The invention relates to a diversion blasting construction method of an
intertidal zone blasting displacement
bank. The method comprises the following steps: (1) dumping filling a
bank body according to a design and construction scheme; (2) calculating for blasting operation design; (3) reserving a
silt pack bulged on the head end of the
bank, and utilizing the
silt pack as one part of an upper
overburden load; (4) extracting and guiding water on the periphery of the
silt pack into a V-shaped channel; (5) embedding explosive, and detonating; (6) continuously throwing stones, and stopping the throwing of stones in a sliding manner after reaching the balance; (7) throwing filling stones of the needed quantity for the next blasting operation on the bank end, continuously throwing filling stones behind the bank end until the
structural balance of the bank body reaches the designed standard height, and arranging a slope by utilizing a construction
machine; (8) preparing the next blasting, and thus
cycling. By adopting the method, the construction progress of the
intertidal zone blasting displacement bank can be accelerated, the
engineering cost is reduced, the blasting and displacement bottoming effect is good, the construction process is simple, the tidal establishment operation is not needed, the explosive is more convenient to bury, the construction process has an important significance on guaranteeing the construction quality and accelerating the construction process, and the popularization value is remarkable.