Manufacturing resource allocation method for nuclear power equipment product value chain based on Nash equilibrium

Through the Nash equilibrium method, the allocation of manufacturing resources in the value chain of nuclear power equipment products is calculated, and the problem of uneven allocation of manufacturing resources in the value chain of nuclear power equipment products is solved, the production efficiency and rationality of resource allocation is improved, and nuclear power equipment is ensured. Improve product quality and efficiency.

CN114331064BActive Publication Date: 2024-11-08ZHEJIANG UNIV
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
CN202111550689.1
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-12-17
Publication Date
2024-11-08
Estimated Expiration
2041-12-17

AI Technical Summary

Technical Problem

There is a problem of uneven allocation of manufacturing resources between production and manufacturing bases in the value chain of nuclear power equipment products, resulting in reduced manufacturing efficiency and increased time costs. There is a lack of research on the allocation of manufacturing resources for multiple production and manufacturing bases.

Method used

Using a Nash equilibrium method, the prediction error, probability density function and cumulative probability distribution function of manufacturing resources are obtained by obtaining historical data, and the correlation demand matrix and demand importance weight are established, and the manufacturing resources are allocated reasonably to ensure the various nuclear power equipment bases. the ratio of resource allocation between them.

Benefits of technology

It improves the production efficiency of the value chain of nuclear power equipment products, ensures the rational allocation of manufacturing resources, solves the problems of shortage and unbalanced allocation of manufacturing resources, and promotes the improvement of the quality and efficiency of nuclear power equipment products.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114331064B_ABST
    Figure CN114331064B_ABST
Patent Text Reader

Abstract

The present invention discloses a method for configuring manufacturing resources in the value chain of a nuclear power equipment product based on Nash equilibrium. The historical data of the configuration of manufacturing resources of each nuclear power equipment base is obtained, and the cumulative probability distribution function of the configuration of manufacturing resources of the nuclear power equipment base is calculated; the prediction accuracy of each nuclear power equipment base for manufacturing resources is calculated, and an associated demand matrix is ​​established, and the demand importance weight is calculated. The importance matrix is ​​constructed and normalized according to the prediction accuracy, the associated demand matrix, and the demand importance weight; the allocation ratio of the manufacturing resources of the nuclear power equipment base is corrected by the Nash equilibrium method and the configuration is implemented. The present invention utilizes the historical data of each nuclear power equipment base, fully considers the demand correlation between each nuclear power equipment base and each manufacturing resource, and processes and obtains the configuration plan of manufacturing resources in the value chain of nuclear power equipment products with the goal of maximizing overall production efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention discloses a resource allocation method in the manufacturing field, and in particular relates to a manufacturing resource allocation method for a nuclear power equipment product value chain based on Nash equilibrium. Background Art

[0002] With the continuous in-depth development of nuclear power equipment products, the various entities in nuclear power equipment products form an upstream and downstream chain relationship. A complete nuclear power equipment product value chain includes multiple links such as the design, manufacturing, assembly, and maintenance of nuclear power equipment, and each link is generally undertaken by different entities.

[0003] The demand for factor conditions in each link of the nuclear power equipment product value chain is different. Different links have different demands for manufacturing resources (i.e., the manufacturing resources required for nuclear power equipment products, such as rare raw materials such as zirconium and plutonium, various logical information of products, various processing and testing equipment, etc.), and have different location preferences. The value chain of nuclear power equipment products can generally be abstracted as the design of nuclear power equipment, primary product production, whole machine production and assembly, and operation and maintenance of nuclear power equipment. From a modular perspective, the value chain of nuclear power equipment products involves five modules: nuclear island equipment, conventional island equipment, auxiliary equipment, instrumentation and control system, and nuclear power materials. It has the characteristics of multiple production and manufacturing bases. Each base undertakes one of the links in the value chain of nuclear power equipment products, and ultimately requires multi-base, cross-field supporting parts assembly to form a nuclear power system as a whole. From the perspective of manufacturing resource allocation, each nuclear power equipment base hopes to obtain as many manufacturing resources as possible, but ultimately it requires multi-base, cross-field to form a nuclear power system as a whole, so there is a competitive and cooperative relationship between each nuclear power equipment base.

[0004] In the value chain of nuclear power equipment products, there is often a certain imbalance in the allocation of manufacturing resources between various manufacturing bases. Due to the lack of experience in manufacturing resource allocation, limited nuclear power equipment resources, and discrete decision variables, the allocation of manufacturing resources is usually determined by historical experience, and the allocation ratio of manufacturing resources in various nuclear power equipment bases is often unsatisfactory. If the extreme manufacturing resource allocation situation is not considered, it may cause the overall manufacturing efficiency of the system to decrease and the manufacturing time cost to increase. In order to make the allocation strategy of manufacturing resources flexible and economical, the Nash equilibrium strategy is introduced to maximize the production efficiency of the nuclear power equipment product value chain under a certain confidence level.

[0005] The rational allocation of manufacturing resources in the value chain of nuclear power equipment products is an important measure to improve the quality and production efficiency of nuclear power equipment. At present, the research on the value chain of nuclear power equipment products mainly focuses on the construction and organizational model of the product chain, and there is still a lack of research on the allocation of manufacturing resources involving multiple production and manufacturing bases in the value chain of nuclear power equipment products. Summary of the invention

[0006] In order to solve the problems existing in the background technology, the present invention provides a method for configuring manufacturing resources in the nuclear power equipment product value chain based on Nash equilibrium, the main purpose of which is to ensure the reasonable configuration of manufacturing resources among multiple nuclear power equipment bases in the nuclear power equipment product value chain.

[0007] like Figure 1 As shown, the technical solution of the present invention comprises the following steps:

[0008] Step 1: Obtain the historical measured data and historical expected data of the manufacturing resource configuration of each nuclear power equipment base in the nuclear power equipment product value chain, and calculate the prediction error, probability density function, and cumulative probability distribution function of the manufacturing resource configuration of the nuclear power equipment base based on the obtained historical measured data and historical expected data;

[0009] Step 2: Using the cumulative probability distribution function of each nuclear power equipment base, calculate the prediction accuracy of each nuclear power equipment base for manufacturing resources, establish the associated demand matrix R, and use the demand importance weight calculation model to calculate the demand importance weight corresponding to the prediction accuracy of each nuclear power equipment base for each manufacturing resource. Then, according to the prediction accuracy, the associated demand matrix R, and the demand importance weight, construct an importance matrix and perform normalization processing, specifically normalizing the corresponding demand importance weight of each manufacturing resource;

[0010] Step 3: Based on the normalized importance matrix W*, the Nash equilibrium method is used to correct the allocation ratio of manufacturing resources for each nuclear power equipment base and implement the configuration accordingly.

[0011] The manufacturing resources mentioned are the manufacturing resources required for nuclear power equipment products, such as rare raw materials such as metal zirconium and plutonium, various logical information of products, various processing and testing equipment, etc.

[0012] The step 1 is specifically as follows:

[0013] (1.1) For manufacturing resources MR i , obtain MB for each nuclear power equipment base j The historical actual configuration data and historical expected configuration data of the manufacturing resources are obtained, and the configuration ratio error Δε at time t is calculated using the following formula: j,t :

[0014]

[0015] in, represents the historical expected configuration data of manufacturing resource i obtained by nuclear power equipment base j at historical time t, represents the historical actual configuration data of manufacturing resource i obtained by nuclear power equipment base j at historical time t, i = 1, 2, ..., m, m is the total number of types of manufacturing resources, j = 1, 2, ..., n, n is the total number of nuclear power equipment bases;

[0016] (1.2) According to the configuration ratio error Δε j,t The kernel function estimation method is used to calculate the forecast error probability density function f of the manufacturing resources of the manufacturing base. j (Δε j ):

[0017]

[0018] in, is the Gaussian kernel function, w is the bandwidth; Δε j represents the independent variable corresponding to the prediction error density function of nuclear power equipment base j; c represents the ordinal number of the sample in the historical actual configuration data, and C is the total number of samples in the historical actual configuration data;

[0019] The sample in the historical actual configuration data is the configuration ratio of the number of manufacturing resources obtained by a nuclear power equipment base to all manufacturing resources.

[0020] (1.3) According to the prediction error probability density function f j (Δε j ), the corresponding probability distribution curve is fitted by cubic spline interpolation method, and the cumulative probability distribution function F is obtained by integrating the probability distribution curve j (Δε j ).

[0021] The specific contents of step 2 are as follows:

[0022] (2.1) According to the cumulative probability distribution function F j (Δε j ) and configuration ratio error Δε j,t , calculate the nuclear power equipment base MB according to the following formula j The prediction accuracy A for manufacturing resource i i (F j (Δε j ), Δε j,t ):

[0023]

[0024] Among them, H(Δε j ,Δε j,t ) represents the step function corresponding to the configuration proportional error;

[0025] When Δε jGreater than the configuration ratio error Δε j,t When H(Δε j ,Δε j,t )=1; otherwise, H(Δε j ,Δε j,t )=0.

[0026] According to the prediction accuracy A i (F j (Δε j ), Δε j,t ) Construct the m×n dimensional prediction accuracy matrix A as follows:

[0027]

[0028] Among them, m is the total number of types of manufacturing resources, and n is the total number of nuclear power equipment bases;

[0029] (2.2) According to the known influence of nuclear power equipment base on manufacturing resources, the correlation demand matrix R between nuclear power equipment base and manufacturing resources is constructed:

[0030]

[0031] Among them, R is an m×n dimensional matrix, n is the total number of nuclear power equipment bases, m is the total number of manufacturing resources, r ij is a triangular fuzzy number, which indicates the influence of nuclear power equipment base j on manufacturing resource i, 1 ≤ i ≤ n, 1 ≤ j ≤ m;

[0032] After defuzzifying the correlation demand matrix R, we get the defuzzified correlation demand matrix R * :

[0033]

[0034] in, is the defuzzified correlation demand matrix R * The element at the oth row and pth column in R, o=1,2,...,m, p=1,2,...,n; *T It is the transposed matrix of R* obtained after defuzzification of the R matrix.

[0035] (2.3) Establish the demand importance weight calculation model of the following formula, and use the demand importance weight calculation model to calculate the demand importance weight w of manufacturing resource i obtained by nuclear power equipment base j ij ;

[0036]

[0037] Among them, p ijis the absolute importance of nuclear power equipment base j to obtain manufacturing resource i, c ij is the implicit importance of nuclear power equipment base j to obtain manufacturing resource i, f ij is the influence of nuclear power equipment base j obtaining manufacturing resource i on the demand for other manufacturing resources, e ij is the impact value of other manufacturing resource demands of nuclear power equipment base j on the current manufacturing resource acquisition demand: u represents the ordinal number of the nuclear power equipment base, and n is the total number of nuclear power equipment bases;

[0038] Absolute importance p ij , implicit importance c ij 、Influence f ij , impact value e ij are all physical quantities known in advance.

[0039] (2.4) According to the prediction accuracy matrix A and the defuzzified correlation demand matrix R * , the demand importance weight w of manufacturing resources obtained by each nuclear power equipment base ij The importance matrix W is constructed as follows:

[0040]

[0041] Then, the elements in the importance matrix W are normalized in groups of each row to obtain the corrected importance matrix W * , and record the importance matrix W * The element in row i and column j of The importance of manufacturing resource i to nuclear power equipment base j.

[0042] The specific contents of step 3 are as follows:

[0043] (3.1) Determine the weight factor of the cooperative production efficiency of each nuclear power equipment base according to the following formula, and use the weight factor to preliminarily obtain the preliminary distribution ratio result:

[0044]

[0045]

[0046] Among them, S represents the set formed by various nuclear power equipment bases, represents the initial allocation ratio of manufacturing resource i to nuclear power equipment base j; |s| represents the number of nuclear power equipment bases participating in set S; v(S) represents the overall production efficiency of set S, v(S)-v(Sj) represents the change in production efficiency brought about by the participation of nuclear power equipment base j; n is the total number of nuclear power equipment bases; n! represents the number of all possible arrangements under the participation of all nuclear power equipment bases; h(|s|) represents the uncorrected weighting factor corresponding to each nuclear power equipment;

[0047] (3.2) According to the corrected importance The initial allocation ratio of manufacturing resource i to nuclear power equipment base j is calculated according to the following formula: Correction is made to correct the uncorrected manufacturing resource allocation ratio to obtain the final allocation ratio corresponding to each nuclear power equipment base:

[0048]

[0049] in, It is the final allocation ratio of nuclear power equipment base j to manufacturing resource i.

[0050] when Greater than or equal to When , the proportion of manufacturing resources allocated to nuclear power equipment base j is lower than the historical average expected level; when Less than When , the proportion of manufacturing resources allocated to nuclear power equipment base j is higher than the historical average expected level, which is an incentive for high prediction accuracy.

[0051] The present invention forms an alliance among various nuclear power equipment bases under the nuclear power equipment product value chain, rationally allocates shared manufacturing resources, and when there are excess manufacturing resources, preferentially allocates the excess resources to nuclear power equipment bases that are in urgent need of manufacturing resources, thereby improving the alliance production efficiency of the nuclear power equipment bases and solving the problem of shortage of manufacturing resources in the nuclear power equipment bases and the problem of being unable to achieve balanced allocation.

[0052] Under this model, each nuclear power equipment base jointly bears the uncertainty of resource allocation and the scarcity of manufacturing resources, allocates the manufacturing resources in the nuclear power equipment product value chain, and uses the importance and overall production efficiency of each nuclear power equipment base as factors to determine the allocation factors, thus obtaining the final allocation ratio of each manufacturing resource of each nuclear power equipment base.

[0053] The present invention utilizes the historical data of each nuclear power equipment base, fully considers the demand correlation between each nuclear power equipment base and various manufacturing resources, takes maximizing the overall production efficiency as the goal, and uses the Nash equilibrium method to obtain the configuration results of manufacturing resources in the nuclear power equipment product value chain and implements the configuration.

[0054] The present invention has the following advantages:

[0055] (1) The objective function of the present invention is to maximize the overall production efficiency, and each nuclear power equipment base jointly bears the risks brought about by the scarcity of manufacturing resources and the uncertainty of the allocation ratio. Therefore, the above process can promote the improvement of the production efficiency of the nuclear power equipment product value chain.

[0056] (2) The present invention takes into account the correlation and importance between the nuclear power equipment base and various manufacturing resources, and establishes a correlation matrix to make the configuration of manufacturing resources more reasonable. BRIEF DESCRIPTION OF THE DRAWINGS

[0057] Figure 1 It is a flow chart of the algorithm solution provided by the present invention.

[0058] Figure 2 It is the configuration error density function distribution diagram corresponding to each nuclear power equipment base. DETAILED DESCRIPTION

[0059] The present invention will be further described below in conjunction with the accompanying drawings and specific implementations.

[0060] The content of the present invention is further described below with reference to a specific implementation case and targeting a manufacturing resource.

[0061] like Figure 1 As shown, the embodiments of the present invention and their implementation process are as follows:

[0062] Take the rare metal dysprosium, a manufacturing resource in the nuclear power field, as an example. Rare metal dysprosium is widely used in the field of nuclear power equipment, such as gray control rod neutron absorber materials, neutron absorber materials and devices, and structural materials containing rare earth oxides. The above-mentioned nuclear power equipment products are often designed, manufactured, and processed in different nuclear power equipment bases. Assume that there are 3 nuclear power equipment bases that configure the manufacturing resource rare metal dysprosium, that is, let m = 1, n = 3.

[0063] Obtain the historical actual configuration data and historical expected configuration data of rare earth manufacturing resources corresponding to each nuclear power equipment product base, and calculate the configuration error Δε of each nuclear power equipment base corresponding to time t according to the formula definition j,t , the results are shown in Table 1:

[0064] Table 1 Historical actual configuration data, historical expected configuration data and configuration errors of nuclear power equipment base for manufacturing resource dysprosium

[0065]

[0066]

[0067] The kernel function estimation method is used to estimate the configuration error data of each nuclear power equipment base. The Gaussian kernel function is selected, the bandwidth is selected by the AMISE rule, and the cubic spline curve interpolation method is used to obtain the configuration error density function distribution curves of nuclear power equipment bases 1, 2, and 3 respectively. Figure 2 shown.

[0068] The obtained configuration error density function is integrated and calculated using continuous graded probability scoring: A1(F1(Δε1), Δε 1,t )=0.82, A1(F2(Δε2),Δε 2,t )=0.88, A1(F3(Δε3),Δε 3,t )=0.75.

[0069] Construct a 1×3 dimensional correlation demand matrix R = [MS, VS, ES].

[0070] The semantic variables of the degree of association between requirements and the corresponding triangular fuzzy numbers are as follows: extremely strong correlation ES = (0.75, 1.0, 1.0), strong correlation VS = (0.5, 0.75, 1.0), general correlation MS = (0.25, 0.5, 0.75), weak correlation LS = (0, 0.25, 0.5), no correlation NS = (0, 0, 0.25). Defuzzify the R matrix to get R * =[0.5, 0.75, 0.92]. Solve using the demand importance weight calculation model:

[0071]

[0072] Get the importance matrix W:

[0073]

[0074] After normalization, W * =[0.24,0.26,0.50] T .

[0075] In this case, there are three nuclear power equipment bases in the nuclear power equipment product value chain. The set of manufacturing resource allocation entities S = {1, 2, 3}, and S contains the subset S{1},S{2},S{3},S{1,2},S{1,3},S{2,3},S{1,2,3}. If the value chain process of design, manufacturing and assembly of nuclear power equipment products is required to be completed within 120 days, then v(S) = 1 / 120. It said that no nuclear power equipment bases participated in the alliance, so v{1}=1 / 260, v{2}=1 / 280, v{3}=1 / 300, v{1,2}=1 / 230, v{1,3}=1 / 248, v{2,3}=1 / 265, v{1,2,3}=1 / 120.

[0076] The overall production efficiency V{1,2,3} of the alliance consisting of three nuclear power equipment bases is calculated according to the following formula:

[0077]

[0078] final

[0079] thus, After normalization, we can get At the next moment, the configuration ratios of rare metals for manufacturing resources of nuclear power equipment bases 1, 2, and 3 are 0.41, 0.36, and 0.22 respectively, which are more reasonable. They are the final calculation results that fully consider the historical configuration data error and the correlation with current demand, and can maximize the production efficiency of the nuclear power equipment product value chain.

Claims

1. A method for manufacturing resource allocation in the value chain of nuclear power equipment products based on Nash equilibrium. It is characterized in that The following steps are involved: Step 1: Obtain the historical measured data and historical expected data of the manufacturing resource configuration of each nuclear power equipment base, and calculate the cumulative probability distribution function of the manufacturing resource configuration of the nuclear power equipment base based on the obtained historical measured data and historical expected data; Step 2: Using the cumulative probability distribution function of each nuclear power equipment base, calculate the prediction accuracy of each nuclear power equipment base for manufacturing resources, establish the associated demand matrix R, and use the demand importance weight calculation model to calculate the demand importance weight corresponding to the prediction accuracy of each nuclear power equipment base for each manufacturing resource. Then, according to the prediction accuracy, the associated demand matrix R, and the demand importance weight, the importance matrix is ​​constructed and normalized; Step 3: Based on the normalized importance matrix W*, the Nash equilibrium method is used to correct the allocation ratio of manufacturing resources for each nuclear power equipment base and implement the configuration accordingly; The specific contents of step 2 are as follows: (2.1) According to the cumulative probability distribution function F j (Δε j ) and configuration ratio error Δε j,t , calculate the nuclear power equipment base MB according to the following formula j The prediction accuracy A for manufacturing resource i i (F j (Δε j ), Δε j,t ): in, represents the step function corresponding to the configuration proportional error; According to the prediction accuracy A i (F j (Δε j ), Δε j,t ) Construct the m×n dimensional prediction accuracy matrix A as follows: Among them, m is the total number of types of manufacturing resources, and n is the total number of nuclear power equipment bases; (2.2) Construct the correlation demand matrix R between nuclear power equipment base and manufacturing resources: Where n is the total number of nuclear power equipment bases, m is the total number of manufacturing resources, r ij is a triangular fuzzy number, which indicates the influence of nuclear power equipment base j on manufacturing resource i, 1≤i≤n, 1≤j≤m; After defuzzifying the correlation demand matrix R, we get the defuzzified correlation demand matrix R * : in, is the defuzzified correlation demand matrix R * The element at the oth row and pth column in , o=1,2,...,m, p=1,2,...,n; (2.3) Establish the demand importance weight calculation model of the following formula, and use the demand importance weight calculation model to calculate the demand importance weight w of manufacturing resource i obtained by nuclear power equipment base j ij ; Among them, p ij is the absolute importance of nuclear power equipment base j to obtain manufacturing resource i, c ij is the implicit importance of nuclear power equipment base j to obtain manufacturing resource i, f ij is the influence of nuclear power equipment base j obtaining manufacturing resource i on the demand for other manufacturing resources, e ij is the impact value of other manufacturing resource demands of nuclear power equipment base j on the current manufacturing resource acquisition demand: u represents the ordinal number of the nuclear power equipment base, and n is the total number of nuclear power equipment bases; (2.4) According to the prediction accuracy matrix A and the defuzzified correlation demand matrix R * , the demand importance weight w of manufacturing resources obtained by each nuclear power equipment base ij The importance matrix W is constructed as follows: Then, the elements in the importance matrix W are normalized in groups of each row to obtain the corrected importance matrix W * , and record the importance matrix W * The element in row i and column j of The importance of manufacturing resource i to nuclear power equipment base j.

2. According to the method for configuring manufacturing resources in the value chain of nuclear power equipment products based on Nash equilibrium according to claim 1, Features: The step 1 is specifically as follows: (1.1) Obtain MB for each nuclear power equipment base j The historical actual configuration data and historical expected configuration data of the manufacturing resources are obtained, and the configuration ratio error Δε at time t is calculated using the following formula: j,t : in, represents the historical expected configuration data of manufacturing resource i obtained by nuclear power equipment base j at historical time t, represents the historical actual configuration data of manufacturing resource i obtained by nuclear power equipment base j at historical time t, i = 1, 2, ..., m, m is the total number of types of manufacturing resources, j = 1, 2, ..., n, n is the total number of nuclear power equipment bases; (1.2) According to the configuration ratio error Δε j,t The kernel function estimation method is used to calculate the prediction error probability density function f of the manufacturing resources of the manufacturing base j (Δε j ): in, is the Gaussian kernel function, w is the bandwidth; Δε j represents the independent variable corresponding to the prediction error density function of nuclear power equipment base j; c represents the ordinal number of the sample in the historical actual configuration data, and C is the total number of samples in the historical actual configuration data; (1.3) According to the prediction error probability density function f j (Δε j ), the corresponding probability distribution curve is fitted by cubic spline interpolation method, and the cumulative probability distribution function F is obtained by integrating the probability distribution curve j (Δε j ).

3. According to the method for configuring manufacturing resources in the value chain of nuclear power equipment products based on Nash equilibrium in claim 1, Features: The specific contents of step 3 are as follows: (3.1) Determine the weight factor of the cooperative production efficiency of each nuclear power equipment base according to the following formula, and use the weight factor to preliminarily obtain the preliminary distribution ratio result: Among them, S represents the set formed by various nuclear power equipment bases, represents the initial allocation ratio of nuclear power equipment base j to manufacturing resource i; |s| represents the number of nuclear power equipment bases participating in set S; v(S) represents the overall production efficiency of set S; n is the total number of nuclear power equipment bases; n! represents the number of all possible arrangements under the participation of all nuclear power equipment bases; h(|s|) represents the uncorrected weighting factor corresponding to each nuclear power equipment; (3.2) According to the corrected importance The initial allocation ratio of manufacturing resource i to nuclear power equipment base j is calculated according to the following formula: After correction, the final allocation ratio corresponding to each nuclear power equipment base is obtained: in, It is the final allocation ratio of nuclear power equipment base j to manufacturing resource i.

Citation Information

Patent Citations

  • 500kV regional control center control domain optimization system

    CN101916999A

  • Load balancing method based on self-organizing resource allocation in non-orthogonal multiple access system

    CN107645731A

  • Physical machine resource allocation model acquisition method and apparatus, and computer device

    WO2021212654A1