model; determining a first tunnel face projection through the first tunnel face point cloud data; the drill jumbo is controlled through the first spatial position information and the first tunnel face projection, automatic operation of the drill jumbo on tunnel excavation engineering is achieved, and engineering efficiency is improved.
Owner:THREE GORGES GROUP IND DEVELOPMENT (BEIJING) CO LTD +1

Dangerous point pre-control management method in thermal power construction

The invention relates to the technical field of thermal power construction, and provides a dangerous point pre-control management method in thermal power construction, which comprises the following steps of: acquiring historical dangerous point data, performing classification and feature extraction, analyzing potential influence by utilizing a virtual evolution technology, and training a dangerous point prediction model; according to the method, dangerous point prediction is carried out through the dangerous point prediction model, dangerous events are effectively prevented through graphical display and real-time pre-control instruction execution, meanwhile, through a continuous optimization and feedback mechanism, the dangerous point prediction precision and the pre-control effect are improved, the safety of a thermal power construction project is improved, and the safety of the thermal power construction project is improved. According to the invention, the problem of insufficient prevention of non-occurrence of dangerous points in the prior art is solved, and the accuracy and advancement of dangerous point pre-control are improved.
Owner:HUANENG NANTONG GAS TURBINE POWER GENERATION CO LTD

Integrated geotechnical bag slope protection system and assembly type construction method thereof

The invention discloses an integrated geotechnical bag side slope protection system and an assembly type construction method thereof, relates to the technical field of side slope protection engineering, and aims to solve the problems that filling aggregates in traditional geotechnical bags are usually single, the stacking mode between the geotechnical bags is simple and direct, the integrity between bag bodies is poor, and the construction cost is high. The geotextile bag has the problems of low strength, easiness in breakage, difficulty in degradation and the like, and comprises a standard geotextile bag 1, a standard geotextile bag 2, filler and a connecting structure. The high-strength environment-friendly building material has good strength and environment-friendly performance. By means of the reasonably-designed connecting structure, firm connection of a plurality of geotechnical bags can be achieved, a continuous protective wall is formed, the phenomena of water and soil loss, erosion, landslide and the like are effectively prevented, the safety and stability of civil engineering are improved, meanwhile, green plants are planted on the upper layers of the geotechnical bags, pollution to the environment is avoided, and the requirements for environmental protection and attractiveness are met.
Owner:STATE GRID GANSU ELECTRIC POWER CORP

Geotextile bag suitable for capillary barrier, slope protection structure and construction method of slope protection structure

The invention discloses a geotechnical bag suitable for a capillary barrier, a slope protection structure and a construction method of the geotechnical bag and the slope protection structure, and belongs to the field of slope engineering.The geotechnical bag comprises a prismatic table-shaped bag body, and the interior of the bag body is divided into a first filling cavity, a second filling cavity and a third filling cavity from left to right through two first geogrids which are arranged in parallel; the interior of the bag body is filled with aggregate through the first filling cavity, the second filling cavity and the third filling cavity, and the aggregate comprises coarse aggregate filled in the first filling cavity, fine aggregate filled in the second filling cavity and organic soil filled in the third filling cavity. According to the geobag suitable for the capillary barrier, the slope protection structure and the construction method of the geobag, the internal structure of the geobag is partitioned through the geogrid, a continuous protection wall is formed, the problems that a traditional geobag is poor in integrity, low in strength, prone to damage and not prone to degradation can be effectively solved, the safety and stability of a project are improved, and the service life of the geobag is prolonged. Meanwhile, good environment-friendly performance is also realized.
Owner:SOUTHEAST UNIV +3

Water conveying pipeline arrangement method for pipeline water conveying system

The invention discloses a water conveying pipeline arrangement method for a pipeline water conveying system, relates to the technical field of water conveying pipeline arrangement, and aims at solving the problems that an existing pipeline arrangement method cannot meet the requirement for variable pipeline arrangement in the pipeline water conveying system, and the economical efficiency, safety and compatibility of the existing pipeline arrangement method need to be improved. The system comprises a pipeline arrangement system. The pipeline arrangement system comprises a measurement module, an analysis module, a path planning module and a material selection module. When the water conveying pipeline of the water conveying system is arranged, the optimal arrangement mode is selected by taking different pipeline arrangement factors into consideration according to different passing modes of different obstacle points, so that a reference scheme is provided for constructors, construction steps are optimized, the engineering efficiency is improved, and the construction cost is reduced. The requirement for variable pipeline arrangement in the pipeline water conveying system is met, and compatibility is good.
Owner:XIAN RES INST OF CHINA COAL TECH & ENG GRP CORP +1

Multi-solver CFD self-correction method and system based on semantic arrangement

The invention provides a multi-solver CFD self-correction method and system based on semantic orchestration, and the method comprises the steps: carrying out the retrieval and slot filling processing of multi-modal input, and generating a simulation intention intermediate representation; carrying out structured verification, default completion and mechanism examination to obtain reachability classification; mapping is established for a CFD solver, and short-distance concurrent trial running and preferential long-distance running are carried out on an equivalent example and job description compiled into a target solver through a mixed strategy; the method comprises the following steps: collecting a structured fingerprint in a running period, generating a minimum change set only reaching a necessary field when a triggering condition is established, writing back to an intention layer, and automatically recompiling and continuing running after the intention layer is formed; and introducing a physical information neural network and a digital twinborn body to provide suggestions or approximate fields, generating reports, and performing Hash signature archiving on measurement point and section data. According to the method, the correctness and the traceability are ensured, and meanwhile, the one-time runnability, the cross-solver transportability and the engineering efficiency are remarkably improved.
Owner:TONGJI UNIV

Charging scheduling method of engineering vehicle, electronic equipment and storage medium

PendingCN119090180AFacilitate intelligent managementCharging scheduling strategy intelligenceData processing applicationsBiological modelsTime informationDriver/operator
The invention relates to an engineering vehicle charging scheduling method, electronic equipment and a storage medium, and the method comprises the steps: obtaining a charging scheduling condition which comprises current time, charging pile information, vehicle information of each engineering vehicle, and construction task data and / or charging preference data of a driver currently corresponding to each engineering vehicle; based on the charging scheduling condition and a pre-trained charging behavior prediction model, the charging behavior of each engineering vehicle is determined, and the charging behavior comprises charging time information and information of a target charging pile; and optimizing the charging behavior of each engineering vehicle by adopting a preset algorithm, and determining a charging scheduling strategy. According to the technical scheme of the invention, the charging scheduling condition related to the engineering vehicle is set, the charging behavior is predicted firstly, and then the prediction result is used as a further optimization object to determine the charging scheduling strategy, so that the charging scheduling strategy can be formulated more intelligently, efficiently and reasonably, and the improvement of the engineering efficiency and the intelligent management of the engineering vehicle are facilitated.
Owner:ZOOMLION HEAVY INDUSTRY SCIENCE AND TECHNOLOGY CO LTD

Equipment management and control modeling design method and equipment based on digital twinning and medium

The invention discloses an equipment management and control modeling design method and equipment based on digital twinning and a medium, and relates to the technical field of equipment modeling, and the method comprises the steps: obtaining a construction twinning model and a plurality of management and control projects; obtaining a construction sub-model based on the construction twinborn model; acquiring a management and control process; acquiring equipment management and control modeling of the construction equipment, and managing and controlling the construction equipment based on the equipment management and control modeling after the management and control process is started; the method is used for solving the problems that in an existing equipment management and control modeling design method, when engineering equipment where an engineering project is located carries out various engineering projects, the actual engineering project process is affected due to the fact that the management and control position cannot be determined in time when the engineering project is switched only by determining the management and control position; and the engineering efficiency is reduced.
Owner:BEIJING YANGGUANG JINLI TECH DEV

Concrete slip form construction method for fitting slopes of water inlets and water outlets of upper and lower reservoirs

The invention provides an upper and lower reservoir water inlet and outlet fitting slope concrete slip form construction method, and belongs to the technical field of building engineering. The method comprises the following steps: firstly, treating a foundation surface, measuring and setting out, and then manufacturing, mounting and fixing reinforcing steel bars; then template installation, fixation and template calibration are carried out; and then a winch system, a slip form and a chute are installed, and finally concrete pouring and curing are conducted. According to the method, innovative improvement is conducted on the manufacturing method of the steel bars and the sliding formwork, and on the basis, a brand-new installation method is designed around the sliding formwork and the chute. The structure is suitable for slope engineering of water inlets and water outlets of upper and lower reservoirs, has excellent structural strength, is convenient to construct and high in engineering efficiency and standardization level, and has outstanding technical advantages and good engineering performance.
Owner:STATE GRID XINYUAN GRP CO LTD +1

MICP intensity prediction method and system based on machine learning and multi-feature fusion

The invention discloses an MICP intensity prediction method and system based on machine learning and multi-feature fusion, and relates to the field of solidified data analysis. An accurate quality prediction mapping model and an abnormal compensation parameter mapping model are constructed based on historical data; the system has the capabilities of predicting curing quality from process parameters and intelligently recommending an optimal disposal scheme from an abnormal state; by setting a dual-threshold quality control mechanism and a real-time abnormity monitoring and early warning system, various abnormal conditions in the curing process can be actively identified and timely responded, and complete closed-loop processing from parameter deviation detection to automatic compensation measure execution to hardware standby switching can be realized. The stability of the solidification process and the consistency of the engineering quality are effectively guaranteed, the requirement for manual intervention and the misjudgment risk are greatly reduced, powerful technical support is provided for standardization, normalization and industrialization development of the sand solidification technology, and the engineering efficiency and economic benefits are remarkably improved.
Owner:HOHAI UNIV

Line protection device for engineering and technical research

The utility model relates to the technical field of electric power auxiliary tools, and discloses a line protection device for engineering and technology research, which comprises a base, the outer wall of the base is provided with a first sliding chute and a second sliding chute, the base is internally provided with a first spring, one end of the first spring is fixedly connected with a sliding block, and the other end of the first spring is fixedly connected with a second sliding chute. And the outer wall of the sliding block is slidably connected to the inner wall of the second sliding groove, the other end of the first spring is fixedly connected to the inner wall of the second sliding groove, the upper surface of the sliding block is fixedly connected with a pulling block, and the outer wall of the sliding block is fixedly connected with a clamping cylinder. According to the wire harness fixing device, the first spring rebounds to push the sliding block to slide on the inner wall of the second sliding groove again and drive the pulling block to move, and meanwhile, the clamping cylinder is promoted to slide on the inner wall of the first sliding groove again to fix the wire harness, so that the effect of fixing a circuit is achieved, the circuit can be arranged neatly and orderly, cable crossing or disorder is avoided, and the wire harness fixing device is convenient to use. And maintenance and overhaul are facilitated.
Owner:SUZHOU YIDATONG ELECTRIC APPLIANCE CO LTD

UWB-based concrete protection layer thickness detection device, method and system

The invention provides a UWB-based concrete protection layer thickness detection device, method and system, and relates to the technical field of concrete thickness detection. The concrete protection layer thickness detection device based on UWB comprises a UWB sensor which is used for transmitting a UWB pulse signal to a concrete protection layer and receiving a UWB pulse reflection signal reflected back from the concrete protection layer; and the controller is used for calculating the one-way propagation time of the UWB pulse signal in the concrete based on the time of transmitting the UWB pulse signal and the time of receiving the UWB pulse reflection signal, and calculating the thickness of the concrete protection layer in combination with the wave velocity of the UWB pulse signal. The method has the advantages of high positioning precision, high time resolution, good environmental interference resistance and low emission power requirement, and can comprehensively improve the detection precision.
Owner:SHANDONG UNIV +2

Inkjet head ink supply system and inkjet printer comprising the same

The present invention relates to an ink jet head ink supply system equipped with an emergency recovery function and an ink jet printer including the ink supply system. The ink jet head ink supply system is characterized by including: an ink jet head; an ink storage device; a supply flow path; a recovery flow path; a flow path blocker; a flow path switcher; a drain pipe; a discharge ink storage portion; and, a drain portion.
Owner:GOSANTECH

Portable auxiliary device suitable for fastening cable clamp of cable bridge

The portable auxiliary device comprises a pressure-bearing cylinder, an opening is formed in one side of the lower portion of the pressure-bearing cylinder, a tensioning device is arranged on the pressure-bearing cylinder, an extension screw rod is connected into the pressure-bearing cylinder and the tensioning device in a sliding mode, the upper end of the extension screw rod is connected with a first fastening nut, and the lower end of the extension screw rod is connected with a second fastening nut. The lower end of the extension screw is connected with a second fastening nut, the second fastening nut is a two-way connecting nut, the pressure-bearing cylinder is placed on one side of the cable clamp bolt and used for placing a tensioning device, the extension screw of the device is connected with a cable clamp screw to be fastened through the second fastening nut, the cable clamp screw is stretched through the tensioning device, and the tensioning device is used for tensioning the cable clamp screw to fasten the cable clamp screw. The cable clamp nut connected to the cable clamp screw ascends along with stretching of the cable clamp screw, the wrench stretches into the opening of the pressure-bearing barrel, the cable clamp nut can be tightened downwards, the fastening force of the cable clamp bolt is enhanced, the device is simple in structure, convenient and fast to manufacture, low in cost and convenient to carry, the engineering efficiency is improved, and meanwhile the fastening force of the cable clamp bolt can be effectively enhanced.
Owner:POWERCHINA HUADONG ENG CORP LTD +1

A dynamic parameterized design method and system for a coal mine roadway support scheme

The application discloses a kind of coal mine roadway supporting scheme dynamic parameterization design method and system, and design method includes the following steps: obtaining the multi-source heterogeneous data of coal mine lane, constructs the knowledge graph of coal mine roadway supporting field, forms original characteristic parameter set;Regression and classification double-path prediction framework is constructed, and the original characteristic parameter is carried out depth feature extraction, associated learning and candidate scheme generation, and the initial scheme of supporting parameter is output;By physical information neural network, the endogenous constraint is applied to the initial scheme of supporting parameter, while combining the rules of supporting specification information, the double verification is carried out to supporting scheme, and through the automatic adjustment of the parameter that does not satisfy constraint condition is carried out to the antagonistic correction mechanism;The supporting scheme is updated dynamically, and the parameter deviation caused by the discontinuity of geological exploration or environmental disturbance is corrected, and the adaptive optimization and iterative update of supporting scheme are realized by reinforcement learning strategy and incremental closed loop mechanism, and the final supporting scheme is obtained.
Owner:CHINA UNIV OF MINING & TECH

Pile driver for bridge construction

The utility model relates to the technical field of building bridge foundation construction equipment, in particular to a pile driver for bridge construction, which comprises an equipment mounting plate, and the left end and the middle part of the top surface of the equipment mounting plate are respectively and fixedly provided with an equipment frame; a cab is fixedly arranged at the right end of the top surface of the equipment mounting plate; a hydraulic cylinder is fixedly arranged at the rear end of the middle part of the top surface of the equipment mounting plate; a drill bit and a pile hammer are movably arranged at the top ends of the two equipment frames correspondingly. According to the pile driver for bridge construction, by extending equipment installation and loading drilling equipment and pile driving equipment on the side face at the same time, various pile driving methods are flexibly adopted for bridge pile driving and foundation building according to site conditions, an electric clamping ring is additionally arranged on the equipment frame carrying a pile driving hammer, and a precast pile can be fixed in an auxiliary mode when the precast pile is driven; and switching of different pile driving devices of the same hole can be achieved by horizontally moving the driving device by a small distance, and the engineering efficiency is improved.
Owner:任维

Analysis and control method of sealing time of post-casting zone after settlement

The present invention provides a method for analyzing and controlling the closing time of a post-casting strip of settlement. The present invention relies on both theoretical data and measured data of the differential deformation between the main building and the podium to perform real-time filtering operations. On the one hand, the theoretical differential deformation can be corrected, and on the other hand, a theoretical basis can be provided for the use of measured data in determining the closing time. The present invention can achieve precise control of the differential deformation of settlement between the main building and the podium of a super high-rise building, and can effectively predict the differential deformation that will occur in the future, so that the closing time control of the post-casting strip of settlement is optimized.
Owner:SHANGHAI CONSTRUCTION GROUP CO LTD

Thin plate clamping device for alignment detection

The utility model discloses a thin plate clamping device for alignment detection, which comprises two racks, an operation table is fixedly arranged at the upper ends of the racks, a mounting frame is fixedly arranged at the upper end of the operation table, and an operation groove is formed in the middle of the interior of the operation table; the driving cavities are formed in the two sides of the interior of the operation table, eight rotating rods are arranged in the driving cavity on one side, one end of each rotating rod extends into the driving cavity on the other side, gears are arranged on the outer portions, located in the driving cavities, of the rotating rods, the gears are fixedly connected with the rotating rods, chains are arranged on the outer portions of the gears, and the chains are connected with the rotating rods through the chains. The chain is connected with the plurality of gears; and the motor is arranged on the side, close to the front end, of the operation table, an output shaft of the motor extends into the driving cavity and is fixedly connected with the rotating rod close to the front end of the driving cavity, and the problems that thin plate conveying is not convenient enough, and thin plates are difficult to position and fix are solved through the structure.
Owner:SUZHOU HOSUN MASCH CO LTD

Pile foundation sediment thickness efficient cleaning instrument

The utility model relates to the technical field of pile foundation sediment cleaning, in particular to a pile foundation sediment thickness efficient cleaning instrument which comprises an upper sediment discharging pipe located on the upper portion, the bottom of the upper sediment discharging pipe is connected with a lower sediment discharging pipe, and the bottom of the lower sediment discharging pipe is connected with an inner collecting pipeline. A gathering cover is installed on the periphery of the bottom of the lower deslagging pipe and the connecting end of the inner collecting pipeline, a plurality of fixing frame bodies and foldable frame bodies for fixing the gathering cover are further arranged on the periphery of the lower deslagging pipe, and an air inlet pipe communicated to the interior of the instrument is further fixedly arranged on the outer side of the upper deslagging pipe. Compared with an existing cleaning mode, the efficient pile foundation sediment thickness cleaning instrument has the remarkable advantages of being efficient, accurate, safe, environmentally friendly and the like, the requirement for pile foundation sediment cleaning can be better met, and the engineering quality and efficiency are improved.
Owner:西安市政道桥建设集团有限公司

Modularized steel structural member

The utility model discloses a modularized steel structural part which comprises a bottom plate, a side plate fixedly connected to the side surface of the bottom plate, a reinforcing column fixedly connected to the upper surface of the bottom plate, a reinforcing plate fixedly connected to the other end of the reinforcing column, a modularized building body fixedly connected to the upper surface of the reinforcing plate, and a mounting plate fixedly connected to one end of the bottom plate. The upper surface of the mounting plate is fixedly connected with a positioning block, the upper surface of the mounting plate is fixedly connected with a mounting bolt, and the mounting bolt is in threaded connection with a fixing nut, so that a prefabricated building assembly is allowed to be manufactured in a factory and then quickly assembled on site, the construction time is greatly shortened, and the engineering efficiency is improved; the building modules can be accurately aligned during installation, the requirement for on-site adjustment is reduced, the stability and safety of the whole structure are improved, the strength of the building structure can be enhanced, the compression resistance and tensile strength of the building are improved, the stability is kept under different load conditions, and the service life is prolonged.
Owner:HENAN HONGPIN HEAVY IND TECH CO LTD

A method, device, electronic device and storage medium for generating service results

The present application provides a method, device, electronic device and storage medium for generating a service result, wherein the method for generating a service result includes: responding to a service request sent by a user through a service request end, searching for a general model file that matches the service request; based on the file category to which the general model file belongs, converting the input information carried by the service request into standard input information that satisfies the input format corresponding to the file category; parsing the general model file to obtain a service model corresponding to the general model file, inputting the standard input information into the service model, obtaining the service result output by the service model, and sending the service result to the service request end. The present application can obtain a general model file that matches a service request, generate a service result corresponding to a service request based on the service model obtained by parsing the general model file, and has high efficiency in service model engineering.
Owner:BEIJING XUEZHITU NETWORK TECH