A method for determining the path of material transportation at a construction site
Through BIM technology, the reverse transportation path of materials on the construction site was generated and adjusted, which solved the problems of poor path selection and poor transportation caused by manual surveys, and achieved more efficient and accurate material transportation path planning.
Patent Information
- Application Number
- CN202111556485.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-17
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2041-12-17
AI Technical Summary
At the construction site, in the existing technology, the determination of the material reverse transport path mainly relies on manual survey, which leads to the path selection being greatly affected by subjective factors, and the optimal path cannot be ensured, and it cannot be adjusted in time to adapt to changes in the actual size of the material and the path width, resulting in poor transportation smooth.
Using a BIM technology method, the shortest path is generated by extracting geometric information data at the construction site, and path adjustment and collision detection are carried out according to material size and tool size to ensure the smoothness and rationality of the path.
The automation and accuracy of material transportation path planning at the construction site is achieved, the influence of human subjective factors is reduced, the transportation efficiency and accuracy is improved, and the path can be quickly adjusted to adapt to the actual situation of materials and tools.
Smart Images

Figure CN114358397B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of material transport path planning, and in particular to a method for determining a material transport path at a construction site. Background Art
[0002] During the construction process, various construction materials and equipment need to be transported from off-site to the corresponding locations inside the building. In order to ensure the smooth progress of construction production and the smooth supply of materials in the complex construction site, the project management personnel must formulate a material transportation plan in advance, determine the transportation route, and open up a transportation channel connecting the site and off-site.
[0003] At present, transportation routes are basically surveyed manually, which has a great impact on plan preparation and actual implementation: (1) If the actual size of the transported materials is larger than the theoretical size, it is necessary to re-survey the site and adjust the transportation route, resulting in duplication of work and extended time; (2) Surveyors use two-dimensional drawings + on-site measurements. The route selection is greatly influenced by subjective factors, and it is difficult to determine whether the selected route is the optimal route; (3) In terms of the selection of transportation tools, plan preparers can only make selections based on past experience and often fail to consider the impact of changes in route width. Summary of the invention
[0004] In view of the above problems, the purpose of the present invention is to provide a method for determining the path for transporting materials on a construction site. Based on the Building Information Model (BIM) technology, the optimal path for transporting materials on site is analyzed, and a transportation plan is formulated based on data analysis to ensure that the transportation path is unobstructed and the transportation tools are reasonably selected, thereby solving the problem that materials cannot be transported in time due to the complexity of the construction site.
[0005] To solve the above technical problems, the embodiments of the present invention provide the following solutions:
[0006] A method for determining a material transport path at a construction site comprises the following steps:
[0007] S1. Extract BIM model data of the construction site;
[0008] S2. Determine the starting point and end point of material transportation, and use BIM software to generate the shortest travel path between the two points;
[0009] S3. Adjust the generated travel path according to the size of the materials;
[0010] S4. According to the material size and the required transport tool, a contour model is made, adapted to the adjusted travel path, and mapped along the travel path to form a material transport projection model;
[0011] S5. Detect the collision relationship between the material transport projection model and the building, and perform a final check on the travel path.
[0012] Preferably, in step S1, the BIM model data includes geometric information of buildings on the construction site.
[0013] Preferably, the step S2 comprises:
[0014] According to the BIM model data, the obstacle parameters are set in the BIM software, where the traversable part is set as a non-obstacle;
[0015] According to the starting and ending points of material transportation, the path parameters are set in the BIM software, and the BIM software is used to generate the travel path with the shortest distance between the two points.
[0016] Preferably, the generating of the travel path with the shortest distance between two points by using BIM software specifically includes:
[0017] Generate a route: Apply grid cells to the plan view, give each grid cell a value related to the distance between the end points of the path; grid cells defined as obstacles are not considered, and if a grid cell is adjacent to these grid cells defined as obstacles on both sides, the cell is also not considered; generate a preliminary path based on the above initial calculations, and create nodes passing through the center points of the grid cells along the possible shortest path;
[0018] Identify obstacles near the preliminary path: place a circle with a radius of a first preset value at each node along the preliminary path, and identify the closest intersection of the obstacle and the circle as a corner snap point of the modified path; in order to capture other corner snap points, perform a pass along the preliminary path, and at any node where the circle with a radius of the first preset value does not intersect the obstacle, use a larger circle with a radius of a second preset value to further search for possible obstacles;
[0019] Generate a modified path: Generate a modified path by following the routing as close to the obstacle as possible along the preliminary path through the above-mentioned corner snap points;
[0020] Optimize the travel path; modify each node on the path to deviate from the obstacle by a third preset value, merge close offset points to make the path smooth, and use the offset points to draw the final optimized travel path.
[0021] Preferably, the first preset value is 0.4 m, and the second preset value is 0.5 m.
[0022] Preferably, the third preset value includes a body radius value and a body swing value, wherein the body radius value is 0.3m, the body swing value is 0.05m, and the third preset value is 0.35m.
[0023] Preferably, the step S3 specifically includes:
[0024] Adjust and check the travel path according to the size of the materials, and adjust the travel path between the obstacles on both sides to ensure maximum transportation space.
[0025] Preferably, the step S4 specifically includes:
[0026] Enable adaptive model editing in BIM software and set the spatial coordinate axes x, y, and z. The x-axis is the length space, the y-axis is the width space, and the z-axis is the height space.
[0027] According to the material size and the required transfer tool, the contour model is made using adaptive parameters. The contour model is the width and height space required for the overall transportation activity, including the material size, transfer tool size, and personnel activity space;
[0028] In the projection model, the parameter-free model function is enabled, a virtual line is established, attached to the travel path, and the virtual line is divided. The x-axis parameter of the contour model corresponding to each length is: the length occupied by materials + the length occupied by the transport tool + the space for personnel activities;
[0029] Load the adaptive contour model into the parameterless model function, complete the spatial parameter fusion of the x, y, and z axes, fill all virtual lines, and complete the path planning.
[0030] Preferably, the step S5 specifically includes:
[0031] Use the collision check function in the BIM software to check the collision between the material transport projection model and the building, analyze the location of each collision point to see if this location meets the transportation conditions, and finally verify the travel path.
[0032] The beneficial effects brought about by the technical solution provided by the embodiment of the present invention include at least:
[0033] The method of the present invention is reasonably designed, uses BIM software to select the optimal path, is easy to operate, and when using model data, does not require manual site survey and path selection, and can minimize the influence of human subjective factors; in the process of material transshipment projection model and building collision detection, the most unfavorable factors in the path can be detected, which is convenient for engineering management personnel to adjust the transportation plan in time; compared with the existing traditional material transshipment path determination method, the method provided by the present invention is faster, more accurate and detailed, and more efficient. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the following briefly introduces the drawings required for use in the description of the embodiments. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0035] Figure 1 It is a flow chart of a method for determining a material transport path at a construction site provided by an embodiment of the present invention;
[0036] Figure 2 is a schematic diagram of adaptive model editing provided by an embodiment of the present invention;
[0037] Figure 3 is a schematic diagram of the X-axis space dimensions provided by an embodiment of the present invention;
[0038] Figure 4 It is a schematic diagram of loading an adaptive contour model into a parameter-free model provided by an embodiment of the present invention. DETAILED DESCRIPTION
[0039] In order to make the objectives, technical solutions and advantages of the present invention more clear, the embodiments of the present invention will be further described in detail below with reference to the accompanying drawings.
[0040] The embodiment of the present invention provides a method for determining a material transport path at a construction site. Figure 1 As shown, the method comprises the following steps:
[0041] S1. Extract the BIM model data of the construction site and store it separately.
[0042] In this step, the BIM model data includes geometric information of buildings at the construction site.
[0043] S2. Determine the starting and ending points of material transportation, and use BIM software to generate the shortest travel path between the two points.
[0044] This step specifically includes: setting obstacle parameters in the BIM software according to the BIM model data, wherein the traversable part (for example, a door) is set as a non-obstacle; setting path parameters in the BIM software according to the starting and end points of the material transportation, and using the BIM software to generate a travel path with the shortest distance between two points.
[0045] Specifically, using BIM software to generate the shortest travel path between two points includes:
[0046] Generate a route: Apply grid cells to the plan view, give each grid cell a value related to the distance between the end points of the path; grid cells defined as obstacles are not considered, and if a grid cell is adjacent to these grid cells defined as obstacles on both sides, the cell is also not considered; generate a preliminary path based on the above initial calculations, and create nodes passing through the center points of the grid cells along the possible shortest path;
[0047] Identify obstacles near the preliminary path: Place a circle with a radius of a first preset value (e.g., 0.4 m) at each node along the preliminary path, and identify the closest intersection of the obstacle and the circle as a corner snap point of the modified path; To capture other corner snap points, perform a pass along the preliminary path, and at any node where the circle with a radius of the first preset value does not intersect the obstacle, use a larger circle with a radius of a second preset value (e.g., 0.5 m) to further search for possible obstacles;
[0048] Generate a modified path: Generate a modified path by following the routing as close to the obstacle as possible along the preliminary path through the above-mentioned corner snap points;
[0049] Optimize the travel path; modify each node on the path to deviate from the obstacle by a third preset value, in the algorithm, the travel path is based on a person, the third preset value includes a body radius value and a body swing value, wherein the body radius value is 0.3m, the body swing value is 0.05m, and the third preset value is 0.35m; offset from the entry / exit angle to the node 90° projection, with a minimum of 30° between offset points; merge close offset points (less than 0.3m) to smooth the path, and use the offset points to draw the final optimized travel path.
[0050] S3. Adjust the generated travel path according to the size of the materials.
[0051] In this step, the travel path is adjusted and checked according to the size of the materials, and the travel path is adjusted between the obstacles on both sides to ensure the maximum transportation space.
[0052] S4. According to the material size and the required transfer tools, a contour model is made, which is adapted to the adjusted travel path and mapped along the travel path to form a material transfer projection model.
[0053] This step specifically includes:
[0054] Enable adaptive model editing in BIM software and set the spatial coordinate axes x, y, and z. The x-axis is the length space, the y-axis is the width space, and the z-axis is the height space.
[0055] According to the material size and the required transfer tool, the contour model is made using adaptive parameters. The contour model is the width and height space required for the overall transportation activity, including the material size, transfer tool size, and personnel activity space. Figure 2 As shown;
[0056] In the projection model, enable the parameterless model function, create a virtual line, attach it to the travel path, and divide the virtual line. The x-axis parameter of the contour model corresponding to each length is: the length occupied by materials + the length occupied by the transport tool + the space for personnel activities. Figure 3 As shown;
[0057] Load the adaptive contour model into the parameterless model function, complete the spatial parameter fusion of the x, y, and z axes, fill all virtual lines, and complete the path planning, such as Figure 4 shown. Figure 4 In the figure, (1) is the starting point of material transportation, (2) is the generated optimal path, (3) is the material reverse transportation projection model, and (4) is the end point of material transportation.
[0058] S5. Detect the collision relationship between the material transport projection model and the building, and perform a final check on the travel path.
[0059] In this step, the collision check function in the BIM software is used to check the collision between the material transport projection model and the building, and the position of each collision point is analyzed to see whether this position meets the transportation conditions, so as to make a final check on the travel path.
[0060] The material transshipment path determination method provided by the present invention is reasonably designed, uses BIM software to select the optimal path, is easy to operate, and when using model data, does not require manual site survey and path selection, and can minimize the influence of human subjective factors; in the process of material transshipment projection model and building collision detection, the most unfavorable factors in the path can be detected, which is convenient for engineering management personnel to adjust the transportation plan in time; compared with the existing traditional material transshipment path determination method, the method provided by the present invention is faster, more accurate and detailed, and more efficient.
[0061] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims
1. A method for determining a material transportation path at a construction site, characterized in that: The following steps are involved: S1. Extract BIM model data of the construction site; S2. Determine the starting point and end point of material transportation, and use BIM software to generate the shortest travel path between the two points; The step S2 comprises: setting obstacle parameters in the BIM software according to the BIM model data, wherein the traversable part is set as a non-obstacle; setting path parameters in the BIM software according to the starting point and the end point of the material transfer, and using the BIM software to generate a travel path with the shortest distance between two points; Wherein, the method of using BIM software to generate a travel path with the shortest distance between two points specifically includes: Generate a route: Apply grid cells to the plan view, give each grid cell a value related to the distance between the end points of the path; grid cells defined as obstacles are not considered, and if a grid cell is adjacent to these grid cells defined as obstacles on both sides, the cell is also not considered; generate a preliminary path based on the above initial calculations, and create nodes passing through the center points of the grid cells along the possible shortest path; Identify obstacles near the preliminary path: place a circle with a radius of a first preset value at each node along the preliminary path, and identify the closest intersection of the obstacle and the circle as a corner snap point of the modified path; in order to capture other corner snap points, perform a pass along the preliminary path, and at any node where the circle with a radius of the first preset value does not intersect the obstacle, use a larger circle with a radius of a second preset value to further search for possible obstacles; Generate a modified path: Generate a modified path by following the routing as close to the obstacle as possible along the preliminary path through the above-mentioned corner snap points; Optimize the travel path; modify each node on the path to deviate from the obstacle by a third preset value, merge close offset points to make the path smooth, and use the offset points to draw the final optimized travel path; S3. Adjust the generated travel path according to the size of the materials; S4. According to the material size and the required transport tool, a contour model is made, adapted to the adjusted travel path, and mapped along the travel path to form a material transport projection model; The step S4 specifically includes: Enable adaptive model editing in BIM software and set the spatial coordinate axes x, y, and z. The x-axis is the length space, the y-axis is the width space, and the z-axis is the height space. According to the material size and the required transfer tool, the contour model is made using adaptive parameters. The contour model is the width and height space required for the overall transportation activity, including the material size, transfer tool size, and personnel activity space; In the projection model, the parameter-free model function is enabled, a virtual line is established, attached to the travel path, and the virtual line is divided. The x-axis parameter of the contour model corresponding to each length is: the length occupied by materials + the length occupied by the transport tool + the space for personnel activities; Load the adaptive contour model into the parameter-free model, complete the spatial parameter fusion of the x, y, and z axes, fill all virtual lines, and complete the path planning; S5. Detect the collision relationship between the material transport projection model and the building, and perform a final check on the travel path.
2. The method for determining the path for transporting materials on a construction site according to claim 1, characterized in that: In step S1, the BIM model data includes geometric information of buildings at the construction site.
3. The method for determining the path for transporting materials on a construction site according to claim 1, characterized in that: The first preset value is 0.4m, and the second preset value is 0.5m.
4. The method for determining the path for transporting materials on a construction site according to claim 1, characterized in that: The third preset value includes a body radius value and a body swing value, wherein the body radius value is 0.3m, the body swing value is 0.05m, and the third preset value is 0.35m.
5. The method for determining the path for transporting materials at a construction site according to claim 1, characterized in that: The step S3 specifically includes: Adjust and check the travel path according to the size of the materials, and adjust the travel path between the obstacles on both sides to ensure maximum transportation space.
6. The method for determining the path for transporting materials at a construction site according to claim 1, characterized in that: The step S5 specifically includes: Use the collision check function in the BIM software to check the collision between the material transport projection model and the building, analyze the location of each collision point to see if this location meets the transportation conditions, and finally verify the travel path.