A method for automatically obtaining building storey height parameters from axial elevation drawings

By identifying and grouping elevation objects in axial elevation drawings, the problem of poor versatility in the extraction of floor height parameters in multi-tower drawings in the existing technology is solved, and automatic acquisition of floor height parameters of single and multi-tower buildings is realized. Improved positioning accuracy and fast filtering capabilities of graph structures in BIM models.

CN113987622BActive Publication Date: 2024-10-29CHANGSHA FANYI PARAMETER INFORMATION TECH CO LTD
View PDF 8 Cites 0 Cited by

Patent Information

Application Number
CN202111126175.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-09-26
Publication Date
2024-10-29
Estimated Expiration
2041-09-26

AI Technical Summary

Technical Problem

The existing technology cannot effectively automatically obtain building height parameters from a multi-tower drawing, has poor versatility, and cannot meet the demand for extraction of floor height parameters of multi-tower buildings.

Method used

By identifying the elevation objects and dimensioning objects in the axial elevation drawing, combined with the longest dimension line on the left or right side of the building element, elevation objects that have nothing to do with the floor height are eliminated, the elevation data is processed in groups, and the floor height data is calculated , suitable for single building and multi-tower drawings.

Benefits of technology

It realizes the automatic acquisition of building height parameters of single or multiple buildings from axial elevation drawings, improves the positioning accuracy of floor plates and beam and column heights in BIM models, and helps solve the problem of automatic global positioning of objects in the BIM modeling process. And quickly filter the axis network information in the architectural drawing structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113987622B_ABST
    Figure CN113987622B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for automatically acquiring building storey height parameters from an axial elevation drawing, comprising the following steps: S1, drawing initialization, selecting the axial elevation drawing of a project building to extract the elevation information of the building, and exploding all blocks within the range where the elevation information needs to be extracted into basic objects; S2, reading all elevation objects within the range where the elevation information needs to be extracted; S3, acquiring elevation data, and acquiring elevation data separately according to whether the range where the elevation information needs to be extracted is a single building drawing or a multi-tower drawing; S4, calculating storey height data, and obtaining storey height data by calculating the difference between adjacent elevation data. Compared with the prior art, the present invention can realize automatic acquisition of building storey height parameters of a single or multiple buildings from an axial elevation drawing, and using storey height parameters as reference data can assist in solving the problem of automatic global positioning of a single modeling object in a project building during the BIM modeling process.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of building information modeling, and in particular relates to a method for automatically acquiring building storey height parameters from an axial elevation drawing. Background Art

[0002] In the field of construction, Building Information Modeling (BIM) is widely regarded as a new tool that can improve production efficiency and delivery quality. BIM can provide a visual building model for a building project. In the prior art, the method of manually remodeling based on the content of two-dimensional CAD drawings to form a BIM model takes a long time and requires a lot of financial and material resources. Therefore, it is of great significance to develop a technology that can automatically convert CAD building drawings into BIM models.

[0003] In developing a technology that can automatically convert CAD architectural drawings into BIM models, it is necessary to use the floor height parameters as the reference data to locate the height of each floor, beam, column and other architectural models. Therefore, it is necessary to solve the problem of automatically obtaining the building floor height parameters from the two-dimensional drawing.

[0004] In the prior art, Chinese patent CN201910252414 discloses a facade recognition method for converting architectural drawings into three-dimensional BIM models, which finds the corresponding floor height of each floor in the facade through the identified elevation symbol. Create a dictionary containing all floor names, where the key of the dictionary is the floor name and the value is the floor height of the floor; in the elevation, for each floor name of the teaching building, find its corresponding text. For example, 1F, find the text with a string equal to "1F" in the elevation. After finding the text, traverse all elevation symbols to determine whether there is a three-dimensional coordinate point of the elevation symbol and the three-dimensional coordinate point of the floor text whose Euclidean distance is less than three times the height of the text, and the horizontal coordinate of the text is less than the horizontal coordinate of the elevation symbol, and the vertical coordinate is greater than the vertical coordinate of the elevation symbol. If the conditions are met, the elevation symbol successfully matches the floor text; the elevation value corresponding to the elevation symbol is written into the dictionary.

[0005] The deficiency of the prior art is that the method has poor versatility and can only extract the floor height parameters of a single building, and cannot directly solve the problem of extracting the floor height parameters of a multi-tower drawing. Summary of the invention

[0006] 1. Technical issues to be resolved

[0007] Based on this, the present invention proposes a method for automatically obtaining building floor height parameters from an axial elevation drawing. The method for automatically obtaining building floor height parameters from an axial elevation drawing is intended to solve the technical problem that the floor height acquisition method in the prior art has poor versatility and cannot solve the extraction of floor height parameters of a multi-tower drawing.

[0008] (II) Technical solution

[0009] In order to solve the above technical problems, the present invention proposes a method for automatically acquiring building storey height parameters from an axial elevation drawing.

[0010] The overall inventive concept of the method for automatically obtaining building storey height parameters from an axial elevation drawing of the present invention is as follows: first, the elevation object and the dimensioning object are identified, and then the elevation object and the dimensioning object are combined, and the elevation object corresponding to the longest dimension line on the left or right side of the building element is used to exclude elevation objects irrelevant to the storey height (such as the elevation corresponding to the roof layer), and the elevation object corresponding to the longest dimension line is retained. Then the elevations are grouped, and by identifying whether it is a single-building drawing or a drawing of multiple towers, the groups of elevation objects that need to be retained are determined, and then the storey height data is calculated using the elevation objects in these groups.

[0011] The present invention proposes a method for automatically obtaining building storey height parameters from an axial elevation drawing, comprising the following steps:

[0012] S1, drawing initialization

[0013] S11, selecting an axial elevation drawing of a project building to extract elevation information of the building, and determining a range of elevation information to be extracted, wherein the range of elevation information to be extracted includes building elements and dimensioning elements;

[0014] S12, exploding all blocks within the range where elevation information needs to be extracted into basic objects;

[0015] S2, reading all elevation objects within the range where elevation information needs to be extracted;

[0016] S3, obtaining elevation data, and obtaining elevation data separately according to whether the elevation information is extracted within a single building drawing or a multi-tower drawing:

[0017] When it is a single-building drawing, find the longest dimension line on the left or right side of the building element, find the elevation objects located on one side of the dimension line and set in sequence along the length direction of the dimension line, and the elevation value on the elevation object is a set of elevation data;

[0018] When it is a multi-tower drawing, find the longest dimension line closest to each building element, find the elevation objects located on one side of the dimension line and set in sequence along the length direction of the dimension line, and the elevation value on the elevation object is a set of elevation data;

[0019] S4, calculate floor height data

[0020] The floor height data is obtained by calculating the difference between adjacent elevation data.

[0021] Preferably, in step S3, after acquiring the elevation data, a step of eliminating interference from the elevation data is also included.

[0022] Preferably, the step of eliminating interference from the elevation data includes: analyzing the difference between two adjacent elevation data in each set of elevation data, and if the difference is less than a preset height, one of the elevation data needs to be eliminated; the elimination method is:

[0023] If one of the two elevation data is positive or negative zero, the other one will be excluded;

[0024] If one of the two elevation data is positive and the other is negative, exclude the negative one;

[0025] If one of the two elevation data has a corresponding floor height line within the range where the elevation information needs to be extracted, and the other does not, the one without the corresponding floor height line will be excluded.

[0026] Preferably, the preset height can be set according to the standard floor elevation of the building, and the value of the preset height is smaller than the standard floor elevation of the building.

[0027] Preferably, after step S1 and before step S3, the method further includes the step of determining whether it is a single-building drawing or a multi-tower drawing:

[0028] Along the height direction of the axial elevation drawing, find the longest dimension line on the left side of the range where the elevation information needs to be extracted and set it as L1, find the longest dimension line on the right side of the range where the elevation information needs to be extracted and set it as L2, compare the lengths of L1 and L2, take the shorter one of L1 and L2, and make a horizontal auxiliary line through point C on the shorter dimension line, and the distance from point C to the bottom end of the shorter dimension line is 50%-80% of the total length of the dimension line;

[0029] The leftmost intersection point of the horizontal auxiliary line and the building element within the range where the elevation information needs to be extracted is A1, and the rightmost intersection point of the auxiliary line and the building element within the range where the elevation information needs to be extracted is A2;

[0030] On line segment A1A2: if there is no continuous line segment with a length ≥ 10m and not intersecting with other basic objects within the range where elevation information needs to be extracted, then the drawing within the range where elevation information needs to be extracted is judged to be a single-building drawing;

[0031] On line segment A1A2: if there is a continuous line segment with a length ≥10m and an intersection with other basic objects within the range where elevation information needs to be extracted, and a vertical auxiliary line is made through the midpoint of the continuous line segment, and the upward part of the vertical auxiliary line does not intersect with other basic objects within the range where elevation information needs to be extracted; then it is judged that the drawing within the range where elevation information needs to be extracted is a multi-tower drawing.

[0032] Preferably, in the step of determining whether it is a single-building drawing or a multi-tower drawing, the first object that the vertical auxiliary line intersects downward is the top of the bottom commercial layer.

[0033] Preferably, the step of determining whether it is a single-building drawing or a multi-tower drawing also includes the step of grouping a multi-tower drawing: dividing a multi-tower drawing into group 0, group 1, and 2-N groups, wherein N is the number of buildings, group 0 is the bottom commercial floor, group 1 is the leftmost building within the range where elevation information needs to be extracted, and group 2-N is the 2nd to Nth buildings from left to right within the range where elevation information needs to be extracted.

[0034] Preferably, the axial elevation drawing of the project building in step S11 is a file in .dwg format; the basic objects in step S12 include: circles, lines, polylines, polygons, text, dimension lines; when the range of elevation information to be extracted in step S12 includes block definitions with attributes, the attribute text needs to be restored; step S12 also includes: S13, resetting the Z coordinates of all objects within the range of elevation information to be extracted to zero.

[0035] Preferably, in step S11, determining the range of elevation information to be extracted includes two methods:

[0036] Method 1: Cut the axial elevation drawing of the project building into a file containing only a single frame according to the range determined by each frame in the axial elevation drawing of the project building;

[0037] Method 2: Manually select a single frame in the axial elevation drawing of the project building to determine the range of elevation information to be extracted.

[0038] Preferably, before step S1, the following steps are also included: check whether the floor plan of the standard floor of the project building can be opened and displayed normally using AutoCAD software; when the floor plan of the standard floor of the project building is a .dwg format file drawn by non-original CAD software, the file needs to be converted into a native file.

[0039] (III) Beneficial effects

[0040] Compared with the prior art, the method of automatically obtaining building storey height parameters from the axial elevation diagram of the present invention has the following beneficial effects:

[0041] Compared with the prior art, the method of automatically obtaining building storey height parameters from the axial elevation drawing of the present invention can realize the automatic acquisition of building storey height parameters of a single or multiple buildings from the axial elevation drawing. With the storey height parameters as the reference data, the technology applied to the BIM model can locate the height of the building models such as the slabs, beams and columns of each floor, and can help solve the problem of automatic global positioning of a single modeling object in the project building during the BIM modeling process. At the same time, it can also assist in the rapid filtering of the axis network information during the recognition of the building structure drawing; by corresponding the elevation information to the axis network, the projection relationship of the elevation drawing is established. BRIEF DESCRIPTION OF THE DRAWINGS

[0042] The features and advantages of the present invention will be more clearly understood by referring to the accompanying drawings, which are schematic and should not be construed as limiting the present invention in any way. In the accompanying drawings:

[0043] Figure 1 In the method for automatically obtaining building storey height parameters from an axial elevation drawing according to an embodiment of the present invention: a single building drawing schematic diagram (single tower);

[0044] Figure 2 In the method for automatically obtaining building storey height parameters from an axial elevation drawing according to an embodiment of the present invention: a schematic diagram of a double-building drawing (twin towers);

[0045] Figure 3 In the method for automatically acquiring building storey height parameters from an axial elevation drawing according to an embodiment of the present invention: a schematic diagram of grouping two-building drawings;

[0046] Figure 4 A schematic diagram of eliminating interference from elevation data in a method for automatically acquiring building storey height parameters from an axial elevation drawing according to an embodiment of the present invention;

[0047] Figure 5 It is a schematic diagram of part of the storey height data obtained by using the method for automatically obtaining the building storey height parameters from the axial elevation diagram according to the embodiment of the present invention;

[0048] Figure 6 It is a schematic flow chart of a method for automatically acquiring building storey height parameters from an axial elevation drawing according to an embodiment of the present invention;

[0049] Figure 7 This is a schematic diagram of a method for determining whether it is a single-building drawing or a multi-tower drawing in a method for automatically acquiring building storey height parameters from an axial elevation drawing according to an embodiment of the present invention. DETAILED DESCRIPTION

[0050] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific embodiments of the present invention are described in detail below in conjunction with the accompanying drawings. In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention can be implemented in many other ways different from those described herein, and those skilled in the art can make similar improvements without violating the connotation of the present invention, so the present invention is not limited by the specific implementation disclosed below.

[0051] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "connected" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection, an electrical connection, a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements, or it can be a "transmission connection", that is, a power connection through various appropriate methods such as belt drive, gear drive or sprocket drive. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0052] The following is combined with Figure 1-6 A method for automatically acquiring building storey height parameters from an axial elevation drawing of the present invention is further described.

[0053] Please focus on Figure 6 The present invention discloses a method for automatically obtaining building storey height parameters from an axial elevation drawing, comprising the following steps:

[0054] S1, drawing initialization

[0055] S11, selecting the axial elevation drawing of the project building to extract the elevation information of the building, and determining the range of the elevation information to be extracted, the range of the elevation information to be extracted includes the building elements and the dimensioning elements.

[0056] S12, exploding all blocks within the range where elevation information needs to be extracted into basic objects.

[0057] S2, read all elevation objects within the range where elevation information needs to be extracted.

[0058] S3, obtaining elevation data, and obtaining elevation data separately according to whether the elevation information is extracted within a single building drawing or a multi-tower drawing:

[0059] When it is a single-building drawing, find the longest dimension line on the left or right side of the building element, find the elevation objects located on one side of the dimension line and set sequentially along the length direction of the dimension line. The elevation value on the elevation object is a set of elevation data.

[0060] When it is a drawing of multiple towers, find the longest dimension line closest to each building element, find the elevation objects located on one side of the dimension line and set sequentially along the length direction of the dimension line, and the elevation value on the elevation object is a set of elevation data.

[0061] S4, calculate floor height data

[0062] The floor height data is obtained by calculating the difference between adjacent elevation data.

[0063] In this implementation, according to the actual situation of the axial elevation drawing, the drawings are divided into single-building drawings (such as Figure 1 As shown, a single building is also called a "single tower") and a multi-tower drawing ( Figure 2 What is shown is a double-building drawing, which is also called "twin towers"). Find the corresponding elevation object based on the position relationship with the longest dimension.

[0064] For a single building, you can select either the left or right group (the default is the left side), and obtain a set of elevation data by finding the corresponding elevation object.

[0065] For multiple buildings, take the elevation on the left side of the ruler, take the elevation on the right side of the ruler, and take the outer side in the middle according to the distance between the elevation and the building. By finding the corresponding elevation object, each building corresponds to a group of elevation objects. According to the elevation information in the elevation object, each group of elevation objects can obtain a set of elevation data (the reason why the elevation data of each building must be obtained is that in a multi-tower drawing, the elevation data of each building is different). By obtaining a set of elevation information from each set of elevation data, the elevation information of each building in a multi-tower drawing can be obtained.

[0066] Based on the elevation information obtained above, the storey height data can be obtained by subtracting the adjacent elevation data. Both elevation data and storey height data can be applied to the BIM model technology to locate the height of the building model such as the floor slabs, beams and columns of each floor in a single building or multiple buildings.

[0067] According to a specific implementation of the present invention, in step S3, after acquiring the elevation data, a step of eliminating interference from the elevation data is also included.

[0068] In this embodiment, in addition to the elevation of the floor height position in the axial elevation drawing, there are also elevations at positions such as settlement. This type of information is interference information of the building floor height parameters. Therefore, if only the elevation information of the floor height needs to be obtained, the interference information needs to be eliminated.

[0069] According to a specific implementation of the present invention, the step of eliminating interference from elevation data includes: analyzing the difference between two adjacent elevation data in each set of elevation data, and if the difference is less than a preset height, one of the elevation data needs to be eliminated; the elimination method is:

[0070] If one of the two elevation data is positive or negative zero, the other one will be excluded.

[0071] If one of the two elevation data is positive and the other is negative, exclude the negative one.

[0072] If one of the two elevation data has a corresponding floor height line within the range where the elevation information needs to be extracted, and the other does not, the one without the corresponding floor height line will be excluded.

[0073] More specifically, the preset height can be set according to the standard floor elevation of the building, and the value of the preset height is smaller than the standard floor elevation of the building.

[0074] In this implementation, the steps for eliminating interference with elevation data are specifically described, which are: analyzing the height difference between each set of elevations. If the height difference is too close, one of the elevations needs to be excluded. The exclusion conditions include: whether one of them is positive or negative zero (excluding the other), whether one is positive and the other negative (excluding the negative one), and whether they correspond to the floor height line (excluding those that do not correspond).

[0075] Further explanation is as follows. In specific implementation, according to the floor height of the building, a preset height is set. When two elevation objects are too close, it is determined that the other one is not the elevation object corresponding to the floor height line, and one of the elevation data needs to be excluded. According to the specific interference elevation information in the axial elevation drawing, the elevation of positive and negative zero, the negative elevation of the settlement position, and the elevation data without a corresponding floor height line are excluded. In this way, the accuracy of data extraction can be further improved.

[0076] like Figure 4 As shown, for the adjacent elevation data ±0.000 and -0.150, their difference is obviously smaller than the floor height. They are two elevation data that are close to each other, and one of them needs to be excluded. According to the above rules, -0.150 is an interfering elevation data and needs to be excluded.

[0077] According to a specific embodiment of the present invention, after step S1 and before step S3, a step of determining whether it is a single-building drawing or a multi-tower drawing is included:

[0078] like Figure 7 As shown, along the height direction of the axial elevation drawing, find the longest dimension line on the left side of the range where the elevation information needs to be extracted and set it as L1, find the longest dimension line on the right side of the range where the elevation information needs to be extracted and set it as L2, compare the lengths of L1 and L2, take the shorter one of L1 and L2, and make a horizontal auxiliary line through point C on the shorter dimension line. The distance from point C to the bottom end of the shorter dimension line is 50%-80% of the total length of the dimension line.

[0079] The leftmost intersection point of the horizontal auxiliary line and the building element within the range where the elevation information needs to be extracted is A1, and the rightmost intersection point of the auxiliary line and the building element within the range where the elevation information needs to be extracted is A2.

[0080] On line segment A1A2: If there is no continuous line segment with a length ≥ 10m and which does not intersect with other basic objects within the range where elevation information needs to be extracted, it is determined that the drawing within the range where elevation information needs to be extracted is a single-building drawing.

[0081] On line segment A1A2: if there is a continuous line segment with a length ≥10m and an intersection with other basic objects within the range where elevation information needs to be extracted, and a vertical auxiliary line is made through the midpoint of the continuous line segment, and the upward part of the vertical auxiliary line does not intersect with other basic objects within the range where elevation information needs to be extracted; then it is judged that the drawing within the range where elevation information needs to be extracted is a multi-tower drawing.

[0082] In this embodiment, the drawing rules of the axial elevation drawing are analyzed, and the above method can automatically determine whether the axial elevation drawing is a single-building drawing or a multi-tower drawing. It is beneficial to determine the number of groups of floor height data that need to be obtained based on this information. Improve the efficiency and accuracy of the method of automatically obtaining building floor height parameters from the axial elevation drawing of the present invention.

[0083] like Figure 5 As shown, a method for automatically acquiring building storey height parameters from an axial elevation drawing according to the present invention is used to automatically acquire a set of elevation and storey height parameters from the building axial elevation drawing.

[0084] According to a specific embodiment of the present invention, in the step of determining whether it is a single-building drawing or a multi-tower drawing, the first object that the vertical auxiliary line intersects downward is the top of the bottom commercial layer.

[0085] Generally, the height of the bottom commercial layer is different from the height of the upper marked layer. In this embodiment, after the top of the bottom commercial layer is automatically found by this method, the range of the bottom commercial layer can be found, which is convenient for obtaining the height data of the bottom commercial layer.

[0086] According to a specific implementation of the present invention, the step of determining whether it is a single-building drawing or a multi-tower drawing also includes the step of grouping a multi-tower drawing: dividing a multi-tower drawing into group 0, group 1, and 2-N groups, wherein N is the number of buildings, group 0 is the bottom commercial layer, group 1 is the leftmost building within the range where elevation information needs to be extracted, and group 2-N is the 2nd to Nth buildings from left to right within the range where elevation information needs to be extracted.

[0087] like Figure 3As shown, when N is equal to 2, it is a double-building drawing. At this time, relying on the above method, a multi-tower drawing is divided into Group 0, Group 1, and Group 2. Group 0 is the bottom commercial layer, Group 1 is the leftmost building within the range where elevation information needs to be extracted, and Group 1 is the rightmost building within the range where elevation information needs to be extracted.

[0088] In this implementation, if it is determined that the drawings within the range where the elevation information needs to be extracted are drawings of a single building, a set of elevations needs to be obtained; if it is determined that the drawings within the range where the elevation information needs to be extracted are drawings of N buildings, N+1 sets of elevations need to be obtained. Each building corresponds to a set of elevation data, and group 0 is a set of elevation data corresponding to the bottom commercial layer. Through this method, similar elevation data can be grouped into the same group, making the elevation data grouping more in line with the actual situation.

[0089] According to a specific implementation of the present invention, the axial elevation drawing of the project building in step S11 is a file in .dwg format. The basic objects in step S12 include: circle, straight line, polyline segment, polygon, text, dimension line. When the range of elevation information to be extracted in step S12 includes block definitions with attributes, the attribute text needs to be restored. Step S12 also includes: S13, resetting the Z coordinates of all objects in the range of elevation information to be extracted to zero.

[0090] More specifically, before step S1, the following steps are also included: check whether the floor plan of the standard floor of the project building can be opened and displayed normally using AutoCAD software; when the floor plan of the standard floor of the project building is a .dwg format file drawn by non-original CAD software, the file needs to be converted into a native file.

[0091] In this implementation, by processing the format of the axial elevation drawing of the project building and the graphic elements in the drawing, it is convenient to read the information normally and avoid poor reading or omissions.

[0092] According to a specific implementation of the present invention, in step S11, determining the range of elevation information to be extracted includes two methods:

[0093] Method 1: Cut the axial elevation drawing of the project building into a file containing only a single frame according to the range determined by each frame in the axial elevation drawing of the project building.

[0094] Method 2: Manually select a single frame in the axial elevation drawing of the project building to determine the range of elevation information to be extracted.

[0095] During specific implementation, one of the above two methods can be selected based on the actual situation of the drawing and the convenience of operation.

[0096] It should be noted that the "multiple towers in one building" structure in the present invention refers to a project building with the following characteristics: there are more than two unrelated towers, but the bottom commercial floors of these towers are connected. The "single building" structure in the present invention refers to a project building with the following characteristics: there is only one independent tower.

[0097] It should also be noted that step S2 of the present invention is to read all elevation objects within the range where elevation information needs to be extracted. In the related art, Chinese patent application number 202111047967.1 records a method for identifying elevation markings of building and structural icons. The patent describes in detail how to automatically identify all elevation objects from the drawings. In addition, Chinese patent CN201910252414 discloses a method for recognizing elevation drawings that convert architectural drawings into three-dimensional BIM models, which specifically discloses a method for recognizing elevation marks. Therefore, step S2 can be implemented, and there is no problem of insufficient disclosure.

[0098] Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.

Claims

1. A method for automatically obtaining building storey height parameters from an axial elevation drawing, characterized in that: The steps include: S1, drawing initialization S11, selecting an axial elevation drawing of a project building to extract elevation information of the building, and determining a range of elevation information to be extracted, wherein the range of elevation information to be extracted includes building elements and dimensioning elements; S12, exploding all blocks within the range where elevation information needs to be extracted into basic objects; S2, reading all elevation objects within the range where elevation information needs to be extracted; S3, obtaining elevation data, and obtaining elevation data separately according to whether the elevation information is extracted within a single building drawing or a multi-tower drawing: When it is a single-building drawing, find the longest dimension line on the left or right side of the building element, find the elevation objects located on one side of the dimension line and set in sequence along the length direction of the dimension line, and the elevation value on the elevation object is a set of elevation data; When it is a multi-tower drawing, find the longest dimension line closest to each building element, find the elevation objects located on one side of the dimension line and set in sequence along the length direction of the dimension line, and the elevation value on the elevation object is a set of elevation data; S4, calculate floor height data By calculating the difference between adjacent elevation data, the layer height data is obtained; After step S1 and before step S3, the method further includes the step of determining whether it is a single-building drawing or a multi-tower drawing: Along the height direction of the axial elevation drawing, find the longest dimension line on the left side of the range where the elevation information needs to be extracted and set it as L1, find the longest dimension line on the right side of the range where the elevation information needs to be extracted and set it as L2, compare the lengths of L1 and L2, take the shorter one of L1 and L2, and make a horizontal auxiliary line through point C on the shorter dimension line, and the distance from point C to the bottom end of the shorter dimension line is 50%-80% of the total length of the dimension line; The leftmost intersection point of the horizontal auxiliary line and the building element within the range where the elevation information needs to be extracted is A1, and the rightmost intersection point of the auxiliary line and the building element within the range where the elevation information needs to be extracted is A2; On line segment A1A2: if there is no continuous line segment with a length ≥ 10m and intersecting with other basic objects within the range where elevation information needs to be extracted, then the drawing within the range where elevation information needs to be extracted is determined to be a single-building drawing; On line segment A1A2: if there is a continuous line segment with a length ≥10m and an intersection with other basic objects within the range where elevation information needs to be extracted, and a vertical auxiliary line is made through the midpoint of the continuous line segment, and the upward part of the vertical auxiliary line does not intersect with other basic objects within the range where elevation information needs to be extracted; then it is judged that the drawing within the range where elevation information needs to be extracted is a multi-tower drawing.

2. The method for automatically obtaining building storey height parameters from an axial elevation drawing according to claim 1, characterized in that: In step S3, after acquiring the elevation data, a step of eliminating interference from the elevation data is also included.

3. The method for automatically obtaining building storey height parameters from an axial elevation drawing according to claim 2, characterized in that: The steps of eliminating interference from elevation data include: analyzing the difference between two adjacent elevation data in each set of elevation data, and if the difference is less than a preset height, one of the elevation data needs to be eliminated; the elimination method is: If one of the two elevation data is positive or negative zero, the other one will be excluded; If one of the two elevation data is positive and the other is negative, exclude the negative one; If one of the two elevation data has a corresponding floor height line within the range where the elevation information needs to be extracted, and the other does not, the one without the corresponding floor height line will be excluded.

4. The method for automatically obtaining building storey height parameters from an axial elevation drawing according to claim 3 is characterized in that: The preset height can be set according to the standard floor elevation of the building, and the value of the preset height is smaller than the standard floor elevation of the building.

5. The method for automatically obtaining building storey height parameters from an axial elevation drawing according to claim 1, characterized in that: In the step of determining whether it is a single-tower drawing or a multi-tower drawing, the first object that the vertical auxiliary line intersects downward is the top of the bottom commercial layer.

6. The method for automatically obtaining building storey height parameters from an axial elevation drawing according to claim 5, characterized in that: The step of determining whether it is a single-building drawing or a multi-tower drawing also includes the step of grouping a multi-tower drawing: dividing a multi-tower drawing into group 0, group 1, and 2-N groups, where N is the number of buildings, group 0 is the bottom commercial layer, group 1 is the leftmost building within the range where elevation information needs to be extracted, and group 2-N is the 2nd to Nth buildings from left to right within the range where elevation information needs to be extracted.

7. The method for automatically obtaining building storey height parameters from an axial elevation drawing according to claim 1, characterized in that: The axial elevation drawing of the project building in step S11 is a file in .dwg format; The basic objects in step S12 include: circle, straight line, polyline segment, polygon, text, dimension line; When the range of elevation information to be extracted in step S12 includes a block definition with attributes, the attribute text needs to be restored; The step S12 also includes: S13, resetting the Z coordinates of all objects within the range where the elevation information needs to be extracted to zero.

8. The method for automatically acquiring building storey height parameters from an axial elevation drawing according to claim 1, characterized in that: In step S11, there are two ways to determine the range of elevation information to be extracted: Method 1: Cut the axial elevation drawing of the project building into a file containing only a single frame according to the range determined by each frame in the axial elevation drawing of the project building; Method 2: Manually select a single frame in the axial elevation drawing of the project building to determine the range of elevation information to be extracted.

9. The method for automatically obtaining building storey height parameters from an axial elevation drawing according to claim 1, characterized in that: Before step S1, the following steps are also included: checking whether the floor plan of the standard floor of the project building can be opened and displayed normally using AutoCAD software; when the floor plan of the standard floor of the project building is a .dwg format file drawn by non-original CAD software, the file needs to be converted into a native file.

Citation Information

Patent Citations

  • Building and structure drawing evaluation annotation identification method

    CN113901541A

  • Full-automatic three-dimensional conversion method aiming at grating architectural plan

    CN103390088A

  • Vertical graph identification method for converting architectural drawing into three-dimensional BIM model

    CN109993827A

  • Railway engineering automation modeling method based on parameterization

    CN110210120A

  • Method, system and medium for constructing external scaffold based on rapid arrangement priority partitioning

    CN111191310A