A method for load transfer in distribution network taking transformer oil temperature into account
By establishing a load transfer optimization model in the distribution network, the problems of insufficient carrying capacity of the urban power grid and high temperature of the transformer are solved, the optimal transfer of load is achieved, the temperature of the transformer is reduced, the carrying capacity of the power grid is improved, and reliable use is ensured for users. electricity.
Patent Information
- Application Number
- CN202111480533.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-06
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2041-12-06
AI Technical Summary
The existing technology cannot simultaneously take into account the insufficient carrying capacity of urban power grids and the high temperature of transformers, especially during peak load periods, resulting in limited power supply capacity and difficulty in ensuring reliable power consumption for users.
By establishing a load transfer optimization model in the distribution network, taking into account the oil temperature constraints of the high-voltage transformer, the load of the low-voltage substation is transferred to the high-voltage substation, and a mixed integer programming model and the CPLEX toolkit are used to solve and optimize Load shifting to reduce transformer temperatures and achieve load balancing throughout the topology.
It effectively reduces the temperature of high-voltage transformers, ensuring their operation within a safe range, improving the carrying capacity of urban power grids, easing the contradiction between supply and demand during peak load periods, ensuring reliable power consumption by users, and reducing grid operation risks.
Smart Images

Figure CN114142476B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power system operation and maintenance. Background Art
[0002] According to the long-term high-speed growth trend of urban power grid load, and due to certain factors that make it impossible for power transmission and transformation equipment to be overhauled on time, the insulation strength of transformer equipment continues to age, and coupled with the continuous high temperature weather in some areas, the power supply capacity of 220kV hub substation will be subject to the dual restrictions of transformer capacity and top oil temperature not exceeding the limit, which directly leads to a significant reduction in the power supply carrying capacity of 110kV urban power grid. In order to ensure the safety of large power grids and avoid large-scale power outages due to equipment exceeding the limit, this poses a severe challenge to the precise control of loads in modern urban power grids.
[0003] By formulating supporting management measures and applying diversified monitoring and analysis methods, once the oil temperature of the top layer or hot spot of the 220kV transformer exceeds the upper limit, the operation and maintenance personnel will immediately take cooling measures such as spraying water and placing ice cubes at the substation end to suppress the continuous increase of the transformer oil temperature. In this way, the cooling capacity of different 220kV transformers is utilized to eliminate or alleviate the "bottleneck" phenomenon of the power supply capacity of the 220kV hub substation. Its application benefits include: on the one hand, it can avoid the super-stable limit operation of key sections of power transmission and transformation equipment and power grid components during peak load periods, and reduce the operation risks of large power grids; on the other hand, it fully activates the surplus flexibility resources of transformer capacity, which helps to optimize the load distribution of the entire network in advance from a global perspective, and ensure the reliable power supply of users to the greatest extent, and ensure the completion of the work goals of ensuring safety, power supply, and people's livelihood.
[0004] At present, many scholars at home and abroad have ignored the need to balance the relationship between transformer utilization and oil temperature increase in power grid emergency dispatch when modeling transformer temperature. If the top oil temperature or hot spot oil temperature of a single transformer exceeds the limit, scholars at home and abroad have adopted demand-side response, load shedding, load transfer and other methods for modeling. These studies are based on a single transformer as the modeling object, rather than the entire receiving city power grid. In summary, the existing research results cannot take into account the dual challenges of insufficient urban power grid carrying capacity and high transformer temperature. Summary of the invention
[0005] In view of the deficiencies of the above-mentioned technologies, the present invention provides a distribution network load transfer method taking into account the transformer oil temperature, which solves the technical problem of how to balance ensuring the grid carrying capacity and the transformer temperature within the limit.
[0006] In order to solve the above technical problems, the present invention provides a method for load transfer in a distribution network taking into account transformer oil temperature, comprising the following steps:
[0007] The distribution network includes low-voltage substations and high-voltage substations. The loads of low-voltage substations are supplied by high-voltage substations.
[0008] Establishing a load transfer optimization model according to the topological structure of the distribution network, wherein the load transfer optimization model includes an objective function, a system operation constraint, and a transformer oil temperature constraint;
[0009] According to the load transfer optimization model, the load of the low-voltage substation is transferred to another high-voltage substation for power supply.
[0010] Furthermore, the load transfer optimization model is a mixed integer programming model, which is solved by using the CPLEX toolkit in the mixed integer programming toolkit.
[0011] Furthermore, the transformer oil temperature constraint of the high voltage substation is linearized to obtain the linearized transformer oil temperature constraint:
[0012]
[0013] In the formula, is the hot spot oil temperature of the transformer at time t+1; is the transformer top oil temperature at time t+1; is the hot spot oil temperature of the transformer at time t; is the transformer top oil temperature at time t; time t to time t+1 is a load transfer optimization cycle; is the transformer load change at time t; S N is the rated capacity of the transformer; is the change in the temperature of the cold source, is the ambient temperature change, is the change in the transformer top layer temperature, θ hs_max is the upper limit of transformer hot spot oil temperature θ to_max It is the upper limit of the transformer top oil temperature;
[0014] ω1 and ω2 are both linearization coefficients:
[0015]
[0016] In the formula, C1=-H(2R oth -R bt ) / (2R ath ), H is the hot spot temperature coefficient, R oth is the equivalent thermal resistance of the transformer oil side, R ath is the equivalent thermal resistance of the transformer air side, R btis the thermal resistance of the insulating oil mixture at different temperatures under the conventional forced oil circulation mode. Under the forced oil circulation guided cooling mode, the internal oil temperature is evenly distributed. At this time, it is considered that R bt =0; C2 = 1-C1; Δt is the discretized time interval introduced between time t and time t+1, which actually represents a load transfer optimization cycle;
[0017] In the formula, K e =2K t P k m(P0+(K t ) 2 P k ) m-1 ; P0 no-load loss of transformer; P k is the short-circuit loss of the transformer; m is the transformer oil index; K t is the load factor of the transformer at time t;
[0018] Where η o =R oth / (R oth +R ath );R oth is the equivalent thermal resistance of the transformer oil side; R ath is the equivalent thermal resistance of the transformer air side;
[0019] Where A is the constant matrix at time t:
[0020] In the formula, the expressions of D1, D2, and D3 are as follows:
[0021]
[0022] In the formula, R ir is thermal resistance; C a is the heat capacity of the external cooling source relative to the environment; C th is the equivalent thermal capacity of the transformer.
[0023] Furthermore, the transformer oil temperature constraint of the high voltage substation is linearized as follows:
[0024] The theoretical models of transformer top oil temperature and hot spot oil temperature under natural temperature and artificial forced cooling measures are established respectively;
[0025] An equivalent thermal model of the theoretical model is established by using a thermoelectric analogy method;
[0026] The perturbation method is used to linearize the equivalent thermal model, and the implicit trapezoidal method is used for discretization. The discretized time interval Δt is taken, and then the change of the ambient temperature at time t is calculated by the improved Euler method. and the change in transformer top oil temperature Make a prediction and get prediction models;
[0027] The change in the temperature of the cold source of artificial forced cooling within a load transfer optimization cycle Δt Ignore, that is and will Substituting into the prediction model, we can get the transformer hotspot oil temperature and the change in transformer top oil temperature Linear prediction model of
[0028] The above-mentioned hot spot oil temperature of transformer and the change in transformer top oil temperature The linearized prediction model is rewritten to obtain the linearized transformer oil temperature constraint.
[0029] Further, the distribution network is a 110kV substation, and the high voltage level substation is a 220kV substation;
[0030] Taking the minimum total number of actions of 110kV line switches during load transfer as the goal, the objective function within a single load transfer optimization cycle is established:
[0031]
[0032] In the formula, S j t is the state of the 110 kV line switch j collected by the remote signal at the tth moment, 0 means the switch is in the open state, and 1 means the switch is in the operating state; S j t+1 is the state of 110kV line switch j collected by remote signal at time t+1; N s Indicates the total number of 110kV line switches.
[0033] Furthermore, the system operation constraints include:
[0034] The switch status of the 110kV line must meet the active power balance constraints of the 110kV power grid;
[0035] The direct supply wiring mode and series supply wiring mode of 110kV substation must meet the radial constraint conditions;
[0036] The maximum active power constraints allowed to be transmitted by all transformers in a 220kV substation;
[0037] The load transfer constraint of 220kV transformer between time t and time t+1.
[0038] Furthermore, the 110kV line switch status must satisfy the active power balance constraint of the 110kV power grid:
[0039] For the 110kV substation direct supply connection mode, the active power balance equation is:
[0040]
[0041] For the 110kV substation series power connection mode, the active power balance equation is:
[0042]
[0043] In the formula, The amount of main transformer disconnected from the grid of 220kVA1 station at time t; The amount of main transformer disconnected from the grid of 220kVA1 station at time t; is the state of 110kV line switch i collected by remote signal at time t; The state of 110kV line switch j collected by remote signal at time t; is the state of 110kV line switch k collected by remote signal at time t; L t is the linear coefficient matrix corresponding to the active power balance equation at time t; b t is the load factor corresponding to the active power balance equation at time t; is the load of the 110kVC station at time t; is the load of 110kVD station at time t.
[0044] Furthermore, the direct supply connection mode and the series supply connection mode of the 110kV substation must meet the radial constraint conditions:
[0045] For 110kV substation direct supply wiring mode:
[0046] For 110kV substation series power supply wiring mode:
[0047] In the formula, is the state of 110kV line switch i collected by remote signal at time t; The state of 110kV line switch j collected by remote signal at time t; It is the state of 110kV line switch k collected by telesignaling at time t.
[0048] Furthermore, the maximum active power constraints allowed to be transmitted by all transformers in a 220kV substation are:
[0049]
[0050] In the formula, is the grid-connected active power of the main transformer of the ith 220kV station at time t+1; n S,i is the number of transformers in the i-th 220kV substation; n S,i ·S N,i N is the maximum active power allowed to be transmitted by all transformers in the i-th 220kV substation; T is the number of 220kV substations; T is the set of all time values; is the linear coefficient row vector of the active power balance equation of 220kV substation i at time t+1, S t+1 is the switch state column vector at time t+1, It is the load factor of the active power balance equation of 220kV substation i at time t+1.
[0051] Furthermore, the load transfer constraint of the 220kV transformer between time t and time t+1 is:
[0052]
[0053] In the formula, is the transfer load of the 220kV transformer between time t and time t+1; L t+1 is the linear coefficient matrix corresponding to the active power balance equation at time t+1; ΔS t is the change in the switch state between time t and time t+1, b t+1 is the load factor corresponding to the active power balance equation at time t+1.
[0054] Compared with the prior art, the present invention has the following beneficial effects:
[0055] 1. The prior art ignores the contradictory relationship between the grid carrying capacity and the transformer oil temperature: as the load increases, the grid carrying capacity needs to be increased. To increase the grid carrying capacity, a single high-voltage transformer is required to be connected. The higher the output power of a single high-voltage transformer, the higher the transformer oil temperature, which is easy to cause overload; however, if the load of the low-voltage substation is not transferred to a single high-voltage transformer, the grid carrying capacity cannot be increased and the load demand cannot be met. In the process of load transfer, the present invention takes into account the transformer oil temperature constraint of the high-voltage substation, and establishes a load transfer optimization model according to the entire topological structure of the distribution network, achieving the following effects: for example, when the temperature of a 220kV transformer is too high, the 110kV load of this transformer is transferred to another 220kV transformer, so that the temperature of the original 220kV transformer can be reduced. At the same time, since there is a temperature constraint in the model, after the load is transferred according to the optimal solution calculated by the load transfer optimization model of the present invention, the temperature of all transformers can be within a safe range.
[0056] 2. The load transfer optimization model of the present invention is a mixed integer programming model, which is solved by the CPLEX toolkit in the mixed integer programming toolkit. It can be solved within seconds and has the advantage of online programmed calculation. It has important guiding significance for quantifying the carrying capacity of urban power grids.
[0057] 3. The load transfer optimization method of the present invention can flexibly reconstruct the operation mode of the high-voltage distribution network to transfer the heavy-load 220kV hub substation load during the peak load period of the urban power grid, thereby ensuring the user's reliable power supply to the greatest extent and alleviating the contradiction between power supply and demand during peak load periods.
[0058] 4. The load transfer optimization method of the present invention can ensure that during the entire load transfer process, the top oil temperature and hot spot oil temperature of any high-voltage transformer will not exceed the limit, and can ensure that the carrying capacity of the hub high-voltage transformer is within a safe range. It is also of great significance to ensure the safe operation of the entire urban power grid transmission and transformation equipment. BRIEF DESCRIPTION OF THE DRAWINGS
[0059] Figure 1 is the equivalent thermal model;
[0060] Figure 2 This is a simplified model under artificial cooling measures;
[0061] Figure 3 It is the relationship diagram between the load transfer optimization period t and the transformer temperature sampling period Δτ;
[0062] Figure 4 This is the direct supply wiring diagram of 110kV substation;
[0063] Figure 5 It is the series connection mode of 110kV substation. DETAILED DESCRIPTION
[0064] The present invention provides a method for load transfer in a distribution network taking transformer oil temperature into consideration, comprising the following steps:
[0065] The distribution network includes low-voltage substations and high-voltage substations, and the load of the low-voltage substation is supplied by the high-voltage substation; a load transfer optimization model is established according to the topological structure of the distribution network, and the load transfer optimization model includes an objective function, system operation constraints and transformer oil temperature constraints; according to the load transfer optimization model, the load of the low-voltage substation is transferred to another high-voltage substation for power supply.
[0066] This specific implementation is described by taking a 110kV substation as a low voltage level substation and a 220kV substation as a high voltage level substation. However, the load transfer method of the distribution network taking into account the transformer oil temperature provided by the present invention is applicable to load transfer between any high and low voltage levels.
[0067] In order to better reflect the invention objectives, technical solutions and beneficial effects of the present invention, specific implementation methods are described below in conjunction with the accompanying drawings.
[0068] 1) Establish transformer oil temperature constraints for high voltage substations
[0069] Step 1: Establish the "electric-thermal" coupled differential equation between the top oil temperature of the 220kV transformer and the environment, that is, establish theoretical models of the top oil temperature and hot spot oil temperature of the transformer under natural temperature and under artificial forced cooling measures. The following takes the forced oil circulation oil-immersed 220kV transformer as the modeling object and gives its transformer thermal model as follows: Figure 1 and Figure 2 As shown. Figure 1 The different thermal resistances are related to the heat transfer mode, thermal parameters of insulating oil and air, and transformer structure. After combining the thermal resistances on the oil side and air side of the transformer, the equivalent thermal model of the forced oil circulation air-cooled transformer can be established using the thermoelectric analogy method. Figure 2 Simplified model. The heat source of the transformer winding is composed of a current source q t Equivalent value, including winding, core and stray losses; C th is the equivalent heat capacity of the insulating oil, windings and oil tank in the transformer, R on , R of The natural commutation and forced commutation thermal resistance of transformer heat transfer to insulating oil; R bt is the thermal resistance of the mixture of insulating oils at different temperatures under the conventional forced oil circulation mode. Under the forced oil circulation guided cooling mode, the cold oil at the pump port is sent into the oil passages of the coil, coil and core under a certain pressure, and the internal oil temperature distribution is more uniform. At this time, it is approximately considered that R bt =0; R dr is the radiation thermal resistance of heat transfer from the radiator to the surrounding air, R an and R af It is the thermal resistance of natural convection and forced convection of air in air cooling.
[0070] According to GB / T1094.7-2008 and IEC 60076-7 guidelines, the heat source of the transformer is a function of no-load loss, short-circuit loss and load factor q t =(P0+k 2 P k ) m Substituting it into Figure 1 The simplified equivalent model can be based on the above and The average winding temperature of the transformer Bottom oil temperature and top oil temperature The differential equation is:
[0071]
[0072] In the formula, C th , R oth , R ath ,P0,P k and m are determined by the transformer design parameters, and R oth and R ath It is also related to the number and rated power of oil pumps and fans respectively.
[0073] For artificial forced cooling measures, the simplified thermal model is as follows: Figure 2 As shown, the cold source temperature θ of artificial forced cooling i t and ambient temperature The difference between them is the temperature difference, mainly due to the thermal resistance R ir and the heat capacity C of the external cooling source relative to the environment a Therefore, write the ambient temperature The differential equation is:
[0074]
[0075] According to IEC 60076-7 guidelines, the hot spot temperature of a 220kV transformer is about and The empirical function of
[0076]
[0077] Wherein, H refers to the hot spot temperature coefficient, H = 1.3.
[0078] Step 2: Based on step 1, the linearization derivation of the differential equation of the top oil temperature and hot oil temperature of the 220kV transformer is realized to form the linear constraints of the top oil temperature and hot oil temperature of the transformer. At time t, the perturbation method is used to linearize equations (2) and (3). The change of the hot oil temperature and the top oil temperature of the 220kV transformer is and Further available
[0079]
[0080]
[0081] Where η o =Roth / (R oth +R ath ), K e =2K t P k m(P0+(K t ) 2 P k ) m-1 , A and B are constant matrices at time t, that is
[0082]
[0083] The implicit trapezoidal method is used to discretize equation (4), and the discretized time interval Δt is taken, then and It can be obtained according to the improved Euler method, and the result is shown in formula (8). This method includes a prediction step and a correction step. First, in the prediction step, the prediction and
[0084]
[0085] Then, substitute into equation (7) to predict and Enter the correction step, then the time t is introduced and for:
[0086]
[0087] It should be noted that the introduction of a discrete time interval Δt between time t and time t+1 actually represents a load transfer optimization cycle. In practice, the thermal time constant of the transformer temperature is generally greater than the sampling period Δτ of the transformer temperature acquisition device. The relationship between these time-related parameters is as follows: Figure 3 As shown in the figure, each green cube represents a sampling period Δτ. In a load transfer optimization period Δt, Can be ignored, that is The following will Substituting equation (7) into equation (8), we get:
[0088]
[0089] In the formula, C1=-H(2R oth -R bt ) / (2R ath ), C2 = 1-C1, the constant matrix A is obtained by equation (6); D1, D2, D3 can be written as equation (10), and ω1, ω2 can be calculated by equation (11).
[0090]
[0091]
[0092] Therefore, rewriting equation (9) can obtain the linear constraints of the top oil temperature and hot spot oil temperature of the 220kV transformer, that is,
[0093]
[0094] 2) Establish a load transfer optimization model based on the linearized transformer oil temperature constraint
[0095] According to the urban high-voltage distribution network transfer equation, an urban high-voltage distribution network load transfer optimization model considering the top oil temperature and hot spot oil temperature of 220kV transformers is established. Under the condition of the minimum number of 110kV line switch operations, a high-voltage distribution network transfer plan considering the top oil temperature and hot spot oil temperature of 220kV transformers is given. When the 110kV power grid mode is adjusted in the tth period, the total number of operations of the 110kV line switch should be considered to be the least. Therefore, the control target in a single load transfer optimization cycle is expressed as follows
[0096]
[0097] Where: S j t is the state of the 110 kV line switch j collected by the remote signal at the tth moment, 0 means the switch is in the open state, and 1 means the switch is in the operating state; S j t+1 is the state of 110kV line switch j collected by remote signal at time t+1; N s Indicates the total number of 110kV line switches.
[0098] In the load transfer optimization cycle Δt, assuming that the load size remains almost unchanged, after the load transfer optimization task at time t is completed, the 110kV line switch state of the high-voltage distribution network must meet the active balance constraint of the 110kV power grid. represents the grid-connected active power of the main transformer of the ith 220kV station at time period t, n S,i is the number of transformers in the i-th 220kV substation; n S,i ·S N,i is the maximum active power allowed to be transmitted by all transformers in the i-th 220kV substation, N T The number of 220kV substations.
[0099]
[0100]
[0101] Where: and They refer to the load factors of the high-voltage distribution network transfer equation at time t, respectively, where i represents the i-th substation; It can be obtained through two typical wiring equations. Figure 4 and 5 The direct supply wiring mode and series supply wiring mode of 110kV substation are given respectively. Figure 4 The active power balance equation of the 110kV substation direct supply connection mode is:
[0102]
[0103] For the 110kV series power supply connection mode, the power balance equation can be obtained as follows:
[0104]
[0105] Due to the radial operation characteristics of the 110kV high-voltage distribution network, the direct supply wiring mode and the series supply wiring mode of the 110kV substation must meet the radial constraint conditions, that is,
[0106] Direct Supply:
[0107] Collusion:
[0108] According to formula (14a), the transfer load of the 220kV transformer between time t and t+1 is
[0109]
[0110] In summary, the load transfer optimization model based on mixed integer programming is composed of the objective function (13) and the system operation constraints (14)~(18) and the linear constraints (12) of the top oil temperature and hot spot oil temperature of the 220kV transformer within a single load transfer optimization period Δt. The model considers the top oil temperature and hot spot oil temperature of the 220kV transformer and is solved using the mixed integer programming toolkit CPLEX.
Claims
1. A method for load transfer in a distribution network taking transformer oil temperature into account, characterized in that: The following steps are involved: The distribution network includes low-voltage substations and high-voltage substations. The loads of low-voltage substations are supplied by high-voltage substations. Establishing a load transfer optimization model according to the topological structure of the distribution network, wherein the load transfer optimization model includes an objective function, a system operation constraint, and a transformer oil temperature constraint; According to the load transfer optimization model, the load of the low-voltage substation is transferred to another high-voltage substation for power supply; The load transfer optimization model is a mixed integer programming model, which is solved by using the CPLEX toolkit in the mixed integer programming toolkit; The transformer oil temperature constraint of the high voltage substation is linearized to obtain the linearized transformer oil temperature constraint: In the formula, is the hot spot oil temperature of the transformer at time t+1; is the transformer top oil temperature at time t+1; is the hot spot oil temperature of the transformer at time t; is the transformer top oil temperature at time t; time t to time t+1 is a load transfer optimization cycle; is the transformer load change at time t; S N is the rated capacity of the transformer; is the change of the cold source temperature, is the ambient temperature change, is the change in the transformer top layer temperature, θ hs_max is the upper limit of transformer hot spot oil temperature θ to_max It is the upper limit of the transformer top oil temperature; ω1 and ω2 are both linearization coefficients: In the formula, C1=-H(2R oth -R bt ) / (2R ath ), H is the hot spot temperature coefficient, R oth is the equivalent thermal resistance of the transformer oil side, R ath is the equivalent thermal resistance of the transformer air side, R bt is the thermal resistance of the insulating oil mixture at different temperatures under the conventional forced oil circulation mode. Under the forced oil circulation guided cooling mode, the internal oil temperature is evenly distributed. At this time, it is considered that R bt =0; C2 = 1-C1; Δt is the discretized time interval introduced between time t and time t+1, which actually represents a load transfer optimization cycle; In the formula, P0 Transformer no-load loss, P k is the short-circuit loss of the transformer, m is the transformer oil index; K t is the load factor of the transformer at time t; Where η o =R oth / (R oth +R ath );R oth is the equivalent thermal resistance of the transformer oil side; R ath is the equivalent thermal resistance of the transformer air side; Where A is the constant matrix at time t: In the formula, the expressions of D1, D2, and D3 are as follows: In the formula, R ir is thermal resistance; C a is the heat capacity of the external cooling source relative to the environment; C th is the equivalent thermal capacity of the transformer.
2. The method for load transfer in a distribution network taking transformer oil temperature into account according to claim 1, characterized in that: The transformer oil temperature constraint of the high voltage level substation is linearized as follows: The theoretical models of transformer top oil temperature and hot spot oil temperature under natural temperature and artificial forced cooling measures are established respectively; An equivalent thermal model of the theoretical model is established by using a thermoelectric analogy method; The perturbation method is used to linearize the equivalent thermal model, and the implicit trapezoidal method is used for discretization. The discretized time interval Δt is taken, and then the change of the ambient temperature at time t is calculated by the improved Euler method. and the change in transformer top oil temperature Make a prediction and get prediction models; The change in the temperature of the cold source of artificial forced cooling within a load transfer optimization cycle Δt Ignore, that is and will Substituting into the prediction model, we can get the transformer hotspot oil temperature and the change in transformer top oil temperature Linear prediction model of The above-mentioned hot spot oil temperature of transformer and the change in transformer top oil temperature The linearized prediction model is rewritten to obtain the linearized transformer oil temperature constraint.
3. The method for load transfer in a distribution network taking transformer oil temperature into account according to claim 1, characterized in that: The low voltage level substation is a 110kV substation, and the high voltage level substation is a 220kV substation; Taking the minimum total number of 110kV line switch operations during load transfer as the goal, the objective function within a single load transfer optimization cycle is established: Where Sjt is the state of the 110 kV line switch j collected by the telesignal at the tth moment, 0 means the switch is in the open state, and 1 means the switch is in the operating state; S j t+1 is the state of 110kV line switch j collected by remote signal at time t+1; N s Indicates the total number of 110kV line switches.
4. The method for load transfer in a distribution network taking transformer oil temperature into account according to claim 3, characterized in that: The system operation constraints include: The switch status of the 110kV line must meet the active power balance constraints of the 110kV power grid; The direct supply wiring mode and series supply wiring mode of 110kV substation must meet the radial constraint conditions; The maximum active power constraints allowed to be transmitted by all transformers in a 220kV substation; The load transfer constraint of 220kV transformer between time t and time t+1.
5. The method for load transfer in distribution network taking transformer oil temperature into consideration according to claim 3, characterized in that: The 110kV line switch status must meet the active power balance constraints of the 110kV power grid: For the 110kV substation direct supply connection mode, the active power balance equation is: For the 110kV substation series power connection mode, the active power balance equation is: In the formula, The amount of main transformer disconnected from the grid of 220kVA1 station at time t; The amount of main transformer disconnected from the grid of 220kVA1 station at time t; is the state of 110kV line switch i collected by remote signal at time t; The state of 110kV line switch j collected by remote signal at time t; is the state of 110kV line switch k collected by remote signal at time t; L t is the linear coefficient matrix corresponding to the active power balance equation at time t; b t is the load factor corresponding to the active power balance equation at time t; is the load of the 110kVC station at time t; is the load of 110kVD station at time t.
6. The method for load transfer in a distribution network taking transformer oil temperature into account according to claim 3, characterized in that: The direct supply wiring mode and series supply wiring mode of 110kV substation must meet the radial constraint conditions: For 110kV substation direct supply wiring mode: For 110kV substation series power supply wiring mode: In the formula, is the state of 110kV line switch i collected by remote signal at time t; The state of 110kV line switch j collected by remote signal at time t; It is the state of 110kV line switch k collected by telesignaling at time t.
7. The method for load transfer in a distribution network taking transformer oil temperature into account according to claim 3, characterized in that: The maximum active power constraints allowed to be transmitted by all transformers in a 220kV substation are: In the formula, is the grid-connected active power of the main transformer of the ith 220kV station at time t+1; n S,i is the number of transformers in the i-th 220kV substation; n S,i ·S N,i N is the maximum active power allowed to be transmitted by all transformers in the i-th 220kV substation; T is the number of 220kV substations; T is the set of all time values; is the linear coefficient row vector of the active power balance equation of 220kV substation i at time t+1, S t+1 is the switch state column vector at time t+1, It is the load factor of the active power balance equation of 220kV substation i at time t+1.
8. The method for load transfer in a distribution network taking transformer oil temperature into account according to claim 3, characterized in that: The load transfer constraint of 220kV transformer between time t and time t+1 is: In the formula, is the transfer load of the 220kV transformer between time t and time t+1; L t+1 is the linear coefficient matrix corresponding to the active power balance equation at time t+1; S t+1 is the switch state column vector at time t+1; ΔS t is the change in the switch state between time t and time t+1, b t+1 is the load factor corresponding to the active power balance equation at time t+1.
