A tunnel operation safety monitoring and protection system
By designing a collection and detection device for connecting hoses in the tunnel operation safety monitoring and protection system, combining the gas collection turbine and fan for gas collection and toxicity and flammability detection, the problem of incomplete detection results in the prior art is solved, and the problem of incomplete detection results is achieved. Comprehensive detection and rapid evacuation of gases of different densities and heights reduce the safety risks of construction workers.
Patent Information
- Application Number
- CN202210024896.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-01-11
- Publication Date
- 2024-11-08
- Estimated Expiration
- 2042-01-11
AI Technical Summary
The existing tunnel gas detection device fails to consider the differences in density and height when detecting harmful gases, resulting in incomplete detection results and the inability to quickly evacuate harmful gases when there are high-strength hazards, which poses safety hazards.
A tunnel operation safety monitoring and protection system including a walking device, a collection device and a detection device are designed. The collection device and a detection device connected to the hose are connected to gas collection and detection using a gas collection turbine and a fan, and are equipped with toxicity and ease. The combustion detector can double-detection of gases of different densities and heights, and the walking device can quickly lead construction personnel to evacuate from dangerous areas.
It realizes comprehensive and accurate detection of gases of different densities and heights in the tunnel, reduces safety hazards for construction personnel, and ensures that harmful gases can be evacuated quickly when they exist.
Smart Images

Figure CN114371044B_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of electric power safety, and in particular to a tunnel operation safety monitoring and protection system. Background Art
[0002] Tunnels are buildings built underground, underwater or in mountains to lay railways or build roads for motor vehicles to pass through. According to their location, they can be divided into three categories: mountain tunnels, underwater tunnels and urban tunnels. During tunnel mining or construction, various toxic and harmful gases will appear, such as carbon monoxide, carbon dioxide, oxygen, sulfur dioxide, methane, PM10 hydrogen sulfide, etc. These gases accumulate in the tunnel. As the concentration increases, they will bring various hidden dangers. If tunnel construction workers rashly enter without protection and detection, there will be fatal risks, so it is very important to protect the personal safety of construction workers in the tunnel.
[0003] In the prior art, a tunnel gas detection device disclosed in application number CN202021817834.9 belongs to the field of gas detection technology, and includes a mobile terminal, a housing and a mounting seat, characterized in that: a middle partition is fixedly connected in the housing, a dust collector is installed on the top of the housing, a temperature and humidity sensor, a gas sensor, a MEMS sensor, a fire smoke sensor and a particle sensor are fixedly connected to the middle partition, the fire smoke sensor and the particle sensor are arranged side by side, a first through hole and a second through hole are opened on the side wall of the housing, the mounting seat includes an upper base and a lower base, the upper base is hinged on the lower base, and a power supply, a data acquisition module electrically connected to the power supply, a transmission module and a main control chip are fixedly connected to the inner bottom wall of the housing. However, this design does not take into account that different gases have different densities and are in different height areas when detecting harmful gases, resulting in incomplete detection results, and when a harmful gas with a higher intensity is detected, it is impossible to quickly carry construction personnel out of the dangerous area, and there are huge safety hazards. Summary of the invention
[0004] In view of the defects in the prior art, the present invention can carry construction personnel and related construction tools to quickly evacuate when harmful gases with relatively high intensity are detected; the collection device of the present invention can assist the detection device in collecting gases of different densities and heights in the tunnel, so that the detection results are more comprehensive and accurate; the detection device of the present invention can perform dual detection of toxicity and flammability on the collected gases, thereby reducing the safety hazards caused by harmful gases in the tunnel to construction personnel.
[0005] The technical solution adopted by the present invention to solve its technical problems is: a tunnel operation safety monitoring and protection system, including a walking device, a collecting device, and a detecting device, the walking device including a bottom plate, a bracket fixedly installed on the top surface of the bottom plate, a collecting device for cooperating with the detecting device to collect gases of different densities is arranged on the top of the bracket, and a detecting device for detecting the collected gas is also arranged on the top of the bracket, the collecting device includes a connecting hose, and the collecting device and the detecting device are connected through the connecting hose; the detecting device includes an air storage shell fixedly installed on the top of the bracket, an air collecting turbine is rotatably installed on the inner annular surface of the air storage shell, a bevel gear four is fixedly installed on the end face of the air collecting turbine, a bevel gear five is rotatably installed on the bevel gear four, the central axis of the bevel gear five passes through the bevel gear four and the air collecting turbine and is fixedly installed with a fan, and the detecting device also includes A connecting pipe, a hole corresponding to the position of the connecting pipe and matching the size is opened on the gas storage shell, one end of the connecting pipe is fixedly connected to the gas storage shell, the detection device also includes a three-way connecting pipe 1, a three-way connecting pipe 2 and three groups of switch shells, the other end of the connecting pipe is fixedly connected to the three-way connecting pipe 1 through the switch shell, the other end of the three-way connecting pipe 1 is fixedly connected to the three-way connecting pipe 2 through the switch shell, the other end of the three-way connecting pipe 2 is fixedly installed with the switch shell, the inside of the switch shell is slidably installed with sealing sheets for controlling gas circulation, the tail ends of the three groups of sealing sheets are fixedly connected to the connecting rod 5, the detection device also includes a toxicity detector and an igniter, the toxicity detector is fixedly installed on the three-way connecting pipe 1, and passes through the three-way connecting pipe all the way to the inside of the three-way connecting pipe 1, the igniter is fixedly installed on the three-way connecting pipe 2, and passes through the three-way connecting pipe 2 all the way to the inside of the three-way connecting pipe 2.
[0006] Furthermore, the walking device also includes two sets of transmission shafts rotatably installed on the bottom of the base plate, and wheels are fixedly installed at both ends of the two sets of transmission shafts. A guardrail for protecting construction workers is also fixedly installed on the top surface of the base plate, and a drive assembly is arranged on one end of the base plate close to the bracket.
[0007] Furthermore, the driving assembly includes a motor 1 fixedly mounted on the base plate, the output shaft of the motor 1 passes through the base plate and is fixedly mounted with a spur gear 1, the transmission shaft 1 is fixedly mounted with a spur gear 2, and the spur gear 2 is meshed with the spur gear 1.
[0008] Furthermore, the collecting device also includes a motor 2 fixedly mounted on the top of the bracket, a spur gear 3 fixedly mounted on the output shaft of the motor 2, a spur gear 4 and a telescopic sleeve 1 also rotatably mounted on the bracket, the central axis of the spur gear 4 passes through the bracket and is fixedly connected to the telescopic sleeve 1, and the spur gear 4 and the spur gear 3 mesh with each other, the telescopic sleeve 1 is fixedly connected to a connecting hose, the other end of the connecting hose is fixedly connected to the air storage shell and passes through the air storage shell until the inside of the air storage shell, the telescopic sleeve 1 is slidably connected with the telescopic sleeve 2, the telescopic sleeve 2 is slidably connected with the telescopic sleeve 3, a dustproof shell is fixedly mounted at the port of the telescopic sleeve 3, and a support 1 is also fixedly mounted on the top of the bracket, a connecting rod 1 is hinged on the support 1, the other end of the connecting rod 1 is hinged with connecting rod 2 and connecting rod 3, the other end of the connecting rod 2 is rotatably connected to the telescopic sleeve 1, the middle part of the connecting rod 3 is rotatably connected to the telescopic sleeve 2, and the other end of the connecting rod 3 is hinged with connecting rod 4, and the other end of the connecting rod 4 is rotatably connected to the telescopic sleeve 3.
[0009] Furthermore, the size of the inner annular surface of the telescopic sleeve 1 matches the size of the outer annular surface of the telescopic sleeve 2, and the size of the inner annular surface of the telescopic sleeve 2 matches the size of the outer annular surface of the telescopic sleeve 3.
[0010] Furthermore, the detection device also includes a motor three fixedly mounted on the top of the bracket, a spur gear five is fixedly mounted on the output shaft of the motor three, a support two is also fixedly mounted on the top of the bracket, a transmission shaft two is rotatably mounted on the support two, a bevel gear one is fixedly mounted on one end of the transmission shaft two, a spur gear six is fixedly mounted on the other end of the transmission shaft two, the spur gear six and the spur gear five are meshed with each other, and a connecting rod six is rotatably mounted at the eccentric part of the spur gear six, the other end of the connecting rod six is rotatably connected to the connecting rod five, and a support three is also fixedly mounted on the top of the bracket, a transmission shaft three is rotatably mounted on the support three, a bevel gear three is fixedly mounted on one end of the transmission shaft three, a bevel gear two is fixedly mounted on the other end of the transmission shaft three, the bevel gear two and the bevel gear one are meshed with each other, the bevel gear three and the bevel gear four are meshed with each other, and the bevel gear three and the bevel gear five are meshed with each other.
[0011] Furthermore, a warning light 1 is installed at the top of the three-way connecting pipe 1, and the warning light 1 is connected to the toxicity detector. A warning light 2 is installed at the top of the three-way connecting pipe 2, and the warning light 2 is connected to the igniter.
[0012] Furthermore, the support includes a layer plate arranged inside the support for placing items such as construction tools.
[0013] Compared with the prior art, the present invention has the following advantages: (1) when harmful gases with relatively high intensity are detected, the walking device of the present invention can carry construction personnel and related construction tools to quickly retreat; (2) the collecting device of the present invention can assist the detection device in collecting gases of different densities and heights in the tunnel, so that the detection results are more comprehensive and accurate; (3) the detection device of the present invention can perform dual detection of toxicity and flammability on the collected gases, thereby reducing the safety hazards caused by harmful gases in the tunnel to construction personnel. BRIEF DESCRIPTION OF THE DRAWINGS
[0014] Figure 1 It is a schematic diagram of the overall structure of the present invention.
[0015] Figure 2 It is a schematic diagram of the structure of the walking device of the present invention.
[0016] Figure 3 It is a schematic diagram of the local structure of the walking device of the present invention.
[0017] Figure 4 It is a schematic diagram of the structure of the collecting device of the present invention.
[0018] Figure 5 For the present invention Figure 4 A magnified view of the structure in the middle.
[0019] Figure 6 It is a schematic diagram of the structure of the detection device of the present invention.
[0020] Figure 7 It is a schematic diagram of the local structure of the detection device of the present invention.
[0021] Figure 8 This is a schematic structural diagram of the detection device of the present invention from another angle.
[0022] In the figure: 1, walking device; 2, collecting device; 3, detecting device; 101, bottom plate; 102, transmission shaft 1; 103, wheel; 104, guardrail; 105, bracket; 106, driving assembly; 10601, motor 1; 10602, spur gear 1; 10603, spur gear 2; 201, motor 2; 202, spur gear 3; 203, spur gear 4; 204, telescopic sleeve 1; 205, connecting hose; 206, telescopic sleeve 2; 207, telescopic sleeve 3; 208, dust cover; 209, support 1; 210, connecting rod 1; 211, connecting rod 2; 212, connecting rod 3; 213, connecting rod 4; 301, motor 302. Spur gear five; 303. Support two; 304. Transmission shaft two; 305. Bevel gear one; 306. Spur gear six; 307. Support three; 308. Transmission shaft three; 309. Bevel gear two; 310. Bevel gear three; 311. Air storage shell; 312. Bevel gear four; 313. Air collecting turbine; 314. Bevel gear five; 315. Fan; 316. Connecting pipe; 317. Three-way connecting pipe one; 318. Three-way connecting pipe two; 319. Toxicity detector; 320. Warning light one; 321. Ignitor; 322. Warning light two; 323. Switch shell; 324. Sealing piece; 325. Connecting rod five; 326. Connecting rod six. DETAILED DESCRIPTION
[0023] In the following description of the present invention, it should be noted that the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside" and "outside" etc. indicating directions or positional relationships are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present invention.
[0024] In the following description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "setting", and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0025] The present invention will be further described below in conjunction with the accompanying drawings and exemplary embodiments, and the illustrative embodiments and description of the present invention are used to explain the present invention, but are not intended to limit the present invention. In addition, if the detailed description of the known technology is unnecessary for illustrating the features of the present invention, it will be omitted.
[0026] Example: Figure 1-Figure 8As shown, a tunnel operation safety monitoring and protection system includes a walking device 1, a collecting device 2, and a detecting device 3. The walking device 1 includes a base plate 101, and a bracket 105 is fixedly installed on the top surface of the base plate 101. The top of the bracket 105 is provided with a collecting device 2 for cooperating with the detecting device 3 to collect gases of different densities. The top of the bracket 105 is also provided with a detecting device 3 for detecting the collected gas. The collecting device 2 includes a connecting hose 205, and the collecting device 2 is connected to the detecting device 3 via the connecting hose 205.
[0027] When construction workers need to enter the tunnel for construction, the walking device 1 is started. The walking device 1 carries the construction workers into the tunnel. The construction workers move quickly in the tunnel by controlling the walking device 1. During the movement, the collecting device 2 and the detecting device 3 are started. The collecting device 2 cooperates with the detecting device 3 to collect the gas at different heights in the tunnel, and performs toxicity detection and flammability detection inside the detecting device 3. When the gas is toxic or flammable, the detecting device 3 issues a warning, and the construction workers take corresponding safety precautions according to the warning or control the walking device 1 to take them away from the danger zone.
[0028] The walking device 1 also includes two sets of transmission shafts 102 rotatably mounted on the bottom of the base plate 101, and wheels 103 are fixedly mounted at both ends of the two sets of transmission shafts 102. A guardrail 104 for protecting construction workers is also fixedly mounted on the top surface of the base plate 101. A driving assembly 106 is provided at one end of the base plate 101 close to the bracket 105; the driving assembly 106 includes a motor 10601 fixedly mounted on the base plate 101, and the output shaft of the motor 10601 passes through the base plate 101 and is fixedly mounted with a spur gear 10602. A spur gear 2 10603 is fixedly mounted on the transmission shaft 102, and the spur gear 2 10603 is meshed with the spur gear 1 10602. The bracket 105 includes a layer plate arranged inside the bracket 105 for placing construction tools and other items.
[0029] The construction worker stands on the bottom plate 101 on the side where the guardrail 104 is installed, and starts the motor 10601, which drives the spur gear 1 10602 to rotate, which drives the spur gear 1 10602 to rotate, which drives the spur gear 2 10603 to rotate, which drives the transmission shaft 102 to rotate, which drives the wheels 103 on both sides to rotate, and the walking device 1 starts to move.
[0030] The collecting device 2 also includes a motor 201 fixedly mounted on the top of the bracket 105, a spur gear 3 202 is fixedly mounted on the output shaft of the motor 201, a spur gear 4 203 and a telescopic sleeve 1 204 are also rotatably mounted on the bracket 105, the central axis of the spur gear 4 203 passes through the bracket 105 and is fixedly connected to the telescopic sleeve 1 204, and the spur gear 4 203 and the spur gear 3 202 are meshed with each other, the telescopic sleeve 1 204 is fixedly connected to the connecting hose 205, the other end of the connecting hose 205 is fixedly connected to the air storage shell 311 and passes through the air storage shell 311 until the inside of the air storage shell 311, and the telescopic sleeve 1 204 is slidably connected to the telescopic sleeve 202. 6. The telescopic sleeve 206 is slidably connected with the telescopic sleeve 3 207, and a dustproof shell 208 is fixedly installed at the port of the telescopic sleeve 3 207. The top of the bracket 105 is also fixedly installed with a support 1 209, and a connecting rod 1 210 is hinged on the support 1 209. The other end of the connecting rod 1 210 is hinged with a connecting rod 211 and a connecting rod 3 212, and the other end of the connecting rod 211 is rotatably connected to the telescopic sleeve 1 204, the middle part of the connecting rod 3 212 is rotatably connected to the telescopic sleeve 206, and the other end of the connecting rod 3 212 is hinged with a connecting rod 4 213, and the other end of the connecting rod 4 213 is rotatably connected to the telescopic sleeve 3 207. The inner ring size of the telescopic sleeve 1 204 is matched with the outer ring size of the telescopic sleeve 206, and the inner ring size of the telescopic sleeve 206 is matched with the outer ring size of the telescopic sleeve 3 207. Blocks (not shown in the figure) are provided inside the telescopic sleeve 1 204 and the telescopic sleeve 2 206 to prevent them from falling off during the telescopic process.
[0031] After the walking device 1 is started, the collecting device 2 and the detecting device 3 are started at the same time, the motor 201 drives the spur gear 3 202 to rotate, the spur gear 3 202 drives the spur gear 4 203 to rotate, the spur gear 4 203 drives the telescopic sleeve 1 204 to swing, when the telescopic sleeve 1 204 swings, the telescopic sleeve 1 204 drives the connecting rod 2 211 and the telescopic sleeve 2 206 to swing, the connecting rod 2 211 drives the connecting rod 1 210 and the connecting rod 3 212 to swing, the connecting rod 3 212 drives the connecting rod 4 213 to swing, in this process, the connecting rod 3 212 and the connecting rod 4 213 cooperate with each other The connecting rod 211 and the connecting rod 3 212 cooperate with each other to drive the telescopic sleeve 206 to slide in the telescopic sleeve 1 204. Driven by the detection device 3, the gas enters the telescopic sleeve 3 207 through the dustproof shell 208, and then enters the detection device 3 through the telescopic sleeve 206, the telescopic sleeve 1 204 and the connecting hose 205. The telescopic sleeve in the collecting device 2 completes a nearly 180-degree swing while extending and retracting, and completely collects the gases of different heights in the tunnel due to different densities, thereby improving the accuracy of the detection results.
[0032] The detection device 3 includes a motor 301 fixedly mounted on the top of the bracket 105, a spur gear 5 302 is fixedly mounted on the output shaft of the motor 301, a support 2 303 is also fixedly mounted on the top of the bracket 105, a transmission shaft 2 304 is rotatably mounted on the support 2 303, a bevel gear 1 305 is fixedly mounted on one end of the transmission shaft 2 304, a spur gear 6 306 is fixedly mounted on the other end of the transmission shaft 2 304, the spur gear 6 306 is meshed with the spur gear 5 302, and a connecting rod 6 326 is rotatably mounted at the eccentric part of the spur gear 6 306, a support 3 307 is also fixedly mounted on the top of the bracket 105, a transmission shaft 308 is rotatably mounted on the support 3 307, and one end of the transmission shaft 308 is fixedly mounted A bevel gear three 310 is fixedly installed on the end of the transmission shaft three 308, and a bevel gear two 309 is fixedly installed on the other end of the transmission shaft three, and the bevel gear two 309 is meshed with the bevel gear one 305. The detection device 3 also includes an air storage shell 311 fixedly installed on the top of the bracket 105, and an air collecting turbine 313 is rotatably installed on the inner ring surface of the air storage shell 311, and a bevel gear four 312 is fixedly installed on the end surface of the air collecting turbine 313, and a bevel gear five 314 is rotatably installed on the bevel gear four 312. The central axis of the bevel gear five 314 passes through the bevel gear four 312 and the air collecting turbine 313 and is fixedly installed with a fan 315, and the bevel gear three 310 is meshed with the bevel gear four 312 and the bevel gear three 310 is meshed with the bevel gear five 314;The detection device 3 also includes a connecting pipe 316. The gas storage shell 311 is provided with a hole corresponding to the position of the connecting pipe 316 and having a size matching that of the connecting pipe 316. One end of the connecting pipe 316 is fixedly connected to the gas storage shell 311. The detection device 3 also includes a three-way connecting pipe 1 317, a three-way connecting pipe 2 318 and three groups of switch shells 323. The other end of the connecting pipe 316 is fixedly connected to the three-way connecting pipe 1 317 through the switch shell 323. The other end of the three-way connecting pipe 1 317 is fixedly connected to the three-way connecting pipe 2 318 through the switch shell 323. The other end of the three-way connecting pipe 2 318 is fixedly installed with the switch shell 323. The interior of the switch shell 323 is slidably installed with sealing sheets 324 for controlling gas circulation. The tail ends of the three groups of sealing sheets 324 are fixedly installed with the three groups of sealing sheets 324. The ends are fixedly connected to the connecting rod 5 325, and the connecting rod 5 325 is rotatably connected to the connecting rod 6 326. The detection device 3 also includes a toxicity detector 319 and an igniter 321. The toxicity detector 319 is fixedly installed on the three-way connecting pipe 1 317 and penetrates the three-way connecting pipe 1 317 until the inside of the three-way connecting pipe 1 317. The igniter 321 is fixedly installed on the three-way connecting pipe 2 318 and penetrates the three-way connecting pipe 2 318 until the inside of the three-way connecting pipe 2 318. The top of the three-way connecting pipe 1 317 is equipped with a warning light 1 320, and the warning light 1 320 is connected to the toxicity detector 319. The top of the three-way connecting pipe 2 318 is equipped with a warning light 2 322, and the warning light 2 322 is connected to the igniter 321. ;
[0033] Start the motor three 301, the motor three 301 drives the spur gear five 302 to rotate, the spur gear five 302 drives the spur gear six 306 to rotate, the spur gear six 306 drives the transmission shaft two 304 to rotate, the transmission shaft two 304 drives the bevel gear one 305 to rotate, the bevel gear one 305 drives the bevel gear two 309 to rotate, the bevel gear two 309 drives the transmission shaft three 308 to rotate, the transmission shaft three 308 drives the bevel gear three 310 to rotate, the bevel gear three 310 drives the bevel gear four 312 and the bevel gear five 314 rotates, bevel gear four 312 drives the gas collection turbine 313 to rotate, bevel gear five 314 drives the fan 315 to rotate, when the gas collection turbine 313 rotates, the gas is sucked into the gas storage shell 311 from the collection device 2, and the gas is blown into the connecting pipe 316 under the force of the fan 315. In this process, the spur gear six 306 drives the connecting rod six 326 to swing, and the connecting rod six 326 drives the connecting rod five 325 to slide in the three switch shells 323. During the process, the connecting rod 5 325 drives the sealing sheet 324 to slide in the switch housing 323, so that the three-way connecting pipe 1 317, the three-way connecting pipe 2 318 and the connecting pipe 316 are connected to each other. At this time, the gas enters the three-way connecting pipe 1 317 and the three-way connecting pipe 2 318 under the force of the fan 315. At this time, the spur gear 6 306 continues to drive the connecting rod 6 326 to swing, and the connecting rod 6 326 drives the connecting rod 5 325 to slide in the opposite direction in the three sets of switch housings 323. The connecting rod 5 325 drives the sealing sheet 324 to slide in the opposite direction in the three sets of switch housings 323. The sealing piece 324 seals the three-way connecting pipe 1 317 and the three-way connecting pipe 2 318. At this time, the toxicity detector 319 detects the gas in the three-way connecting pipe 1 317. If the gas is toxic, the warning light 1 320 will give an alarm. In this process, the igniter 321 ignites to test the flammability of the gas in the three-way connecting pipe 2 318. If it is a flammable gas, the warning light 2 322 will give an alarm. After seeing the warning light, the construction personnel can immediately take corresponding protective measures, or control the walking device 1 to take the construction personnel away from the danger zone.
[0034] The working principle of the present invention is as follows: when construction workers need to enter the tunnel for construction, the walking device 1 is started, and the walking device 1 carries the construction workers into the tunnel. The construction workers move quickly in the tunnel by controlling the walking device 1. During the movement, the collecting device 2 and the detecting device 3 are started. The collecting device 2 cooperates with the detecting device 3 to collect gases at different heights in the tunnel, and performs toxicity detection and flammability detection inside the detecting device 3. When the gas is toxic gas or flammable gas, the detecting device 3 issues a warning, and the construction workers take corresponding safety protection according to the warning or control the walking device 1 to take them away from the danger zone.
[0035] It should be understood that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. For those skilled in the art, the technical solutions described in the above embodiments can be modified, or some of the technical features therein can be replaced by equivalents; and all these modifications and replacements should fall within the scope of protection of the claims attached to the present invention.
Claims
1. A tunnel operation safety monitoring and protection system, comprising a walking device (1), a collecting device (2), and a detecting device (3), characterized in that: The walking device (1) comprises a bottom plate (101), a bracket (105) is fixedly mounted on the top surface of the bottom plate (101), a collecting device (2) for cooperating with a detecting device (3) to collect gases of different densities is arranged on the top of the bracket (105), a detecting device (3) for detecting the collected gas is also arranged on the top of the bracket (105), the collecting device (2) comprises a connecting hose (205), and the collecting device (2) and the detecting device (3) are connected via the connecting hose (205); The detection device (3) comprises an air storage shell (311) fixedly mounted on the top of the bracket (105); an air collecting turbine (313) is rotatably mounted on the inner annular surface of the air storage shell (311); a bevel gear four (312) is fixedly mounted on the end surface of the air collecting turbine (313); a bevel gear five (314) is rotatably mounted on the bevel gear four (312); a central axis of the bevel gear five (314) passes through the bevel gear four (312) and the air collecting turbine (313). The fan (315) is fixedly mounted thereon, the detection device (3) further comprising a connecting pipe (316), a hole corresponding to the position of the connecting pipe (316) and having a size matching that of the connecting pipe (316) is opened on the gas storage shell (311), one end of the connecting pipe (316) is fixedly connected to the gas storage shell (311), the detection device (3) further comprising a three-way connecting pipe 1 (317), a three-way connecting pipe 2 (318) and three sets of switch shells (323), the other end of the connecting pipe (316) One end is fixedly connected to the three-way connecting pipe 1 (317) through the switch housing (323), the other end of the three-way connecting pipe 1 (317) is fixedly connected to the three-way connecting pipe 2 (318) through the switch housing (323), the other end of the three-way connecting pipe 2 (318) is fixedly installed with the switch housing (323), the inside of the switch housing (323) is slidably installed with sealing sheets (324) for controlling gas circulation, and the tail ends of the three groups of sealing sheets (324) are connected to the connecting rod 5 ( 325), the detection device (3) further comprising a toxicity detector (319) and an igniter (321), the toxicity detector (319) being fixedly mounted on the three-way connecting pipe (317) and penetrating the three-way connecting pipe (317) until it reaches the interior of the three-way connecting pipe (317), the igniter (321) being fixedly mounted on the three-way connecting pipe (318) and penetrating the three-way connecting pipe (318) until it reaches the interior of the three-way connecting pipe (318); The collecting device (2) further comprises a second motor (201) fixedly mounted on the top of the bracket (105); a spur gear (202) is fixedly mounted on the output shaft of the second motor (201); a spur gear (203) and a telescopic sleeve (204) are also rotatably mounted on the bracket (105); a central axis of the spur gear (203) passes through the bracket (105) and is fixedly connected to the telescopic sleeve (204); the spur gear (203) and the spur gear (202) are meshed with each other; the telescopic sleeve (204) is fixedly connected to the connecting hose (205); the other end of the connecting hose (205) is fixedly connected to the air storage shell (311) and passes through the air storage shell (311) until it reaches the inside of the air storage shell (311); the telescopic sleeve (204) is slidably connected to the second telescopic sleeve (203); and the telescopic sleeve (204) is slidably connected to the second telescopic sleeve (203). 06), a telescopic sleeve 2 (206) is slidably connected to a telescopic sleeve 3 (207), a dust cover (208) is fixedly installed at the end of the telescopic sleeve 3 (207), a support 1 (209) is also fixedly installed on the top of the bracket (105), a connecting rod 1 (210) is hinged on the support 1 (209), the other end of the connecting rod 1 (210) is hinged to a connecting rod 2 (211) and a connecting rod 3 (212), the other end of the connecting rod 2 (211) is rotatably connected to the telescopic sleeve 1 (204), the middle part of the connecting rod 3 (212) is rotatably connected to the telescopic sleeve 2 (206), and the other end of the connecting rod 3 (212) is hinged to a connecting rod 4 (213), the other end of the connecting rod 4 (213) is rotatably connected to the telescopic sleeve 3 (207); The inner ring size of the telescopic sleeve 1 (204) matches the outer ring size of the telescopic sleeve 2 (206), and the inner ring size of the telescopic sleeve 2 (206) matches the outer ring size of the telescopic sleeve 3 (207); The detection device (3) further comprises a motor three (301) fixedly mounted on the top of the bracket (105), a spur gear five (302) fixedly mounted on the output shaft of the motor three (301), a support two (303) fixedly mounted on the top of the bracket (105), a transmission shaft two (304) rotatably mounted on the support two (303), a bevel gear one (305) fixedly mounted on one end of the transmission shaft two (304), a spur gear six (306) fixedly mounted on the other end of the transmission shaft two (304), the spur gear six (306) meshing with the spur gear five (302), and a connecting gear rotatably mounted on the eccentric portion of the spur gear six (306) Rod six (326), the other end of the connecting rod six (326) is rotatably connected to the connecting rod five (325), the top of the bracket (105) is also fixedly installed with a support three (307), the support three (307) is rotatably installed with a transmission shaft three (308), one end of the transmission shaft three (308) is fixedly installed with a bevel gear three (310), the other end of the transmission shaft three (308) is fixedly installed with a bevel gear two (309), the bevel gear two (309) and the bevel gear one (305) are meshed with each other, the bevel gear three (310) and the bevel gear four (312) are meshed with each other, and the bevel gear three (310) and the bevel gear five (314) are meshed with each other; A warning light (320) is installed at the top end of the three-way connecting pipe (317), and the warning light (320) is connected to the toxicity detector (319). A warning light (322) is installed at the top end of the three-way connecting pipe (318), and the warning light (322) is connected to the igniter (321).
2. A tunnel operation safety monitoring and protection system according to claim 1, characterized in that: The walking device (1) further comprises two sets of transmission shafts (102) rotatably mounted on the bottom of the base plate (101), wheels (103) being fixedly mounted at both ends of the two sets of transmission shafts (102), a guardrail (104) for protecting construction workers being fixedly mounted on the top surface of the base plate (101), and a driving assembly (106) being arranged at one end of the base plate (101) close to the bracket (105).
3. A tunnel operation safety monitoring and protection system according to claim 2, characterized in that: The driving assembly (106) comprises a motor 1 (10601) fixedly mounted on the base plate (101); an output shaft of the motor 1 (10601) passes through the base plate (101) and is fixedly mounted with a spur gear 1 (10602); a spur gear 2 (10603) is fixedly mounted on the transmission shaft 1 (102); and the spur gear 2 (10603) and the spur gear 1 (10602) are meshed with each other.
4. A tunnel operation safety monitoring and protection system according to claim 2, characterized in that: The support (105) comprises a layer plate arranged inside the support (105) for placing construction tools.
