A simulation and prediction method for irrigation and drainage process

Through multi-method collaborative optimization strategy and the same-fold ratio method, the error problem of hydrological models in the simulation and prediction of irrigation drainage process is solved, and more accurate irrigation area drainage and process are obtained, and reliable technical support is provided.

CN113887151BActive Publication Date: 2024-11-19YELLOW RIVER INST OF HYDRAULIC RES YELLOW RIVER CONSERVANCY COMMISSION +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111138161.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-09-27
Publication Date
2024-11-19
Estimated Expiration
2041-09-27

AI Technical Summary

Technical Problem

There are errors in the simulation and prediction of irrigation drainage processes in the existing hydrological models, which are difficult to reflect the complexity of irrigation drainage processes in irrigation areas and the interaction of multiple factors.

Method used

Multi-method collaborative optimization strategy is adopted, combining hydrological model, water balance method, sub-item method and drainage method to check the drainage volume of the irrigation area, and the hydrological model simulation results are used as a typical drainage process to optimize the irrigation and drainage process. Simulation and prediction.

Benefits of technology

The simulation result error is minimized to the extent possible, and the resulting drainage process is more in line with the actual situation, providing reliable technical support for the simulation and prediction of the drainage process in the irrigation area.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113887151B_ABST
    Figure CN113887151B_ABST
Patent Text Reader

Abstract

The present invention belongs to the field of irrigation technology, and discloses a method for simulating and predicting an irrigation and drainage process, including: step 1: constructing a hydrological model of an irrigation area according to the water cycle characteristics of the irrigation area; step 2: determining the parameters that need to be calibrated for the hydrological model; step 3: simulating the scenario plan using the hydrological model after parameter calibration to obtain the irrigation and drainage process and drainage volume; step 4: respectively using the water balance method, the sub-item method, and the drainage ratio method to calculate the drainage volume of the irrigation area; step 5: according to the multi-method collaborative optimization strategy, coupling the hydrological model, the water balance method, the sub-item method, and the drainage ratio method to obtain the drainage volume respectively, to obtain the total drainage volume after verification; step 6: selecting the simulated irrigation and drainage process of the hydrological model as a typical drainage process, and amplifying the total drainage volume by the same multiple ratio to obtain the daily drainage process of the irrigation area. The drainage process obtained by the present invention is more in line with the actual situation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of irrigation, and in particular relates to an irrigation and drainage process simulation and prediction method. Background Art

[0002] Irrigation and drainage in irrigation areas are inevitable accompanying processes in agricultural irrigation. Studying the laws and processes of irrigation and drainage is one of the effective ways to improve the efficiency of agricultural water resources utilization. At present, most of the research on irrigation and drainage processes is done by establishing a distributed hydrological model of the irrigation area to simulate and analyze the hydrological cycle process of the irrigation area. The hydrological model is an important method for studying the hydrological cycle process of a watershed or region. The model depicts the physical process of water movement, simulates rainfall, evapotranspiration, overland flow, river flow, groundwater runoff, and the interaction between various hydrological processes, such as Figure 1 shown.

[0003] Generally speaking, hydrological models are composed of several independent and interconnected process-based modules, mainly including overland flow, rivers and lakes, unsaturated zone / vadose zone, evapotranspiration, saturated zone and other modules. Each sub-module represents a description of a major hydrological process, which can be combined to describe the hydrological cycle process of the basin according to different simulation requirements.

[0004] Hydrological models also have some limitations in simulating the hydrological cycle of irrigation areas:

[0005] (1) For hydrological models, the basic data and parameters required are numerous and complex. The model itself has uncertainty, and the simulation results may have some errors. The uncertainty research of hydrological models is also an important issue facing hydrological science. At present, there are few studies on the uncertainty of hydrological models in China.

[0006] (2) For irrigation areas, the irrigation and drainage process is affected by many factors, such as crop type, irrigation process, human factors, irrigation and drainage system, meteorological factors, groundwater movement conditions, soil properties, etc. Its formation process and change law are relatively complex, and the hydrological model is difficult to reflect the real irrigation and drainage process. Summary of the invention

[0007] Aiming at the problem of errors in simulating and predicting the irrigation and drainage process using only a hydrological model, the present invention proposes an irrigation and drainage process simulation and prediction method.

[0008] In order to achieve the above object, the present invention adopts the following technical solutions:

[0009] A method for simulating and predicting an irrigation and drainage process, comprising:

[0010] Step 1: Construct a hydrological model of the irrigation area based on the water cycle characteristics of the irrigation area;

[0011] Step 2: Determine the parameters that need to be calibrated for the hydrological model;

[0012] Step 3: Use the hydrological model with calibrated parameters to simulate the scenario and obtain the irrigation and drainage process and drainage volume;

[0013] Step 4: Calculate the drainage volume of the irrigation area using the water balance method, item method, and drainage ratio method;

[0014] Step 5: According to the drainage obtained by coupling the hydrological model, water balance method, item method and drainage ratio method using the multi-method collaborative optimization strategy, the total drainage volume after verification is obtained;

[0015] Step 6: Select the simulated irrigation and drainage process of the hydrological model as the typical drainage process, and magnify it by the same multiple according to the total drainage volume to obtain the daily drainage process of the irrigation area.

[0016] Furthermore, the parameters that need to be calibrated include:

[0017] Drainage ditch roughness, ditch leakage coefficient, slope flow Manning coefficient, unsaturated zone soil saturated moisture content and saturated hydraulic conductivity, saturated zone hydraulic conductivity, drainage time constant.

[0018] Further, the water balance method comprises:

[0019] Determine the input items and output items of the irrigation area water balance system; the input items include rainfall, irrigation water volume, and lateral recharge volume, and the output items include irrigation area water withdrawal volume, groundwater evaporation volume, groundwater extraction volume, and irrigation area drainage volume;

[0020] Construct the water balance equation for the irrigation area:

[0021] ΔW 地 =W 降雨 +W 灌溉 -W 潜水蒸发 -W 排水 ±W 侧向 -W 开采 (3)

[0022] In the formula, ΔW 地 is the groundwater storage variable; W 降雨 Recharge for rainfall; W 灌溉 is the irrigation infiltration recharge; W 潜水蒸发 is the evaporation rate; W 排水 is the displacement; W 侧向 is the difference in lateral replenishment and discharge. If the replenishment is greater than the discharge, it is positive, otherwise it is negative. 开采 The amount of groundwater extraction.

[0023] Furthermore, the item-by-item method includes:

[0024] The drainage volume of the irrigation area is calculated based on rainfall recharge, field drainage, drainage ditch groundwater recharge, and evaporation loss. The formula is:

[0025] W=W p +W f +QW E (4)

[0026] Where W is the drainage volume of the irrigation area; W p is the rainfall recharge; W f is the field drainage volume; Q is the groundwater recharge of the drainage ditch; W E is the evaporation loss;

[0027] In the formula,

[0028]

[0029]

[0030] Among them, Q is the groundwater recharge of the drainage ditch; K is the permeability coefficient; L is the length of the water collection corridor; H1 is the average water level on the left and right sides of the drainage ditch; h is the water depth in the ditch; R is the influence radius; S is the water level difference in the direction of the groundwater recharge ditch, S = △Hh; △H is the thickness of the aquifer at the stable groundwater level on both sides above the ditch bottom; qr is the reference flow rate; H is the thickness of the aquifer.

[0031] Furthermore, the introduction and comparison method includes:

[0032] The irrigation area diversion and drainage ratio β is calculated based on the historical diversion and drainage conditions of the irrigation area:

[0033] β = water consumption / discharge

[0034] Water consumption = water diversion - water withdrawal

[0035] The drainage volume can be predicted by the water consumption and the irrigation area drainage ratio β.

[0036] Furthermore, the multi-method collaborative optimization strategy includes:

[0037]

[0038] Where P j is the total drainage volume after calibration; P s Simulates discharge for hydrological model; P h Calculate the drainage volume using the water balance method; P f The displacement is calculated by the item-by-item method; P yThe drainage volume is calculated using the drainage ratio method; a, b, c, and d represent the relative importance of the hydrological model method, water balance method, item method, and drainage ratio method, respectively, and can take any value between 1 and 10. The larger the value, the higher the importance. That is, a / sum(a,b,c,d), b / sum(a,b,c,d), c / sum(a,b,c,d), and d / sum(a,b,c,d) respectively represent the weights of the drainage volume obtained by the hydrological model method, water balance method, item method, and drainage ratio method in the total drainage volume after verification.

[0039] Furthermore, the step 6 comprises:

[0040] The simulated irrigation and drainage process of the hydrological model is selected as the typical drainage process, and the selected typical drainage process is amplified so that the total drainage volume of the amplified period is equal to the total drainage volume after verification, and the optimized irrigation and drainage process can be obtained; the calculation process of the amplification ratio is as follows:

[0041] k=P j / P d (7)

[0042] Where, k is the magnification ratio; P j is the total drainage volume after calibration; P d is the total drainage volume in a typical drainage process.

[0043] Compared with the prior art, the present invention has the following beneficial effects:

[0044] The present invention proposes a method for simulating and predicting irrigation and drainage processes, which specifically includes two strategies: first, a multi-method collaborative optimization strategy is proposed, that is, through coupling hydrological models, water balance method, sub-item method, drainage ratio method and other existing or original methods for analysis and calculation, the total drainage volume is verified using different principles and multiple methods, thereby minimizing the error of simulation results; secondly, the simulation results of the hydrological model are used as the typical drainage process, and the typical drainage process is "magnified" using the same multiple ratio method. The calculated drainage process is more in line with the actual situation, which can provide reliable technical support for the simulation and prediction of the drainage process in the irrigation area. BRIEF DESCRIPTION OF THE DRAWINGS

[0045] Figure 1 This is a schematic diagram of the basin's hydrological cycle;

[0046] Figure 2 A basic flow chart of a method for simulating and predicting an irrigation and drainage process according to an embodiment of the present invention;

[0047] Figure 3 This is a generalized diagram of groundwater recharge in a drainage ditch according to an embodiment of the present invention;

[0048] Figure 4 The changes in drainage ratio of the irrigation area over the years according to the embodiment of the present invention;

[0049] Figure 5 The model range and surface elevation of the embodiment of the present invention;

[0050] Figure 6 This is the daily drainage process of Schemes A and B of the embodiments of the present invention;

[0051] Figure 7 This is the daily drainage process of Schemes B, C, and D of the embodiments of the present invention. DETAILED DESCRIPTION

[0052] The present invention will be further explained below with reference to the accompanying drawings and specific embodiments:

[0053] like Figure 2 As shown, a method for simulating and predicting an irrigation and drainage process includes:

[0054] Step S101: constructing a hydrological model of the irrigation area according to the water cycle characteristics of the irrigation area;

[0055] Specifically, the hydrological model includes:

[0056] 1) Overland flow

[0057] Slope flow is the surface runoff generated when the net rainfall rate is greater than the infiltration rate after deducting evaporation and vegetation interception from rainfall. It then accumulates continuously, flows into the river network along the slope, and finally reaches the outlet of the basin. Slope runoff is affected by factors such as rainfall, topography, slope roughness, and infiltration intensity. Slope flow is used to calculate the amount of water flowing from the surface slope to the river. When establishing the MIKE11 model, the slope flow module is indispensable because the slope flow provides lateral recharge for the river flow. The model uses the finite difference method to simulate slope flow, and the input parameters are the Manning coefficient, the detention depth, and the initial surface water depth.

[0058] 2) Rivers and Lakes

[0059] Rivers and lakes are simulated using hydrodynamic models. The model can perform relatively comprehensive calculations and use the Saint-Venant equation to perform one-dimensional river channel routing, including water level and flow calculations. After coupling, a complete and dynamic coupling simulation of the surface and underground water flow dynamics process can be performed. The one-dimensional river channel model is based on the simplified Saint-Venant one-dimensional hydrodynamic model. It can simulate the water volume change process of the river channel very well and exchange water volume with the basin runoff. The basic Saint-Venant one-dimensional hydrodynamic equation is as follows:

[0060]

[0061]

[0062] Where: x is the distance coordinate, t is the time coordinate, A is the cross-sectional area of ​​the water flow, Q is the flow rate, q is the measured inflow, n is the riverbed roughness coefficient, R is the hydraulic radius, and g is the acceleration of gravity.

[0063] 3) Unsaturated zone

[0064] The unsaturated zone refers to the unsaturated water flow area with the surface as the upper boundary and the groundwater level as the lower boundary. The changes in soil moisture content and soil water potential in the unsaturated zone are affected by the unsaturated water flow process. In addition, the amount of surface water infiltrating into the unsaturated zone soil and the water exchange process between the unsaturated zone and the saturated zone are also controlled by the unsaturated zone water flow process. The upper part of the unsaturated zone is affected by precipitation, evaporation and infiltration, and the soil moisture content fluctuates greatly. The lower boundary changes accordingly due to the fluctuation of the groundwater level. The hydrological model mainly uses three methods to calculate the unsaturated zone module: one is the Richards equation; the second is to simulate a simple gravity water outflow process; and the third is a two-layer water balance model.

[0065] 4) Evaporation

[0066] In the calculation of the evapotranspiration module of the hydrological model, meteorological and vegetation cover data are needed to predict rainfall evaporation, which includes the absorption of rainfall by the plant canopy, the amount of water falling from the plant canopy to the soil layer, and the evaporation of the plant canopy, soil surface and roots.

[0067] 5) Saturated zone

[0068] The Saturated Zone module is used to calculate the movement of saturated groundwater in a watershed. The hydrological model can describe the movement of three-dimensional water flow on the indefinite boundaries of heterogeneous aquifers. The model uses the three-dimensional Darcy equations to simulate the independent parameters of the time and space transformations and numerically solves them using implicit finite differences. The governing equations for the flow of three-dimensional saturated flow in the pores of saturated soil are as follows:

[0069]

[0070] Among them, Kxx, Kyy, and Kzz are the hydraulic conductivities of the model along the x, y, and z directions, respectively, and they are all assumed to be parallel to the main axis of the hydraulic conductivity; h is the groundwater head, Q represents the source and leakage term of the flow per unit area, and S is the water storage coefficient.

[0071] The saturated zone module requires the definition of geological layers and numerical layers. The geological layers include the properties of each stratum, such as the bottom elevation of the aquifer, the hydraulic conductivity coefficient in the horizontal and vertical directions, the water supply degree and the water storage degree. The various hydrogeological parameters generally use empirical values ​​and need to be calibrated.

[0072] Step S102: determining the parameters that need to be calibrated for the hydrological model;

[0073] Furthermore, the parameters that need to be calibrated include:

[0074] Drainage ditch roughness, ditch leakage coefficient, slope flow Manning coefficient, unsaturated zone soil saturated moisture content and saturated hydraulic conductivity, saturated zone hydraulic conductivity, drainage time constant.

[0075] Step S103: simulating the scenario plan using the hydrological model after parameter calibration to obtain the irrigation and drainage process and drainage volume;

[0076] Step S104: Calculate the drainage volume of the irrigation area using the water balance method, the item method, and the drainage ratio method;

[0077] Specifically, the water balance method includes:

[0078] The input items of the irrigation area water balance system include rainfall, irrigation water, lateral recharge, etc.; the output items include irrigation area water withdrawal, groundwater evaporation, groundwater extraction and irrigation area drainage. Based on the above analysis, the irrigation area water balance equation can be expressed as:

[0079] ΔW 地 =W 降雨 +W 灌溉 -W 潜水蒸发 -W 排水 ±W 侧向 -W 开采 (3)

[0080] In the formula, ΔW 地 is the groundwater storage variable (10,000 m 3 );W 降雨 is the rainfall supply (10,000 m 3 );W 灌溉 is the irrigation infiltration recharge (10,000 m 3 );W 潜水蒸发 is the evapotranspiration (10,000 m 3 );W 排水 is the displacement (10,000 m 3 );W 侧向 is the difference in lateral displacement (10,000 m 3 ), if the supply is greater than the excretion, it is positive, otherwise it is negative; W 开采 is the groundwater extraction volume (10,000 m 3 ).

[0081] Specifically, the item-by-item method includes:

[0082] Irrigation area drainage mainly consists of rainfall recharge received by the drainage system, field irrigation water overflow and lateral seepage recharge, and groundwater recharge; water loss in drainage ditch is mainly due to evaporation and infiltration. When the groundwater level is high, the amount of water recharged by the drainage ditch is limited and can be basically ignored. The main consumption item is water surface evaporation.

[0083] The drainage volume of the irrigation area is calculated based on rainfall recharge, field drainage, drainage ditch groundwater recharge, and evaporation loss. The formula is:

[0084] W=W p +W f +QW E (4)

[0085] Where W is the drainage volume of the irrigation area (10,000 m 3 );W p is the rainfall recharge (10,000 m 3 );;W f is the field drainage volume (10,000 m 3 ); Q is the groundwater recharge of the drainage ditch (10,000 m 3 );W E is the evaporation loss (10,000 m 3 ).

[0086] Atmospheric precipitation recharge is received through drainage ditches to produce surface drainage in irrigation areas. The amount of rainfall recharge directly received by the drainage ditches is calculated based on the rainfall, total area of ​​the drainage ditches, etc.

[0087] Field drainage includes overflow drainage beyond the ridges and deep seepage water generated in the tillage layer. The overflow drainage is related to the height of the ridges. The deep seepage water is the excess water stored in the tillage layer removed after irrigation into the fields, and finally forms drainage through the field ditches.

[0088] There is currently no standard basis or method for calculating the groundwater recharge of the drainage ditch (the amount of groundwater recharged to the drainage ditch). In this embodiment, the drainage ditch is generalized as a non-pressure, non-complete, double-sided water infiltration canal, and the calculation formula is as follows:

[0089]

[0090]

[0091] Where Q is the groundwater recharge (discharge) of the drainage ditch (m 3 ), T is the drainage time (d), K is the permeability coefficient (m / d), L is the length of the water collection corridor (m), R is the influence radius (m), H is the thickness of the aquifer (m), S is the water level difference in the direction of the groundwater recharge channel (m), S = △Hh; △H is the thickness of the aquifer at the stable groundwater level on both sides above the ditch bottom (m), and h is the water depth in the ditch (m).

[0092] The generalized diagram of groundwater recharge drainage ditch calculation is as follows Figure 3 shown.

[0093] Specifically, the introduction and comparison method includes:

[0094] The diversion and drainage ratio can reflect the irrigation and drainage ratio of the irrigation area. The diversion and drainage ratio β of the irrigation area can be calculated based on the diversion and drainage conditions of the irrigation area in recent years. Since the irrigation water does not enter the field and does not participate in the water circulation process of the irrigation area, it is obvious that the relationship between drainage and water consumption is closer. Here, the diversion and drainage ratio of the irrigation area β = water consumption / drainage, water consumption = diversion - drainage, and the diversion and drainage are known quantities. The drainage can be predicted by the water consumption and the diversion and drainage ratio β of the irrigation area. The diversion and drainage ratio is affected by the construction and operation of the irrigation area drainage system engineering, and generally shows a stable change trend. The changes in the diversion and drainage ratio of a certain irrigation area over the years are shown in Figure 4 shown.

[0095] Step S105: obtaining the verified total drainage volume according to the drainage volumes obtained by coupling the hydrological model, the water balance method, the item method, and the drainage ratio method using the multi-method collaborative optimization strategy;

[0096] Specifically, the multi-method collaborative optimization strategy includes:

[0097] Through the analysis and calculation of multiple methods such as coupling hydrological model, water balance method, sub-item method, drainage ratio method, etc., a multi-method collaborative optimization strategy is formed, and the total drainage volume is checked using different principles and multiple methods. The strategy is expressed as follows:

[0098]

[0099] Where P j is the total drainage volume after verification (10,000 m 3 );P s The simulated discharge of the hydrological model (10,000 m 3 );P h Calculate the drainage volume by water balance method (10,000 m 3 );P f Calculate the displacement by item method (10,000 m 3 );P y Calculate the displacement by drainage ratio method (10,000 m 3 ); a, b, c, d represent the relative importance of the hydrological model method, water balance method, item method, and exclusion ratio method, respectively, and can take any value between 1 and 10. The larger the value, the higher the importance. That is, a / sum(a,b,c,d), b / sum(a,b,c,d), c / sum(a,b,c,d), d / sum(a,b,c,d) represent the weights of the drainage obtained by the hydrological model method, water balance method, item method, and exclusion ratio method in the total drainage after verification.

[0100] Step S106: Select the simulated irrigation and drainage process of the hydrological model as a typical drainage process, and magnify it by the same multiple according to the total drainage volume to obtain the daily drainage process of the irrigation area.

[0101] Specifically, the same multiple ratio method includes:

[0102] This strategy requires that the selected typical drainage process be amplified by “volume ratio” so that the total drainage volume in the amplified period is equal to the total drainage volume after verification, and the irrigation drainage process optimized by this strategy can be obtained. The strategy is expressed as follows:

[0103] k=P j / P d (7)

[0104] Where, k is the magnification ratio; P j is the total drainage volume after the above verification (10,000 m 3 );P d is the total drainage volume of a typical drainage process. Here, the hydrological model simulation results are used as the typical drainage process (10,000 m 3 ).

[0105] As a specific feasible implementation method, the irrigation and drainage process simulation and prediction method proposed in this embodiment is applied to the irrigation area on the south bank of the Yellow River in Inner Mongolia to simulate and predict the drainage process in the irrigation area. Taking the irrigation area on the south bank of Inner Mongolia as the research object, on the basis of studying the drainage law and influencing factors of the irrigation area, a model database is built, and a distributed hydrological model that conforms to the actual situation of the irrigation area is established. Figure 5 shown.

[0106] After the model configuration is completed, the parameter adjustment is started. By referring to relevant literature and continuously testing, the main parameters that need to be calibrated are determined by observing the degree of change in the simulation results. According to the simulation results of the calibration period, the calibration parameters mainly include riverbed roughness, channel leakage coefficient, overland flow Manning coefficient, saturated moisture content and saturated hydraulic conductivity of unsaturated zone soil, hydraulic conductivity of saturated zone, drainage time constant, etc. The parameter calibration results are shown in Table 1.

[0107] Table 1 Model parameter calibration results

[0108]

[0109]

[0110] According to the multi-method collaborative optimization strategy, numerical verification is performed using a variety of methods such as hydrological model, water balance method, item method, and exclusion ratio method. In this example, the importance of each method is 1, that is, the weight is the same. The prediction and verification results of each method under each scenario are shown in Table 2.

[0111] Table 2 Multi-method prediction and verification results Unit: 10,000 m3

[0112]

[0113] According to the verification results, the hydrological model simulation results are taken as typical drainage processes and amplified by the same multiple according to the total drainage volume. Finally, the daily drainage process of the irrigation area is obtained through the multi-method collaborative optimization strategy and the same multiple method analysis and calculation (see Figure 6-7 ).

[0114] From the above, it can be seen that the drainage process and total amount predicted by the method of this embodiment are closer to the actual situation of the irrigation area. The hydrological model itself has certain uncertainties, and the model simulation results may have some errors. Although the calibration of model parameters can improve the accuracy, the calibration indicators such as correlation coefficient R, mean square error RMSE and Nash efficiency coefficient (E) focus on evaluating the degree of fit of the entire drainage process, and there is no good constraint and control on the total drainage amount. As can be seen from Table 2, the simulation results of the hydrological model are mostly small, and the error of the results after verification using a multi-method collaborative optimization strategy is relatively smaller and closer to the actual situation of the irrigation area. Since the drainage process simulated by the hydrological model has a high degree of fit with the actual drainage process, the model simulation results are used as a typical drainage process, and the typical drainage process is "enlarged" using the same multiple ratio method, and the calculated drainage process is also more in line with the actual drainage process.

[0115] For irrigation areas with severe soil salinization and poor water resources, the method of this embodiment can be applied to research on irrigation drainage prediction and resource evaluation. It demonstrates the drainage of irrigation areas under different conditions in detail, evaluates and analyzes the feasibility and reliability of industrial and agricultural production and ecological water supply, saves money and increases revenue, and provides technical support for the resource utilization of irrigation drainage, which has good practical effects and application value.

[0116] In summary, the present invention proposes a method for simulating and predicting irrigation and drainage processes, which specifically includes two strategies: first, a multi-method collaborative optimization strategy is proposed, that is, through the analysis and calculation of multiple existing or original methods such as coupling hydrological models, water balance method, sub-item method, and drainage ratio method, the total drainage volume is verified using different principles and multiple methods, thereby minimizing the error of simulation results; secondly, the simulation results of the hydrological model are used as the typical drainage process, and the typical drainage process is "magnified" using the same multiple ratio method. The calculated drainage process is more in line with the actual situation, which can provide reliable technical support for the simulation and prediction of the drainage process in the irrigation area.

[0117] The above is only a preferred embodiment of the present invention. It should be pointed out that a person skilled in the art can make several improvements and modifications without departing from the principle of the present invention. These improvements and modifications should also be regarded as within the scope of protection of the present invention.

Claims

1. A method for simulating and predicting irrigation and drainage processes, characterized in that: include: Step 1: Construct a hydrological model of the irrigation area based on the water cycle characteristics of the irrigation area; Step 2: Determine the parameters that need to be calibrated for the hydrological model; Step 3: Use the hydrological model with calibrated parameters to simulate the scenario and obtain the irrigation and drainage process and drainage volume; Step 4: Calculate the drainage volume of the irrigation area using the water balance method, item method, and drainage ratio method; The water balance method includes: Determine the input items and output items of the irrigation area water balance system; the input items include rainfall, irrigation water volume, and lateral recharge volume, and the output items include irrigation area water withdrawal volume, groundwater evaporation volume, groundwater extraction volume, and irrigation area drainage volume; Construct the water balance equation for the irrigation area: ΔW 地 =In 降雨 +W 灌溉 -IN 潜水蒸发 -IN 排水 ±In 侧向 - IN 开采 (3) In the formula, ΔW 地 is the groundwater storage variable; W 降雨 Recharge for rainfall; W 灌溉 is the irrigation infiltration recharge; W 潜水蒸发 is the evaporation rate; W 排水 is the displacement; W 侧向 is the difference in lateral replenishment and discharge. If the replenishment is greater than the discharge, it is positive, otherwise it is negative. 开采 is the groundwater extraction volume; The itemized approach includes: The drainage volume of the irrigation area is calculated based on rainfall recharge, field drainage, drainage ditch groundwater recharge, and evaporation loss. The formula is: W= W p + W f + Q-W E (4) Where W is the drainage volume of the irrigation area; W p is the rainfall recharge; W f is the field drainage volume; Q is the groundwater recharge of the drainage ditch; W E is the evaporation loss; In the formula, Among them, Q is the groundwater recharge of the drainage ditch; K is the permeability coefficient; L is the length of the water collection corridor; H1 is the average water level on the left and right sides of the drainage ditch; h is the water depth in the ditch; R is the influence radius; S is the water level difference in the direction of the groundwater recharge ditch, S = △Hh; △H is the thickness of the aquifer at the stable groundwater level on both sides above the ditch bottom; qr is the reference flow; H is the thickness of the aquifer; The parallelism method comprises: The irrigation area diversion and drainage ratio β is calculated based on the historical diversion and drainage conditions of the irrigation area: β = water consumption / discharge Water consumption = water diversion - water withdrawal The drainage volume can be predicted by the water consumption and the irrigation area drainage ratio β; Step 5: According to the drainage obtained by coupling the hydrological model, water balance method, item method and drainage ratio method using the multi-method collaborative optimization strategy, the total drainage volume after verification is obtained; The multi-method collaborative optimization strategy includes: Where P j is the total drainage volume after calibration; P s Simulates discharge for hydrological model; P h Calculate the drainage volume using the water balance method; P f The displacement is calculated by the item-by-item method; P y The drainage volume is calculated by the drainage ratio method; a, b, c, and d represent the relative importance of the hydrological model method, water balance method, item method, and drainage ratio method, respectively, and can be any value between 1 and 10. The larger the value, the higher the importance. That is, a / sum(a,b,c,d), b / sum(a,b,c,d), c / sum(a,b,c,d), and d / sum(a,b,c,d) represent the weights of the drainage volume obtained by the hydrological model method, water balance method, item method, and drainage ratio method in the total drainage volume after verification, respectively. Step 6: Select the simulated irrigation and drainage process of the hydrological model as the typical drainage process, and magnify it by the same multiple according to the total drainage volume to obtain the daily drainage process of the irrigation area.

2. The irrigation and drainage process simulation and prediction method according to claim 1, characterized in that: The parameters that need to be calibrated include: Drainage ditch roughness, ditch leakage coefficient, slope flow Manning coefficient, unsaturated zone soil saturated moisture content and saturated hydraulic conductivity, saturated zone hydraulic conductivity, drainage time constant.

3. The irrigation and drainage process simulation and prediction method according to claim 1, characterized in that: The step 6 comprises: The simulated irrigation and drainage process of the hydrological model is selected as the typical drainage process, and the selected typical drainage process is amplified so that the total drainage volume of the amplified period is equal to the total drainage volume after verification, and the optimized irrigation and drainage process can be obtained; the calculation process of the amplification ratio is as follows: k=P j / P d (7) Where, k is the magnification ratio; P j is the total drainage volume after calibration; P d is the total drainage volume in a typical drainage process.