A rock breaking method combining static splitting and blasting in rock tunnels under extreme conditions
Through the combined method of static splitting technology and trace explosive blasting, the blasting vibration problem in tunnel construction under extreme conditions is solved, safe and efficient tunnel boring is achieved, and the construction environment and railway operation are ensured.
Patent Information
- Application Number
- CN202111425333.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-11-26
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2041-11-26
AI Technical Summary
Under extreme conditions, tunnel blasting vibration is high, making it difficult to ensure the safety of the construction environment and affect the normal operation of the railway line.
Using static splitting technology combined with trace explosive blasting, a split hole is arranged in the tunnel through a hydraulic splitter and performs multiple splitting. Then a gun hole is arranged in the center of the split rock block and spaced charge blasting is carried out, and the holes are detonated to reduce the Blasting vibration.
The blasting vibration is effectively controlled, the tunnel excavation speed is improved, the construction environment is safe, and the impact on railway line operation is reduced.
Smart Images

Figure CN113982604B_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of tunnel engineering, and in particular to a rock breaking method for rock tunnels under extreme conditions by combining static splitting and blasting. Background Art
[0002] With the continuous improvement of urban railway lines, the tunnel construction environment has become more and more complex, and the three-dimensional interaction of new and old railway lines is inevitable, which puts higher requirements on tunnel construction technology. The drilling and blasting method is widely used in urban underground space construction due to its economic and efficient characteristics, and has achieved huge economic and social benefits. However, for extreme conditions, such as the tunnel engineering of the interactive railway line, the control of blasting vibration is very demanding, which requires that the vibration peak speed of the existing railway line be controlled within a very small range and not affect the normal operation of the railway line.
[0003] However, the current conventional tunnel blasting causes large vibrations, making it difficult to ensure the safety of the tunnel construction environment. Summary of the invention
[0004] The main purpose of the present invention is to overcome the above-mentioned defects in the prior art and propose a method for combining static splitting and blasting to break rock in rock tunnels under extreme conditions. By combining the characteristics of static splitting technology with low disturbance and fast blasting rock breaking speed, the present invention replaces the conventional tunnel blasting method, solves the problem of rock tunnel construction under extreme conditions, and ensures the safety of the tunnel construction environment.
[0005] The present invention adopts the following technical solution:
[0006] A rock breaking method for rock tunnels under extreme conditions using static splitting and blasting combined, comprising:
[0007] 1) Splitting hole arrangement:
[0008] The diameter, hole depth and hole spacing of the splitting hole are determined according to the diameter, working end length and splitting radius of the hydraulic splitting machine, respectively. The diameter of the splitting hole is the same as the diameter of the hydraulic splitting machine, the depth of the splitting hole is the same as the working end length of the hydraulic splitting machine, and the hole spacing of the splitting hole is the splitting radius of the hydraulic splitting machine;
[0009] Use a down-the-hole drill to first arrange split holes along the tunnel contour, and then arrange split holes on the tunnel face;
[0010] 2) Static splitting construction:
[0011] The hydraulic splitter is placed in the splitting hole and splits the rock on the tunnel face into blocks of a certain size.
[0012] 3) Blasting and fragmentation with trace explosives:
[0013] Use a rock drill to arrange blastholes in the center of the split rock;
[0014] The explosives are loaded into the blasthole in the form of interval charging, the detonator is arranged in the explosive section in the hole, the wire is led out of the blasthole, and the blasthole is filled with blasthole mud;
[0015] blasting rocks;
[0016] 4) Shovel loading:
[0017] The crushed rocks are shoveled by an excavator and transported to a designated location for stacking, completing a cycle of tunnel rock crushing.
[0018] Specifically, before the splitting holes are arranged, the method further includes: determining the splitting radius of the hydraulic splitting machine, specifically:
[0019] Drill a splitting hole in the tunnel section with a hole diameter and a hole depth that are the same as the diameter and working section length of the hydraulic splitter;
[0020] Place the hydraulic splitter in the splitting hole and start the splitting machine. Under the action of the splitter, cracks will appear in the splitting hole, and the length of the cracks is the splitting radius of the splitter.
[0021] Specifically, the cleavage hole arrangement further includes:
[0022] The splitting holes are perpendicular to the tunnel face and are arranged symmetrically.
[0023] Specifically, the static splitting construction includes placing a hydraulic splitter in a splitting hole and performing multiple splitting operations, and further includes:
[0024] A splitting hole is reserved between the two splitters to induce cracks to distribute along the hole.
[0025] Specifically, the blasting and crushing with trace explosives, using a rock drill to arrange blast holes in the center of the split rock block, also includes:
[0026] The blasthole is arranged at the center of the split rock block, and the depth of the blasthole is the same as the depth of the split hole.
[0027] Specifically, the trace explosive is blasted and broken, and the explosive is loaded into the blast hole in the form of a spaced charge structure, specifically:
[0028] The explosives are separated by air spacers and evenly distributed along the depth of the blasthole.
[0029] Specifically, the air spacer is a sealed plastic bag filled with air.
[0030] Specifically, the trace explosives are used to blast and break the rock blocks, specifically:
[0031] The rock blasting is carried out by detonating hole by hole.
[0032] It can be seen from the above description of the present invention that, compared with the prior art, the present invention has the following beneficial effects:
[0033] The rock-breaking method for rock tunnels under extreme conditions provided by the present invention uses static hydraulic splitting technology to replace the traditional rock tunnel blasting excavation method, solves the safety problem of blasting vibration caused by tunnel blasting construction, and ensures the production and life safety of residents in the construction area. At the same time, the blasting scheme uses trace explosives for blasting, which improves the tunneling speed and reduces the blasting vibration generated by it. At the same time, the splitting holes further reduce the blasting vibration, and both effectively control the blasting vibration. The rock-breaking method can safely and smoothly complete rock tunnel projects under extreme conditions and improve the tunneling speed. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Figure 1 A schematic diagram of the cleavage radius of the cleavage hole of the present invention;
[0035] Figure 2 It is a schematic diagram of the tunnel face of the present invention;
[0036] Figure 3 It is a schematic diagram of the arrangement of the cleavage holes of the present invention;
[0037] Figure 4 It is a schematic diagram of rock splitting at the tunnel face of the present invention;
[0038] Figure 5 It is the arrangement diagram of blast holes on the face of the present invention;
[0039] Figure 6 This is a blasthole arrangement diagram for splitting rock blocks with a prism according to the present invention;
[0040] Figure 7 It is a blasthole arrangement diagram for irregularly splitting rock blocks of the present invention;
[0041] Figure 8 It is a diagram of the blasthole charging structure of the present invention.
[0042] Among them, splitting radius 1; splitting hole 2; tunnel face 3; tunnel contour 4; splitting hole on the tunnel contour 5; splitting hole in the tunnel face 6; cracks between holes 7; irregular splitting rock blocks 8; prismatic splitting rock blocks 9; blasthole 10; explosive 11; air spacer 12; detonator 13; wire 14; blasting mud 15. DETAILED DESCRIPTION
[0043] The present invention is further described below through specific implementation modes.
[0044] The rock breaking method of rock tunnels under extreme conditions provided by the present invention uses static hydraulic splitting technology to replace the traditional rock tunnel blasting excavation method, solves the safety problem of blasting vibration caused by tunnel blasting construction, and ensures the production and life safety of residents in the construction area. At the same time, the blasting scheme uses trace explosives for blasting, which improves the tunneling speed and reduces the blasting vibration generated by it, while the splitting holes further reduce the blasting vibration, and both effectively control the blasting vibration. The rock breaking method can safely and smoothly complete rock tunnel projects under extreme conditions and improve the tunneling speed.
[0045] A rock breaking method for rock tunnels under extreme conditions by combining static splitting and blasting, specifically comprising the following steps:
[0046] S1: Determine the splitting radius R of the hydraulic splitter
[0047] 1) Drill a splitting hole 2 in the tunnel section, the hole diameter and hole depth of which are the same as the diameter of the splitter and the length of the working section; Figure 1 A schematic diagram of the cleavage radius of the cleavage hole according to an embodiment of the present invention;
[0048] 2) Place the hydraulic splitter in the splitting hole and start the splitter. Under the action of the hydraulic splitter, cracks will appear in the splitting hole, and the length of the crack is 1 of the splitting length of the splitter.
[0049] S2: Splitting hole arrangement
[0050] 1) The diameter, hole depth and hole spacing of the splitting hole are determined according to the diameter, working end length and splitting radius 1 of the hydraulic splitting machine, respectively. The diameter of the splitting hole 2 is the same as the diameter of the hydraulic splitting machine, the depth of the splitting hole 2 is the same as the working end length of the hydraulic splitting machine, and the hole spacing is the splitting radius 1 of the hydraulic splitting machine.
[0051] 2) First, a splitting hole 5 is arranged along the tunnel profile 4 using a down-the-hole drill, and then a splitting hole 6 is arranged on the tunnel face 3. The splitting hole 6 is perpendicular to the tunnel face 3, and the splitting holes 5 and 6 are arranged symmetrically.
[0052] S3: Static splitting construction
[0053] 1) Since there are many splitting holes 5 and 6, they need to be completed in multiple times. In a single splitting, splitting is required, that is, a splitting hole 5 and 6 need to be separated between two splitters to induce cracks 7 to be distributed between the holes. Under the action of the hydraulic splitter, cracks 7 will appear between the holes, and the rock on the tunnel face 3 will be split into rock blocks 8 and 9 of a certain size. The split rock blocks have two forms, one is a regular prism 9, which is not connected to the tunnel contour, and the other is an irregular rock column 8, which is connected to the tunnel contour.
[0054] S4: Explosive fragmentation with trace explosives
[0055] 1) Subsequently, a blast hole 10 is arranged at the center of the split rock blocks 8 and 9 using a rock drill. The depth of the blast hole 10 is the same as that of the split holes 5 and 6.
[0056] 2) After the drilling is completed, the explosives 11 are separated by air spacers 12, which are sealed plastic bags filled with air. A small amount of explosives are placed in the blast hole in the form of a separated charge structure. At the same time, a detonator 13 is installed in the explosive section 11 in the hole, a wire 14 is led out of the blast hole, and the blast hole is filled with gun mud 15, and then the blasting is completed hole by hole.
[0057] 3) Under the action of the energy of the explosive, the split rock blocks 8 and 9 will be further broken.
[0058] S5: Shovel loading
[0059] Finally, the crushed rocks are shoveled by factory vehicles and excavators and transported to designated locations for stacking, completing a cycle of tunnel rock crushing.
[0060] The above is only a specific implementation of the present invention, but the design concept of the present invention is not limited thereto. Any non-substantial changes to the present invention using this concept shall be deemed as an infringement of the protection scope of the present invention.
Claims
1. A rock breaking method for rock tunnels under extreme conditions by combining static splitting and blasting, characterized in that: include: 1) Splitting hole arrangement: The diameter, hole depth and hole spacing of the splitting hole are determined according to the diameter, working end length and splitting radius of the hydraulic splitting machine, respectively. The diameter of the splitting hole is the same as the diameter of the hydraulic splitting machine, the depth of the splitting hole is the same as the working end length of the hydraulic splitting machine, and the hole spacing of the splitting hole is the splitting radius of the hydraulic splitting machine; Use a down-the-hole drill to first arrange split holes along the tunnel contour, and then arrange split holes on the tunnel face; 2) Static splitting construction: The hydraulic splitter is placed in the splitting hole and splits the rock on the tunnel face into blocks of a certain size. 3) Blasting and fragmentation with trace explosives: Use a rock drill to arrange blastholes in the center of the split rock; The explosives are loaded into the blasthole in the form of interval charging, the detonator is arranged in the explosive section in the hole, the wire is led out of the blasthole, and the blasthole is filled with blasthole mud; blasting rocks; 4) Shovel loading: The crushed rocks are shoveled by an excavator and transported to a designated location for stacking, thus completing one cycle of tunnel rock crushing; The cleavage hole arrangement further comprises: The splitting holes are perpendicular to the tunnel face and are arranged symmetrically; The static splitting construction includes placing a hydraulic splitter in the splitting hole and performing multiple splitting operations, and further includes: A splitting hole is reserved between the two splitters to induce cracks to distribute along the hole; The blasting and crushing with trace explosives, using a rock drill to arrange blast holes in the center of the split rock block, also includes: The blasthole is arranged at the center of the split rock block, and the depth of the blasthole is the same as the depth of the split hole; The micro-explosive blasting and fragmentation is performed by placing the explosives in the blast hole in a spaced charging structure, specifically: The explosives are separated by air spacers and evenly distributed along the depth of the blasthole; The air spacer is a sealed plastic bag filled with air.
2. The rock breaking method of rock tunnel under extreme conditions by static splitting and blasting according to claim 1 is characterized in that: Before the splitting holes are arranged, the splitting radius of the hydraulic splitter is determined, specifically: Drill a splitting hole in the tunnel section with a diameter and a hole depth that are the same as the diameter and the length of the working end of the hydraulic splitter; Place the hydraulic splitter in the splitting hole and start the splitting machine. Under the action of the splitter, cracks will appear in the splitting hole, and the length of the cracks is the splitting radius of the splitter.
3. The rock breaking method of rock tunnel under extreme conditions by static splitting and blasting according to claim 1 is characterized in that: The micro-explosive blasting and breaking, and blasting rock blocks, are specifically: The rock blasting is carried out by detonating hole by hole.
Citation Information
Patent Citations
Hard rock tunnel non-blasting digging blocking method and construction method
CN104314574A
Blasting vibration limited rock tunnel excavation method
CN106014421A
Rock tunnel splitting and blasting coupling structure
CN217300576U
KR20190011888A