A station intelligent planning method based on orbit determination accuracy

Through the intelligent planning method of station measurement based on orbital accuracy, analyze historical errors, calculate visibility forecasts, and build weight tables, and dynamically adjust resources, solving the problem of manual intervention in station measurement planning in the existing technology, achieving high precision and resources Optimized automation planning.

CN113917505BActive Publication Date: 2024-11-08THE 54TH RESEARCH INSTITUTE OF CHINA ELECTRONICS TECHNOLOGY GROUP CORPORATION
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202111213505.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-10-19
Publication Date
2024-11-08
Estimated Expiration
2041-10-19

AI Technical Summary

Technical Problem

In the existing satellite measurement and control technology, the station planning method requires manual intervention and cannot be completed automatically, and it is difficult to effectively use limited measurement and control station resources to obtain high-precision orbital determination results.

Method used

Using intelligent station planning method based on orbital accuracy, analyzing historical orbital errors, calculating satellite visibility forecasts, building weight tables, dynamically adjusting weight information, and using resource scheduling strategy algorithm to generate station tracking planning schemes to ensure orbital determination Precision and resource optimization.

Benefits of technology

It realizes automated station planning, improves satellite orbital calculation accuracy, optimizes station resource usage, and has intelligent planning, easy expansion and cross-platform compatibility.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113917505B_ABST
    Figure CN113917505B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for intelligent planning of measuring stations based on orbit determination accuracy, which belongs to the field of satellite measurement and control technology. The method uses the medium- and long-term forecast orbit and the distribution of ground station networks to complete comprehensive tracking and forecasting calculations; intelligently obtains satellite positioning accuracy through data mining and analysis; formulates a measuring station observation plan based on factors such as the location distribution of the measuring stations, the quality of the measurement data, and the accuracy of the measurement and control equipment; and realizes intelligent planning of measuring station resources based on orbit determination accuracy. The method has the characteristics of simple operation, high orbit determination accuracy, intelligent planning, easy expansion, and strong compatibility.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of satellite measurement and control technology, and in particular to an intelligent planning method for measuring stations based on orbit determination accuracy, which can be used for measuring station resource planning of high-precision orbit satellites. Background Art

[0002] Satellite orbit determination is a method of observing and determining the orbital position, speed, etc. of a satellite in real time using ground monitoring or other means. Research on orbit determination technology has always been one of the important topics in the aerospace field, and it is of great significance in navigation positioning, satellite control, etc. Most of the autonomous orbit determination of artificial satellites uses dynamic filtering algorithms, including the Kalman filtering algorithm and some improved algorithms about it. In the process of satellite measurement and control, how to use limited measurement and control station resources to complete multiple types of tasks such as satellite orbit measurement, telemetry and remote control, data injection, and payload data reception requires comprehensive consideration of various needs and reasonable planning of measurement and control station resources.

[0003] There are many methods for station planning, including greedy algorithm, particle swarm algorithm, taboo combination, etc. In most cases, the algorithm cannot be completed automatically due to the need to consider various satellite measurement and control mission requirements, and manual intervention is required. In a certain series of satellites, in order to obtain high-precision orbit determination results, high-precision measurement equipment is installed on the satellite, and dedicated high-precision measurement and control stations are deployed on the ground. How to plan these dedicated measurement and control stations, how to use the orbit determination accuracy to reasonably, quickly and efficiently formulate satellite mission plans, and then effectively use the measurement and control stations, satellites and other equipment resources, has become an urgent problem to be solved. Summary of the invention

[0004] The problem to be solved by the present invention is to avoid the problem that the algorithms in the above-mentioned background technologies cannot be completed automatically and require manual intervention, and to provide an intelligent station planning method based on orbit determination accuracy. The method has the characteristics of high accuracy of satellite orbit determination calculation results, station optimization resources, intelligent planning, easy expansion, strong compatibility, etc.

[0005] In order to achieve the above object, the technical solution adopted by the present invention is:

[0006] A station intelligent planning method based on orbit determination accuracy comprises the following steps:

[0007] (1) Analyze whether the orbit determination result meets the orbit determination accuracy based on the historical orbit determination error; if it meets the orbit determination accuracy requirement, proceed to step (2); if it does not meet the orbit determination accuracy requirement, increase the orbit determination number and re-analyze the result error again until it meets the requirement; finally determine the satellite tracking requirement during the tracking plan of the measuring station, that is, the number of orbit rise / fall circles required for the satellite to be planned every day;

[0008] (2) Calculate the visibility forecast of the station to the satellite, obtain the circle information set of the station to the satellite, and generate the visibility arc set T i ;

[0009] (3) Determine the visibility arc set T i Each visibility arc is an ascending arc or a descending arc. During the arc time, the satellite's motion trend is from south to north, which is called an ascending arc, and vice versa, which is a descending arc.

[0010] (4) According to the visibility arc set T i Construct a weight table, which includes the weight table of station idleness, the weight table of planned circles between the station and the satellite, and the weight table of visibility arc length. Dynamically modify the weight information during the planning process and select the circle with the largest weight value.

[0011] (5) Based on the weight table constructed in step (4), the planning period is divided into sub-periods at intervals of one hour, and the number of ascent and descent cycles that can meet the orbit determination accuracy requirements is planned for each satellite. According to the station resource planning requirements, a resource scheduling strategy algorithm is used to generate a planning scheme for each sub-period;

[0012] (6) All sub-period planning schemes generated in step (5) are aggregated to form a station tracking satellite planning scheme.

[0013] Furthermore, the method further comprises the following steps:

[0014] (7) Adjust the weight ratio and repeat steps (1) to (6) to achieve the advancement of the planning scheme from local optimality to global optimality.

[0015] Furthermore, step (3) specifically includes the following steps:

[0016] (301) Obtain satellite ephemeris data, and use Lagrange interpolation method to obtain the ephemeris of the arc segment start time and end time, i.e., start_j2000_orbitpoint, end_j2000_orbitpoint;

[0017] (302) converting start_j2000_orbitpoint and end_j2000_orbitpoint from the J2000 coordinate system into earth-fixed ephemeris data, i.e., start_fixed_orbitpoint and end_fixed_orbitpoint;

[0018] (303) The start_fixed_orbitpoint and end_fixed_orbitpoint are converted into the longitude and latitude of the earth-fixed system, and the type of the visibility arc is determined by the latitude.

[0019] Furthermore, step (5) specifically includes the following steps:

[0020] (501) constructing a matrix M, wherein the rows of the matrix M represent satellites, and the columns represent stations. The row and column values ​​are used to store the percentage information of the visible arc segments of the station satellites in the current sub-period and the duration of the occupied period. If the station satellites are not visible, the values ​​are set to null.

[0021] (502) traverse the matrix M according to the station number, wherein the ascending and descending circles are multiplied by the corresponding weight, the station resource utilization rate is multiplied by the corresponding weight, the two products are added, and the sum is sorted from large to small, which is the priority order of selecting the observed stars for the station;

[0022] (503) generating a station tracking planning scheme based on the priority order and using a resource scheduling strategy algorithm;

[0023] (504) Recording station tracking planning results;

[0024] (505) Each time the planning of a sub-arc segment is completed, the station availability table, the weight of the planned circles between the station and the satellite, and the arc segment arc length weight table are dynamically updated, and the planning of all sub-arc segments is finally completed.

[0025] Furthermore, the specific method of the resource scheduling strategy algorithm in step (503) is:

[0026] (5001) Calculate the station conflicts of visible arcs between different low-orbit satellites, expand the visible arc attributes, and use Θ i,j is the arc segment t i,j Other stars with station conflicts are visible arcs;

[0027] The calculation rules for conflicting arcs are:

[0028] If the measuring station used is the same measuring station and the measuring station arcs have intersections, it will be recorded as a conflicting arc; the said measuring station arcs have intersections means that: the two measuring station time periods have time overlaps with each other;

[0029] (5002) Conflict resolution for measuring stations:

[0030] The conflict resolution rule is: delete all station arcs that conflict with the current station period, that is, Θ i,j All arcs included;

[0031] (5003) According to the tracking requirements, select the low-orbit satellite tracking and control circle number; the specific method is as follows:

[0032] 1) Traverse the matrix M and select the elements of the matrix M that have a visible time period for the local star;

[0033] 2) Continue to screen the elements of matrix M according to the minimum arc length;

[0034] 3) Select the station with the smallest station load among the elements of matrix M;

[0035] 4) If there are multiple selected stations, the tracking time, idleness and weight are combined to obtain the optimal station;

[0036] (5004) completing the arrangement of medium and high orbit satellite plans according to the remaining allocatable time period of each station resource and the intersection of the station's visible arc to the satellite;

[0037] (5005) Generate a planning scheme, and perform simulation evaluation on the generated planning scheme to determine whether it meets the requirements.

[0038] Compared with the background technology, the present invention has the following advantages:

[0039] 1. The present invention adopts a planning scheme based on orbit determination accuracy, which can better meet the needs of the application level.

[0040] 2. The method of the present invention is autonomous and controllable and can be used alone or in an integrated manner.

[0041] 3. The present invention can be used across platforms, such as Windows system, Ubuntu series system, CentOS series system, Kylin Linux operating system, etc.

[0042] 4. The present invention has the characteristics of easy expansion, simple operation and intelligent planning. BRIEF DESCRIPTION OF THE DRAWINGS

[0043] Figure 1 Flow chart of the station planning method in an embodiment of the present invention. DETAILED DESCRIPTION

[0044] The present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.

[0045] For the convenience of description, first define the relevant symbols as follows:

[0046] Sat: Satellite set Sat = {Sat1, Sat2, ...Sat N};

[0047] Equ: Equipment set Equ = {Equ1, Equ2, … Equ M};

[0048] T i :SatelliteSat i The visible arc set T i ={t i,1 ,t i,2 ,…,t i,n};

[0049] T i,j : The set of visible arcs of all devices to the satellite, T i,j ={t 1,1 ,t 1,2 ,…,,,t n,m};

[0050] t i,j =(s i,j ,e i,j ,q i,j ,Q i,j ), s i,j Start time, e i,j End time, corresponding to the observation device q i,j ∈Equ,Q i,j For circle number.

[0051] A station intelligent planning method based on orbit determination accuracy comprises the following steps:

[0052] (1) Analyze the orbit determination results based on historical orbit determination errors to see if they meet the orbit determination accuracy requirements. If they meet the orbit determination accuracy requirements, proceed to step (2); if they do not meet the requirements, increase the number of orbit determinations and re-analyze the result errors until they meet the requirements; finally, determine the tracking requirements of a satellite during the tracking plan of the measuring station, that is, the number of ascent / descent circles that need to be planned for this satellite every day.

[0053] (2) Calculate the visibility forecast of the station to the satellite, obtain the circle information set of the station to the satellite, and generate the visibility arc set T i .

[0054] (3) For step (2), generate a set of visibility arcs and determine whether each visibility arc is an ascending arc or a descending arc (during this arc time, if the movement trend of the satellite is from south to north, it is called an ascending arc, otherwise it is called a descending arc).

[0055] (4) For the visibility arc set in step (3), a weight table is constructed based on the visibility arcs. The weight table includes a weight table for station idleness, a weight table for planned circles between stations and satellites, and a weight table for the arc length of visibility arcs. The weight information can be dynamically modified during the planning process to select the weight value and the maximum circle. Among them, the station tracking plan will always assign task planning to the relatively idle station resources to achieve the purpose of resource balance; the station tracking plan will always assign satellite circles to different stations to meet the orbit determination requirements.

[0056] Before planning, it is assumed that the mean of all stations is Wf=1 / Nf (Nf is the number of stations), and the weight of all satellites is Ws=1 / Ns (Ns is the number of satellites); initially, the idleness of all stations is 100%, and the weight of the planned circles between stations and satellites is 100%; within a planning interval (half an hour is a planning interval), it is assumed that there are visible periods for station 1 to satellite 1, station 1 to satellite 2, station 2 to satellite 1, and station 2 to satellite 2. Finally, it is assumed that station 1 is the best choice for satellite 1 based on the weighted summation method, then the idleness of station 1 is changed to Tz (occupied time) / Tt (total time), and the weight table of planned circles between station 1 and satellite 1 is changed to Mp (planned times) / Mt (total planned times = rise times + fall times).

[0057] The station idleness weight table is as follows:

[0058]

[0059] The planned circle weight table is as follows:

[0060]

[0061] The arc length weight table of visible arc segments is as follows:

[0062]

[0063] (5) Based on the weight table constructed in step (4), the planning period is divided into several sub-periods at intervals of one hour. Every day, a number of ascent and descent cycles that can meet the orbit determination accuracy requirements should be planned for each satellite. According to the station resource planning requirements, a resource scheduling strategy algorithm is used to generate a planning plan for each sub-period.

[0064] (6) For each sub-period planning scheme generated in step (5), collect the final station tracking satellite planning scheme.

[0065] (7) Adjust the weight ratio and repeatedly execute the above planning process to achieve the advancement of the planning scheme from local optimality to global optimality.

[0066] In this method, the specific manner of determining whether each visibility arc segment is an ascending arc segment or a descending arc segment in step (3) is as follows:

[0067] (301) Obtain satellite ephemeris data, and use Lagrange interpolation to obtain the ephemeris of the arc segment start time and end time, i.e., start_j2000_orbitpoint, end_j2000_orbitpoint;

[0068] (302) converting start_j2000_orbitpoint and end_j2000_orbitpoint from the J2000 coordinate system into earth-fixed ephemeris data, i.e., start_fixed_orbitpoint and end_fixed_orbitpoint;

[0069] (303) Finally, the start_fixed_orbitpoint and end_fixed_orbitpoint are converted into the longitude and latitude of the earth fixed system, and the type of the visibility arc is determined by the latitude.

[0070] In step (5), the number of ascent and descent cycles that can meet the orbit determination accuracy requirements is planned for each satellite every day, and a planning scheme for each sub-period is generated. The specific method is as follows:

[0071] (501) In the matrix M, rows represent satellites and columns represent stations. The row and column values ​​are used to store information such as the visible arc segments of the station satellites in the current sub-period and the percentage of the occupied period duration. If the station satellites are not visible, the values ​​are set to null.

[0072] The element table of matrix M is as follows:

[0073]

[0074] (502) traverse the matrix M according to the station number; for each station, select the priority of the observed stars according to the principle of balancing the utilization rate of the station resources and selecting the ascending and descending circles so that the planned arc segment has the largest span;

[0075] (503) generating a station tracking planning scheme based on the priority order and using a resource scheduling strategy algorithm;

[0076] (504) Recording station tracking planning results;

[0077] (505) Each time a sub-arc segment is planned, the station availability table, the weight of the planned circles between the station and the satellite, and the arc segment arc length weight table are dynamically updated.

[0078] The specific method of the resource scheduling strategy algorithm is as follows:

[0079] (5001) Calculate the visibility forecast of low-orbit satellites to each ground station within the selected time and generate a visible arc segment set T i ;

[0080] (5002) Calculate the device conflicts of visible arcs between different low-orbit satellites and expand the visible arc attributes:

[0081]

[0082] Θ i,jis the arc segment t i,j The arc segments visible to other stars with equipment conflicts, Θ i,j ={(i1,j1),(i2,j2),…}:

[0083] if q i,j =q i′,j′ and

[0084] then i′,j′ ∈Θ i,j

[0085] D is the device tracking switching time.

[0086] (5003) Resolve device conflicts:

[0087]

[0088] Remove t from the set of visible arcs i*,j* , and update Θ i*,j* The elements in the table correspond to the conflict information of the visible arcs. Repeat the above operation until all Θ i,j is empty;

[0089] (5004) Arc selection and planning: According to the tracking requirements, select the low-orbit satellite tracking and control circles. If there are multiple optional tracking and control circles, select the device with the longest tracking time, while taking into account the load balance of the equipment;

[0090] (5005) Use the remaining station resources to complete the planning of medium and high orbit satellites; because the medium and high orbits are visible for a long time, it is impossible to track them all the time, and they must be screened and cut according to the maximum arc length of the tracking. Prioritize the planning of medium orbit satellites, and then plan the high orbit satellites. Because the visible arc is too long, the arc of birth and descent is not considered. Just randomly select the arc length according to the visible period and insert it into the plan;

[0091] (5006) Perform simulation evaluation on the generated plan to determine whether it meets the requirements;

[0092] The evaluation method is described as follows:

[0093] 1) Determine whether the satellite meets the number of observation arcs required;

[0094] 2) Determine whether the low-orbit satellite meets the requirements of the ascending and descending arc;

[0095] 3) Determine whether there is any conflict in the observation time of the measuring station.

[0096] If the requirements are not met, turn to manual planning, adjust the constraint values ​​and increase the number of measuring stations to obtain a planning solution that meets the requirements.

[0097] In summary, the present invention proposes a method for intelligent station planning based on orbit determination accuracy, aiming at the problem that the current methods for station planning cannot be completed automatically and require manual intervention, and how to effectively use the measurement and control stations, satellites and other equipment resources to obtain high-precision orbit determination. This method uses the medium- and long-term forecast orbit and the distribution of the ground station network to complete the comprehensive tracking and forecasting calculation; through data mining and analysis, the satellite positioning accuracy is intelligently obtained; the station observation plan is formulated based on the comprehensive station location distribution, measurement data quality, measurement and control equipment accuracy and other factors; it can realize intelligent planning of station resources based on orbit determination accuracy, and has the characteristics of simple user operation, high orbit determination accuracy, intelligent planning, easy expansion, and strong compatibility.

Claims

1. A station intelligent planning method based on orbit determination accuracy, characterized in that: The following steps are involved: (1) Analyze whether the orbit determination result meets the orbit determination accuracy based on the historical orbit determination error; if it meets the orbit determination accuracy requirement, proceed to step (2); if it does not meet the orbit determination accuracy requirement, increase the orbit determination number and re-analyze the result error again until it meets the requirement; finally determine the satellite tracking requirement during the tracking plan of the measuring station, that is, the number of orbit rise / fall circles required for the satellite to be planned every day; (2) Calculate the visibility forecast of the station to the satellite, obtain the circle information set of the station to the satellite, and generate the visibility arc set T i ; (3) Determine the visibility arc set T i Each visibility arc is an ascending arc or a descending arc; during the arc time, the movement trend of the satellite is from south to north, which is called an ascending arc, and vice versa, which is a descending arc; specifically, the following steps are included: (301) Obtain satellite ephemeris data, and use Lagrange interpolation method to obtain the ephemeris of the arc segment start time and end time, i.e., start_j2000_orbitpoint, end_j2000_orbitpoint; (302) converting start_j2000_orbitpoint and end_j2000_orbitpoint from the J2000 coordinate system into earth-fixed ephemeris data, i.e., start_fixed_orbitpoint and end_fixed_orbitpoint; (303) converting start_fixed_orbitpoint and end_fixed_orbitpoint into longitude and latitude of the earth fixed system, and using the latitude to determine the type of the visibility arc; (4) According to the visibility arc set T i Construct a weight table, which includes the weight table of station idleness, the weight table of planned circles between the station and the satellite, and the weight table of visibility arc length. Dynamically modify the weight information during the planning process and select the circle with the largest weight value. (5) Based on the weight table constructed in step (4), the planning period is divided into sub-periods at intervals of one hour, and the number of ascent and descent cycles that can meet the orbit determination accuracy requirements is planned for each satellite. According to the station resource planning requirements, a resource scheduling strategy algorithm is used to generate a planning scheme for each sub-period; specifically, the following steps are included: (501) constructing a matrix M, wherein the rows of the matrix M represent satellites, and the columns represent stations. The row and column values ​​are used to store the percentage information of the visible arc segments of the station satellites in the current sub-period and the duration of the occupied period. If the station satellites are not visible, the values ​​are set to null. (502) traverse the matrix M according to the station number, wherein the ascending and descending circles are multiplied by the corresponding weight, the station resource utilization rate is multiplied by the corresponding weight, the two products are added, and the sum is sorted from large to small, which is the priority order of selecting the observed stars for the station; (503) generating a station tracking planning scheme based on the priority order and using a resource scheduling strategy algorithm; (504) Recording station tracking planning results; (505) After each sub-arc segment is planned, the station availability table, the weight of the planned circles between the station and the satellite, and the arc segment length weight table are dynamically updated, and the planning of all sub-arc segments is finally completed; (6) All sub-period planning schemes generated in step (5) are aggregated to form a station tracking satellite planning scheme.

2. The method for intelligent station planning based on orbit determination accuracy according to claim 1 is characterized in that: The following steps are also included: (7) Adjust the weight ratio and repeat steps (1) to (6) to achieve the advancement of the planning scheme from local optimality to global optimality.

3. The method for intelligent station planning based on orbit determination accuracy according to claim 1 is characterized in that: The specific method of the resource scheduling strategy algorithm in step (503) is: (5001) Calculate the station conflicts of visible arcs between different low-orbit satellites, expand the visible arc attributes, and use Q i,j is the arc segment t i,j The arc segments visible to other stars with station conflicts; The calculation rules for conflicting arcs are: If the measuring station used is the same measuring station and the measuring station arcs have intersections, it will be recorded as a conflicting arc; the said measuring station arcs have intersections means that: the two measuring station time periods have time overlaps with each other; (5002) Conflict resolution for measuring stations: The conflict resolution rule is: delete all station arcs that conflict with the current station period, that is, Q i,j All arcs included; (5003) According to the tracking requirements, select the low-orbit satellite tracking and control circle number; the specific method is as follows: 1) Traverse the matrix M and select the elements of the matrix M that have a visible time period for the local star; 2) Continue to screen the elements of matrix M according to the minimum arc length; 3) Select the station with the smallest station load among the elements of matrix M; 4) If there are multiple selected stations, the tracking time, idleness and weight are combined to obtain the optimal station; (5004) completing the arrangement of medium and high orbit satellite plans according to the remaining allocatable time period of each station resource and the intersection of the station's visible arc to the satellite; (5005) Generate a planning scheme, and perform simulation evaluation on the generated planning scheme to determine whether it meets the requirements.